CN106650053A - USRAMS-based optimization design method of rainwater pipe network - Google Patents

USRAMS-based optimization design method of rainwater pipe network Download PDF

Info

Publication number
CN106650053A
CN106650053A CN201611110069.5A CN201611110069A CN106650053A CN 106650053 A CN106650053 A CN 106650053A CN 201611110069 A CN201611110069 A CN 201611110069A CN 106650053 A CN106650053 A CN 106650053A
Authority
CN
China
Prior art keywords
shp
storm sewer
design
sewer network
usrams
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611110069.5A
Other languages
Chinese (zh)
Other versions
CN106650053B (en
Inventor
周玉文
娄富豪
刘子龙
张静
刘原
卢兴超
吴献平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing University of Technology
Original Assignee
Beijing University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Technology filed Critical Beijing University of Technology
Priority to CN201611110069.5A priority Critical patent/CN106650053B/en
Publication of CN106650053A publication Critical patent/CN106650053A/en
Application granted granted Critical
Publication of CN106650053B publication Critical patent/CN106650053B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/15Vehicle, aircraft or watercraft design

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

An USRAMS-based optimization design method of a rainwater pipe network belongs to the crossing field of drainage pipe line design and hydraulic models. Aiming at the imperfection of the rational formula method and the requirements of the new version Outdoor Drainage Specifications, the invention is based on rainwater pipe network design data to establish a USRAMS rainwater pipe network hydraulic model; kinematic wave is adopted for simulating calculation; pipe section overload is used as the verification standard according to the model results; the design scheme is optimized according to the model results so that the reliability of rainwater pipe network design is increased. The number of required parameters is less and the parameters are easy to obtain; the runoff coefficient and the water catchment time can be directly obtained; the process of establishing models is simple and quick; the model results are reliable; the applicability of the method is guaranteed; the method has operability; complicated programming is not required; steps can be finished by means of present software; the operation is simple and easy; the feasibility of the invention is guaranteed.

