CN106677046A - Damaged road repairing method - Google Patents

Damaged road repairing method Download PDF

Info

Publication number
CN106677046A
CN106677046A CN201710006214.3A CN201710006214A CN106677046A CN 106677046 A CN106677046 A CN 106677046A CN 201710006214 A CN201710006214 A CN 201710006214A CN 106677046 A CN106677046 A CN 106677046A
Authority
CN
China
Prior art keywords
fixed
less
fixed column
road
breakage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710006214.3A
Other languages
Chinese (zh)
Inventor
孙晗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710006214.3A priority Critical patent/CN106677046A/en
Publication of CN106677046A publication Critical patent/CN106677046A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/10Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for raising or levelling sunken paving; for filling voids under paving; for introducing material into substructure

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention provides a damaged road repairing method. The damaged road repairing method is characterized by comprising the following steps that 1, the damaged portion is washed thoroughly through a high-pressure water gun and then subjected to drying treatment, specifically, the drying treatment can be implemented with hot air or in a natural drying mode; 2, the damaged portion treated in the step 1 is coated with an optical curing adhesive and cured selectively, and the optical curing adhesive is made to form meshes of the specific size; 3, a plurality of fixing columns are arranged in the damaged portion covered with the optical curing adhesive, and the end, close to the road surface, of each fixing column is lower than the plane of the road surface; and 4, a concrete or asphalt mixture is poured into the damaged portion with the fixing columns and cured. According to the damaged road repairing method, the fixing columns are arranged in the damaged portion and provided with a fixing net, one end of each fixing column is directly inserted into a foundation, then the concrete or asphalt mixture is poured, and therefore the portion is repaired more firmly and is free of secondary damage.

