CN106647591B - A kind of logistics center's energy consumption and disposal of pollutants monitoring and assessment system - Google Patents

A kind of logistics center's energy consumption and disposal of pollutants monitoring and assessment system Download PDF

Info

Publication number
CN106647591B
CN106647591B CN201710055520.6A CN201710055520A CN106647591B CN 106647591 B CN106647591 B CN 106647591B CN 201710055520 A CN201710055520 A CN 201710055520A CN 106647591 B CN106647591 B CN 106647591B
Authority
CN
China
Prior art keywords
energy consumption
disposal
pollutants
value
server
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710055520.6A
Other languages
Chinese (zh)
Other versions
CN106647591A (en
Inventor
张永
杨泽洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201710055520.6A priority Critical patent/CN106647591B/en
Publication of CN106647591A publication Critical patent/CN106647591A/en
Application granted granted Critical
Publication of CN106647591B publication Critical patent/CN106647591B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/048Monitoring; Safety

Abstract

The invention discloses a kind of logistics center's energy consumption and disposal of pollutants monitoring and assessment systems, including cargo handling process cyclic control system, transportational process cyclic control system, circulation and process process cyclic control system, sort process cyclic control system, storage process cyclic control system and director server, each process cyclic control system includes equipment, executing agency, detector, communication system and process server, process servers can judge whether equipment is in optimum Working at this time according to the detection data that detector is sent, when process servers detect that equipment is not in optimum Working at this time, process servers can alarm or are adjusted to equipment;All detection datas that all process cyclic control systems of director server are sent, which summarize, to be preserved and carries out energy consumption and disposal of pollutants data analysis and formulate governing plan.The present invention has the advantages that each process energy consumption of logistics center and disposal of pollutants situation be monitored in real time and be assessed.

