CN106651151A - Post-evaluation method for electric energy substitute item - Google Patents
Post-evaluation method for electric energy substitute item Download PDFInfo
- Publication number
- CN106651151A CN106651151A CN201611104701.5A CN201611104701A CN106651151A CN 106651151 A CN106651151 A CN 106651151A CN 201611104701 A CN201611104701 A CN 201611104701A CN 106651151 A CN106651151 A CN 106651151A
- Authority
- CN
- China
- Prior art keywords
- index
- evaluation
- subsystem
- level
- electric energy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000011156 evaluation Methods 0.000 title claims abstract description 128
- 230000008901 benefit Effects 0.000 claims abstract description 62
- 230000007613 environmental effect Effects 0.000 claims abstract description 29
- 238000010276 construction Methods 0.000 claims abstract description 22
- 238000004458 analytical method Methods 0.000 claims description 16
- 238000005265 energy consumption Methods 0.000 claims description 16
- 238000007726 management method Methods 0.000 claims description 15
- 238000013461 design Methods 0.000 claims description 12
- 238000010438 heat treatment Methods 0.000 claims description 12
- 239000003344 environmental pollutant Substances 0.000 claims description 6
- 231100000719 pollutant Toxicity 0.000 claims description 6
- 238000005516 engineering process Methods 0.000 claims description 5
- 230000033228 biological regulation Effects 0.000 claims description 4
- 238000011234 economic evaluation Methods 0.000 claims description 4
- 239000003245 coal Substances 0.000 claims description 3
- 238000002485 combustion reaction Methods 0.000 claims description 3
- 238000002360 preparation method Methods 0.000 claims description 3
- 238000013278 delphi method Methods 0.000 claims description 2
- 239000007787 solid Substances 0.000 claims description 2
- 230000017525 heat dissipation Effects 0.000 claims 1
- 238000000034 method Methods 0.000 abstract description 10
- 230000008569 process Effects 0.000 abstract description 3
- 230000009466 transformation Effects 0.000 description 11
- 238000012986 modification Methods 0.000 description 4
- 230000004048 modification Effects 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 238000013210 evaluation model Methods 0.000 description 3
- MWUXSHHQAYIFBG-UHFFFAOYSA-N nitrogen oxide Inorganic materials O=[N] MWUXSHHQAYIFBG-UHFFFAOYSA-N 0.000 description 3
- 238000003556 assay Methods 0.000 description 2
- 238000009826 distribution Methods 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 235000006508 Nelumbo nucifera Nutrition 0.000 description 1
- 240000002853 Nelumbo nucifera Species 0.000 description 1
- 235000006510 Nelumbo pentapetala Nutrition 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 239000000523 sample Substances 0.000 description 1
- 239000002910 solid waste Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0635—Risk analysis of enterprise or organisation activities
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
- Y02P90/82—Energy audits or management systems therefor
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Educational Administration (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The embodiment of the invention provides a post-evaluation method for an electric energy substitute item. The method comprises the steps of S1, establishing an electric energy substitute item evaluation system, wherein the electric energy substitute item evaluation system comprises at least one of the subsystems: a construction process evaluation subsystem which is used for evaluating the whole construction process of the electric energy substitute item, a technical performance evaluation subsystem which is used for evaluating the performance of the electric energy substitute item, an economic benefit evaluation subsystem which is used for evaluating the economic benefit of the electric energy substitute item, a social benefit evaluation subsystem which is used for evaluating the social benefit of the electric energy substitute item and an environmental benefit evaluation subsystem which is used for evaluating the environmental benefit of the electric energy substitute item; S2, establishing a level index for each subsystem, wherein each subsystem at least comprises a first-level index, and each first-level index comprises N second-level indexes, and the N is equal to 0, 1, 2 and the like; and S3, evaluating the electric energy substitute item according to the level index and the electric energy substitute item evaluation system.
Description
Technical field
The invention belongs to areas of information technology, more particularly to a kind of electric energy alternatives purpose post evaluation method.