Description

A kind of road damage revamping method
Technical field
The present invention relates to a kind of road technology field, more particularly to a kind of road damage revamping method.
Background technology
Road is from the infrastructure that the meaning of a word is exactly for various trackless vehicles and walk;It is divided into by its handling characteristics Highways and streets, backroad, factories and mines road, forestry road, examination road, contest road, automobile test road, workshop Passage and school's road etc., ancient china also has post road.Also refer to the approach for reaching certain target, things development, change in addition Approach.
Whether impact of the road to vehicle safety shows the development of road and the construction of road network with the people's The economic development of living standard, living habit and society is adapted.If car multichannel is few, Road Service Life can be reduced, easily Go wrong, thus traffic safety problem can be projected.Next to that whether road management facility is scientific and reasonable with traffic control device. If scientific and reasonable, vehicle also can be methodically dredged when traffic congestion, solve traffic jam issue, reduce traffic The generation of security incident.It is again impact of the road design to traffic safety.Often have some roads, because its design it is unreasonable, Cause driver easily to produce the judgement of mistake, cause vehicle accident, this should cause road design personnel and management personnel Pay attention to.Driver fatigue, bend and the irrational collocation of the gradient is easily set all to cause traffic thing as expressway straight line is long Therefore.
Road occurs the situation of breakage in practical process, at present for the processing mode of breakage is mainly in breakage Place's concrete perfusion or asphalt mixture, but mend is of long duration, again can be again damaged, mainly after the coagulation that irrigates Soil or asphalt mixture are bad with original road surface conjugation, are easy to depart from by rolling for vehicle, so urgently providing A kind of new technical scheme is solving technical problem of the prior art.
The content of the invention
Based on this, in order to solve the technical problem of the above, the present invention provides a kind of road damage revamping method.
Technical solution of the present invention is as follows:
A kind of road damage revamping method, it is characterised in that comprise the following steps:
S1, using giant by breakage washes clean, and be dried process;The dried can pass through hot blast Or natural drying method is realizing;
S2, the breakage after by S1 process spray optic-solidified adhesive, selectivity solidification, and the optic-solidified adhesive for making is formed and specifies big Little mesh;
S3, located at optic-solidified adhesive breakage in be provided with some fixed columns;And the fixed column is less than near the one end on road surface The plane on road surface;
S4, concrete or asphalt mixture are poured into a mould in the breakage for be provided with fixed column, and solidified.
Wherein in an embodiment, the fixed column is provided with branched structure, and the branched structure and the fixed column One end towards ground is at an acute angle.
Wherein in an embodiment, the branched structure is at an acute angle towards one end of ground with the fixed column, described sharp Angle is less than or equal to 80 °, and not less than 25 °.
Wherein in an embodiment, the fixed column is reinforcing bar.
Wherein in an embodiment, the acute angle is less than or equal to 60 °, and not less than 30 °.
Wherein in an embodiment, fixed net is additionally provided with, the fixed Netcom crosses fixed column and is fixed in the breakage.
Wherein in an embodiment, the fixed column fixes on fixed net through the mesh of fixed net;The fixed net is Wire netting.
Wherein in an embodiment, between the fixed net at least two, and adjacent fixed net gap is provided with.
Wherein in an embodiment, gap is provided with not less than 50mm between the adjacent fixed net;Or be not less than 45mm;Or not less than 40mm;Or not less than 30mm.
Wherein in an embodiment, the fixed column is at least two.
Beneficial effects of the present invention:
A kind of road damage revamping method of the present invention, in breakage fixed column is provided with, and the fixed column is provided with fixed net, institute State fixed column one end to be directly plugged in ground, then again with concrete or asphalt mixture cast, the mend for so making More firmly, will not be damaged again.
Description of the drawings
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing The accompanying drawing to be used needed for having technology description is briefly described.
Fig. 1 is a kind of structural representation of road breakage;
Fig. 2 is a kind of road damage revamping structural section schematic diagram;
Fig. 3 is a kind of another schematic cross-section of road damage revamping structure;
Fig. 4 is a kind of road damage revamping structure middle frame structure schematic diagram;
Fig. 5 is a kind of another structural representation of road damage revamping structure middle frame.
Fig. 6 is a kind of road damage revamping method schematic diagram.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than the embodiment of whole.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
It should be noted that when element is referred to as " being arranged at " another element, it can directly on another element Or can also there is element placed in the middle.When an element is considered as " connection " another element, it can be directly connected to To another element or may be simultaneously present centering elements.Term as used herein " vertical ", " level ", " left side ", For illustrative purposes only, it is unique embodiment to be not offered as " right side " and similar statement.
Unless otherwise defined, all of technology used herein and scientific terminology and the technical field for belonging to the present invention The implication that technical staff is generally understood that is identical.The term for being used in the description of the invention is intended merely to describe specific reality Apply the purpose of mode, it is not intended that of the invention in limiting.Term as used herein "and/or" includes one or more correlations The arbitrary and all of combination of Listed Items.
Fig. 1 and Fig. 2, a kind of road damage revamping structure, including ground 10 and road surface 20 are referred to, its feature exists In, there is breakage 30 on the road surface 20, the breakage 30 is provided with some fixed columns 40, the insertion of the one end of the fixed column 40 In ground 10, the other end is located in the breakage 30, and the other end of the fixed column 40 is less than the horizontal plane on the road surface 20; The breakage 30 is also filled out and is provided with concrete 31, and the concrete 31 fills and leads up the breakage 30, and the grafting of the fixed column 40 In the concrete 31;Wherein, the fixed column 40 is inverted " u " font, and " U " the type opening is plugged in the ground 10 In;The preferred reinforcing bar of the fixed column 40, it is also possible to select alloy, rigid plastics or other hard materials;The fixed column 40 at least want two, and when the fixed column 40 is not inverted " u " font, the fixed column 40 is bending towards the one end on road surface 20 Shape, towards ground 10, the fixed column one end for so making is generally the tire of pointed damage vehicle for the one end for the fixed column 40 for making, or Person be basset jeopardize people safety etc..
Fig. 4 is referred to, wherein in an embodiment, the fixed column 40 is provided with branched structure 41, and the branch ties Structure 41 is at an acute angle towards one end of ground 10 with the fixed column 40.
Wherein in an embodiment, the branched structure 41 is at an acute angle towards one end of ground 10 with the fixed column 40, The acute angle is less than or equal to 80 °, and not less than 25 °.Wherein in an embodiment, the preferably acute angle is less than or equal to 60 °, and not Less than 30 °.
Fig. 3 ~ Fig. 5 is referred to, wherein in an embodiment, fixed net 50 is additionally provided with, the fixed net 50 passes through fixed column 40 are fixed in the breakage 30, fixed net 50 is equipped with fixed column 40 and so pours into a mould overmulling equivalent in breakage 30 Solidifying soil defines steel fibre reinforced concrete block, and the steadiness for so making is more preferably, more durable.
Fig. 4 is referred to, wherein in an embodiment, the fixed column 40 will fix net 50 through the mesh of fixed net 50 It is fixed;The fixed net 50 is wire netting, and the mesh of fixed net 50 becomes not less than 50mm.
Wherein in an embodiment, between the fixed net 50 at least two, and adjacent fixed net gap is provided with. In a wherein embodiment, gap is provided with not less than 50mm between preferably described adjacent fixed net;Or not less than 45mm;Or Not less than 40mm;Or not less than 30mm.
Fig. 6 is referred to, a kind of road damage revamping method is comprised the following steps:
S1, using giant by the washes clean of breakage 30, and be dried process;The dried can be by heat Wind or natural drying method are realizing;
S2, the breakage 30 after by S1 process spray optic-solidified adhesive, and selectivity solidification, the optic-solidified adhesive for making forms regulation The mesh of size, for example, the length of side is 100mm;So because optic-solidified adhesive is more preferable than concrete with the contact of breakage 30;
S3, located at optic-solidified adhesive breakage 30 in be provided with some fixed columns 40;And the fixed column 40 is near road surface 20 Plane of the one end less than road surface 20;The fixed column 40 at least wants two, when the fixed column 40 is not inverted " u " font, institute One end that fixed column 40 is stated towards road surface 20 is bending, and the one end for the fixed column 40 for making is towards ground 10, the fixation for so making Post one end is generally the tire of pointed damage vehicle, or safety for jeopardizing people etc. of basseting.
S4, being provided with cast concrete or asphalt mixture in the breakage 30 of fixed column 40, and solidify.
Wherein, step S2 can be exchanged with step S3, and concrete glue, photocuring are provided with optic-solidified adhesive Glue can be UV glue, and concrete glue can be cloud stone glue.
It is understandable to enable the above objects, features and advantages of the present invention to become apparent from, above in conjunction with accompanying drawing to the present invention Specific embodiment be described in detail.Elaborate many details in order to fully understand this in superincumbent description It is bright.But the present invention can be implemented with being much different from alternate manner described above, and those skilled in the art can be not Similar improvement is done in the case of running counter to intension of the present invention, therefore the present invention is not limited by particular embodiments disclosed above.And And, each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not in above-described embodiment The all possible combination of each technical characteristic be all described, if however, there is no contradiction in the combination of these technical characteristics, All it is considered to be the scope of this specification record.
Embodiment described above only expresses the several embodiments of the present invention, and its description is more concrete and detailed, but and Therefore the restriction to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art For, without departing from the inventive concept of the premise, some deformations and improvement can also be made, these belong to the guarantor of the present invention Shield scope.Therefore, the protection domain of patent of the present invention should be defined by claims.