Description

A kind of logistics center's energy consumption and disposal of pollutants monitoring and assessment system
Technical field
The present invention relates to a kind of logistics center's energy consumption and disposal of pollutants monitoring and assessment system, belong to energy consumption and Disposal of pollutants regulation technique.
Background technology
Include the processes such as handling, transport, circulation and process, sorting, storage in the operation of modern logistics industry, logistics center.It is existing Some logistics centers pertain only to the real time monitoring of the cargo in logistics distribution process, can not also disappear to each process energy of logistics center Consumption and disposal of pollutants situation monitored in real time and assessed, and then can not to each process there are the problem of carry out timely processing, nothing Method makes the equipment of each process remain optimum Working, i.e., the equipment of each process can not be made to remain that the minimum energy disappears Consumption, minimum disposal of pollutants and best productivity, cause logistics center's working efficiency low, and production cost is high.So there is an urgent need for hairs It is bright it is a kind of each process energy consumption of logistics center and disposal of pollutants situation can be monitored in real time and assessed, keep logistics center each Equipment is in monitoring and the assessment system of optimum Working always.
Invention content
Goal of the invention:In order to overcome the deficiencies in the prior art, present invention offer is a kind of can be to each mistake of logistics center Journey energy consumption and disposal of pollutants situation are monitored in real time and are assessed, and each equipment of logistics center is made to be in best effort shape always Logistics center's energy consumption of state and disposal of pollutants monitoring and assessment system.
Technical solution:To achieve the above object, the technical solution adopted by the present invention is:
A kind of logistics center's energy consumption and disposal of pollutants monitoring and assessment system, including cargo handling process loop control system System, circulation and process process cyclic control system, sort process cyclic control system, was stored in a warehouse at transportational process cyclic control system Journey cyclic control system and director server;
The cargo handling process cyclic control system includes handling executing agency, handling facilities, handling detector, handling communication System and handling server, handling executing agency fill for controlling adjustment handling facilities, handling detector for detecting in real time Unload equipment working condition, energy consumption and disposal of pollutants information;Handling facilities operating mode, energy consumption and the pollution that the handling detector will detect Emission information is sent to handling server, the current working that handling server will receive in real time by loading and unloading communication system Energy consumption detected value work as compared with the energy consumption standard value of the corresponding operating mode and energy consumption maximum permissible value and by what is received simultaneously Compared with the emission standard value and disposal of pollutants maximum permissible value of the disposal of pollutants detected value of preceding operating mode with the correspondence operating mode, It makes the following judgment successively:If energy consumption detected value is less than or equal to energy consumption standard value and disposal of pollutants detected value is less than or equal to pollution and arranges Standard value is put, then judges that handling facilities are in optimum Working at this time;If it is maximum allowable that energy consumption detected value is more than or equal to energy consumption When value or disposal of pollutants detected value are more than or equal to disposal of pollutants maximum permissible value, handling provide alarm with server;If Energy consumption detected value is more than or equal to energy consumption standard value and is more than or equal to dirt less than energy consumption maximum permissible value or disposal of pollutants detected value It contaminates discharge standard value and is less than disposal of pollutants maximum permissible value, handling server is referred to equipment adjustment by loading and unloading communication system Order is sent to handling executing agency, and handling executing agency is adjusted handling facilities according to equipment adjust instruction, and handling is made to set It is standby to be in optimum Working;
The transportational process cyclic control system includes transport executing agency, transporting equipment, transport detector, transport communication System and transport server, transport executing agency transport for controlling adjustment transporting equipment, transport detector for detecting in real time Transfer device operating mode, energy consumption and disposal of pollutants information;Transporting equipment operating mode, energy consumption and the pollution that the transport detector will detect Emission information is sent to transport server, the current working that transport server will receive in real time by transporting communication system Energy consumption detected value work as compared with the energy consumption standard value of the corresponding operating mode and energy consumption maximum permissible value and by what is received simultaneously Compared with the emission standard value and disposal of pollutants maximum permissible value of the disposal of pollutants detected value of preceding operating mode with the correspondence operating mode, It makes the following judgment successively:If energy consumption detected value is less than or equal to energy consumption standard value and disposal of pollutants detected value is less than or equal to pollution and arranges Standard value is put, then judges that transporting equipment is in optimum Working at this time;If it is maximum allowable that energy consumption detected value is more than or equal to energy consumption When value or disposal of pollutants detected value are more than or equal to disposal of pollutants maximum permissible value, transport provides alarm with server;If Energy consumption detected value is more than or equal to energy consumption standard value and is more than or equal to dirt less than energy consumption maximum permissible value or disposal of pollutants detected value It contaminates discharge standard value and is less than disposal of pollutants maximum permissible value, transport server is referred to equipment adjustment by transporting communication system Order is sent to transport executing agency, and transport executing agency is adjusted transporting equipment according to equipment adjust instruction, and transport is made to set It is standby to be in optimum Working;
The circulation and process process cyclic control system includes circulation and process executing agency, circulation and process equipment, circulating adds Work detector, circulation and process communication system and circulation and process server, circulation and process executing agency is for controlling adjustment circulation Process equipment, circulation and process detector for detecting circulate process equipment operating mode, energy consumption and disposal of pollutants information in real time;The stream The circulation and process equipment working condition detected, energy consumption and disposal of pollutants information are passed through circulation and process communication system by logical processing detector Be sent to circulation and process server in real time, circulation and process server by the energy consumption detected value of the current working received with it is right Should operating mode energy consumption standard value and energy consumption maximum permissible value compare and simultaneously by the disposal of pollutants of the current working received Detected value is sentenced as follows successively compared with the emission standard value of the corresponding operating mode and disposal of pollutants maximum permissible value It is disconnected:If energy consumption detected value is less than or equal to energy consumption standard value and disposal of pollutants detected value is less than or equal to emission standard value, sentence Disconnected circulation and process equipment at this time is in optimum Working;If energy consumption detected value is more than or equal to energy consumption maximum permissible value, or dirty When dye discharge detected value is more than or equal to disposal of pollutants maximum permissible value, circulation and process provides alarm with server;If energy consumption Detected value, which is more than or equal to energy consumption standard value and is more than or equal to pollution less than energy consumption maximum permissible value or disposal of pollutants detected value, to be arranged It puts standard value and is less than disposal of pollutants maximum permissible value, circulation and process server is by circulation and process communication system by equipment tune Whole instruction is sent to circulation and process executing agency, circulation and process executing agency according to equipment adjust instruction to circulation process equipment into Row adjustment, makes circulation and process equipment be in optimum Working;