Background technology
Transformation project is substituted as China carries out electric energy so far, there are multiple provinces to carry out extremely successful electric energy and replaced
For transformation project, the construction mode for adapting to local heat supply and energy saving requirement is explored, to local heat capacity and energy-conservation effect
Fruit is lifted and serves positive impetus.
In order to production not to society, life are impacted, it is necessary to which the science that electric energy substitutes transformation project is commented
Estimate, with quantitatively evaluating electric energy substitute modification scheme quality, when need to electric energy substitute project carry out post-evaluation.One rationally,
It is right that science, effective, accurate electric energy substitute transformation Post-assessment Method needs:How program evaluation result;Whether construction scheme closes
Reason;How quantificational description electric energy substitutes the aspects such as the implementation result of modification measures carries out research and probe.
Traditional electric energy substitutes appraisal mainly includes the individual events such as heat capacity, security reliability, economic benefit assessment;
But this traditional appraisal procedure lacks the assessment to project social environment and energy consumption level after transformation, is still unable to effective evaluation
The practical problem such as project energy-saving effect and social environment benefit.Therefore, urgent need is a kind of more comprehensively, comprehensively and accurately electric energy is replaced
For the post evaluation method of transformation project.
The content of the invention
For in prior art for electric energy substitute when project carries out further evaluation not enough comprehensively and appraisal procedure is poor
Problem, the purpose of the embodiment of the present invention is to provide a kind of effective and efficient electric energy alternatives purpose post evaluation method.
In order to solve the above problems, the embodiment of the present invention proposes a kind of electric energy alternatives purpose post evaluation method, and it is special
Levy and be, comprise the following steps:
Step 1, set up electric energy substitute project evaluation system;Wherein described electric energy substitutes project evaluation system including following
At least one subsystem:For assessing the work progress evaluation subsystem of the whole work progress of electric energy replacement project, for assessing
Electric energy substitutes the technical performance evaluation subsystem of project performance, the economic benefit for assessing electric energy replacement Project Economy Benefit and comments
Valency subsystem, for assess electric energy substitute project social benefit evaluation on social benefits subsystem, for assessing electric energy alternatives
The assessment on environmental benefits subsystem of mesh environmental benefit;
Step 2, set up level index for each subsystem;Wherein described each subsystem at least includes first class index, and
Each first class index include N number of two-level index, N=0,1,2 ...;
Step 3, project evaluation system is substituted according to level index and electric energy, project is substituted to electric energy and is estimated.
Wherein, the step 2 is specifically included:
Set up work progress and evaluate the level index of subsystem including one level below index:Pre-Stage Decision-Making, design prepare, apply
Work is built, operational management;
The level index of technical performance evaluation subsystem includes one level below index:Heating system energy consumption index, building
Heat consumption, promotion equipment, architecture science are reduced energy consumption;
The level index of evaluation of economic benefit subsystem includes one level below index:Financial evaluation, economic evaluation;
The level index of evaluation on social benefits subsystem includes one level below index:Energy-saving index, resource can be referred to using row
Mark, sustainability index, socioeconomic impact;
The level index of assessment on environmental benefits subsystem includes one level below index:Disposal of pollutants index, environmental quality refer to
Mark, disposal of three wastes index, Environmental costs evaluation.
Wherein, it is that at least one of level index first class index sets up two-level index, specifically includes:
Set up work progress and evaluate the Pre-Stage Decision-Making first class index of subsystem including following two-level index:Feelings processed can be compiled carefully
Condition, amount of energy saving predictablity rate, construction work regulation;
Set up work progress and evaluate the design preparation first class index of subsystem including following two-level index:Planning and designing feelings
Condition, bidding management situation;
Set up work progress and evaluate the construction first class index of subsystem including following two-level index:Construction project time management
Situation, Safety Management situation, construction quality administrative situation;
Set up work progress and evaluate the operation management first class index of subsystem including following two-level index:Ground System Construction feelings
Condition, coal combustion equipment mortality, energy consumption platform service condition, energy-saving equipment put into operation situation;
The heating system energy consumption index first class index of technical performance evaluation subsystem includes following two-level index:Primary energy
Utilization rate, the thermal efficiency, for thermal comfort, for thermal safety, reliability of heat-supply system;
The heat consumption of building first class index of technical performance evaluation subsystem includes following two-level index:Heating Design heat is negative
Lotus, design space-heating load compliance rate, heat consumption of building;
Evaluation of economic benefit subsystem specifically includes following two-level index:Net present value (NPV), investment payback time, total return of investment
Rate, Thermo-economic Evaluation, Environmental Economics evaluation;
Evaluation on social benefits subsystem specifically includes following two-level index:Ten thousand yuan of output value comprehensive energy consumption rates of descent, area Jing
Ji promotion rate, power-saving technology utilization rate;
The following two-level index of pollutant emission first class index of assessment on environmental benefits subsystem:Gaseous effluent, solid row
Put thing, noise pollution.