Claims (10)

1. a kind of road damage revamping method, it is characterised in that comprise the following steps:
S1, using giant by breakage washes clean, and be dried process;The dried can pass through hot blast Or natural drying method is realizing;
S2, the breakage after by S1 process spray optic-solidified adhesive, selectivity solidification, and the optic-solidified adhesive for making is formed and specifies big Little mesh;
S3, located at optic-solidified adhesive breakage in be provided with some fixed columns;And the fixed column is less than near the one end on road surface The plane on road surface;
S4, concrete or asphalt mixture are poured into a mould in the breakage for be provided with fixed column, and solidified.
2. a kind of road damage revamping method according to claim 1, it is characterised in that the fixed column is provided with branch Structure, and the branched structure is at an acute angle towards one end of ground with the fixed column.
3. a kind of road damage revamping method according to claim 2, it is characterised in that the branched structure is solid with described Fixed column is at an acute angle towards one end of ground, and the acute angle is less than or equal to 80 °, and not less than 25 °.
4. a kind of road damage revamping method according to claim 1, it is characterised in that the fixed column is reinforcing bar.
5. a kind of road damage revamping method according to claim 3, it is characterised in that the acute angle is less than or equal to 60 °, And not less than 30 °.
6. a kind of road damage revamping method according to claim 1, it is characterised in that be additionally provided with fixed net, it is described solid Determine Netcom and cross fixed column to be fixed in the breakage.
7. a kind of road damage revamping method according to claim 6, it is characterised in that the fixed column is through fixed net Mesh, fixed net is fixed;The fixed net is wire netting.
8. a kind of road damage revamping method according to claim 6, it is characterised in that the fixed net is at least two Gap is provided between individual and adjacent fixed net.
9. a kind of road damage revamping method according to claim 8, it is characterised in that between the adjacent fixed net Gap is provided with not less than 50mm;Or not less than 45mm;Or not less than 40mm;Or not less than 30mm.
10. a kind of road damage revamping method according to claim 1, it is characterised in that the fixed column is at least two Root.
CN201710006214.3A 2017-01-05 2017-01-05 Damaged road repairing method Pending CN106677046A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710006214.3A CN106677046A (en) 2017-01-05 2017-01-05 Damaged road repairing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710006214.3A CN106677046A (en) 2017-01-05 2017-01-05 Damaged road repairing method

