CN106677054A - Wind barrier and bridge with same - Google Patents

Wind barrier and bridge with same Download PDF

Info

Publication number
CN106677054A
CN106677054A CN201710034809.XA CN201710034809A CN106677054A CN 106677054 A CN106677054 A CN 106677054A CN 201710034809 A CN201710034809 A CN 201710034809A CN 106677054 A CN106677054 A CN 106677054A
Authority
CN
China
Prior art keywords
air
article
partitions
air partition
partition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710034809.XA
Other languages
Chinese (zh)
Other versions
CN106677054B (en
Inventor
喻珍福
赖士谦
洪锦祥
陈阵
郭震山
胡玉柳
刘秋江
刘海青
黄萍
郭景阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Transportation Planning and Design Institute Co., Ltd.
Original Assignee
FUJIAN TRAFFIC PLAN DESIGNING INST
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN TRAFFIC PLAN DESIGNING INST filed Critical FUJIAN TRAFFIC PLAN DESIGNING INST
Priority to CN201710034809.XA priority Critical patent/CN106677054B/en
Publication of CN106677054A publication Critical patent/CN106677054A/en
Application granted granted Critical
Publication of CN106677054B publication Critical patent/CN106677054B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D1/00Bridges in general
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/103Parapets, railings ; Guard barriers or road-bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a wind barrier and a bridge with the same. The wind barrier includes a first wind barrier body, a second wind barrier body, a third wind barrier body, a fourth wind barrier body, a fifth wind barrier body and a sixth wind barrier body; the first wind barrier body, the second wind barrier body, the third wind barrier body, the fourth wind barrier body and the fifth barrier body are arranged on two sides, in the range of 50 meters, of a bridge tower of the bridge, and the sixth screen is arranged on a part 50 meters away; the heights of the first wind barrier and the second wind barrier are identical, and the ventilation rate of the first wind barrier is less than that of the second wind barrier; the heights of the second wind barrier and he third wind barrier are identical, and the ventilation rate of the second wind barrier is less than that of the third wind barrier; the height of the third wind barrier is greater than that of the fourth wind barrier, and the ventilation rate of the third wind barrier is less than that of the fourth wind barrier; the heights of the fourth wind barrier and the fifth wind barrier are identical, and the ventilation rate of the fourth wind barrier is less than that of the fifth wind barrier; and the height of the fifth wind barrier is greater than that of the sixth wind barrier, and the ventilation rate of the fifth wind barrier is less than that of the sixth wind barrier.