Wherein, the step 3 is specifically included:
Stepwise level evaluation analysis model is passed in step 31, generation, and described passing in stepwise level evaluation analysis model is each
Level index all gives weighted value, and wherein first class index is the weighted value sum of its corresponding subordinate's index;
Step 32, using indexs at different levels recursion layer by layer, to obtain final comprehensive score.
Wherein, the step 32 is specifically included:
Work progress evaluates the comprehensive score of subsystem:
P1=a1×l1+a2×l2+…+an×ln
Wherein (l1, l2..., ln) it is that work progress evaluates the index set that the first class index and two-level index of subsystem are generated,
(a1, a2..., an) it is the corresponding weighted value of each index;
The comprehensive score of technical performance evaluation subsystem is:
P2=b1×m1+b2×m2+…+bn×mn
Wherein (m1,m2,…,mn) for technical performance evaluation subsystem first class index and two-level index generate index set,
(b1,b2,…,bn) it is the corresponding weighted value of each index;
The comprehensive score of evaluation of economic benefit subsystem is:
P3=c1×n1+c2×n2+…+cn×nn
Wherein (n1,n2,…,nn) for evaluation of economic benefit subsystem first class index and two-level index generate index set,
(c1,c2,…,cn) it is the corresponding weighted value of each index;
The comprehensive score of evaluation on social benefits subsystem is:
P4=d1×o1+d2×o2+…+dn×on
Wherein (o1,o2,…,on) for evaluation on social benefits subsystem first class index and two-level index generate index set,
(d1,d2,…,dn) it is the corresponding weighted value of each index;
The comprehensive score of assessment on environmental benefits subsystem is:
P5=e1×p1+e2×p2+…+en×pn
Wherein (p1, p2..., pn) for assessment on environmental benefits subsystem first class index and two-level index generate index set,
(e1, e2..., en) the corresponding weighted value of each index.
Wherein, the step 32 also includes:
Most subordinate index in each subsystem is carried out into calculating scoring and obtains bottom index score value;
According to passing stepwise level evaluation analysis model, start to calculate analysis successively to upper strata that to obtain other at different levels from the bottom
Score value;
Project is substituted to electric energy according to the score values at different levels of subsystem and makes overall merit.
The beneficial effects of the present invention is:
1. the present invention is selected during carrying out being assessed after electric energy substitutes transformation project by segmenting the content of bottom index
, so that achievement data regulation and standardization, it is ensured that the accuracy of assessment result.
2. index system proposed by the invention contains work progress, technical performance, economic benefit, social benefit and ring
The multinomial electric energy such as border benefit substitutes the index evaluated, the features such as highlighting electric energy and substitute adaptability, the harmony of transformation project;Point
Analyse and set up electric energy and substitute transformation project appraisement system, evaluation model, evaluation criterion and evaluation criterion weight, can be from multiple
Angle quantitative reaction implements the reducing energy consumption level after electric energy is substituted.
3. the present invention had both considered the professional experiences of industry specialists, turn avoid the larger subjective judgement of deviation so that refer to
Mark weight is more accurate.