The sort process cyclic control system includes sorting executing agency, sorting device, sorting detector, sorting communication System and sorting server, sorting executing agency adjust sorting device for controlling, and sorting detector divides for detecting in real time Pick equipment working condition, energy consumption and disposal of pollutants information;Sorting device operating mode, energy consumption and the pollution that the sorting detector will detect Emission information is sent to sorting server, the current working that sorting server will receive in real time by sorting communication system Energy consumption detected value work as compared with the energy consumption standard value of the corresponding operating mode and energy consumption maximum permissible value and by what is received simultaneously Compared with the emission standard value and disposal of pollutants maximum permissible value of the disposal of pollutants detected value of preceding operating mode with the correspondence operating mode, It makes the following judgment successively:If energy consumption detected value is less than or equal to energy consumption standard value and disposal of pollutants detected value is less than or equal to pollution and arranges Standard value is put, then judges that sorting device is in optimum Working at this time;If it is maximum allowable that energy consumption detected value is more than or equal to energy consumption When value or disposal of pollutants detected value are more than or equal to disposal of pollutants maximum permissible value, sorting provides alarm with server;If Energy consumption detected value is more than or equal to energy consumption standard value and is more than or equal to dirt less than energy consumption maximum permissible value or disposal of pollutants detected value It contaminates discharge standard value and is less than disposal of pollutants maximum permissible value, sorting server is referred to equipment adjustment by sorting communication system Order is sent to sorting executing agency, and sorting executing agency is adjusted sorting device according to equipment adjust instruction, and sorting is made to set It is standby to be in optimum Working;
The storage process cyclic control system includes storage executing agency, storage facilities, storage detector, storage communication System and storage server, storage executing agency is for controlling adjustment storage facilities, and storage detector for detecting storehouse in real time Store up equipment working condition, energy consumption and disposal of pollutants information;Storage facilities operating mode, energy consumption and the pollution that the storage detector will detect Emission information is sent to storage server, the current working that storage server will receive in real time by communication system of storing in a warehouse Energy consumption detected value work as compared with the energy consumption standard value of the corresponding operating mode and energy consumption maximum permissible value and by what is received simultaneously Compared with the emission standard value and disposal of pollutants maximum permissible value of the disposal of pollutants detected value of preceding operating mode with the correspondence operating mode, It makes the following judgment successively:If energy consumption detected value is less than or equal to energy consumption standard value and disposal of pollutants detected value is less than or equal to pollution and arranges Standard value is put, then judges that storage facilities is in optimum Working at this time;If it is maximum allowable that energy consumption detected value is more than or equal to energy consumption When value or disposal of pollutants detected value are more than or equal to disposal of pollutants maximum permissible value, storage provides alarm with server;If Energy consumption detected value is more than or equal to energy consumption standard value and is more than or equal to dirt less than energy consumption maximum permissible value or disposal of pollutants detected value It contaminates discharge standard value and is less than disposal of pollutants maximum permissible value, storage server is referred to equipment adjustment by communication system of storing in a warehouse Order is sent to storage executing agency, and storage executing agency is adjusted storage facilities according to equipment adjust instruction, and storage is made to set It is standby to be in optimum Working;
The director server handling server, transport server, circulation and process server, sorting server and Detection data is sent to director server by storage in real time with server, and director server carries out summarizing guarantor to the data received It deposits and carries out energy consumption data mining analysis, disposal of pollutants data mining analysis while formulating energy consumption and disposal of pollutants management meter It draws.
Specifically, the director server carries out energy consumption data mining analysis to the data received, energy consumption point is specifically included Item analysis, energy consumption trend analysis, Comparison of Energy Consumption, the year-on-year ring of energy consumption are than analysis and the comparative analysis of energy consumption period.
Specifically, the director server carries out disposal of pollutants data mining analysis to the data received, dirt is specifically included Contaminate subanalysis, pollution tendencies are analyzed, pollution comparative analysis, pollute year-on-year ring than analyzing and polluting period comparative analysis.
Specifically, being connected with display screen on the director server, pass through the analysis number of display screen real-time display director server According to.
Specifically, being connected with printer on the director server.
Specifically, the handling detector, transport detector, circulation and process detector, sorting detector and storage detection Device is made of operating mode inductor, energy consumption inductor and pollutant inductor.
Advantageous effect:Logistics center's energy consumption provided by the invention and disposal of pollutants monitoring and assessment system, can be to object The energy consumption of each equipment and disposal of pollutants situation are monitored in real time and are assessed during flow center is each, and to each each in the process Equipment there are the problem of carry out timely processing, so that each equipment is in optimum Working always, and the system can be to testing number It is preserved according to summarize and carries out energy consumption data mining analysis, disposal of pollutants data mining analysis while formulating energy consumption and pollution Governing plan is discharged, is conducive to the scientific management to logistics center, all kinds of energy such as oil, electricity, natural gas is not only greatly saved And the discharge of each pollutant, the working environment of logistics center is improved, and due to being not necessarily to rely on a large amount of manpower, larger journey It improves work efficiency to degree, reduces the production cost of enterprise.
Description of the drawings
Fig. 1 is the structural diagram of the present invention.
Specific implementation mode
The present invention is further described below in conjunction with the accompanying drawings.
It is a kind of logistics center's energy consumption and disposal of pollutants monitoring and assessment system, including cargo handling process as shown in Figure 1 Cyclic control system, transportational process cyclic control system, circulation and process process cyclic control system, sort process loop control system System, storage process cyclic control system and director server.
