CN106655222A - 一种将ups进行集群管理参与电网功率调整的方法 - Google Patents
一种将ups进行集群管理参与电网功率调整的方法 Download PDFInfo
- Publication number
- CN106655222A CN106655222A CN201611035720.7A CN201611035720A CN106655222A CN 106655222 A CN106655222 A CN 106655222A CN 201611035720 A CN201611035720 A CN 201611035720A CN 106655222 A CN106655222 A CN 106655222A
- Authority
- CN
- China
- Prior art keywords
- power
- ups
- upss
- factor
- power adjustment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/24—Arrangements for preventing or reducing oscillations of power in networks
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
本发明涉及一种将UPS进行集群管理参与电网功率调整的方法,本方法广泛运用于电力辅助服务交易市场的领域。本方法主要包括:利用现有变电站UPS的可调容量或对其进行适当经济扩容,建立UPS电能资源协调控制系统将这些分布于各个变电站的UPS小容量可调电能资源进行汇聚整合,形成具有一定规模大容量的可调电能资源;依据当前电网运行方式及功率调整要求,调度自动化系统系统通过电力数据专网通道向UPS控制系统发送功率调整指令并在设备侧执行,实现电网的总体功率调整目标。本发明的主旨是利用有效的、可调的电能资源,提供一种新的电网自动功率调整方式,充分利用闲置的大量UPS的电能资源,减少对电厂发电机组设备的寿命损害,保障电网的经济、稳定运行。
Description
技术领域
本技术运用于电力辅助服务交易市场的领域。
背景技术
保障电网安全、优质、经济运行是调度运行部门主要的工作责任,在电网正常供电的过程中,供电是有质量要求的,其中,电网的频率调整尤其重要。目前,为保证电网的运行频率变化在安全范围内,主要是通过AGC等系统实现电网的自动功率调整,达到电网的稳定运行。AGC是指发电机组提供足够的可调整容量及一定的调节速率,在允许的调节偏差下实时跟踪频率,以满足系统频率稳定的需求,这需要运行人员手动或者自动操作发电机调节器,这样的方式极大地减少了设备运行的寿命周期。
发明内容
为了解决上述问题,本发明的目的是在于提供一种新的电网功率调整方式,应用互联网共享思路和物联网技术,利用整合分散变电站UPS的可调电能资源来进行电网的频率自动调整方法,其技术特征如下步骤:
步骤1、利用分散变电站UPS的可调电能资源或者对现有的UPS进行扩容,并将其进行汇聚整合、集群控制,形成一定规模的大容量的可调的电能资源库;
步骤2、建立UPS电能量充放协调控制系统。在电力调度主站建立主站协控系统,监测各UPS的设备状态,可接收调度自动化系统的功率调整指令并根据规则计算后,对各个变电站UPS发送充放电指令。在变电站端建立UPS协控子站系统,通过电力调度数据专网接收主站协控系统发出的指令并在设备侧执行,向主站上传各个UPS的状态数据;
步骤3、调度自动化系统分析当前电网运行方式、频率、电能量平衡等信息,计算出电网的实时功率调整目标,并根据预制的功率调整规则,计算出利用UPS进行功率调整的指标参数;
步骤4、调度自动化系统将功率调整目标数据发送UPS协控系统主站侧,协控系统根据各个UPS的可调容量及设备状态等信息,计算得出每个UPS的调控指标,并通过电力调度数据专网下发至子站系统,各个UPS进行电能充放,以此达到电网自动功率调整。
附图说明
图1将UPS进行集群管理参与电网功率调整的方法原理图。
图2将UPS进行集群管理参与电网功率调整的方法数据流转示意图。
具体实施方式
以下结合附图对本发明实施方式做进一步详述。
一种将UPS进行集群管理参与电网功率调整的方法,是基于图1所示的原理和图2所示的数据流转方式实现的。该方法主要的实施步骤如下:
1、调度自动化系统系统依据电网功率调整的范围及调整规则,将得到的数据进行计算、分析,得到电网实时功率调整的目标及调整指标参数,并发送给UPS协控主站系统;
2、UPS协控主站系统收到功率调整信息,通过对各变电站设备的运行情况及各变电站可调电能资源进行计算分析,规划各变电站UPS电能量调节分配表;
3、根据电能量分配表,UPS协控主站系统把功率调整指令及参数分配给变电站UPS协控子站系统;
4、变电站UPS协控子站系统计算每个UPS的调控指标,并向站内的UPS发送具体的功率调整指令;