Description

A kind of air partition and the bridge with the air partition
Technical field
The present invention relates to technical field of bridge engineering, and in particular to a kind of air partition and the bridge with the air partition.
Background technology
In prior art, being designed without of air partition takes into full account the safety of bridge maintainer, bridge tower Wind field variety nearby Seriality, the operability and attractive in appearance of construction, it is impossible to meet the overall requirement of modern Bridge Design.
For example, one kind is disclosed in the Chinese patent literature of Publication No. CN200978389Y to keep out the wind air partition, described gear Barrier bar and drag-line of the wind air partition by air partition column and on air partition column is constituted, air partition column by air partition column backboard and with Air partition column backboard column reinforcement composition connected vertically, air partition column back panel straps arc, it inclines with vertical plane For 10 °, described barrier bar has been the horizontal deep bead of the effect of keeping out the wind to bevel angle θ, generally strip, along the length direction of air partition Arrangement, the shape of cross section of Windbreak barrier strip is semicircle of the one side windward with arc, hinders bar front plate, the horizontal stroke of barrier bar rear plate Cross sectional shape is similar to the shape of cross section of barrier bar, and barrier bar is clipped between barrier bar front plate, barrier bar rear plate, and barrier bar front plate leads to Cross screw bolt and nut to be connected with air partition column reinforcement, so as to barrier bar is movably arranged on air partition column.
A kind of road air partition is disclosed in the Chinese patent literature of Publication No. CN204608623U, including two symmetrically set The base put, is provided with support bar on the base, warning tape and polylith air partition leaf are provided between two support bars Piece, is provided with air vent on the air partition blade, illuminating lamp is provided with the top of the support bar, is also provided with too including top The body of rod of positive energy cell panel and wind power generation component, is provided with intensity of illumination sensor, control box and accumulator on the body of rod, The solar panel and wind power generation component are connected with the storage battery, and pcb board is provided with the control box, described A/D module and single-chip microcomputer, the A/D module has been assigned to be electrically connected with the intensity of illumination sensor, single-chip microcomputer respectively on pcb board Connect, the single-chip microcomputer is electrically connected respectively with the accumulator, illuminating lamp.
As can be seen here, this air partition complex structure of the prior art, and do not take into full account the peace of bridge maintainer Entirely, the bridge tower nearby seriality of Wind field variety, the operability of construction and attractive in appearance.
The content of the invention
In order to overcome problems of the prior art, the present invention to provide a kind of air partition and the bridge with the air partition, should Air partition is not only simple in structure, and has taken into full account the safety of bridge maintainer, the bridge tower nearby seriality of Wind field variety, construction Operability and attractive in appearance.
For achieving the above object, air partition of the present invention includes the first air partition, the second air partition, the 3rd air partition, the 4th wind Barrier, the 5th air partition and the 6th air partition, the first air partition, the second air partition, the 3rd air partition, the 4th air partition and the 5th air partition are arranged in bridge The each 50m in bridge tower both sides in the range of, the 6th air partition is adopted beyond 50m, wherein the first air partition is highly identical with the second air partition, and And first air partition ventilative rate less than the second air partition ventilative rate, the second air partition is highly identical with the 3rd air partition, and second The ventilative rate of air partition is less than the ventilative rate of the 3rd air partition, and the height of the 3rd air partition is more than the height of the 4th air partition, the 3rd air partition , less than the ventilative rate of the 4th air partition, the 4th air partition is highly identical with the 5th air partition, and the ventilative rate of the 4th air partition for ventilative rate Less than the ventilative rate of the 5th air partition, more than the height of the 6th air partition, the ventilative rate of the 5th air partition is less than for the height of the 5th air partition The ventilative rate of six air partitions.
First air partition, the second air partition, the 3rd air partition, the 4th air partition, the 5th air partition and the 6th air partition include air partition article, stand Post and base, adopt four sides weld all around between air partition bar and column, reliably weld between column and base.
Preferably, first air partition includes an A air partitions article, the 2nd A air partitions article, a 3rd A air partition Article, a 4th A air partition article, two the 5th A air partitions article, a 6th A air partition article, a 7th A air partition article and 12 Eight A air partition bars, A air partition article, the 2nd A air partition article, the 3rd A air partition article, the 4th A air partition article, two Individual 5th A air partitions article, the 6th A air partitions article, a 7th A air partition article and 12 the 8th A air partitions article are from top to bottom successively It is arranged in parallel and is welded on column;The column of the first air partition A includes an A column connecting pieces, the 2nd A column connecting pieces With the 3rd A column connecting pieces, an A column connecting pieces include flat segments and segmental arc, the flat segments weldering of an A column connecting pieces Be connected on the base of the first air partition, the segmental arc of an A column connecting pieces respectively with the 2nd A column connecting pieces and the 3rd A columns Connector sleekly connects, and the 2nd A column connecting pieces and the 3rd A column connecting pieces are arc;First A air partitions article, the 2nd A wind Barrier article, the 3rd A air partitions article, the 4th A air partitions article, the 5th A air partitions article, the 6th A air partitions article, the 7th A air partitions article and the 8th A air partitions article Cross section be round rectangle.
Second air partition include B air partition article, the 2nd B air partition article, the 3rd B air partition article, one 4th B air partitions article, the 5th B air partitions article, the 6th B air partitions article, a 7th B air partition article and 11 the 8th B air partitions Bar, a B air partitions article, the 2nd B air partitions article, the 3rd B air partitions article, the 4th B air partitions article, the 5th B Air partition article, the 6th B air partitions article, a 7th B air partition article and 11 the 8th B air partitions article be arranged in parallel successively from top to bottom And it is welded on column;The column of the second air partition B includes a B column connecting pieces, the 2nd B column connecting pieces and the 3rd B Column connecting piece, a B column connecting pieces include flat segments and segmental arc, and the flat segments of a B column connecting pieces are welded on the On the base of two air partition B, the segmental arc of a B column connecting pieces respectively with the 2nd B column connecting pieces and the 3rd B column connecting pieces Sleekly connect, the 2nd B column connecting pieces and the 3rd B column connecting pieces are arc;First B air partitions article, the 2nd B air partitions article, The horizontal stroke of the 3rd B air partitions article, the 4th B air partitions article, the 5th B air partitions article, the 6th B air partitions article, the 7th B air partitions article and the 8th B air partitions article Section is round rectangle.
3rd air partition include C air partition article, the 2nd C air partition article, the 3rd C air partition article, two 4th C air partitions article and 11 the 5th C air partitions article, a C air partitions article, the 2nd C air partitions article, a 3rd C air partition Article, two the 4th C air partitions article and 11 the 5th C air partitions article be arranged in parallel successively from top to bottom and are welded on column; The column of the 3rd air partition includes a C column connecting pieces, the 2nd C column connecting pieces and the 3rd C column connecting pieces, a C columns Connector includes flat segments and segmental arc, and the flat segments of a C column connecting pieces are welded on the base of the 3rd air partition, a C The segmental arc of column connecting piece is sleekly connected respectively with the 2nd C column connecting pieces and the 3rd C column connecting pieces, the 2nd C columns Connector and the 3rd C column connecting pieces are arc;First C air partitions article, the 2nd C air partitions article, the 3rd C air partitions article, the 4th C air partitions Article and the cross section of the 5th C air partitions article be round rectangle.