Publications (1)

Publication Number Publication Date
CN106677046A true CN106677046A (en) 2017-05-17

Family

ID=58849874

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710006214.3A Pending CN106677046A (en) 2017-01-05 2017-01-05 Damaged road repairing method

Country Status (1)

Country Link
CN (1) CN106677046A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101994284A (en) * 2009-08-27 2011-03-30 王可权 Method for repairing broken asphalt pavement
CN102219437A (en) * 2011-05-11 2011-10-19 邓敬森 Cement concrete material for rapid repairing of road and preparation method thereof
CN102953308A (en) * 2012-05-17 2013-03-06 湖南大学 Construction method of bamboo wood reinforcement bidirectional enhanced part-cut and part-fill weak roadbed
US20140017004A1 (en) * 2011-05-19 2014-01-16 Geary Trust, The Pothole and utility cut repair overlay and method of installation
CN105071308A (en) * 2015-09-10 2015-11-18 江苏省电力公司金湖县供电公司 Repair method of damaged cable

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101994284A (en) * 2009-08-27 2011-03-30 王可权 Method for repairing broken asphalt pavement
CN102219437A (en) * 2011-05-11 2011-10-19 邓敬森 Cement concrete material for rapid repairing of road and preparation method thereof
US20140017004A1 (en) * 2011-05-19 2014-01-16 Geary Trust, The Pothole and utility cut repair overlay and method of installation
CN102953308A (en) * 2012-05-17 2013-03-06 湖南大学 Construction method of bamboo wood reinforcement bidirectional enhanced part-cut and part-fill weak roadbed
CN105071308A (en) * 2015-09-10 2015-11-18 江苏省电力公司金湖县供电公司 Repair method of damaged cable

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
钱军: "水泥混凝土路面的维护与修补", 《中国新技术新产品》 *

Similar Documents

Publication Publication Date Title
Qu et al. Investigation and verification on seismic behavior of precast concrete frame piers used in real bridge structures: Experimental and numerical study
CN107553693B (en) The preparation method of crash bearer
CN107905109A (en) The loads such as the cast-in-place platform simulation of great-leap-forward bridge are segmented precompressed construction method
CN204644890U (en) The external prestressing intelligence Strengthening and Monitoring system of Hollow Slab Beam Bridge
CN106758871A (en) A kind of full cantilever construction prestressed concrete continuous rigid-framed bridge and its construction method
CN106049289B (en) Bailey beam make-shift bridge transform the construction method of steel reinforced concrete combination permanent bridge as
CN107119602A (en) Suitable for the anticollision guardrail structure and its construction method of Expressway Extension Project
CN110485314A (en) Highway T beam spells wide structure and method under a kind of operation state
CN207376392U (en) A kind of road damage revamping structure
JP6166454B1 (en) Construction method of artificial ground on semi-underground road
CN106677046A (en) Damaged road repairing method
CN106758662A (en) A kind of road damage revamping structure
CN206448129U (en) One kind carries fixed column road damage revamping structure
CN211690084U (en) Pavement additional paving structure using existing waveform guard bar
CN110331667A (en) When being open to traffic under execution conditions bridge joining method
CN209099165U (en) A kind of expanded joint structure suitable for bridge
CN113901554A (en) Power transmission line crossing construction method based on unmanned aerial vehicle modeling and BIM technology
CN204982748U (en) Device is increased to frame -type concrete guardrail
CN211735059U (en) Prefabricated assembly type prestressed concrete guardrail reservation platform
CN212612617U (en) Open-hole type cast-in-place concrete template supporting device
Rocchetti RC traffic barrier with GFRP reinforcement
Pilko Roundabout design guidelines: Case study of Croatia
Arampatzis et al. Road safety audit on a freeway: Proposed countermeasures
CN104652206A (en) Assembled urban interchange system
CN102444094A (en) Method for improving reinforcing and anti-dazzle facilities of wave-form beam guardrail of central partition zone of expressway

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170517

RJ01 Rejection of invention patent application after publication