The cargo handling process cyclic control system includes handling executing agency, handling facilities, handling detector, handling communication System and handling server, handling executing agency fill for controlling adjustment handling facilities, handling detector for detecting in real time Unload equipment working condition, energy consumption and disposal of pollutants information;Handling facilities operating mode, energy consumption and the pollution that the handling detector will detect Emission information is sent to handling server, the current working that handling server will receive in real time by loading and unloading communication system Energy consumption detected value work as compared with the energy consumption standard value of the corresponding operating mode and energy consumption maximum permissible value and by what is received simultaneously Compared with the emission standard value and disposal of pollutants maximum permissible value of the disposal of pollutants detected value of preceding operating mode with the correspondence operating mode, It makes the following judgment successively:If energy consumption detected value is less than or equal to energy consumption standard value and disposal of pollutants detected value is less than or equal to pollution and arranges Standard value is put, then judges that handling facilities are in optimum Working at this time;If it is maximum allowable that energy consumption detected value is more than or equal to energy consumption When value or disposal of pollutants detected value are more than or equal to disposal of pollutants maximum permissible value, handling provide alarm with server;If Energy consumption detected value is more than or equal to energy consumption standard value and is more than or equal to dirt less than energy consumption maximum permissible value or disposal of pollutants detected value It contaminates discharge standard value and is less than disposal of pollutants maximum permissible value, handling server is referred to equipment adjustment by loading and unloading communication system Order is sent to handling executing agency, and handling executing agency is adjusted handling facilities according to equipment adjust instruction, and handling is made to set It is standby to be in optimum Working.
The transportational process cyclic control system includes transport executing agency, transporting equipment, transport detector, transport communication System and transport server, transport executing agency transport for controlling adjustment transporting equipment, transport detector for detecting in real time Transfer device operating mode, energy consumption and disposal of pollutants information;Transporting equipment operating mode, energy consumption and the pollution that the transport detector will detect Emission information is sent to transport server, the current working that transport server will receive in real time by transporting communication system Energy consumption detected value work as compared with the energy consumption standard value of the corresponding operating mode and energy consumption maximum permissible value and by what is received simultaneously Compared with the emission standard value and disposal of pollutants maximum permissible value of the disposal of pollutants detected value of preceding operating mode with the correspondence operating mode, It makes the following judgment successively:If energy consumption detected value is less than or equal to energy consumption standard value and disposal of pollutants detected value is less than or equal to pollution and arranges Standard value is put, then judges that transporting equipment is in optimum Working at this time;If it is maximum allowable that energy consumption detected value is more than or equal to energy consumption When value or disposal of pollutants detected value are more than or equal to disposal of pollutants maximum permissible value, transport provides alarm with server;If Energy consumption detected value is more than or equal to energy consumption standard value and is more than or equal to dirt less than energy consumption maximum permissible value or disposal of pollutants detected value It contaminates discharge standard value and is less than disposal of pollutants maximum permissible value, transport server is referred to equipment adjustment by transporting communication system Order is sent to transport executing agency, and transport executing agency is adjusted transporting equipment according to equipment adjust instruction, and transport is made to set It is standby to be in optimum Working.
The circulation and process process cyclic control system includes circulation and process executing agency, circulation and process equipment, circulating adds Work detector, circulation and process communication system and circulation and process server, circulation and process executing agency is for controlling adjustment circulation Process equipment, circulation and process detector for detecting circulate process equipment operating mode, energy consumption and disposal of pollutants information in real time;The stream The circulation and process equipment working condition detected, energy consumption and disposal of pollutants information are passed through circulation and process communication system by logical processing detector Be sent to circulation and process server in real time, circulation and process server by the energy consumption detected value of the current working received with it is right Should operating mode energy consumption standard value and energy consumption maximum permissible value compare and simultaneously by the disposal of pollutants of the current working received Detected value is sentenced as follows successively compared with the emission standard value of the corresponding operating mode and disposal of pollutants maximum permissible value It is disconnected:If energy consumption detected value is less than or equal to energy consumption standard value and disposal of pollutants detected value is less than or equal to emission standard value, sentence Disconnected circulation and process equipment at this time is in optimum Working;If energy consumption detected value is more than or equal to energy consumption maximum permissible value, or dirty When dye discharge detected value is more than or equal to disposal of pollutants maximum permissible value, circulation and process provides alarm with server;If energy consumption Detected value, which is more than or equal to energy consumption standard value and is more than or equal to pollution less than energy consumption maximum permissible value or disposal of pollutants detected value, to be arranged It puts standard value and is less than disposal of pollutants maximum permissible value, circulation and process server is by circulation and process communication system by equipment tune Whole instruction is sent to circulation and process executing agency, circulation and process executing agency according to equipment adjust instruction to circulation process equipment into Row adjustment, makes circulation and process equipment be in optimum Working.
The sort process cyclic control system includes sorting executing agency, sorting device, sorting detector, sorting communication System and sorting server, sorting executing agency adjust sorting device for controlling, and sorting detector divides for detecting in real time Pick equipment working condition, energy consumption and disposal of pollutants information;Sorting device operating mode, energy consumption and the pollution that the sorting detector will detect Emission information is sent to sorting server, the current working that sorting server will receive in real time by sorting communication system Energy consumption detected value work as compared with the energy consumption standard value of the corresponding operating mode and energy consumption maximum permissible value and by what is received simultaneously Compared with the emission standard value and disposal of pollutants maximum permissible value of the disposal of pollutants detected value of preceding operating mode with the correspondence operating mode, It makes the following judgment successively:If energy consumption detected value is less than or equal to energy consumption standard value and disposal of pollutants detected value is less than or equal to pollution and arranges Standard value is put, then judges that sorting device is in optimum Working at this time;If it is maximum allowable that energy consumption detected value is more than or equal to energy consumption When value or disposal of pollutants detected value are more than or equal to disposal of pollutants maximum permissible value, sorting provides alarm with server;If Energy consumption detected value is more than or equal to energy consumption standard value and is more than or equal to dirt less than energy consumption maximum permissible value or disposal of pollutants detected value It contaminates discharge standard value and is less than disposal of pollutants maximum permissible value, sorting server is referred to equipment adjustment by sorting communication system Order is sent to sorting executing agency, and sorting executing agency is adjusted sorting device according to equipment adjust instruction, and sorting is made to set It is standby to be in optimum Working.