4th air partition include D air partition article, the 2nd D air partition article, the 3rd D air partition article, one 4th D air partitions article, the 5th D air partitions article, a 6th D air partition article and six the 7th D air partitions article, D air partition article, One the 2nd D air partitions article, the 3rd D air partitions article, the 4th D air partitions article, the 5th D air partitions article, a 6th D air partition Article and six the 7th D air partitions article be arranged in parallel successively from top to bottom and be welded on column;The column of the 4th air partition includes First D column connecting pieces, the 2nd D column connecting pieces and the 3rd D column connecting pieces, a D column connecting pieces include flat segments and Segmental arc, the flat segments of a D column connecting pieces are welded on the base of the 4th air partition, the segmental arc of a D column connecting pieces Sleekly it is connected with the 2nd D column connecting pieces and the 3rd D column connecting pieces respectively, the 2nd D column connecting pieces and the 3rd D columns connect Fitting is arc;First D air partitions article, the 2nd D air partitions article, the 3rd D air partitions article, the 4th D air partitions article, the 5th D air partitions article, the 6th The cross section of D air partitions article and the 7th D air partitions article is round rectangle.
5th air partition include E air partition article, the 2nd E air partition article, the 3rd E air partition article, one 4th E air partitions article, a 5th E air partition article and five the 6th E air partitions article, E air partition article, the 2nd E air partition article, One the 3rd E air partitions article, the 4th E air partitions article, a 5th E air partition article and five the 6th E air partitions article are from top to bottom successively It is arranged in parallel and is welded on column;The column of the 5th air partition includes an E column connecting pieces, the 2nd E column connecting pieces With the 3rd E column connecting pieces, an E column connecting pieces include flat segments and segmental arc, the flat segments weldering of an E column connecting pieces Be connected on the base of the 5th air partition, the segmental arc of an E column connecting pieces respectively with the 2nd E column connecting pieces and the 3rd E columns Connector sleekly connects, and the 2nd E column connecting pieces and the 3rd E column connecting pieces are arc;First E air partitions article, the 2nd E wind The cross section of barrier article, the 3rd E air partitions article, the 4th E air partitions article, the 5th E air partitions article and the 6th E air partitions article is round rectangle.
6th air partition includes a F air partition article, a 2nd F air partition article, a 3rd F air partition article and three 4th F air partitions article, a F air partitions article, the 2nd F air partitions article, a 3rd F air partition article and three the 4th F air partitions article It is arranged in parallel successively from top to bottom and is welded on column;The column of the 6th air partition include a F column connecting pieces, second F column connecting pieces and the 3rd F column connecting pieces, a F column connecting pieces include flat segments and segmental arc, F columns connection The flat segments of part are welded on the base of the 6th air partition, the segmental arc of a F column connecting pieces respectively with the 2nd F column connecting pieces Sleekly connect with the 3rd F column connecting pieces, the 2nd F column connecting pieces and the 3rd F column connecting pieces are arc;First F wind The cross section of barrier article, the 2nd F air partitions article, the 3rd F air partitions article and the 4th F air partitions article is round rectangle.
It is further preferred that the base includes first component, second component and the 3rd component, described first component will Second component is surrounded, and a horizontal end face of the second component and an inclined end face are used to be connected to by the 3rd component On the concrete girder of bridge;3rd component includes anchor bar, and the anchor bar is bent into several fonts, several fonts Top horizontal section be arranged on concrete girder back outer rim and web at pre-embedded steel slab two-sided welding, the bottom of several fonts Bending place is connected with vertical muscle.
The structure of main bridge of the bridge with above-mentioned air partition of the present invention be seven across symmetrical mixing girder stayed-cable bridge, end bay and Near main span Sarasota be concrete box girder, in across part be steel box-girder, using close Sarasota Liang Dun consolidate system, at auxiliary pier arrange Bi-directional movable bearing;Longitudinal sliding motion, horizontal hold-down support are adopted in transition pier and abutment;It is designed with the bridge floor of the bridge Left maintaining roadway railing, right maintaining roadway railing, left suspension cable, right suspension cable, the anti-guardrail, right wing side of pushing away in left side are prevented pushing away guardrail, a left side Tapping pipe, right tapping pipe, left central median anticollision barrier and right median dividing strip anticollision barrier, described left central median Anticollision barrier and right median dividing strip anticollision barrier are arranged on the position of the centre of the bridge floor of the steel box-girder, left central median Pouring asphalt concrete is provided between anticollision barrier and right median dividing strip anticollision barrier, left maintaining roadway railing is arranged on institute The left side edge of the bridge floor of steel box-girder is stated, right maintaining roadway railing is arranged on the right side edge of the bridge floor of the steel box-girder, left side Prevent that pushing away guardrail is arranged between left maintaining roadway railing and left central median anticollision barrier, right wing side prevents that pushing away guardrail is arranged on right inspection Cultivating oneself according to a religious doctrine, railing and right wing side are anti-to push away between guardrail, and left side is anti-to push away the distance between guardrail and left maintaining roadway railing less than left side It is anti-to push away the distance between guardrail and left central median anticollision barrier, right wing side prevent pushing away between guardrail and right maintaining roadway railing away from The distance between guardrail and right median dividing strip anticollision barrier are pushed away from anti-less than right wing side, left side prevents that the side for pushing away guardrail is arranged There is left tapping pipe, right wing side prevents that the side for pushing away guardrail is provided with right tapping pipe;Left maintaining roadway railing and right maintaining roadway railing with Air partition merges setting.
The invention has the advantages that:Air partition of the present invention and the bridge with the air partition compared with prior art, Be not only simple in structure, and taken into full account the safety of bridge maintainer, bridge tower nearby the seriality of Wind field variety, construction can Operability and attractive in appearance, air partition bar adopts four sides weld all around, column reliably to weld with base with column, and construction technology meets《Highway Bridges and culverts construction technique normalizing》(JTJ/T F50-2011) and《Road Engineering Quality Checking And Evaluation standard》(JTG F80/1-2004) Requirement.
Description of the drawings
Fig. 1 is the bridge deck cross-sectional view (steel box-girder) of the bridge with the air partition of the present invention.
Fig. 2 is the bridge deck cross-sectional view (concrete box girder) of the bridge with the air partition of the present invention.
Fig. 3 is the arrangement schematic diagram of air partition of the present invention.
Fig. 4 is the elevation of the first air partition A.
Fig. 5 is the profile in I-I directions in Fig. 4.
Fig. 6 and Fig. 7 are the pillar structure schematic diagrams of the first air partition A.
Fig. 8 is the structural representation of the air partition bar of the first air partition A.
Fig. 9 is the elevation of the second air partition B.
Figure 10 is the profile in I-I directions in Fig. 9.
Figure 11 and Figure 12 are the pillar structure schematic diagrams of the second air partition B.
Figure 13 is the structural representation of the air partition bar of the second air partition B.
Figure 14 is the elevation of the 3rd air partition C.
Figure 15 is the profile in I-I directions in Figure 14.