Description

A kind of Optimal Design of Stom Sewer Networks method based on USRAMS
Technical field
The present invention relates to a kind of Optimal Design of Stom Sewer Networks method based on USRAMS, belongs to waste pipe-network design and waterpower Modelling technique crossing domain.
Background technology
China's design of rainwater system, carries out pipe network and sets using push pull azobenzene compounds with reference to steady uniform flow theory for a long time Meter is calculated, and the method is only applicable to the design of smaller area, application and larger charge for remittance basin due to the restriction of itself applicable elements When, its computational accuracy is low.New edition《Code for design of outdoor sewerage engineering》(GB 50014-2006) regulation is when catchment area is more than 2km2 When, rainwater design is preferably checked and adjusted using mathematical model method.With the issue of new edition outdoor drainage specification, modelling technique Start to promote in China, the such as MIKE URBAN of Denmark DHI companies, the particularly ICM of Wallingford companies of Britain, the U.S. The SWMM modeling tools software of EPA companies is used widely at home.
Urban waterlogging risk analysis model system (Urban StormWater Risk Analysis Modeling System) (abbreviation USRAMS) is by the independent development on the basis of studying for many years of supply and drain water system research department of Beijing University of Technology 's.USRAMS is mainly made up of one-dimensional pipe net leakage rate simulation calculating section with two-dimentional earth's surface waterflooding simulation calculating section, supports one Dimension pipe network is calculated with the coupled simulation of two-dimentional earth's surface, and the built-in module storehouse ArcEngine provided based on ArcGIS is developed, Using the map data management platform ArcGIS of current main-stream as the management system of underlying database, adopt Layer data storehouse system based on MicrosoftAccess databases.USRAMS is using domestic conventional SWMM at present as one The computing engines of dimension pipe net leakage rate water force, and isochrone module is with the addition of on this basis so that software is more conformed to China's actual conditions, using the waterlogging waterflooding computing engines of independent research in two-dimentional overland flow is calculated, based on path tracing And principle of water balance carries out two-dimentional earth's surface waterflooding sunykatuib analysis.USRAMS make use of well the data processing work(of ArcGIS Can, can be very good the process that pipe net leakage rate basic data is carried out by ArcGIS.
At present, according to new edition《Code for design of outdoor sewerage engineering》Require, the Designed recurrence period of China's Storm Sewer Network has brought up to 3 To 5 years, method for designing still continued to use push pull azobenzene compounds, in order that pipe network system is safer《Specification》Regulation reduction coefficient m values Take 1.Push pull azobenzene compounds are the Process of Confluence that pipe network is calculated based on constant hydraulics theory, are managed using steady flow theory The hydrodynamics process of net is calculated, and its feature is to apply simple, but there is also many practical problems and be difficult to solve.Reasoning is public Formula method is determining the charge for remittance time, the true remittance of pipeline not to be simulated by discharge curve according to time of flowing full flowing Stream process.And more accurately to simulate pipe network Process of Confluence need to adopt based on the unsteady flow algorithm of Saint-venant Equations, The unsteady flow motion of Saint-venant Equations description is the long wave propagation phenomenon in a kind of shallow water, commonly referred to dynamic wave, because Predominant intermolecular forces for water movement are gravity, belong to the category of gravitational wave, such as ignore Inertia and pressure in the equation of motion , only considering the impact of frictional resistance and base slope, the motion after simplifying described by equation group is referred to as kinematic wave.
Kinematic wave calculation method is, using the reduced form of each pipe duct equation of momentum, to solve continuity equation.With motion Pipe duct water surface slope is equal to pipe duct base slope when ripple is calculated, and the maximum stream flow that can be conveyed by pipe duct, is pipe duct flowing full normal water Fluxion value, the calculation of this kind of form does not account for backwater effect, and outlet/inlet loss, current are reversed or pressure current, also limited For dendritic network topology.From the closest (water surface slope of design conditions of waterpower theory, kinematic wave method and push pull azobenzene compounds Degree is equal to pipeline base slope, and maximum stream flow is pipe duct normal water flow valuve), therefore need to be with fortune when push pull azobenzene compounds design result is checked Dynamic ripple method.
For the defect and new edition of push pull azobenzene compounds《Outdoor drainage specification》Requirement, propose it is a kind of based on USRAMS's Optimal Design of Stom Sewer Networks method.USRAMS Storm Sewer Network hydraulic models are built based on Storm Sewer Network design data, using motion Ripple be simulated calculate, according to model result by pipeline section overload (as shown in figure 1, pipeline section operation water level elevation be higher than pipe crest level, But the phenomenon on ground is not out, it is not allow presence to overload in design of pipe networks) as the standard of check, according to model result pair Design is optimized, so as to reach the purpose for improving Storm Sewer Network designed reliability.