The storage process cyclic control system includes storage executing agency, storage facilities, storage detector, storage communication System and storage server, storage executing agency is for controlling adjustment storage facilities, and storage detector for detecting storehouse in real time Store up equipment working condition, energy consumption and disposal of pollutants information;Storage facilities operating mode, energy consumption and the pollution that the storage detector will detect Emission information is sent to storage server, the current working that storage server will receive in real time by communication system of storing in a warehouse Energy consumption detected value work as compared with the energy consumption standard value of the corresponding operating mode and energy consumption maximum permissible value and by what is received simultaneously Compared with the emission standard value and disposal of pollutants maximum permissible value of the disposal of pollutants detected value of preceding operating mode with the correspondence operating mode, It makes the following judgment successively:If energy consumption detected value is less than or equal to energy consumption standard value and disposal of pollutants detected value is less than or equal to pollution and arranges Standard value is put, then judges that storage facilities is in optimum Working at this time;If it is maximum allowable that energy consumption detected value is more than or equal to energy consumption When value or disposal of pollutants detected value are more than or equal to disposal of pollutants maximum permissible value, storage provides alarm with server;If Energy consumption detected value is more than or equal to energy consumption standard value and is more than or equal to dirt less than energy consumption maximum permissible value or disposal of pollutants detected value It contaminates discharge standard value and is less than disposal of pollutants maximum permissible value, storage server is referred to equipment adjustment by communication system of storing in a warehouse Order is sent to storage executing agency, and storage executing agency is adjusted storage facilities according to equipment adjust instruction, and storage is made to set It is standby to be in optimum Working.
The director server handling server, transport server, circulation and process server, sorting server and Detection data is sent to director server by storage in real time with server, and director server carries out summarizing guarantor to the data received It deposits and carries out energy consumption data mining analysis, disposal of pollutants data mining analysis while formulating energy consumption and disposal of pollutants management meter It draws;It is same that the energy consumption data mining analysis specifically includes separate energy consumption analysis, energy consumption trend analysis, Comparison of Energy Consumption, energy consumption Than ring than analysis and the comparative analysis of energy consumption period, the disposal of pollutants data mining analysis specifically includes pollution subanalysis, dirt Trend analysis, pollution comparative analysis, the year-on-year ring of pollution are contaminated than analysis and pollution period comparative analysis.
In this case, it is connected with display screen and printer on the director server, passes through display screen real-time display director server Analysis data;Handling detector, transport detector, circulation and process detector, sorting detector in this case and storage detection Device is made of operating mode inductor, energy consumption inductor and pollutant inductor.
The operation principle of the present invention is that:
When work, the handling detector in cargo handling process cyclic control system can be by the operating mode detected, energy consumption and pollution The detection datas such as discharge are sent to handling server by communication system in real time, and handling server can be current by what is received The energy consumption detected value of operating mode is compared with the energy consumption standard value of this corresponding operating mode and energy consumption maximum permissible value and will receive simultaneously The disposal of pollutants detected value of current working and the emission standard value of this corresponding operating mode and disposal of pollutants maximum permissible value phase Compare, is less than less than or equal to energy consumption standard value and disposal of pollutants detected value etc. when handling relatively obtain with server energy consumption detected value When emission standard value, handling server then judges that handling facilities are in optimum Working at this time, do not need at this time Any adjustment is made to handling facilities;When handling relatively obtained with server energy consumption detected value more than or equal to energy consumption maximum permissible value or When person's disposal of pollutants detected value is more than or equal to disposal of pollutants maximum permissible value, handling server can alarm, and illustrate to load and unload at this Equipment there is a problem of serious, and manpower intervention is needed to solve the problems, such as;It is more than when handling relatively obtain energy consumption detected value with server Equal to energy consumption standard value and less than energy consumption maximum permissible value or disposal of pollutants detected value be more than or equal to emission standard value and When less than disposal of pollutants maximum permissible value, illustrate that handling facilities are in normal operating conditions at this, but be not optimum Working, Equipment adjust instruction can be sent to handling executing agency by handling at this time with server by loading and unloading communication system, load and unload execution machine Structure can be adjusted handling facilities after receiving equipment adjust instruction, and handling facilities is made to be in optimum Working.
The transport detector in transportational process cyclic control system can be by the operating mode detected, energy consumption and disposal of pollutants simultaneously Etc. detection datas be sent to transport server, the current working that transport server can will receive in real time by communication system Energy consumption detected value work as compared with the energy consumption standard value of this corresponding operating mode and energy consumption maximum permissible value and by what is received simultaneously Compared with the emission standard value and disposal of pollutants maximum permissible value of this operating mode of the disposal of pollutants detected value of preceding operating mode with correspondence, It is less than or equal to dirt less than or equal to energy consumption standard value and disposal of pollutants detected value when transport relatively obtains with server energy consumption detected value When contaminating discharge standard value, transport server then judges that transporting equipment is in optimum Working at this time, at this time need not be to dress It unloads equipment and makees any adjustment;It is more than or equal to energy consumption maximum permissible value or dirt when transport relatively obtains energy consumption detected value with server When dye discharge detected value is more than or equal to disposal of pollutants maximum permissible value, transport server can alarm, and illustrate handling facilities at this There is a problem of serious, manpower intervention is needed to solve the problems, such as;It is more than or equal to when transport relatively obtains energy consumption detected value with server Energy consumption standard value and it is more than or equal to emission standard value less than energy consumption maximum permissible value or disposal of pollutants detected value and is less than When disposal of pollutants maximum permissible value, illustrate that handling facilities are in normal operating conditions at this, but be not optimum Working, at this time Equipment adjust instruction can be sent to transport executing agency by transport with server by transporting communication system, and transport executing agency connects Transporting equipment can be adjusted after receiving equipment adjust instruction, transporting equipment is made to be in optimum Working.