Figure 16 and Figure 17 are the pillar structure schematic diagrams of the 3rd air partition C.
Figure 18 is the structural representation of the air partition article of the 3rd air partition C.
Figure 19 is the elevation of the 4th air partition D.
Figure 20 is the profile in I-I directions in Figure 19.
Figure 21 and Figure 22 are the pillar structure schematic diagrams of the 4th air partition D.
Figure 23 is the structural representation of the air partition article of the 4th air partition D.
Figure 24 is the elevation of the 5th air partition E.
Figure 25 is the profile in I-I directions in Figure 24.
Figure 26 and Figure 27 are the pillar structure schematic diagrams of the 5th air partition E.
Figure 28 is the structural representation of the air partition article of the 5th air partition E.
Figure 29 is the elevation of the 6th air partition F.
Figure 30 is the profile in I-I directions in Figure 29.
Figure 31 and Figure 32 are the pillar structure schematic diagrams of the 6th air partition F.
Figure 33 is the structural representation of the air partition article of the 6th air partition F.
Figure 34 is the side view of base.
Figure 35 is the elevation of base.
Figure 36 is the structural representation of first component DZN1 of base.
Figure 37 is the structural representation of the second component DZN2 of base.
Figure 38 is pre-embedded steel slab schematic diagram.
Figure 39 is the structural representation of the 3rd component DZN3 of base.
Figure 40 is the profile in I-I directions in Figure 39.
Specific embodiment
Following examples are used to illustrate the present invention, but are not limited to the scope of the present invention.
As shown in Figure 1 to Figure 2, the structure of main bridge of the bridge with air partition of the present invention is seven oblique across symmetrical hybrid beam Draw bridge, be concrete box girder near end bay and main span Sarasota, in across it is most of be steel box-girder, using close Sarasota beam pier induration System, arranges bi-directional movable bearing at auxiliary pier;Longitudinal sliding motion, horizontal hold-down support are adopted in transition pier and abutment;The bridge Be designed with the bridge floor of beam left maintaining roadway railing 11, right maintaining roadway railing 12, left suspension cable 13, right suspension cable 14, left side prevent Push away guardrail 17, right wing side to prevent pushing away in guardrail 18, left tapping pipe 19, right tapping pipe 20, left central median anticollision barrier 21 and the right side Central median anticollision barrier 22, described left central median anticollision barrier 21 and right median dividing strip anticollision barrier 22 is arranged on The position of the centre of the bridge floor of the steel box-girder, left central median anticollision barrier 21 and right median dividing strip anticollision barrier 22 it Between be provided with pouring asphalt concrete, left maintaining roadway railing 11 is arranged on the left side edge of the bridge floor of the steel box-girder, right inspection Railing 12 of cultivating oneself according to a religious doctrine is arranged on the right side edge of the bridge floor of the steel box-girder, and left side prevents that pushing away guardrail 17 is arranged on left maintaining roadway railing Between 11 and left central median anticollision barrier 21, right wing side is anti-to push away guardrail 18 and is arranged on right maintaining roadway railing 12 and prevent with right wing side Push away between guardrail 18, left side is anti-push away guardrail 17 it is anti-less than left side with the distance between left maintaining roadway railing 11 push away guardrail 17 with The distance between left central median anticollision barrier 21, right wing side is anti-, and to push away guardrail 18 little with the distance between right maintaining roadway railing 12 Prevent pushing away the distance between guardrail 18 and right median dividing strip anticollision barrier 22 in right wing side, left side prevents that the side for pushing away guardrail 17 sets Left tapping pipe 19 is equipped with, right wing side prevents that the side for pushing away guardrail 18 is provided with right tapping pipe 20;Left maintaining roadway railing 11 and right maintenance Road railing 12 merges setting with air partition.
Left maintaining roadway railing 11 and right maintaining roadway railing 12 are used to guarantee the safety of bridge maintainer.
Described anticollision barrier adopts beams of metal post fence, and anti-collision level is SA levels.Fence upright is welded using steel plate Molding, a height of 1500mm, basic spacing 1500mm, crossbeam specification is 1500 × 100 × 6mm, and full-length is 5980mm, is arranged Four.Anticollision barrier column, crossbeam, column bottom adopt Q345C steel, should meet GB/T 1591-2008.
Anticollision barrier should meet the flexible of main bridge and rotate displacement at the expansion joint of bridge, and between the column of two ends crossbeam is contacted Upper setting slotted hole meets the flexible requirement of girder, and contact crossbeam two ends are supported on reinforcing bar cylinder (being welded in outer cross rail inner) and meet Rotating requires.
During laying on floorings protective coating agent and binding agent, it is ensured that pave-load layer and floorings secure bond, in wheel Not rubbing under effect, not agglomeration.Bituminous concrete should not turn over oil under 60 celsius temperatures, not soften;It is Celsius subzero 15 It is not crisp strong when spending.When maintaining roadway is mated formation, should on maintenance guidance tape protective coating agent and binding agent, it is ensured that pave-load layer and floorings jail It is solidly connected.
Girder two ends are equipped with expansion joint.Due to main bridge it is different from access bridge width, expansion joint direction across bridge should from into kerb, In order to avoid rainwater is laterally revealed, affect attractive in appearance.
The each component of bridge deck should all carry out application in welding and before installing, it is proposed that following application scheme:
As shown in figure 3, the arrangement of air partition of the present invention and design consider the company of Wind field variety near the bridge tower of bridge Continuous property, the operability and attractive in appearance of construction.A, B, C, D and E totally five class wind is adopted in the range of each 50m in bridge tower both sides of bridge Barrier (i.e. the first air partition A, the second air partition B, the 3rd air partition C, the 4th air partition D and the 5th air partition E);Standard F class wind is adopted beyond 50m Barrier (i.e. the 6th air partition F).
Wherein the first air partition A is highly identical with the second air partition B, and the ventilative rate of the first air partition A is less than the second air partition B Ventilative rate, the second air partition B is highly identical with the 3rd air partition C, and the ventilative rate of the second air partition B is less than the 3rd air partition C Ventilative rate, the height of the 3rd air partition C is more than the height of the 4th air partition D, and the ventilative rate of the 3rd air partition C is saturating less than the 4th air partition D Wind rate, the 4th air partition D is highly identical with the 5th air partition E, and the ventilative rate of the 4th air partition D is ventilative less than the 5th air partition E Rate, the height of the 5th air partition E is more than the height of the 6th air partition F, and the ventilative rate of the 5th air partition E is less than the ventilative rate of the 6th air partition F.
In a preferred embodiment, the first air partition A is 4.2 meters high, and the ventilative rate of the first air partition A is 10%, the second wind Barrier B is 4.2 meters high, and the ventilative rate of the second air partition B is 20%, and the 3rd air partition C is 4.2 meters high, and the ventilative rate of the 3rd air partition C is 30%, the 4th air partition D are 3.6 meters high, and the ventilative rate of the 4th air partition D is 40%, and the 5th air partition E is 3.6 meters high, the 5th air partition E Ventilative rate be 50%, the 6th air partition F is 3.0 meters high, and the ventilative rate of the 6th air partition F is 60%.
As shown in Fig. 4 to Fig. 8, the first air partition A, the second air partition B, the 3rd air partition C, the 4th air partition D, the 5th air partition E and Six air partition F include air partition bar 1, column 2 and base 3, and four sides weld all around, column 2 and base 3 are adopted between air partition bar 1 and column 2 Between reliably weld.