The content of the invention
The present invention predominantly overcomes the shortcoming of push pull azobenzene compounds, using hydraulic model technology improve Storm Sewer Network design can By property, the Storm Sewer Network to being designed with push pull azobenzene compounds carries out check optimization.Using USRAMS and hydraulics general principle, propose A kind of Optimal Design of Stom Sewer Networks method based on USRAMS.
Technical scheme is as follows:
A kind of Optimal Design of Stom Sewer Networks method based on USRAMS is comprised the steps of successively:
(1) by inference equation completes Preliminary design to Storm Sewer Network;
According to new edition《Code for design of outdoor sewerage engineering》(GB 50014-2006) ground inlet time t15~15min is taken, if Count weight current P to take 3~5 years, runoff coefficient Ψ is obtained by all kinds of floor areas with calculated with weighted average method, reduction coefficient m values take 1, Rain Intensity Formula Based parameter chooses local parameter.The first of Storm Sewer Network is completed using existing achievements of a ruler municipal pipeline design software Step design, and export the Storm Sewer Network Hydraulic Calculating Table of .xls forms and the Storm Sewer Network floor plan of .dwg forms.
(2) Storm Sewer Network is processed with the GISization of water catchment area data
(2.1) GISization of Storm Sewer Network data is processed
In the Storm Sewer Network Hydraulic Calculating Table of the .xls forms that Preliminary design is obtained Storm Sewer Network information according to The call format of CADTableConvert softwares is pasted in the text of .txt forms, and text is named as Y.txt, reads Y.txt texts, using CADTableConvert softwares using existing CADTableConvert softwares In GIS transformation functions complete the GISization of Storm Sewer Network, finally using output Shape functions by the Storm Sewer Network after GISization Inspection shaft, delivery port, pipeline section is output as respectively .shp formatted files, and be respectively designated as inspection shaft .shp, delivery port .shp, Pipeline section .shp.
(2.2) GISization of water catchment area data is processed
The .dwg formatted files that Preliminary design is obtained are loaded in ArcGIS softwares, and using SQL statement cad file is selected " Layer " in Ploygon figure layers=' all elements of HY_YS_AREA_BORDERLING', selected element is exported as into .shp Formatted file is simultaneously named as face .shp while being loaded in ArcGIS softwares.Rebuild the word of loaded .shp formatted files Section, addition numbering (Text types), delivery port (Text types) field, using field calculator input " numbering "=' Sub'&'FID' For number field assignment.The inspection shaft .shp files that step (2.1) is obtained are loaded in ArcGIS, using in ArcGIS Face .shp and inspection shaft .shp are set up corresponding relation by Spatial Join instruments, and in making it with step (1) Preliminary design Corresponding relation is consistent, using the input of field calculator " face. delivery port "=' inspection shaft. numbering ' be face .shp file water outlets Mouth field assignment, output face .shp is simultaneously named as water catchment area .shp.
(3) USRAMS Storm Sewer Networks hydraulic model builds
(3.1) design Storm Sewer Network data are imported
The inspection shaft .shp obtained in step (2), delivery port .shp, pipeline section .shp, water catchment area .shp files are imported to In USRAMS software Access databases, while the rainfall gauge field unification of water catchment area .shp files is entered as into RG1, during charge for remittance Between, runoff coefficient field be entered as t respectively1、Ψ。
(3.2) Chicago rainfall pattern is built
The Designed recurrence period P according to selected by local Rain Intensity Formula Based and step (1), is generated using existing Chicago rainfall pattern Device builds Chicago rainfall pattern, and its moderate rain peak coefficient r takes 0.3~0.5, time interval and takes 1min, rainfall duration T and takes 180min.Will The precipitation time series file of generation is imported in USRAMS models.
(4) USRAMS Storm Sewer Networks hydraulic model operation is calculated
Delivery type material calculation is 1min, run time takes 3h, report time step-length and takes 1min, the selection of earth's surface Confluence Model Isochrone, pipe network Confluence Model choose kinematic wave, and moving model after the completion of parameter setting preserves mould after model running terminates Type result.
(5) Storm Sewer Network design result is optimized according to model result
According to model result for exist pipeline section overload pipeline section, with reference to pipeline section max calculation flow choose again caliber with The gradient, while being modified to pipeline section using the modification caliber in achievements of a ruler Municipal Pipe-line Software, modification gradient order so as to excessively stream Ability be equal to max calculation flow, treat to it is all overload pipeline sections modification after the completion of, using achievements of a ruler Municipal Pipe-line Software to modification after Storm Sewer Network retried, and again export .xls forms Storm Sewer Network Hydraulic Calculating Table.
Till the no overloading of repeat step (1)~step (5) all pipeline sections in model result.
Beneficial effect of the present invention is mainly reflected in:
1. method of the present invention is adopted, traditional push pull azobenzene compounds can be overcome the shortcomings of, using modelling technique rain is made Grid design result is relatively reliable, and the planning and designing for Storm Sewer Network provide guidance.