Simultaneously the circulation and process detector in circulation and process process cyclic control system can by the operating mode detected, energy consumption and The detection datas such as disposal of pollutants are sent to circulation and process server by communication system in real time, and circulation and process server can incite somebody to action Compared with the energy consumption standard value and energy consumption maximum permissible value of this operating mode of the energy consumption detected value of the current working received with correspondence, simultaneously Simultaneously by the disposal of pollutants detected value of the current working received and the emission standard value of this corresponding operating mode and disposal of pollutants Maximum permissible value compares, and is less than or equal to energy consumption standard value and pollution when circulation and process relatively obtains energy consumption detected value with server When discharging detected value less than or equal to emission standard value, circulation and process then judges that circulation and process equipment is at this time with server Optimum Working at this time need not make handling facilities any adjustment;When circulation and process relatively obtains energy consumption inspection with server When measured value is more than or equal to energy consumption maximum permissible value or disposal of pollutants detected value more than or equal to disposal of pollutants maximum permissible value, circulation Processing server can alarm, and illustrate that handling facilities there is a problem of serious at this, need manpower intervention to solve the problems, such as;Work as circulation Processing relatively obtains energy consumption detected value with server more than or equal to energy consumption standard value and is less than energy consumption maximum permissible value or pollution Detected value is discharged more than or equal to emission standard value and when being less than disposal of pollutants maximum permissible value, is illustrated at this at handling facilities In normal operating conditions, but it is not optimum Working, circulation and process server can pass through circulation and process communication system at this time Equipment adjust instruction is sent to circulation and process executing agency, circulation and process executing agency receives meeting pair after equipment adjust instruction Circulation and process equipment is adjusted, and circulation and process equipment is made to be in optimum Working.
The sorting detector in sort process cyclic control system can be by the operating mode detected, energy consumption and disposal of pollutants simultaneously Etc. detection datas be sent to sorting server, the current working that sorting server can will receive in real time by communication system Energy consumption detected value work as compared with the energy consumption standard value of this corresponding operating mode and energy consumption maximum permissible value and by what is received simultaneously Compared with the emission standard value and disposal of pollutants maximum permissible value of this operating mode of the disposal of pollutants detected value of preceding operating mode with correspondence, It is less than or equal to dirt less than or equal to energy consumption standard value and disposal of pollutants detected value when sorting relatively obtains with server energy consumption detected value When contaminating discharge standard value, sorting server then judges that sorting device is in optimum Working at this time, at this time need not be to dress It unloads equipment and makees any adjustment;It is more than or equal to energy consumption maximum permissible value or dirt when sorting relatively obtains energy consumption detected value with server When dye discharge detected value is more than or equal to disposal of pollutants maximum permissible value, sorting server can alarm, and illustrate handling facilities at this There is a problem of serious, manpower intervention is needed to solve the problems, such as;It is more than or equal to when sorting relatively obtains energy consumption detected value with server Energy consumption standard value and it is more than or equal to emission standard value less than energy consumption maximum permissible value or disposal of pollutants detected value and is less than When disposal of pollutants maximum permissible value, illustrate that handling facilities are in normal operating conditions at this, but be not optimum Working, at this time Equipment adjust instruction can be sent to sorting executing agency by sorting with server by sorting communication system, and sorting executing agency connects Sorting device can be adjusted after receiving equipment adjust instruction, sorting device is made to be in optimum Working.
The storage detector in storage process cyclic control system can be by the operating mode detected, energy consumption and disposal of pollutants simultaneously Etc. detection datas be sent to storage server, the current working that storage server can will receive in real time by communication system Energy consumption detected value work as compared with the energy consumption standard value of this corresponding operating mode and energy consumption maximum permissible value and by what is received simultaneously Compared with the emission standard value and disposal of pollutants maximum permissible value of this operating mode of the disposal of pollutants detected value of preceding operating mode with correspondence, It is less than or equal to dirt less than or equal to energy consumption standard value and disposal of pollutants detected value when storage relatively obtains with server energy consumption detected value When contaminating discharge standard value, storage server then judges that storage facilities is in optimum Working at this time, at this time need not be to dress It unloads equipment and makees any adjustment;It is more than or equal to energy consumption maximum permissible value or dirt when storage relatively obtains energy consumption detected value with server When dye discharge detected value is more than or equal to disposal of pollutants maximum permissible value, storage server can alarm, and illustrate handling facilities at this There is a problem of serious, manpower intervention is needed to solve the problems, such as;It is more than or equal to when storage relatively obtains energy consumption detected value with server Energy consumption standard value and it is more than or equal to emission standard value less than energy consumption maximum permissible value or disposal of pollutants detected value and is less than When disposal of pollutants maximum permissible value, illustrate that handling facilities are in normal operating conditions at this, but be not optimum Working, at this time Equipment adjust instruction can be sent to storage executing agency by storage with server by communication system of storing in a warehouse, and storage executing agency connects Storage facilities can be adjusted after receiving equipment adjust instruction, storage facilities is made to be in optimum Working.
During the work time, the handling server in cargo handling process cyclic control system, transportational process loop control system Transport server in system, the circulation and process server in circulation and process process cyclic control system, sort process cycle The storage server in sorting server, storage process cyclic control system in control system can also be by testing number factually When be sent to director server, director server, which to receiving all detection datas can summarize, preserves and carries out separate energy consumption point Analysis, energy consumption trend analysis, Comparison of Energy Consumption, the year-on-year ring of energy consumption are than energy consumption datas such as analysis and the comparative analyses of energy consumption period Mining analysis and carry out pollution subanalysis, pollution tendencies analysis, pollution comparative analysis, the year-on-year ring of pollution than analysis and It pollutes the disposals of pollutants data mining analysis such as period comparative analysis while formulating energy consumption and disposal of pollutants governing plan;It is using In the process, staff can more intuitively understand the working condition of each equipment by display screen, and can pass through printer Print the information of all kinds of needs.
This system can respectively the energy consumption of each equipment and disposal of pollutants situation monitor in real time in the process to logistics center And assessment, and to each equipment during each there are the problem of carry out timely processing, so that each equipment is in optimum Working always, And the system, which can carry out detection data to summarize, preserves and carries out energy consumption data mining analysis, disposal of pollutants data mining point It analyses while formulating energy consumption and disposal of pollutants governing plan, be conducive to the scientific management to logistics center, be not only greatly saved The discharge of all kinds of energy such as oil, electricity, natural gas and each pollutant, improves the working environment of logistics center, and due to nothing A large amount of manpower need to be relied on, largely improves work efficiency, reduces the production cost of enterprise.
The above is only a preferred embodiment of the present invention, it should be pointed out that:For the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered It is considered as protection scope of the present invention.