As shown in fig. 6, the first air partition A include A air partition article ANF1, the 2nd A air partition article ANF2, one Individual 3rd A air partition article ANF3, the 4th A air partition article ANF4, two the 5th A air partition article ANF5, a 6th A air partitions article ANF6, a 7th A air partitions article ANF7 and 12 the 8th A air partition article ANF8, an A air partition article ANF1, the 2nd A Air partition article ANF2, the 3rd A air partition article ANF3, the 4th A air partition article ANF4, two the 5th A air partition article ANF5, one Six A air partition article ANF6, a 7th A air partitions article ANF7 and 12 the 8th A air partitions article ANF8 be arranged in parallel successively from top to bottom And it is welded on column.
As shown in fig. 7, the column of the first air partition A include an A column connecting piece AN1, the 2nd A column connecting pieces AN2 and 3rd A column connecting piece AN3, an A column connecting pieces AN1 include flat segments and segmental arc, an A column connecting piece AN1's Flat segments are welded on the base of the first air partition A, the segmental arc of an A column connecting piece AN1 respectively with the 2nd A column connecting pieces AN2 and the 3rd A column connecting pieces AN3 sleekly connect, and the 2nd A column connecting pieces AN2 and the 3rd A column connecting piece AN3 are Arc.
In a preferred embodiment, the curvature of an A column connecting pieces AN1 and the 2nd A column connecting piece AN2 junctions It is 2871mm that radius is the radius of curvature of 2871mm, an A column connecting pieces AN1 and the 3rd A column connecting piece AN3 junctions, Segmental arc of the top of the 2nd A column connecting piece AN2 by radius for 287mm is connected with the 3rd A column connecting piece AN3.
As shown in figure 8, an A air partition article ANF1, the 2nd A air partition article ANF2, the 3rd A air partition article ANF3, the 4th A air partitions article ANF4, the 5th A air partition article ANF5, the 6th A air partition article ANF6, the cross section of the 7th A air partitions article ANF7 and the 8th A air partition article ANF8 Round rectangle is, its width is 60mm, length is 2000mm, and radius is 18mm at the fillet of round rectangle.
The height of the first A air partition article ANF1 is 196mm, and the height of the 2nd A air partition article ANF2 is 188mm, the 3rd A air partitions article The height of ANF3 is 184mm, and the height of the 4th A air partition article ANF4 is 179mm, and the height of the 5th A air partition article ANF5 is 178mm, The height of the 6th A air partition article ANF6 is 181mm, and the height of the 7th A air partition article ANF7 is 179mm, the height of the 8th A air partition article ANF8 Spend for 180mm.
As shown in Figures 9 to 11, the second air partition B includes a B air partition article BNF1, a 2nd B air partition article BNF2, the 3rd B air partition article BNF3, the 4th B air partition article BNF4, the 5th B air partition article BNF5, a 6th B wind Barrier article BNF6, a 7th B air partitions article BNF7 and 11 the 8th B air partition article BNF8, B air partition article BNF1, 2nd B air partition article BNF2, the 3rd B air partition article BNF3, the 4th B air partition article BNF4, the 5th B air partition article BNF5, One the 6th B air partition article BNF6, a 7th B air partitions article BNF7 and 11 the 8th B air partitions article BNF8 put down successively from top to bottom Row is arranged and is welded on column.
As shown in figure 12, the column of the second air partition B include a B column connecting piece BN1, the 2nd B column connecting pieces BN2 and 3rd B column connecting piece BN3, a B column connecting pieces BN1 include flat segments and segmental arc, a B column connecting piece BN1's Flat segments are welded on the base of the second air partition B, the segmental arc of a B column connecting piece BN1 respectively with the 2nd B column connecting pieces BN2 and the 3rd B column connecting pieces BN3 sleekly connect, and the 2nd B column connecting pieces BN2 and the 3rd B column connecting piece BN3 are Arc.
In a preferred embodiment, the curvature of a B column connecting pieces BN1 and the 2nd B column connecting piece BN2 junctions It is 2871mm that radius is the radius of curvature of 2871mm, a B column connecting pieces BN1 and the 3rd B column connecting piece BN3 junctions, Segmental arc of the top of the 2nd B column connecting piece BN2 by radius for 287mm is connected with the 3rd B column connecting piece BN3.
As shown in figure 13, a B air partition article BNF1, the 2nd B air partition article BNF2, the 3rd B air partition article BNF3, the 4th B air partitions Article BNF4, the 5th B air partition article BNF5, the 6th B air partition article BNF6, the 7th B air partitions article BNF7 and the 8th B air partition article BNF8 it is transversal Face is round rectangle, and its width is 60mm, and length is 2000mm, and radius is 18mm at the fillet of round rectangle.
The height of the first B air partition article BNF1 is 192mm, and the height of the 2nd B air partition article BNF2 is 186mm, the 3rd B air partitions article The height of BNF3 is 182mm, and the height of the 4th B air partition article BNF4 is 180mm, and the height of the 5th B air partition article BNF5 is 179mm, The height of the 6th B air partition article BNF6 is 178mm, and the height of the 7th B air partition article BNF7 is 179mm, the height of the 8th B air partition article BNF8 Spend for 180mm.
As shown in Figure 14 to Figure 18, the 3rd air partition C includes a C air partition article CNF1, a 2nd C air partition article CNF2, the 3rd C air partition article CNF3, two the 4th C air partitions article CNF4 and 11 the 5th C air partition article CNF5, a C Air partition article CNF1, the 2nd C air partition article CNF2, the 3rd C air partition article CNF3, two the 4th C air partitions article CNF4 and 11 Individual 5th C air partitions article CNF5 be arranged in parallel successively from top to bottom and is welded on column.
As shown in figure 17, the column of the 3rd air partition C include a C column connecting piece CN1, the 2nd C column connecting pieces CN2 and 3rd C column connecting piece CN3, a C column connecting pieces CN1 include flat segments and segmental arc, a C column connecting piece CN1's Flat segments are welded on the base of the 3rd air partition C, the segmental arc of a C column connecting piece CN1 respectively with the 2nd C column connecting pieces CN2 and the 3rd C column connecting pieces CN3 sleekly connect, and the 2nd C column connecting pieces CN2 and the 3rd C column connecting piece CN3 are Arc.
In a preferred embodiment, the curvature of a C column connecting pieces CN1 and the 2nd C column connecting piece CN2 junctions It is 2871mm that radius is the radius of curvature of 2871mm, a C column connecting pieces CN1 and the 3rd C column connecting piece CN3 junctions, Segmental arc of the top of the 2nd C column connecting piece CN2 by radius for 287mm is connected with the 3rd C column connecting piece CN3.
As shown in figure 18, a C air partition article CNF1, the 2nd C air partition article CNF2, the 3rd C air partition article CNF3, the 4th C air partitions The cross section of article CNF4 and the 5th C air partition article CNF5 is round rectangle, and its width is 60mm, and length is 2000mm, circle Radius is 18mm at the fillet of angular moment shape.
The height of the first C air partition article CNF1 is 195mm, and the height of the 2nd C air partition article CNF2 is 186mm, the 3rd C air partitions article The height of CNF3 is 182mm, and the height of the 4th C air partition article CNF4 is 179mm, and the height of the 5th C air partition article CNF5 is 180mm.
As shown in Figure 19 to Figure 23, the 4th air partition D includes a D air partition article DNF1, a 2nd D air partition article DNF2, the 3rd D air partition article DNF3, the 4th D air partition article DNF4, the 5th D air partition article DNF5, a 6th D wind Barrier article DNF6 and six the 7th D air partition article DNF7, D air partition article DNF1, the 2nd D air partition article DNF2, one the Three D air partition article DNF3, the 4th D air partition article DNF4, the 5th D air partition article DNF5, a 6th D air partitions article DNF6 and six Individual 7th D air partitions article DNF7 be arranged in parallel successively from top to bottom and is welded on column.
As shown in figure 22, the column of the 4th air partition D include a D column connecting piece DN1, the 2nd D column connecting pieces DN2 and 3rd D column connecting piece DN3, a D column connecting pieces DN1 include flat segments and segmental arc, a D column connecting piece DN1's Flat segments are welded on the base of the 4th air partition D, the segmental arc of a D column connecting piece DN1 respectively with the 2nd D column connecting pieces DN2 and the 3rd D column connecting pieces DN3 sleekly connect, and the 2nd D column connecting pieces DN2 and the 3rd D column connecting piece DN3 are Arc.
In a preferred embodiment, the curvature of a D column connecting pieces DN1 and the 2nd D column connecting piece DN2 junctions It is 2859mm that radius is the radius of curvature of 2871mm, a D column connecting pieces DN1 and the 3rd D column connecting piece DN3 junctions, Segmental arc of the top of the 2nd D column connecting piece DN2 by radius for 287mm is connected with the 3rd D column connecting piece DN3.
