CN106640089A - Platform system for vertical shaft heading machine - Google Patents

Platform system for vertical shaft heading machine Download PDF

Info

Publication number
CN106640089A
CN106640089A CN201610898055.8A CN201610898055A CN106640089A CN 106640089 A CN106640089 A CN 106640089A CN 201610898055 A CN201610898055 A CN 201610898055A CN 106640089 A CN106640089 A CN 106640089A
Authority
CN
China
Prior art keywords
jurisdiction
section
vertical shaft
shaft
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610898055.8A
Other languages
Chinese (zh)
Other versions
CN106640089B (en
Inventor
田振华
苗军克
周艳
高随芹
郭迈迈
占华龙
孟永红
赵智峰
陈俊文
杜自彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luoyang Mining Machinery and Engineering Design Institute Co Ltd
Original Assignee
Luoyang Mining Machinery and Engineering Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luoyang Mining Machinery and Engineering Design Institute Co Ltd filed Critical Luoyang Mining Machinery and Engineering Design Institute Co Ltd
Priority to CN201610898055.8A priority Critical patent/CN106640089B/en
Publication of CN106640089A publication Critical patent/CN106640089A/en
Application granted granted Critical
Publication of CN106640089B publication Critical patent/CN106640089B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D1/00Sinking shafts
    • E21D1/03Sinking shafts mechanically, e.g. by loading shovels or loading buckets, scraping devices, conveying screws
    • E21D1/06Sinking shafts mechanically, e.g. by loading shovels or loading buckets, scraping devices, conveying screws with shaft-boring cutters
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D1/00Sinking shafts
    • E21D1/08Sinking shafts while moving the lining downwards
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D5/00Lining shafts; Linings therefor
    • E21D5/04Lining shafts; Linings therefor with brick, concrete, stone, or similar building materials
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D5/00Lining shafts; Linings therefor
    • E21D5/12Accessories for making shaft linings, e.g. suspended cradles, shutterings
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D7/00Shaft equipment, e.g. timbering within the shaft

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a platform system for a vertical shaft heading machine. A cylindrical stand column is arranged in the center of a platform, shaft guide holes are symmetrically formed in the portions, on the two sides of the stand column, of the platform, a first shaft cover and a second shaft cover are correspondingly arranged above the shaft guide holes, and a segment limiting and centering tool is arranged on one side of the first shaft cover; a rotating mechanism is arranged on the periphery above the stand column, at least four lifting mechanisms are evenly distributed between the rotating mechanism and the platform; a vertical-shaft segment erector system is arranged on the rotating mechanism, a vertical shaft anchor rod drilling system is arranged at the corresponding portion, in a U-shaped opening of the vertical-shaft segment erector system, of the rotating mechanism, and a first vertical-shaft leading drilling system and a second vertical-shaft leading drilling system are arranged on the two sides above the vertical-shaft segment erector system respectively; a segment is arranged on one side of the middle of the vertical-shaft segment erector system; a pair of guide rails are arranged at the portions, on one side of the stand column, of the platform and provided with an emergency segment containing system. The multiple devices share the assembly of the rotating mechanism and the lifting mechanisms, weight is reduced, the shaft wall can be expanded, and university is improved.