2. this patent methods described desired parameters are few and can be easily obtained, runoff coefficient, the charge for remittance time can direct access, model Build process simple and fast, model result reliability, it is ensured that the applicability of method.
3. this patent methods described has operability, the programming without the need for carrying out complexity, only need to be by existing soft Part can complete each step, and operation is simple, easily realizes, it is ensured that the exploitativeness of this patent.
Description of the drawings:
Fig. 1 is pipeline overload schematic diagram
Fig. 2 is the workflow schematic diagram of " a kind of Optimal Design of Stom Sewer Networks method based on USRAMS " of the invention.
Before the optimization of Fig. 3 pipelines
After the optimization of Fig. 4 pipelines
Specific embodiment:
The present invention's is embodied as flow process as shown in Fig. 2 comprising the following steps:
(1) according to new edition《Code for design of outdoor sewerage engineering》(GB 50014-2006) ground inlet time t15~15min is taken, Designed recurrence period P takes 3~5 years, and runoff coefficient Ψ is obtained by all kinds of floor areas with calculated with weighted average method, reduction coefficient m values 1 is taken, Rain Intensity Formula Based parameter chooses local parameter.Storm Sewer Network is completed using existing achievements of a ruler municipal pipeline design software Preliminary design, and export the Storm Sewer Network Hydraulic Calculating Table of .xls forms and the Storm Sewer Network floor plan of .dwg forms.
(2) in the Storm Sewer Network Hydraulic Calculating Table of the .xls forms for obtaining Preliminary design Storm Sewer Network information according to The call format of CADTableConvert softwares is pasted in the text of .txt forms, and text is named as Y.txt, reads Y.txt texts, using CADTableConvert softwares using existing CADTableConvert softwares In GIS transformation functions complete the GISization of Storm Sewer Network, finally using output Shape functions by the Storm Sewer Network after GISization Inspection shaft, delivery port, pipeline section is output as respectively .shp formatted files, and be respectively designated as inspection shaft .shp, delivery port .shp, Pipeline section .shp.
(3) the .dwg formatted files for obtaining Preliminary design are loaded in ArcGIS softwares, and using SQL statement CAD is selected " Layer " in file Ploygon figure layers=' all elements of HY_YS_AREA_BORDERLING', selected element is exported as .shp formatted file and face .shp is named as while being loaded in ArcGIS softwares.Rebuild loaded .shp formatted files Field, addition numbering (Text types), delivery port (Text types) field, using field calculator input " numbering "=' Sub'&' FID' is number field assignment.The inspection shaft .shp files that step (2) is obtained are loaded in ArcGIS, using in ArcGIS Face .shp and inspection shaft .shp are set up corresponding relation by Spatial Join instruments, and in making it with step (1) Preliminary design Corresponding relation is consistent, using the input of field calculator " face. delivery port "=' inspection shaft. numbering ' be face .shp file water outlets Mouth field assignment, output face .shp is simultaneously named as water catchment area .shp.
(4) inspection shaft .shp, delivery port .shp, pipeline section .shp, the water catchment area that will be obtained in step (2)~step (3) .shp file is imported in USRAMS software Access databases, while the rainfall gauge field unification of water catchment area .shp files is assigned It is worth for RG1, charge for remittance time, runoff coefficient field are entered as respectively t1、Ψ。
(5) the Designed recurrence period P according to selected by local Rain Intensity Formula Based and step (1), using existing Chicago rainfall pattern Maker builds Chicago rainfall pattern, and its moderate rain peak coefficient r takes 0.3~0.5, time interval and takes 1min, rainfall duration T and takes 180min.The precipitation time series file of generation is imported in USRAMS models.
(6) delivery type material calculation is that 1min, run time take 3h, report time step-length and take 1min, earth's surface Confluence Model Choose isochrone, pipe network Confluence Model and choose kinematic wave, moving model after the completion of parameter setting is protected after model running terminates Deposit model result.
(7) pipe is chosen according to model result again for the pipeline section that there is pipeline section overload with reference to pipeline section max calculation flow Footpath and the gradient, while being modified to pipeline section using the modification caliber in achievements of a ruler Municipal Pipe-line Software, modification gradient order so as to Conveyance capacity is equal to max calculation flow, after the completion for the treatment of to all overload pipeline section modifications, using achievements of a ruler Municipal Pipe-line Software to repairing Storm Sewer Network after changing is retried, and exports the Storm Sewer Network Hydraulic Calculating Table of .xls forms again.
(8) till the no overloading of repeat step (1)~step (7) all pipeline sections in model result.
Effect explanation:
Explanation is compared with the effect before and after the pipeline section optimization between inspection shaft YDX446 and inspection shaft YDX444, is optimized In front and back effect is as shown in Figure 3, Figure 4.
Compared according to effect before and after Fig. 3, Fig. 4 optimization, there is pipeline overloading before pipeline optimization, do not deposited after pipeline optimization In pipeline overloading, the exploitativeness of this patent is illustrated.