As shown in figure 23, a D air partition article DNF1, the 2nd D air partition article DNF2, the 3rd D air partition article DNF3, the 4th D air partitions Article DNF4, the 5th D air partition article DNF5, the cross section of the 6th D air partitions article DNF6 and the 7th D air partition article DNF7 are round rectangle, Its width is 60mm, and length is 2000mm, and radius is 18mm at the fillet of round rectangle.
The height of the first D air partition article DNF1 is 198mm, and the height of the 2nd D air partition article DNF2 is 186mm, the 3rd D air partitions article The height of DNF3 is 181mm, and the height of the 4th D air partition article DNF4 is 179mm, and the height of the 5th D air partition article DNF5 is 178mm, The height of the 6th D air partition article DNF6 is 179mm, and the height of the 7th D air partition article DNF7 is 180mm.
As shown in Figure 24 to Figure 28, the 5th air partition E includes an E air partition article ENF1, a 2nd E air partition article ENF2, the 3rd E air partition article ENF3, the 4th E air partition article ENF4, a 5th E air partitions article ENF5 and five the 6th E wind Barrier bar ENF6, E air partition article ENF1, the 2nd E air partition article ENF2, the 3rd E air partition article ENF3, one the 4th E air partition article ENF4, a 5th E air partitions article ENF5 and five the 6th E air partitions article ENF6 be arranged in parallel successively from top to bottom and It is welded on column.
As shown in figure 27, the column of the 5th air partition E include an E column connecting piece EN1, the 2nd E column connecting pieces EN2 and 3rd E column connecting piece EN3, an E column connecting pieces EN1 include flat segments and segmental arc, an E column connecting piece EN1's Flat segments are welded on the base of the 5th air partition E, the segmental arc of an E column connecting piece EN1 respectively with the 2nd E column connecting pieces EN2 and the 3rd E column connecting pieces EN3 sleekly connect, and the 2nd E column connecting pieces EN2 and the 3rd E column connecting piece EN3 are Arc.
As shown in figure 28, an E air partition article ENF1, the 2nd E air partition article ENF2, the 3rd E air partition article ENF3, the 4th E air partitions The cross section of article ENF4, the 5th E air partitions article ENF5 and the 6th E air partition article ENF6 is round rectangle, and its width is 60mm, long Degree is 2000mm, and radius is 18mm at the fillet of round rectangle.
The height of the first E air partition article ENF1 is 194mm, and the height of the 2nd E air partition article ENF2 is 184mm, the 3rd E air partitions article The height of ENF3 is 180mm, and the height of the 4th E air partition article ENF4 is 178mm, and the height of the 5th E air partition article ENF5 is 179mm, The height of the 6th E air partition article ENF6 is 180mm.
As shown in Figure 29 to Figure 33, the 6th air partition F includes a F air partition article FNF1, a 2nd F air partition article FNF2, a 3rd F air partitions article FNF3 and three the 4th F air partition article FNF4, a F air partition article FNF1, a 2nd F wind Barrier article FNF2, a 3rd F air partitions article FNF3 and three the 4th F air partitions article FNF4 be arranged in parallel successively from top to bottom and weld It is connected on column.
As shown in figure 32, the column of the 6th air partition F include a F column connecting piece FN1, the 2nd F column connecting pieces FN2 and 3rd F column connecting piece FN3, a F column connecting pieces FN1 include flat segments and segmental arc, a F column connecting piece FN1's Flat segments are welded on the base of the 6th air partition F, the segmental arc of a F column connecting piece FN1 respectively with the 2nd F column connecting pieces FN2 and the 3rd F column connecting pieces FN3 sleekly connect, and the 2nd F column connecting pieces FN2 and the 3rd F column connecting piece FN3 are Arc.
As shown in figure 33, a F air partition article FNF1, the 2nd F air partition article FNF2, the 3rd F air partitions article FNF3 and the 4th F air partitions The cross section of bar FNF4 is round rectangle, and its width is 60mm, and length is 2000mm, radius at the fillet of round rectangle It is 18mm.
The height of the first F air partition article FNF1 is 220mm, and the height of the 2nd F air partition article FNF2 is 203mm, the 3rd F air partitions article The height of FNF3 is 197mm, and the height of the 4th F air partition article FNF4 is 200mm.
As shown in Figure 34 to Figure 40, the base 3 includes first component DZN1, second component DZN2 and the 3rd component DZN3, described first component DZN1 surrounds second component DZN2, a horizontal end face 341 of the second component DZN2 It is used to be connected to the concrete girder of bridge by the 3rd component DZN3 with an inclined end face 342.
As shown in figure 39, the 3rd component DZN3 includes anchor bar 391, and the anchor bar 391 is bent into several fonts, The top horizontal section of several fonts be arranged on concrete girder back outer rim and web at the two-sided welding of pre-embedded steel slab 393, The bottom bending place of several fonts is connected with vertical muscle 392.
In a preferred embodiment, a diameter of 20mm of anchor bar 391, the top horizontal segment length of several fonts is 140mm。
In the present invention, anticollision barrier column, crossbeam, column bottom adopt Q345C steel, should meet GB/T 1591- 2008.Bolt, nut and packing ring are using standard fasteners and meet《Hex nut》(GB/T 6170-2000)、《Plain washer》 (GB97.1-2002)、《Hexagon-headed bolt》(GB/T5782-2000)、《Hexagon socket cap head screw》(GB70.1-2000) isotactic The requirement of model, wherein bolt, the intensity requirement of screw are not less than 8.8 grades.Column and air partition strip adoption Q345C steel.Kerbstone, Tapping pipe and its base plate etc. adopt Q235B steel, sluicing tube cover plate to adopt ZG230-450.7cm is laid on runway steel bridge deck Pouring asphalt concrete, coagulation floorings upper berth 11.5cm pouring asphalt concretes.Maintaining roadway asphalt sand material material, Thickness is 3.0cm, and its color will be required to determine by owner according to landscape design.
In a preferred embodiment, the long 848m of bridge main bridge of the present invention, span setting:(35+44+66)m+ The double rope face mixing girder stayed-cable bridges of 550m+ (66+44+35) m+8m double towers.Directly across certain river and the provincial highway highway of northern bank, it is anhydrous in Basis, both sides basis is fully seated within the bank.Span setting (35+44+66) m+550m+ (66+44+35) m.End bay adopts coagulation Native box beam, in across steel box-girder is adopted, steel is with concrete demarcation line away from Sarasota centrage 24m.
Anticollision barrier bedplate should complete in a pre-installation rust preventive painting and tapping, tapping hole planted agent's oiling antirust, and prevent Debris are fallen in hole.Should polish smooth after anticollision barrier column welding fabrication, it is ensured that column is attractive in appearance.Crossbeam is shaped steel, it is desirable to table Face is smooth without vestige is scratched, and screwhole position should be accurate.The all screws of anticollision barrier are all answered Zincing passivation and clear up screw thread.Anticollision is protected Hurdle manufactures the required precision installed:Upright post flat face allowable deviation (every 10 root post leads to ray examination) ± 2mm;Crossbeam plane is allowed Deviation (the logical ray examination per 30m) ± 2mm;Stem height allowable deviation ± 1mm.
Maintaining roadway handrail base should complete before welding rust preventive painting, and in factory and steel box-girder Mi Shui is welded.Kerbstone is put down Face position allowable deviation is less than 5mm, and welding point deviation is less than 1mm.Should polish smooth after maintaining roadway railing butt welding, it is ensured that It is attractive in appearance.Tapping pipe should complete rust preventive painting before welding and installation, should seal water-tight after welding and installation, and plan-position is accurate Really.
Double-head arrow mark is adopted in accompanying drawing 1-40 of the present invention is scantling, the line segment side mark between double-head arrow Digital unit be millimeter.But it will be appreciated to those of skill in the art that the invention is not limited in embodiment and Concrete size described by accompanying drawing, on the basis of without departing from basic idea of the present invention, changes concrete size and still falls within this Bright claimed scope.
Although the present invention is described in detail above to have used general explanation and specific embodiment, at this On the basis of invention, it can be made some modifications or improvements, this will be apparent to those skilled in the art.Therefore, Without departing from theon the basis of the spirit of the present invention these modifications or improvements, belong to the scope of protection of present invention.