Description of the drawings
Fig. 1 is electric energy alternatives purpose post evaluation method schematic diagram;
Fig. 2 is that electric energy substitutes project post evaluation method analysis model structure chart;
Fig. 3 is that work progress evaluates subsystem structure chart;
Fig. 4 is technical performance evaluation subsystem structure chart;
Fig. 5 is evaluation of economic benefit subsystem structure chart;
Fig. 6 is evaluation on social benefits subsystem structure chart;
Fig. 7 is assessment on environmental benefits subsystem structure chart.
Specific embodiment
In order that the objects, technical solutions and advantages of the present invention become more apparent, below in conjunction with accompanying drawing, the present invention is entered
One step is described in detail.It should be appreciated that specific embodiment described herein is not used to limit this only to explain the present invention
Invention.
Below in conjunction with the accompanying drawings and embodiments of the invention are further illustrated to the method for rear assessment.
As shown in figure 1, electric energy alternatives purpose post evaluation method of the present invention at least includes four steps:
S1. evaluation system after electric energy replacement project is set up.
It is described to set up evaluation system after electric energy replacement project and comprise the following steps:
1) determination of subsystem:By substituting the machine operation in comprehensive Quantified Evaluation model, equipment water to electric energy
The distribution situation of flat, the project implementation process, traffic-operating period, the ability for affecting and energy saving being substituted with reference to electric energy, setting is evaluated
Subsystem.
Fig. 2 show one embodiment of the present of invention, and evaluation system includes after electric energy replacement project:Work progress evaluates son
System, technical performance evaluation subsystem, evaluation of economic benefit subsystem, evaluation on social benefits subsystem, assessment on environmental benefits
System.
2) determination of pointer type:With cost type, profit evaluation model, moderate type index sorting technique as foundation, according to step
1) selected evaluation subsystem selects then one-level evaluation index.
3) determination of lower floor's index:According to step 2) selected one-level evaluation index determines other lower floor's indexs.
Fig. 3 show one embodiment of the present of invention, and work progress evaluates subsystem scope entirely implementing for project
Journey, including Pre-Stage Decision-Making, design preparation, construction, operational management one-level evaluation index.Wherein, Pre-Stage Decision-Making one-level is evaluated
Index includes:Situation processed, amount of energy saving predictablity rate, construction plan regulation two-level appraisement index can be compiled carefully;Design prepares one
Level evaluation index includes:Planning and designing situation, bidding management situation two-level appraisement index;Construction one-level evaluation index bag
Include:Construction project time management situation, Safety Management situation, construction quality administrative situation two-level appraisement index;Operation management one
Level evaluation index includes:Local System Construction situation, coal combustion equipment mortality, energy consumption platform service condition, energy-saving equipment put into operation
Situation two-level appraisement index.
Fig. 4 show one embodiment of the present of invention, and the main purpose of technical performance evaluation subsystem is the evaluation of science
Heating system energy consumption index, building's heat consumption index, promotion equipment, architecture science are reduced energy consumption, including heat supply system
System energy consumption index, building's heat consumption index one-level evaluation index.Wherein:Heating system energy consumption one-level evaluation index includes:One
Secondary energy utilization rate, the thermal efficiency, for thermal comfort index, heat supply safety index, reliability of heat-supply system index two-level appraisement index;Building
Material consumption heat one-level evaluation index includes:Design space-heating load, design space-heating load compliance rate, building's heat consumption index
Two-level appraisement index.
Fig. 5 show one embodiment of the present of invention, and evaluation of economic benefit subsystem comments benefit evaluation with technical performance
Valency combines, and the comprehensive function effect of indices is embodied in different classes of benefit, and by cost effectiveness (CE) project is reacted
The level of profitability.By project net present value method, general item investment income approach, period of investment recovery from time index, value index,
Objective evaluation electric energy more comprehensive than forthright index substitutes the income of transformation project.Evaluate from thermoeconomics and Environmental Economics angle
Project economics.Wherein:Financial evaluation one-level evaluation index includes:Net present value (NPV), investment payback time, two grades of the rate of return on total investment are commented
Valency index;Financial evaluation one-level evaluation index includes:Thermo-economic Evaluation, Environmental Economics evaluate two-level appraisement index.