Claims (1)

1. a kind of Optimal Design of Stom Sewer Networks method based on USRAMS, it is characterised in that comprise the following steps:
(1) by inference equation completes Preliminary design to Storm Sewer Network;
According to《Code for design of outdoor sewerage engineering》Ground inlet time t15~15min is taken, Designed recurrence period P takes 3~5 years, runoff system Number Ψ is obtained by all kinds of floor areas with calculated with weighted average method, and reduction coefficient m values take 1, and Rain Intensity Formula Based parameter is chosen and worked as Ground parameter;The Preliminary design of Storm Sewer Network is completed using existing achievements of a ruler municipal pipeline design software, and exports .xls forms The Storm Sewer Network floor plan of Storm Sewer Network Hydraulic Calculating Table and .dwg forms;
(2) Storm Sewer Network is processed with the GISization of water catchment area data
(2.1) GISization of Storm Sewer Network data is processed
In the Storm Sewer Network Hydraulic Calculating Table of the .xls forms that Preliminary design is obtained Storm Sewer Network information according to The call format of CADTableConvert softwares is pasted in the text of .txt forms, and text is named as Y.txt, reads Y.txt texts, using CADTableConvert softwares using existing CADTableConvert softwares In GIS transformation functions complete the GISization of Storm Sewer Network, finally using output Shape functions by the Storm Sewer Network after GISization Inspection shaft, delivery port, pipeline section is output as respectively .shp formatted files, and be respectively designated as inspection shaft .shp, delivery port .shp, Pipeline section .shp;
(2.2) GISization of water catchment area data is processed
The .dwg formatted files that Preliminary design is obtained are loaded in ArcGIS softwares, and using SQL statement cad file is selected " Layer " in Ploygon figure layers=' all elements of HY_YS_AREA_BORDERLING', selected element is exported as into .shp Formatted file is simultaneously named as face .shp while being loaded in ArcGIS softwares;Rebuild the word of loaded .shp formatted files Section, addition numbering, delivery port field, using field calculator input " numbering "=' Sub'&'FID' be number field assignment;Will The inspection shaft .shp files that step (2.1) is obtained are loaded in ArcGIS, will using the Spatial Join instruments in ArcGIS Face .shp and inspection shaft .shp sets up corresponding relation, and it is consistent with the corresponding relation in step (1) Preliminary design, profit With the input of field calculator " face. delivery port "=' inspection shaft. numbering ' be face .shp file delivery port field assignment, output face .shp and it is named as water catchment area .shp;
(3) USRAMS Storm Sewer Networks hydraulic model builds
(3.1) design Storm Sewer Network data are imported
The inspection shaft .shp obtained in step (2), delivery port .shp, pipeline section .shp, water catchment area .shp files are imported to In USRAMS software Access databases, while the rainfall gauge field unification of water catchment area .shp files is entered as into RG1, during charge for remittance Between, runoff coefficient field be entered as t respectively1、Ψ;
(3.2) Chicago rainfall pattern is built
The Designed recurrence period P according to selected by local Rain Intensity Formula Based and step (1), using existing Chicago rainfall pattern maker structure Chicago rainfall pattern is built, its moderate rain peak coefficient r takes 0.3~0.5, time interval and takes 1min, rainfall duration T and takes 180min;To generate Precipitation time series file import in USRAMS models;
(4) USRAMS Storm Sewer Networks hydraulic model operation is calculated
Delivery type material calculation is 1min, run time takes 3h, report time step-length and takes the streams such as 1min, the selection of earth's surface Confluence Model When line, pipe network Confluence Model choose kinematic wave, moving model after the completion of parameter setting, after model running terminates preservation model knot Really;
(5) Storm Sewer Network design result is optimized according to model result
According to model result for the pipeline section that there is pipeline section overload, caliber and slope are chosen again with reference to pipeline section max calculation flow Degree, while being modified to pipeline section using the modification caliber in achievements of a ruler Municipal Pipe-line Software, modification gradient order so as to excessively stream energy Power is equal to max calculation flow, after the completion for the treatment of to all overload pipeline section modifications, using achievements of a ruler Municipal Pipe-line Software to amended Storm Sewer Network is retried, and exports the Storm Sewer Network Hydraulic Calculating Table of .xls forms again;
Till the no overloading of repeat step (1)~step (5) all pipeline sections in model result.
CN201611110069.5A 2016-12-06 2016-12-06 Rainwater pipe network optimization design method based on USRAMS Expired - Fee Related CN106650053B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611110069.5A CN106650053B (en) 2016-12-06 2016-12-06 Rainwater pipe network optimization design method based on USRAMS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611110069.5A CN106650053B (en) 2016-12-06 2016-12-06 Rainwater pipe network optimization design method based on USRAMS