Claims (10)

1. a kind of air partition, it is characterised in that the air partition include the first air partition, the second air partition, the 3rd air partition, the 4th air partition, the Five air partitions and the 6th air partition, the first air partition, the second air partition, the 3rd air partition, the 4th air partition and the 5th air partition are arranged in the bridge of bridge In the range of each 50m in tower both sides, the 6th air partition is adopted beyond 50m, wherein the first air partition is highly identical with the second air partition, and the , less than the ventilative rate of the second air partition, the second air partition is highly identical with the 3rd air partition, and the second air partition for the ventilative rate of one air partition Ventilative rate less than the 3rd air partition ventilative rate, the height of the 3rd air partition more than the 4th air partition height, the 3rd air partition it is ventilative Rate is less than the ventilative rate of the 4th air partition, and the 4th air partition is highly identical with the 5th air partition, and the ventilative rate of the 4th air partition is less than The ventilative rate of the 5th air partition, the height of the 5th air partition is more than the height of the 6th air partition, and the ventilative rate of the 5th air partition is less than the 6th wind The ventilative rate of barrier.
2. air partition as claimed in claim 1, it is characterised in that first air partition, the second air partition, the 3rd air partition, the 4th wind Barrier, the 5th air partition and the 6th air partition include air partition article, column and base, and four sides weld all around is adopted between air partition bar and column, stand Reliably weld between post and base.
3. air partition as claimed in claim 2, it is characterised in that first air partition include an A air partition article, one the Two A air partitions article, the 3rd A air partition article, the 4th A air partition article, two the 5th A air partitions article, the 6th A air partition article, one Individual 7th A air partitions article and 12 the 8th A air partitions article, an A air partitions article, the 2nd A air partitions article, a 3rd A wind Barrier article, a 4th A air partition article, two the 5th A air partitions article, a 6th A air partition article, a 7th A air partition article and 12 8th A air partitions article be arranged in parallel successively from top to bottom and are welded on column;The column of the first air partition A is vertical including an A Post connector, the 2nd A column connecting pieces and the 3rd A column connecting pieces, an A column connecting pieces include flat segments and segmental arc, The flat segments of the first A column connecting pieces are welded on the base of the first air partition, and the segmental arc of an A column connecting pieces is respectively with Two A column connecting pieces and the 3rd A column connecting pieces sleekly connect, and the 2nd A column connecting pieces and the 3rd A column connecting pieces are Arc;First A air partitions article, the 2nd A air partitions article, the 3rd A air partitions article, the 4th A air partitions article, the 5th A air partitions article, the 6th A air partitions article, The cross section of the 7th A air partitions article and the 8th A air partitions article is round rectangle.
4. air partition as claimed in claim 2, it is characterised in that second air partition include a B air partition article, one the Two B air partitions article, the 3rd B air partition article, the 4th B air partition article, the 5th B air partition article, the 6th B air partition article, one Individual 7th B air partitions article and 11 the 8th B air partitions article, a B air partitions article, the 2nd B air partitions article, a 3rd B wind Barrier article, a 4th B air partition article, a 5th B air partition article, a 6th B air partition article, a 7th B air partition article and 11 8th B air partitions article be arranged in parallel successively from top to bottom and are welded on column;The column of the second air partition B is vertical including a B Post connector, the 2nd B column connecting pieces and the 3rd B column connecting pieces, a B column connecting pieces include flat segments and segmental arc, The flat segments of the first B column connecting pieces are welded on the base of the second air partition B, the segmental arc of a B column connecting pieces respectively with 2nd B column connecting pieces and the 3rd B column connecting pieces sleekly connect, and the 2nd B column connecting pieces and the 3rd B column connecting pieces are equal For arc;First B air partitions article, the 2nd B air partitions article, the 3rd B air partitions article, the 4th B air partitions article, the 5th B air partitions article, the 6th B air partitions Article, the cross section of the 7th B air partitions article and the 8th B air partitions article be round rectangle.
5. air partition as claimed in claim 2, it is characterised in that the 3rd air partition include a C air partition article, one the Two C air partitions article, the 3rd C air partitions article, two the 4th C air partitions article and 11 the 5th C air partitions article, C air partition article, One the 2nd C air partition article, a 3rd C air partition article, two the 4th C air partitions article and 11 the 5th C air partitions article from top to bottom according to It is secondary to be arranged in parallel and be welded on column;The column of the 3rd air partition includes that a C column connecting pieces, the 2nd C columns connect Part and the 3rd C column connecting pieces, a C column connecting pieces include flat segments and segmental arc, the flat segments of a C column connecting pieces It is welded on the base of the 3rd air partition, the segmental arc of a C column connecting pieces is vertical with the 2nd C column connecting pieces and the 3rd C respectively Post connector sleekly connects, and the 2nd C column connecting pieces and the 3rd C column connecting pieces are arc;First C air partitions article, the 2nd C The cross section of air partition article, the 3rd C air partitions article, the 4th C air partitions article and the 5th C air partitions article is round rectangle.
6. air partition as claimed in claim 2, it is characterised in that the 4th air partition include a D air partition article, one the Two D air partitions article, the 3rd D air partitions article, the 4th D air partitions article, the 5th D air partitions article, a 6th D air partition article and six Individual 7th D air partitions article, a D air partitions article, the 2nd D air partitions article, the 3rd D air partitions article, a 4th D air partition Article, the 5th D air partitions article, a 6th D air partition article and six the 7th D air partitions article be arranged in parallel successively from top to bottom and It is welded on column;The column of the 4th air partition includes the connection of a D column connecting pieces, the 2nd D column connecting pieces and the 3rd D columns Part, a D column connecting pieces include flat segments and segmental arc, and the flat segments of a D column connecting pieces are welded on the 4th air partition On base, the segmental arc of a D column connecting pieces sleekly connects respectively with the 2nd D column connecting pieces and the 3rd D column connecting pieces Connect, the 2nd D column connecting pieces and the 3rd D column connecting pieces are arc;First D air partitions article, the 2nd D air partitions article, the 3rd D air partitions Article, the cross section of the 4th D air partitions article, the 5th D air partitions article, the 6th D air partitions article and the 7th D air partitions article be round rectangle.
7. air partition as claimed in claim 2, it is characterised in that the 5th air partition include an E air partition article, one the Two E air partitions article, the 3rd E air partitions article, the 4th E air partitions article, a 5th E air partition article and five the 6th E air partitions article, one An individual E air partitions article, the 2nd E air partitions article, the 3rd E air partitions article, the 4th E air partitions article, a 5th E air partition article It is arranged in parallel successively from top to bottom and is welded on column with five the 6th E air partition article;The column of the 5th air partition includes the One E column connecting pieces, the 2nd E column connecting pieces and the 3rd E column connecting pieces, an E column connecting pieces include flat segments and arc Shape section, the flat segments of an E column connecting pieces are welded on the base of the 5th air partition, the segmental arc point of an E column connecting pieces Sleekly it is not connected with the 2nd E column connecting pieces and the 3rd E column connecting pieces, the 2nd E column connecting pieces and the 3rd E columns connect Part is arc;First E air partitions article, the 2nd E air partitions article, the 3rd E air partitions article, the 4th E air partitions article, the 5th E air partitions article and the 6th E The cross section of air partition bar is round rectangle.
8. air partition as claimed in claim 2, it is characterised in that the 6th air partition include a F air partition article, one the Two F air partitions article, a 3rd F air partition article and three the 4th F air partitions article, F air partition article, the 2nd F air partition article, one Individual 3rd F air partitions article and three the 4th F air partitions article be arranged in parallel successively from top to bottom and are welded on column;6th air partition Column include a F column connecting pieces, the 2nd F column connecting pieces and the 3rd F column connecting pieces, a F column connecting piece bags Flat segments and segmental arc are included, the flat segments of a F column connecting pieces are welded on the base of the 6th air partition, F columns connection The segmental arc of part is sleekly connected respectively with the 2nd F column connecting pieces and the 3rd F column connecting pieces, the 2nd F column connecting pieces and 3rd F column connecting pieces are arc;The horizontal stroke of the first F air partitions article, the 2nd F air partitions article, the 3rd F air partitions article and the 4th F air partitions article Section is round rectangle.
9. the air partition as described in any one of claim 2-8, it is characterised in that the base includes first component, second component With the 3rd component, described first component surrounds second component, and a horizontal end face of the second component and one incline Angled end-face is used to be connected to the concrete girder of bridge by the 3rd component;3rd component includes anchor bar, the anchor Gu reinforcing bar is bent into several fonts, the top horizontal section of several fonts be arranged on it is pre- at concrete girder back outer rim and web Steel plate two-sided welding is buried, the bottom bending place of several fonts is connected with vertical muscle.
10. a kind of bridge of the air partition with described in any one of claim 1-9, it is characterised in that the structure of main bridge of bridge is Seven across symmetrical mixing girder stayed-cable bridge, is concrete box girder near end bay and main span Sarasota, in across part be steel box-girder, using close rope Tower Liang Dun consolidates system, and bi-directional movable bearing is arranged at auxiliary pier;Fix using longitudinal sliding motion, laterally in transition pier and abutment Bearing;Left maintaining roadway railing, right maintaining roadway railing, left suspension cable, right suspension cable, left side are designed with the bridge floor of the bridge The anti-guardrail, right wing side of pushing away is prevented pushing away guardrail, left tapping pipe, right tapping pipe, left central median anticollision barrier and right median dividing strip Anticollision barrier, described left central median anticollision barrier and right median dividing strip anticollision barrier is arranged on the bridge of the steel box-girder The position of the centre in face, between left central median anticollision barrier and right median dividing strip anticollision barrier pouring asphalt is provided with Concrete, left maintaining roadway railing is arranged on the left side edge of the bridge floor of the steel box-girder, and right maintaining roadway railing is arranged on the steel The right side edge of the bridge floor of box beam, left side is anti-push away guardrail be arranged on left maintaining roadway railing and left central median anticollision barrier it Between, right wing side is anti-to push away that guardrail is arranged on right maintaining roadway railing and right wing side is anti-pushes away between guardrail, and left side is anti-to push away guardrail with left inspection The distance between railing of cultivating oneself according to a religious doctrine is anti-less than left side to push away the distance between guardrail and left central median anticollision barrier, and right wing side is prevented Push away the distance between guardrail and right maintaining roadway railing to prevent pushing away between guardrail and right median dividing strip anticollision barrier less than right wing side Distance, left side prevents that the side for pushing away guardrail is provided with left tapping pipe, and right wing side prevents that the side for pushing away guardrail is provided with right tapping pipe;It is left Maintaining roadway railing and right maintaining roadway railing merge setting with air partition.
CN201710034809.XA 2017-01-18 2017-01-18 A kind of air partition and the bridge with the air partition Active CN106677054B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710034809.XA CN106677054B (en) 2017-01-18 2017-01-18 A kind of air partition and the bridge with the air partition