Claims (6)

1. a kind of logistics center's energy consumption and disposal of pollutants monitoring and assessment system, it is characterised in that:It is followed including cargo handling process Ring control system, transportational process cyclic control system, circulation and process process cyclic control system, sort process loop control system System, storage process cyclic control system and director server;
The cargo handling process cyclic control system includes handling executing agency, handling facilities, handling detector, handling communication system And handling server, handling executing agency set for controlling adjustment handling facilities, handling detector for detecting handling in real time Standby operating mode, energy consumption and disposal of pollutants information;Handling facilities operating mode, energy consumption and the disposal of pollutants that the handling detector will detect Information is sent to handling server in real time by loading and unloading communication system, and handling server is by the energy of the current working received The current work that consumes detected value compared with the energy consumption standard value of the corresponding operating mode and energy consumption maximum permissible value and will receive simultaneously The disposal of pollutants detected value of condition is compared with the emission standard value of the corresponding operating mode and disposal of pollutants maximum permissible value, successively It makes the following judgment:If energy consumption detected value is less than or equal to energy consumption standard value and disposal of pollutants detected value is less than or equal to disposal of pollutants mark Quasi- value, then judge that handling facilities are in optimum Working at this time;If energy consumption detected value is more than or equal to energy consumption maximum permissible value, or When person's disposal of pollutants detected value is more than or equal to disposal of pollutants maximum permissible value, handling provide alarm with server;If energy consumption Detected value, which is more than or equal to energy consumption standard value and is more than or equal to pollution less than energy consumption maximum permissible value or disposal of pollutants detected value, to be arranged It puts standard value and is less than disposal of pollutants maximum permissible value, handling are sent out equipment adjust instruction by loading and unloading communication system with server Handling executing agency is given, handling executing agency is adjusted handling facilities according to equipment adjust instruction, makes at handling facilities In optimum Working;
The transportational process cyclic control system includes transport executing agency, transporting equipment, transport detector, transport communication system With transport server, transport executing agency sets for controlling adjustment transporting equipment, transport detector for detecting transport in real time Standby operating mode, energy consumption and disposal of pollutants information;Transporting equipment operating mode, energy consumption and the disposal of pollutants that the transport detector will detect Information is sent to transport server in real time by transporting communication system, and transport server is by the energy of the current working received The current work that consumes detected value compared with the energy consumption standard value of the corresponding operating mode and energy consumption maximum permissible value and will receive simultaneously The disposal of pollutants detected value of condition is compared with the emission standard value of the corresponding operating mode and disposal of pollutants maximum permissible value, successively It makes the following judgment:If energy consumption detected value is less than or equal to energy consumption standard value and disposal of pollutants detected value is less than or equal to disposal of pollutants mark Quasi- value, then judge that transporting equipment is in optimum Working at this time;If energy consumption detected value is more than or equal to energy consumption maximum permissible value, or When person's disposal of pollutants detected value is more than or equal to disposal of pollutants maximum permissible value, transport provides alarm with server;If energy consumption Detected value, which is more than or equal to energy consumption standard value and is more than or equal to pollution less than energy consumption maximum permissible value or disposal of pollutants detected value, to be arranged It puts standard value and is less than disposal of pollutants maximum permissible value, transport is sent out equipment adjust instruction by transporting communication system with server Transport executing agency is given, transport executing agency is adjusted transporting equipment according to equipment adjust instruction, makes at transporting equipment In optimum Working;
The circulation and process process cyclic control system includes circulation and process executing agency, circulation and process equipment, circulation and process inspection Device, circulation and process communication system and circulation and process server are surveyed, circulation and process executing agency is for controlling adjustment circulation and process Equipment, circulation and process detector for detecting circulate process equipment operating mode, energy consumption and disposal of pollutants information in real time;The circulation adds Work detector is real-time by circulation and process communication system by the circulation and process equipment working condition detected, energy consumption and disposal of pollutants information It is sent to circulation and process server, the energy consumption detected value of the current working received is somebody's turn to do by circulation and process server with corresponding The energy consumption standard value and energy consumption maximum permissible value of operating mode compare and simultaneously detect the disposal of pollutants of the current working received Value makes the following judgment successively compared with the emission standard value of the corresponding operating mode and disposal of pollutants maximum permissible value:If Energy consumption detected value is less than or equal to energy consumption standard value and disposal of pollutants detected value is less than or equal to emission standard value, then judges at this time Circulation and process equipment is in optimum Working;If energy consumption detected value is more than or equal to energy consumption maximum permissible value or disposal of pollutants When detected value is more than or equal to disposal of pollutants maximum permissible value, circulation and process provides alarm with server;If energy consumption detected value It is more than or equal to emission standard more than or equal to energy consumption standard value and less than energy consumption maximum permissible value or disposal of pollutants detected value Value and it is less than disposal of pollutants maximum permissible value, circulation and process server is by circulation and process communication system by equipment adjust instruction It is sent to circulation and process executing agency, circulation and process executing agency adjusts circulation process equipment according to equipment adjust instruction It is whole, so that circulation and process equipment is in optimum Working;
The sort process cyclic control system includes sorting executing agency, sorting device, sorting detector, sorting communication system And sorting server, sorting executing agency set for controlling adjustment sorting device, sorting detector for detecting sorting in real time Standby operating mode, energy consumption and disposal of pollutants information;Sorting device operating mode, energy consumption and the disposal of pollutants that the sorting detector will detect Information is sent to sorting server in real time by sorting communication system, and sorting server is by the energy of the current working received The current work that consumes detected value compared with the energy consumption standard value of the corresponding operating mode and energy consumption maximum permissible value and will receive simultaneously The disposal of pollutants detected value of condition is compared with the emission standard value of the corresponding operating mode and disposal of pollutants maximum permissible value, successively It makes the following judgment:If energy consumption detected value is less than or equal to energy consumption standard value and disposal of pollutants detected value is less than or equal to disposal of pollutants mark Quasi- value, then judge that sorting device is in optimum Working at this time;If energy consumption detected value is more than or equal to energy consumption maximum permissible value, or When person's disposal of pollutants detected value is more than or equal to disposal of pollutants maximum permissible value, sorting provides alarm with server;If energy consumption Detected value, which is more than or equal to energy consumption standard value and is more than or equal to pollution less than energy consumption maximum permissible value or disposal of pollutants detected value, to be arranged It puts standard value and is less than disposal of pollutants maximum permissible value, sorting is sent out equipment adjust instruction by sorting communication system with server Sorting executing agency is given, sorting executing agency is adjusted sorting device according to equipment adjust instruction, makes at sorting device In optimum Working;
The storage process cyclic control system includes storage executing agency, storage facilities, storage detector, storage communication system And storage server, storage executing agency set for controlling adjustment storage facilities, storage detector for detecting storage in real time Standby operating mode, energy consumption and disposal of pollutants information;Storage facilities operating mode, energy consumption and the disposal of pollutants that the storage detector will detect Information is sent to storage server in real time by communication system of storing in a warehouse, and storage server is by the energy of the current working received The current work that consumes detected value compared with the energy consumption standard value of the corresponding operating mode and energy consumption maximum permissible value and will receive simultaneously The disposal of pollutants detected value of condition is compared with the emission standard value of the corresponding operating mode and disposal of pollutants maximum permissible value, successively It makes the following judgment:If energy consumption detected value is less than or equal to energy consumption standard value and disposal of pollutants detected value is less than or equal to disposal of pollutants mark Quasi- value, then judge that storage facilities is in optimum Working at this time;If energy consumption detected value is more than or equal to energy consumption maximum permissible value, or When person's disposal of pollutants detected value is more than or equal to disposal of pollutants maximum permissible value, storage provides alarm with server;If energy consumption Detected value, which is more than or equal to energy consumption standard value and is more than or equal to pollution less than energy consumption maximum permissible value or disposal of pollutants detected value, to be arranged It puts standard value and is less than disposal of pollutants maximum permissible value, storage is sent out equipment adjust instruction by communication system of storing in a warehouse with server Storage executing agency is given, storage executing agency is adjusted storage facilities according to equipment adjust instruction, makes at storage facilities In optimum Working;
Handling server, transport server, circulation and process server, sorting server and storage server Detection data is sent to director server in real time, director server, which to the data received summarize, to be preserved and carry out energy consumption Data mining analysis, disposal of pollutants data mining analysis while formulating energy consumption and disposal of pollutants governing plan.
2. logistics center's energy consumption according to claim 1 and disposal of pollutants monitoring and assessment system, it is characterised in that: The director server carries out energy consumption data mining analysis to the data received, specifically includes separate energy consumption analysis, energy consumption trend Analysis, Comparison of Energy Consumption, the year-on-year ring of energy consumption are than analysis and the comparative analysis of energy consumption period.
3. logistics center's energy consumption according to claim 1 and disposal of pollutants monitoring and assessment system, it is characterised in that: The director server carries out disposal of pollutants data mining analysis to the data received, specifically includes pollution subanalysis, pollution Trend analysis, pollution comparative analysis, the year-on-year ring of pollution are than analyzing and polluting period comparative analysis.
4. logistics center's energy consumption according to claim 1 and disposal of pollutants monitoring and assessment system, it is characterised in that: It is connected with display screen on the director server, passes through the analysis data of display screen real-time display director server.
5. logistics center's energy consumption according to claim 1 and disposal of pollutants monitoring and assessment system, it is characterised in that: It is connected with printer on the director server.
6. logistics center's energy consumption according to claim 1 and disposal of pollutants monitoring and assessment system, it is characterised in that: The handling detector, transport detector, circulation and process detector, sorting detector and storage detector are incuded by operating mode Device, energy consumption inductor and pollutant inductor composition.
CN201710055520.6A 2017-01-25 2017-01-25 A kind of logistics center's energy consumption and disposal of pollutants monitoring and assessment system Active CN106647591B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710055520.6A CN106647591B (en) 2017-01-25 2017-01-25 A kind of logistics center's energy consumption and disposal of pollutants monitoring and assessment system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710055520.6A CN106647591B (en) 2017-01-25 2017-01-25 A kind of logistics center's energy consumption and disposal of pollutants monitoring and assessment system