5、站内的各UPS执行充放电指令;
6、执行操作结果通过协控子站系统、协控主站系统逆向传输到调度自动化系统;
7、变电站UPS协控子站系统实时的将站内的UPS等信息及时上送给UPS协控主站系统,该信息主要包括:设备运行状态的监控、站内UPS剩余电容量等信息;
8、UPS协控主站系统将分散的各变电站UPS信息整合,上送给调度自动化系统系统;
9、调度自动化系统系统将数据进行备份、整理,作为电网功率调整分析的数据基础;且实时监视各变电站站内运行的设备。
Claims (3)
1.一种将UPS进行集群管理参与电网功率调整的方法,根据其权利要求其特征在于:利用物联网技术对现有广泛分布部署的UPS中的闲置容量进行汇聚整合、集群控制,建立一定规模容量的“虚拟集群发电机”,用于电网自动功率调整。
2.一种将UPS进行集群管理参与电网功率调整的方法,根据其权利要求其特征在于:建立新的UPS电能量充放协调控制系统,通过电力调度数据专网通道,对各个UPS设备进行状态监测及充放电控制。
3.一种将UPS进行集群管理参与电网功率调整的方法,根据其权利要求其特征在于:基于影响因素分层评价方法建立集群UPS调节顺序表。根据设备健康状态、设备参与调节的频次及输出功率等因素,建立多层因素分析算法,确定以上各影响因素权重;运用定量分析法确定各因素的评价结果,最终形成集群UPS调节顺序表。
(1)建立多层因素评价算法。分析收集影响UPS设备状态的各因素量,包括设备健康状态、设备参与调节的频次及输出频率等进行分类,建立评价模型的递阶层次结构,确立清晰的因素量体系。
(2)运用多层因素评价算法确定各影响因素量的权重。方法为:确定两两比较判断矩阵;计算同一层次所有元素的组合权重,给出因素集V={,,…,},子因素集Vi={,,…,}。确定比较判断矩阵的方法为:由专家利用1-9比例标度法分别对每一层次的评估状态量的相对重要进行定义,并用准确的数值量化表示,确定两两比较判断矩阵;因素集V={,,…,}中各因素相对于总的评估结果。
(3)建立可调节影响因素定量评价算法,一次求出各层因素量的评价结果,其中Y为权重向量,为评价值,设定S的评价范围为(0-10);运用定量分析方法确定可调节顺序表。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611035720.7A CN106655222A (zh) | 2016-11-23 | 2016-11-23 | 一种将ups进行集群管理参与电网功率调整的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611035720.7A CN106655222A (zh) | 2016-11-23 | 2016-11-23 | 一种将ups进行集群管理参与电网功率调整的方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106655222A true CN106655222A (zh) | 2017-05-10 |
Family
ID=58811034
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611035720.7A Pending CN106655222A (zh) | 2016-11-23 | 2016-11-23 | 一种将ups进行集群管理参与电网功率调整的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106655222A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108401473A (zh) * | 2017-07-28 | 2018-08-14 | 深圳欣锐科技股份有限公司 | 一种大功率模块化ups系统 |
CN111082868A (zh) * | 2019-11-26 | 2020-04-28 | 上海电力设计院有限公司 | 一种发电集群通信共享系统及方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105703457A (zh) * | 2016-01-20 | 2016-06-22 | 慈松 | 一种基站机房ups铅酸电池管控方法与装置 |
CN106096285A (zh) * | 2016-06-16 | 2016-11-09 | 东北电力大学 | 一种储能系统应对高风电渗透率系统调频需求效用评估方法 |
CN206211657U (zh) * | 2016-12-07 | 2017-05-31 | 中国电建集团成都勘测设计研究院有限公司 | 水电站集控中心双套不间断电源供电系统 |
-
2016