Fig. 6 show one embodiment of the present of invention, and whether the assessment of evaluation on social benefits subsystem is from being conducive to society to send out
The angle of exhibition, construction and the impact of the enforcement to related social factor of comprehensive assay project, that is, carry out social assessment.Including
Row index, sustainability index, socioeconomic impact one-level evaluation index can be utilized including energy-saving index, resource.Wherein:Society
Economic impact one-level evaluation index includes:Regional economy promotion rate, power-saving technology utilization rate, ten thousand yuan of output value comprehensive energies decline
Rate two-level index.
Fig. 7 show one embodiment of the present of invention, and whether the assessment of assessment on environmental benefits subsystem is from being conducive to environment to send out
The angle of exhibition, the impact built with enforcement to Related Environmental Factors of comprehensive assay project, that is, carry out environmental evaluation.Including
Disposal of pollutants index, environmental quality indicators, disposal of three wastes index, Environmental costs evaluate one-level evaluation index.Wherein, pollutant row
Putting index includes reducing discharging CO2, nitrogen oxides, noise, solid waste two-level index.
S2. level evaluation analysis model is set up.
Using stepwise level evaluation analysis model is passed, the model gives weight using linear analysis function pair index at different levels
Value;Upper strata index considers respective weights value superposition gained by lower floor's index;Layer by layer recursion obtains final comprehensive score to indexs at different levels.
Electric energy is substituted transformation evaluation score and is calculated using linear relationship formula:
P1=A1×X1+A2×X2+…+An×Xn
Wherein (X1, X2..., Xn) be index set, (A1, A2..., An) it is each index weights.
Work progress evaluates subsystem and each level evaluation index score is calculated using linear relationship formula:
P1=a1×l1+a2×l2+…+an×ln
Wherein (l1, l2..., ln) be index set, (a1, a2..., an) it is each index weights.
Technical performance evaluation subsystem and each level evaluation index score are calculated using linear relationship formula:
P2=b1×m1+b2×m2+…+bn×mn
Wherein (m1,m2,…,mn) be index set, (b1,b2,…,bn) it is each index weights.
Evaluation of economic benefit subsystem and each level evaluation index score are calculated using linear relationship formula:
P3=c1×n1+c2×n2+…+cn×nn
Wherein (n1,n2,…,nn) be index set, (c1,c2,…,cn) it is each index weights.
Evaluation on social benefits subsystem and each level evaluation index score are calculated using linear relationship formula:
P4=d1×o1+d2×o2+…+dn×on
Wherein (o1,o2,…,on) be index set, (d1,d2,…,dn) it is each index weights.
Assessment on environmental benefits subsystem and each level evaluation index score are calculated using linear relationship formula:
P5=e1×p1+e2×p2+…+en×pn
Wherein (p1, p2..., pn) be index set, (e1, e2..., en) it is each index weights.
S3. the weight of each index in each evaluation system is obtained.
The weight of indexs at different levels is obtained using Delphi method.
S4. assessment result is obtained by model analysis.
First evaluation system Zhong subordinate index is carried out into calculating scoring and obtain bottom index score value;Then according to analysis
Model calculates layer by layer analysis and obtains other score values at different levels;Finally according to system score values at different levels to power distribution network Energy-saving Projects
Make overall merit.
The above is the preferred embodiment of the present invention, it is noted that for those skilled in the art
For, on the premise of without departing from principle of the present invention, some improvements and modifications can also be made, these improvements and modifications
Should be regarded as protection scope of the present invention.
Claims (7)
1. a kind of electric energy alternatives purpose post evaluation method, it is characterised in that comprise the following steps:
Step 1, set up electric energy substitute project evaluation system;Wherein the electric energy substitute project evaluation system include it is following at least
One subsystem:For assessing the work progress evaluation subsystem of the whole work progress of electric energy replacement project, for assessing electric energy
The technical performance evaluation subsystem of replacement project performance, evaluation of economic benefit for assessing electric energy replacement Project Economy Benefit
System, for assess electric energy substitute project social benefit evaluation on social benefits subsystem, for assess electric energy substitute project ring
The assessment on environmental benefits subsystem of border benefit;
Step 2, set up level index for each subsystem;Wherein described each subsystem at least includes first class index, and described
Each first class index include N number of two-level index, N=0,1,2 ...;
Step 3, project evaluation system is substituted according to level index and electric energy, project is substituted to electric energy and is estimated.