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710034809.XA CN106677054B (en) 2017-01-18 2017-01-18 A kind of air partition and the bridge with the air partition

Publications (2)

Publication Number Publication Date
CN106677054A true CN106677054A (en) 2017-05-17
CN106677054B CN106677054B (en) 2017-12-26

Family

ID=58860201

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710034809.XA Active CN106677054B (en) 2017-01-18 2017-01-18 A kind of air partition and the bridge with the air partition

Country Status (1)

Country Link
CN (1) CN106677054B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114481878A (en) * 2022-01-25 2022-05-13 同济大学 Windproof, fireproof and explosion-proof integrated structure for bridge tower area

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004316496A (en) * 2003-04-14 2004-11-11 Nippon Steel Corp Windbreak wall structure with windmill
CN203080431U (en) * 2013-01-23 2013-07-24 交通运输部天津水运工程科学研究所 Wind prevention and dust suppression net plate
CN204282194U (en) * 2014-11-28 2015-04-22 中铁第一勘察设计院集团有限公司 A kind of high-speed railway split blade type channel beam wind shielding structure
CN204435245U (en) * 2014-12-08 2015-07-01 鞍钢集团矿业公司 Mine haul road surface anti-wind net
CN104963277A (en) * 2015-07-02 2015-10-07 江苏宏远科技工程有限公司 Crosswind guiding device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004316496A (en) * 2003-04-14 2004-11-11 Nippon Steel Corp Windbreak wall structure with windmill
CN203080431U (en) * 2013-01-23 2013-07-24 交通运输部天津水运工程科学研究所 Wind prevention and dust suppression net plate
CN204282194U (en) * 2014-11-28 2015-04-22 中铁第一勘察设计院集团有限公司 A kind of high-speed railway split blade type channel beam wind shielding structure
CN204435245U (en) * 2014-12-08 2015-07-01 鞍钢集团矿业公司 Mine haul road surface anti-wind net
CN104963277A (en) * 2015-07-02 2015-10-07 江苏宏远科技工程有限公司 Crosswind guiding device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114481878A (en) * 2022-01-25 2022-05-13 同济大学 Windproof, fireproof and explosion-proof integrated structure for bridge tower area
CN114481878B (en) * 2022-01-25 2023-09-26 同济大学 Wind-proof, fireproof and explosion-proof integrated structure for bridge tower area

Also Published As

Publication number Publication date
CN106677054B (en) 2017-12-26

Similar Documents

Publication Publication Date Title
CN109371815B (en) Beam-body corrugated steel combined protective shed frame and manufacturing method thereof
CN208027578U (en) Novel traffic signal lamp
CN206486846U (en) Full assembling shaped steel guardrail
CN106677054B (en) A kind of air partition and the bridge with the air partition
CN102587301B (en) Double-layer flexible windproof net
CN103074846A (en) Bridge with transverse bearing system
CN112109736B (en) Multi-type combined transport rail transport system
CN210031489U (en) Stool type bracket capping beam support
CN108978433B (en) Joint construction structure of suspension type monorail and highway bridge
CN209339019U (en) A kind of anti-wind and snow Lang Peng of steel and concrete structure
CN201962569U (en) Column-type combination steel frame flyover
CN211872617U (en) Permanent isolation guardrail for urban bridge
CN208586514U (en) A kind of simply supported girder bridge expansion gap device
CN209923799U (en) Novel windproof net
CN207484299U (en) A kind of grade separation bridge steel structural shielding canopy
CN214301206U (en) Bridge structure combining sunken sidewalk and gallery
CN206052560U (en) A kind of protection hanging canopy for bridge span construction of the highway
CN103061248A (en) Water source pollution preventing bridge type tunnel structure and construction method thereof
CN202543814U (en) Dual-layer flexible windproof fence
CN208455505U (en) A kind of mountain ridge driving channel safeguard structure
US20240200290A1 (en) Bridge girder with high central-wall-beam
CN217949823U (en) Protective shed frame device for crossing existing railway on expressway
CN220079734U (en) Anti-collision buffer guardrail for bridge of municipal engineering
CN209443353U (en) The body of a bridge uses the overpass of corrugated steel construction
CN113863134B (en) Bridge deck structure capable of adjusting bridge deck elevation and bridge deck elevation adjusting method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Yu Zhenfu

Inventor after: Pan Fan

Inventor after: Lai Shiqian

Inventor after: Hong Jinxiang

Inventor after: Chen Zhen

Inventor after: Guo Zhenshan

Inventor after: Hu Yuliu

Inventor after: Liu Qiujiang

Inventor after: Liu Haiqing

Inventor after: Huang Ping

Inventor before: Yu Zhenfu

Inventor before: Guo Jingyang

Inventor before: Lai Shiqian

Inventor before: Hong Jinxiang

Inventor before: Chen Zhen

Inventor before: Guo Zhenshan

Inventor before: Hu Yuliu

Inventor before: Liu Qiujiang

Inventor before: Liu Haiqing

Inventor before: Huang Ping

GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 350004 No. 43 Jiaotong Road, Fuzhou City, Fujian Province

Patentee after: Fujian Transportation Planning and Design Institute Co., Ltd.

Address before: 350004 No. 43 Jiaotong Road, Fuzhou City, Fujian Province

Patentee before: Fujian Traffic Plan Designing Inst.