Publications (2)

Publication Number Publication Date
CN106650053A true CN106650053A (en) 2017-05-10
CN106650053B CN106650053B (en) 2020-07-31

Family

ID=58818480

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611110069.5A Expired - Fee Related CN106650053B (en) 2016-12-06 2016-12-06 Rainwater pipe network optimization design method based on USRAMS

Country Status (1)

Country Link
CN (1) CN106650053B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107742170A (en) * 2017-10-25 2018-02-27 天津大学 A kind of storm sewer system the Hydraulic Design parameter optimization method
CN108132984A (en) * 2017-12-14 2018-06-08 重庆大学 Pipe network repetition period of rainfall rendering intent, device and computer readable storage medium
CN110147574A (en) * 2019-04-16 2019-08-20 吉林大学珠海学院 Auxiliary design method, system and the storage medium of roofing siphon storm-water system
CN110298075A (en) * 2019-05-23 2019-10-01 深圳市规划国土发展研究中心 Graph model processing method is opened based on ArcGIS+InfoWorks ICM Municipal flowing line one
CN111709108A (en) * 2019-12-27 2020-09-25 广州市市政工程设计研究总院有限公司 Pollution emission reduction analysis method and system based on big data
CN113806901A (en) * 2021-09-27 2021-12-17 福州城建设计硏究院有限公司 Method for optimizing rainwater pipe system designed based on rainwater management model and storage device
CN114564774A (en) * 2022-01-26 2022-05-31 同济大学 Push method and model method coupling interactive driving design and modeling method for rainwater pipe duct

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102890792A (en) * 2011-07-20 2013-01-23 北京源汇远科技有限公司 Municipal drainage pipe network decision evaluation method
CN103902783A (en) * 2014-04-11 2014-07-02 北京工业大学 Draining pipeline network optimizing method based on generalized reverse learning difference algorithm
CN105224747A (en) * 2015-10-06 2016-01-06 北京工业大学 Based on the urban waterlogging model building method of CAD engineering drawing information and design of pipe networks reckoner

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102890792A (en) * 2011-07-20 2013-01-23 北京源汇远科技有限公司 Municipal drainage pipe network decision evaluation method
CN103902783A (en) * 2014-04-11 2014-07-02 北京工业大学 Draining pipeline network optimizing method based on generalized reverse learning difference algorithm
CN105224747A (en) * 2015-10-06 2016-01-06 北京工业大学 Based on the urban waterlogging model building method of CAD engineering drawing information and design of pipe networks reckoner