2. electric energy alternatives purpose post evaluation method according to claim 1, it is characterised in that the step 2 is specifically wrapped
Include:
Set up work progress and evaluate the level index of subsystem including one level below index:Pre-Stage Decision-Making, design prepare, construction is built
If, operational management;
The level index of technical performance evaluation subsystem includes one level below index:Heating system energy consumption index, building heat dissipation
Amount;
The level index of evaluation of economic benefit subsystem includes one level below index:Financial evaluation, economic evaluation;
The level index of evaluation on social benefits subsystem includes one level below index:Energy-saving index, resource can using row index, can
Continuation index, socioeconomic impact;
The level index of assessment on environmental benefits subsystem includes one level below index:Disposal of pollutants index, environmental quality indicators, three
It is useless to administer index, Environmental costs evaluation.
3. electric energy alternatives purpose post evaluation method according to claim 2, it is characterised in that in level index extremely
A few first class index sets up two-level index, specifically includes:
Set up work progress and evaluate the Pre-Stage Decision-Making first class index of subsystem including following two-level index:Situation processed, section can be compiled carefully
Energy predicting accuracy rate, construction work regulation;
Set up work progress and evaluate the design preparation first class index of subsystem including following two-level index:Planning and designing situation, trick
Bidding management situation;
Set up work progress and evaluate the construction first class index of subsystem including following two-level index:Construction project time management feelings
Condition, Safety Management situation, construction quality administrative situation;
Set up work progress and evaluate the operation management first class index of subsystem including following two-level index:Ground System Construction situation,
Coal combustion equipment mortality, energy consumption platform service condition, energy-saving equipment put into operation situation;
The heating system energy consumption index first class index of technical performance evaluation subsystem includes following two-level index:Primary energy is utilized
Rate, the thermal efficiency, for thermal comfort, for thermal safety, reliability of heat-supply system;
The heat consumption of building first class index of technical performance evaluation subsystem includes following two-level index:Design space-heating load,
Design space-heating load compliance rate, heat consumption of building;
Evaluation of economic benefit subsystem specifically includes following two-level index:Net present value (NPV), investment payback time, the rate of return on total investment, heat
Economics Evaluation, Environmental Economics evaluation;
Evaluation on social benefits subsystem specifically includes following two-level index:Ten thousand yuan of output value comprehensive energy consumption rates of descent, regional economy promote
Enter rate, power-saving technology utilization rate;
The following two-level index of pollutant emission first class index of assessment on environmental benefits subsystem:Gaseous effluent, solid emission,
Noise pollution.
4. electric energy alternatives purpose post evaluation method according to claim 1, it is characterised in that the step 3 is specifically wrapped
Include:
Stepwise level evaluation analysis model is passed in step 31, generation, and described passing in stepwise level evaluation analysis model is that every one-level refers to
Mark all gives weighted value, and wherein first class index is the weighted value sum of its corresponding subordinate's index;
Step 32, using indexs at different levels recursion layer by layer, to obtain final comprehensive score.