Publications (2)

Publication Number Publication Date
CN106647591A CN106647591A (en) 2017-05-10
CN106647591B true CN106647591B (en) 2018-11-06

Family

ID=58842260

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710055520.6A Active CN106647591B (en) 2017-01-25 2017-01-25 A kind of logistics center's energy consumption and disposal of pollutants monitoring and assessment system

Country Status (1)

Country Link
CN (1) CN106647591B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113031548A (en) * 2021-03-04 2021-06-25 舟山鼠浪湖码头有限公司 Energy consumption monitoring system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008243110A (en) * 2007-03-29 2008-10-09 Hitachi Ltd System for evaluating emission amount of fuel environmental impact substance
CN101776270A (en) * 2010-01-08 2010-07-14 东南大学 Method for performing mixed incineration on agricultural and forestal wastes, sludge and household refuses by using fluidized bed
CN102609828A (en) * 2012-01-17 2012-07-25 东南大学 Method for assessing energy consumption of logistics enterprise based on process
AU2015101560A4 (en) * 2015-09-20 2015-11-26 Macau University Of Science And Technology Linear programming-based approach to scheduling of crude oil operations in refinery for energy efficiency optimization
CN105184525A (en) * 2015-05-21 2015-12-23 北京巨柱智伟能源环保科技有限公司 Green logistics service system
FR3031216A1 (en) * 2014-12-31 2016-07-01 Skyworld Int Overseas Ltd METHOD FOR DISTRIBUTION OF REMOTELY CONTROLLED GOODS, AND AUTOMATIC DISTRIBUTION POSITION FOR IMPLEMENTING SAID METHOD
CN105894224A (en) * 2014-12-30 2016-08-24 北京巨柱智伟能源环保科技有限公司 Environmental logistics-based energy-saving, emission-reducing and haze-eliminating method
KR20160140043A (en) * 2015-05-29 2016-12-07 전자부품연구원 Collaborative Greenhouse Gas Emission Management Service Providing Method and System applying the same

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008243110A (en) * 2007-03-29 2008-10-09 Hitachi Ltd System for evaluating emission amount of fuel environmental impact substance
CN101776270A (en) * 2010-01-08 2010-07-14 东南大学 Method for performing mixed incineration on agricultural and forestal wastes, sludge and household refuses by using fluidized bed
CN102609828A (en) * 2012-01-17 2012-07-25 东南大学 Method for assessing energy consumption of logistics enterprise based on process
CN105894224A (en) * 2014-12-30 2016-08-24 北京巨柱智伟能源环保科技有限公司 Environmental logistics-based energy-saving, emission-reducing and haze-eliminating method
FR3031216A1 (en) * 2014-12-31 2016-07-01 Skyworld Int Overseas Ltd METHOD FOR DISTRIBUTION OF REMOTELY CONTROLLED GOODS, AND AUTOMATIC DISTRIBUTION POSITION FOR IMPLEMENTING SAID METHOD
CN105184525A (en) * 2015-05-21 2015-12-23 北京巨柱智伟能源环保科技有限公司 Green logistics service system
KR20160140043A (en) * 2015-05-29 2016-12-07 전자부품연구원 Collaborative Greenhouse Gas Emission Management Service Providing Method and System applying the same
AU2015101560A4 (en) * 2015-09-20 2015-11-26 Macau University Of Science And Technology Linear programming-based approach to scheduling of crude oil operations in refinery for energy efficiency optimization

Also Published As

Publication number Publication date
CN106647591A (en) 2017-05-10

Similar Documents

Publication Publication Date Title
CN103390163B (en) A kind of Post address automatic acquiring method
CN107831387A (en) A kind of electric power station equipment operation condition intelligent monitoring method
CN105967063B (en) Maintenance platform fault analysis process system and method
CN106647591B (en) A kind of logistics center's energy consumption and disposal of pollutants monitoring and assessment system
CN104794771B (en) One kind patrols inspection automatic planning and a device
CN107911693A (en) A kind of method that transformer substation video monitoring device automatic operating is safeguarded
Charłampowicz Maritime container terminal service quality in the face of COVID-19 outbreak
Li et al. Intelligent monitoring system of coal conveyor belt based on computer vision technology
CN117170335B (en) Cooperative control platform for complex product production line of parts
CN104192543A (en) Automatic charging tray LS information collecting line and operating method thereof
CN117094609B (en) Intelligent management system for aluminum profile production quality based on machine vision
CN205926335U (en) Bin device based on commodity circulation automated sorting system
CN212375416U (en) Electroplating system
CN106228248B (en) A kind of system automatic trouble diagnosis method based on fuzzy FMEA analysis
CN116415864A (en) Intelligent logistics quick inspection machine based on artificial intelligence
CN116859842A (en) Chemical production line safety evaluation system
CN107798358A (en) A kind of harbour container management method, apparatus and system
CN204759441U (en) Two -dimensional code check out test set and corresponding detecting system
CN110223015A (en) Logistics Process link processing method, management system, device and storage equipment
CN106487591A (en) A kind of server automatic get-on carriage statistic device and its system
CN106776911A (en) Lot abnormality processings optimization method and system that the alarm of WAT boards causes
Efimova et al. Elimination of losses in information services based on approaches of IT-service management
Ait-Alla et al. Real-time fault detection for advanced maintenance of sustainable technical systems
CN109828186A (en) A kind of long-range Distribution Network Failure active forewarning system
Burgos Simon et al. A vision-based application for container detection in Ports 4.0

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 210093 Nanjing University Science Park, 22 Hankou Road, Gulou District, Nanjing City, Jiangsu Province

Patentee after: Southeast University

Address before: 211189 No. 2 Southeast University Road, Jiangning District, Nanjing, Jiangsu

Patentee before: Southeast University

CP02 Change in the address of a patent holder