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
杨伟明等: "基于CADTableConvert和雨水管网设计计算表的自动SWMM水力模型构建方法研究", 《给水排水》 *
杨祺琪等: "基于SWMM和改进差分进化算法的雨水管网优化方法", 《中国给水排水》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107742170A (en) * 2017-10-25 2018-02-27 天津大学 A kind of storm sewer system the Hydraulic Design parameter optimization method
CN108132984A (en) * 2017-12-14 2018-06-08 重庆大学 Pipe network repetition period of rainfall rendering intent, device and computer readable storage medium
CN108132984B (en) * 2017-12-14 2021-10-22 重庆大学 Rendering method and device for rainfall recurrence period of pipe network and computer readable storage medium
CN110147574A (en) * 2019-04-16 2019-08-20 吉林大学珠海学院 Auxiliary design method, system and the storage medium of roofing siphon storm-water system
CN110147574B (en) * 2019-04-16 2022-12-13 吉林大学珠海学院 Auxiliary design method and system for roof siphon rainwater system and storage medium
CN110298075A (en) * 2019-05-23 2019-10-01 深圳市规划国土发展研究中心 Graph model processing method is opened based on ArcGIS+InfoWorks ICM Municipal flowing line one
CN110298075B (en) * 2019-05-23 2022-09-23 深圳市规划国土发展研究中心 Urban municipal drainage pipeline one-map modeling processing method based on ArcGIS + InfoWorks ICM
CN111709108A (en) * 2019-12-27 2020-09-25 广州市市政工程设计研究总院有限公司 Pollution emission reduction analysis method and system based on big data
CN111709108B (en) * 2019-12-27 2024-01-23 广州市市政工程设计研究总院有限公司 Pollution emission reduction analysis method and system based on big data
CN113806901A (en) * 2021-09-27 2021-12-17 福州城建设计硏究院有限公司 Method for optimizing rainwater pipe system designed based on rainwater management model and storage device
CN114564774A (en) * 2022-01-26 2022-05-31 同济大学 Push method and model method coupling interactive driving design and modeling method for rainwater pipe duct

Also Published As

Publication number Publication date
CN106650053B (en) 2020-07-31

Similar Documents

Publication Publication Date Title
CN106650053A (en) USRAMS-based optimization design method of rainwater pipe network
CN105224747B (en) Urban waterlogging model building method based on CAD engineering drawings information and design of pipe networks computational chart
CN105117572B (en) Automatic SWMM hydraulic models construction method based on Storm Sewer Network design schedule
CN105117573B (en) Auto hydraulic model building method based on CAD drainage pipeline networks drawing informations
CN105138707B (en) A kind of SWMM hydraulic model input file Inp document generating methods based on GIS model databases
CN103366067B (en) The method of simulation and prediction fluid torque-converter performance
CN103258235B (en) A kind of water supply network reorganization and expansion optimization method based on improving artificial fish-swarm algorithm
CN103309727B (en) A kind of vane pump cavitation numerical simulation automatic operation method based on ANSYS-CFX software
CN110689283A (en) River system and canal system staggered system water supply simulation method and device based on underground water model
CN110889160A (en) Municipal pipeline construction method based on BIM technology
CN108614915B (en) Hydrological model free construction strategy method based on scene driving
CN109635501A (en) A kind of reduction water supply network leakage loss method based on hydraulic model
CN108647778A (en) Dynamic prediction method for drainage flow of drainage port of urban rainwater system
CN115270241A (en) Design method and system of multi-bucket siphon roof drainage system
CN103559399A (en) Water transportation pipe network leakage positioning method based on Bayesian decision theory and genetic algorithm
Li et al. Non-dominated sorting genetic algorithms-iibased on multi-objective optimization model in the water distribution system
Wei et al. Application of BIM technology in building water supply and drainage design
Wu et al. Numerical investigation of dissolved oxygen transportation through a coupled SWE and Streeter–Phelps model
CN114896891A (en) Steam simulation calculation method based on error correction of nuclear extreme learning machine
CN117764001A (en) CFD and Modelica-based building siphon drainage pipe network optimization method, device and medium
WO2024148660A1 (en) Indirect liquid level monitoring and analysis method for urban drainage system based on directed topological network
CN110298075A (en) Graph model processing method is opened based on ArcGIS+InfoWorks ICM Municipal flowing line one
Geller et al. Effect of modeling setup parameters in SWMM predictions of large-scale tunnel filling
陈曦 et al. Multi-objective optimization of an improved Xin'anjiang model: A case study in Linhuanji catchment
Fisher-Jeffes et al. A simple economic model for the comparison of SUDS and conventional drainage systems in South Africa

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200731