5. electric energy alternatives purpose post evaluation method according to claim 4, it is characterised in that the step 32 is specifically wrapped
Include:
Work progress evaluates the comprehensive score of subsystem:
P1=a1×l1+a2×l2+…+an×ln
Wherein (l1, l2..., ln) it is that work progress evaluates the index set that the first class index and two-level index of subsystem are generated, (a1,
a2..., an) it is the corresponding weighted value of each index;
The comprehensive score of technical performance evaluation subsystem is:
P2=b1×m1+b2×m2+…+bn×mn
Wherein (m1,m2,…,mn) for technical performance evaluation subsystem first class index and two-level index generate index set, (b1,
b2,…,bn) it is the corresponding weighted value of each index;
The comprehensive score of evaluation of economic benefit subsystem is:
P3=c1×n1+c2×n2+…+cn×nn
Wherein (n1,n2,…,nn) for evaluation of economic benefit subsystem first class index and two-level index generate index set, (c1,
c2,…,cn) it is the corresponding weighted value of each index;
The comprehensive score of evaluation on social benefits subsystem is:
P4=d1×o1+d2×o2+…+dn×on
Wherein (o1,o2,…,on) for evaluation on social benefits subsystem first class index and two-level index generate index set, (d1,
d2,…,dn) it is the corresponding weighted value of each index;
The comprehensive score of assessment on environmental benefits subsystem is:
P5=e1×p1+e2×p2+…+en×pn
Wherein (p1, p2..., pn) for assessment on environmental benefits subsystem first class index and two-level index generate index set, (e1,
e2..., en) the corresponding weighted value of each index.
6. electric energy alternatives purpose post evaluation method according to claim 5, it is characterised in that the step 32 is also wrapped
Include:
Most subordinate index in each subsystem is carried out into calculating scoring and obtains bottom index score value;
According to passing stepwise level evaluation analysis model, start to calculate analysis successively to upper strata from the bottom and obtain other and at different levels comment
Score value;
Project is substituted to electric energy according to the score values at different levels of subsystem and makes overall merit.
7. electric energy alternatives purpose post evaluation method according to claim 4, it is characterised in that adopt in the step 31
Delphi method obtains the weight of index.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611104701.5A CN106651151A (en) | 2016-12-05 | 2016-12-05 | Post-evaluation method for electric energy substitute item |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611104701.5A CN106651151A (en) | 2016-12-05 | 2016-12-05 | Post-evaluation method for electric energy substitute item |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106651151A true CN106651151A (en) | 2017-05-10 |
Family
ID=58818589
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611104701.5A Pending CN106651151A (en) | 2016-12-05 | 2016-12-05 | Post-evaluation method for electric energy substitute item |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106651151A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108009748A (en) * | 2017-12-22 | 2018-05-08 | 东南大学 | A kind of electric energy substitutes project effects of energy saving and emission reduction evaluation method |
CN108305018A (en) * | 2018-03-16 | 2018-07-20 | 肖鑫茹 | A kind of accurate clean manufacturing benefit evaluation system of evaluation |
CN108665161A (en) * | 2018-05-09 | 2018-10-16 | 国网山东省电力公司青岛供电公司 | A kind of electric energy replacement potentiality measuring and calculating service system |
CN110910011A (en) * | 2019-11-20 | 2020-03-24 | 国网安徽省电力有限公司电力科学研究院 | Operation method for implementing electric energy replacement strategy based on environmental protection target constraint |
CN113643153A (en) * | 2021-08-13 | 2021-11-12 | 南京工程学院 | Electric energy substitution diffusion analysis method taking enterprise as main body |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013012133A (en) * | 2011-06-30 | 2013-01-17 | Chugoku Electric Power Co Inc:The | Calculation support system for repair cost of generator and transformer and calculation support method for the same |
CN105023059A (en) * | 2015-07-09 | 2015-11-04 | 国家电网公司 | Electric power replacement comprehensive benefit evaluation method based on net income investment ratio method |
CN105844399A (en) * | 2016-03-22 | 2016-08-10 | 国家电网公司 | Post evaluation method of power distribution network energy-saving reconstruction project |
-
2016
- 2016-12-05 CN CN201611104701.5A patent/CN106651151A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013012133A (en) * | 2011-06-30 | 2013-01-17 | Chugoku Electric Power Co Inc:The | Calculation support system for repair cost of generator and transformer and calculation support method for the same |