- 2016-11-23 CN CN201611035720.7A patent/CN106655222A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105703457A (zh) * | 2016-01-20 | 2016-06-22 | 慈松 | 一种基站机房ups铅酸电池管控方法与装置 |
CN106096285A (zh) * | 2016-06-16 | 2016-11-09 | 东北电力大学 | 一种储能系统应对高风电渗透率系统调频需求效用评估方法 |
CN206211657U (zh) * | 2016-12-07 | 2017-05-31 | 中国电建集团成都勘测设计研究院有限公司 | 水电站集控中心双套不间断电源供电系统 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108401473A (zh) * | 2017-07-28 | 2018-08-14 | 深圳欣锐科技股份有限公司 | 一种大功率模块化ups系统 |
WO2019019183A1 (zh) * | 2017-07-28 | 2019-01-31 | 深圳欣锐科技股份有限公司 | 一种大功率模块化ups系统 |
CN108401473B (zh) * | 2017-07-28 | 2021-06-18 | 深圳欣锐科技股份有限公司 | 一种大功率模块化ups系统 |
CN111082868A (zh) * | 2019-11-26 | 2020-04-28 | 上海电力设计院有限公司 | 一种发电集群通信共享系统及方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101340095B (zh) | 用于配电网的无功分层自适应控制方法 | |
CN103248056B (zh) | 一种风电场集中并网地区的无功电压紧急控制方法 | |
US20150311710A1 (en) | A time based global optimization dispatching method | |
CN112966882B (zh) | 一种基于时空全局匹配的配电网调度方法 | |
CN113364055B (zh) | 一种源网荷储网络化协调频率控制方法 | |
CN108494034A (zh) | 一种配电网电动汽车充电负荷分配计算方法 | |
CN104600695A (zh) | 基于在线状态估计和实时调度计划的趋势潮流计算方法 | |
CN108336766A (zh) | 一种储能系统多智能体协同控制方法及装置 | |
CN106558876B (zh) | 一种交直流混合主动配电网的运行控制方法 | |
CN106992526A (zh) | 一种分层分布式的光伏接入配电网电压控制系统及方法 | |
CN109508891A (zh) | 一种储能电站综合性能评估方法和装置 | |
CN112994097A (zh) | 一种基于智能配变终端系统的高比例分布式光伏协同控制方法 | |
CN104158187A (zh) | 一种局域电网能量和功率二次分配的控制方法及控制系统 | |
CN101764404B (zh) | 省地协调电压控制中省地协调运行状态的判断方法 | |
CN109617099A (zh) | 一种虚拟储能协调控制系统及其方法 | |
CN104600708B (zh) | 含svg的风电场自动电压控制分配方法 | |
CN113285475A (zh) | 一种基于边云协同计算的多储能联合优化主动调控方法 | |
CN106786624B (zh) | 一种全网无功电压优化分层控制方法及系统 | |
CN106655222A (zh) | 一种将ups进行集群管理参与电网功率调整的方法 | |
MansourLakouraj et al. | Multi-timescale risk-constrained volt/var control of distribution grids with electric vehicles and solar inverters | |
CN104836227A (zh) | 基于案例推理的配电网主动电压控制方法 | |
Kiani et al. | ADMM-based hierarchical single-loop framework for EV charging scheduling considering power flow constraints | |
CN107732947A (zh) | 一种用于能源互联网的需求响应系统及方法 | |
CN117057547A (zh) | 智慧能源服务平台多形态负荷资源调度模型构建方法、装置、存储介质 | |
CN105337257B (zh) | 一种基于中心服务器实现站域保护定值自适应的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170510 |