CN105023059A (en) * | 2015-07-09 | 2015-11-04 | 国家电网公司 | Electric power replacement comprehensive benefit evaluation method based on net income investment ratio method |
CN105844399A (en) * | 2016-03-22 | 2016-08-10 | 国家电网公司 | Post evaluation method of power distribution network energy-saving reconstruction project |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108009748A (en) * | 2017-12-22 | 2018-05-08 | 东南大学 | A kind of electric energy substitutes project effects of energy saving and emission reduction evaluation method |
CN108009748B (en) * | 2017-12-22 | 2021-11-12 | 东南大学 | Energy-saving emission-reducing effect evaluation method for electric energy substitution project |
CN108305018A (en) * | 2018-03-16 | 2018-07-20 | 肖鑫茹 | A kind of accurate clean manufacturing benefit evaluation system of evaluation |
CN108305018B (en) * | 2018-03-16 | 2022-11-18 | 中环联合(北京)认证中心有限公司 | Accurate clean production benefit evaluation system of evaluation |
CN108665161A (en) * | 2018-05-09 | 2018-10-16 | 国网山东省电力公司青岛供电公司 | A kind of electric energy replacement potentiality measuring and calculating service system |
CN108665161B (en) * | 2018-05-09 | 2022-05-27 | 国网山东省电力公司青岛供电公司 | Electric energy substitution potential measuring and calculating service system |
CN110910011A (en) * | 2019-11-20 | 2020-03-24 | 国网安徽省电力有限公司电力科学研究院 | Operation method for implementing electric energy replacement strategy based on environmental protection target constraint |
CN113643153A (en) * | 2021-08-13 | 2021-11-12 | 南京工程学院 | Electric energy substitution diffusion analysis method taking enterprise as main body |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106651151A (en) | Post-evaluation method for electric energy substitute item | |
Geng et al. | Recent progress on innovative eco-industrial development | |
Zhang et al. | Evaluating the relationships among economic growth, energy consumption, air emissions and air environmental protection investment in China | |
Lin et al. | A model for developing a target integrated low carbon city indicator system: The case of Xiamen, China | |
CN105844399A (en) | Post evaluation method of power distribution network energy-saving reconstruction project | |
Zeng et al. | Mitigation paths for Chinese iron and steel industry to tackle global climate change | |
Yu et al. | An environmental fairness based optimisation model for the decision-support of joint control over the water quantity and quality of a river basin | |
Guo et al. | Simulation evaluation of urban low-carbon competitiveness of cities within Wuhan city circle in China | |
CN106779165A (en) | Power system environment dispatching method based on urban air-quality Predicting Technique | |
Liu et al. | A linguistic group decision-making framework for bid evaluation in mega public projects considering carbon dioxide emissions reduction | |
Elzarka et al. | A vague set fuzzy multi-attribute group decision-making model for selecting onsite renewable energy technologies for institutional owners of constructed facilities | |
Wu et al. | Key driving forces on the development of low carbon city (LCC) in China | |
CN103455718A (en) | Energy utilization efficiency evaluation method and system | |
Tabata et al. | Life cycle assessment of integrated municipal solid waste management systems, taking account of climate change and landfill shortage trade-off problems | |
CN111967721A (en) | Comprehensive energy system greening level evaluation method and system | |
Liu et al. | The potential for carbon reduction in construction waste sorting: A dynamic simulation | |
CN106056307A (en) | Electric power replacement technology comprehensive benefit assessment method based on comprehensive weighting method | |
Zou et al. | Factor reallocation and cost pass-through under the carbon emission trading policy: Evidence from Chinese metal industrial chain | |
Liu et al. | Emergy-based urban dynamic modeling of long-run resource consumption, economic growth and environmental impact: conceptual considerations and calibration | |
Gan et al. | Optimization path of Economy-Society-Ecology system orienting industrial structure adjustment: evidence from Sichuan Province in China | |
Wang et al. | Energy efficiency evaluation of key energy consumption sectors in China based on a macro-evaluating system | |
CN101246566A (en) | Building continuous design method based on full life cycle cost estimation | |
Deru et al. | Improving sustainability of buildings through a performance-based design approach | |
Kong et al. | Environmental and economic multi-objective optimization of comprehensive energy industry: A case study | |
Huang et al. | Balancing the water-energy dilemma in nexus system planning with bi-level and multi-uncertainty |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170510 |
|
RJ01 | Rejection of invention patent application after publication |