Description

A kind of shaft excavation machine plateform system
Technical field
The present invention relates to shaft excavation machine related system, especially a kind of shaft excavation machine plateform system.
Background technology
In heading equipment field, the equipment for excavating vertically downward is referred to as shaft excavation machine, and shaft excavation machine is in all of tunnel It is design difficulty highest in the construction equipments such as road, massif, is a set of extremely complex system, is related to machinery, electric air-liquid The various fields such as pressure, ventilation, cooling, dedusting, mud-water separation, accurate guiding, personnel and equipment safety, with high content of technology, work Flow process is complicated.
Shaft excavation machine needs to drill stratum in digging process, reconnoitres;The split borehole wall for scraping out type is managed Sheet built;Due to being vertical shaft, more than 2 tons, needs carry out anchoring process to a section of jurisdiction weight to assembled complete section of jurisdiction.
Traditional horizontal tunnel development machine, its duct piece assembling machine, advance drilling, anchor pole are bored and are all installed separately, these three Part will individually provide space and be arranged, and shaft excavation machine needs weight the smaller the better due to its particularity, space collection Into degree, the higher the better, if this 3 parts integrated, difficulty is very big, and needs to consider several factors:Function will Completely, do not interfere each other, it is also contemplated that space for maintenance, control mode, assemble sequence.
To meet plant maintenance requirement, needs open up goods and materials on platform and transport passage (cage guide), are guarantee personnel and set Standby safety, passage will be closed at ordinary times by manhole cover system, just be opened only when needing to use, due to 2 passages more than on platform, Placing when vertical shaft duct piece assembling machine, advance drilling, anchor pole are bored needs to get out of the way channel position, causes the more complicated difficulty of design.
In view of the foregoing, the structure of existing development machine needs to redesign.
The content of the invention
The invention aims to overcome deficiency of the prior art, there is provided a kind of shaft excavation machine plateform system, By numerous integration of equipments together, the space of a large amount of preciousnesses is saved;Multiple equipment shares a set of slew gear, elevating mechanism, Weight is alleviated, great amount of cost has been saved;The extension of the achievable borehole wall, improves versatility, can be cost-effective for enterprise, there is one Fixed economic benefit;Using remote controller operation, the security of workman is improve;Each equipment adopts modular assembly together, It is easy to safeguard.
The present invention to achieve these goals, is adopted the following technical scheme that:A kind of shaft excavation machine plateform system, be By:Section of jurisdiction, the spacing centralizing tool in section of jurisdiction, the first well lid, vertical shaft duct piece assembling machine system, platform, column, elevating mechanism, guide rail, Emergent section of jurisdiction parking system, slew gear, the second well lid, vertical shaft anchor pole drill system, the advanced drill system of the first vertical shaft, the second vertical shaft Advanced drill system is constituted;Platform is circle, and Platform center arranges cylinder column, on the platform of column both sides cage guide is symmetrical arranged Hole, the symmetrical cage guide hole top is correspondingly arranged the first well lid and the second well lid, and the side on the first well lid arranges section of jurisdiction limit Position centralizing tool, column top periphery arranges slew gear, and at least four lifts are uniformly distributed between slew gear and platform Structure, vertical shaft duct piece assembling machine system adopts U-shaped structure, vertical shaft duct piece assembling machine system to be arranged on slew gear, vertical shaft section of jurisdiction Vertical shaft anchor pole drill system is set in the U-shaped mouth of assembling machine system on corresponding slew gear, vertical shaft duct piece assembling machine system Top both sides are respectively provided with the advanced drill system of the first vertical shaft and the advanced drill system of the second vertical shaft, in vertical shaft duct piece assembling machine system Portion side arranges section of jurisdiction, and the initial position of the section of jurisdiction is located at the top of the first well lid, on the platform of column side a pair are arranged Guide rail, arranges emergent section of jurisdiction parking system on the pair of guide rail, the pair of guide rail is perpendicular to the first well lid and the second well lid The line of centres.
Section of jurisdiction is transported to after plateform system from ground, the spacing centralizing tool in the section of jurisdiction at the upper side of the first well lid gradually with section of jurisdiction Contact, the spacing centralizing tool in section of jurisdiction is limited the position of section of jurisdiction, makes section of jurisdiction perpendicular to the center surface of the first well lid, will Section of jurisdiction is arranged on the middle part side of U-shaped vertical shaft duct piece assembling machine system, and then the spacing centralizing tool in section of jurisdiction sets back, vertical shaft pipe Piece assembling machine system controls the height of section of jurisdiction by adjusting the height of elevating mechanism, by rotating above slew gear to control The operating position of tubulation piece, vertical shaft duct piece assembling machine system is attached to section of jurisdiction behind required position, vertical shaft duct piece assembling machine System sets back, and moves in circles by above step, and section of jurisdiction is arranged on the borehole wall by the program of design;
When having a power failure, the stand-by power supply being equipped with by platform side makes vertical shaft duct piece assembling machine system carrying section of jurisdiction exist Rotate on slew gear, emergent section of jurisdiction parking system is slided to desired location along guide rail, treat that vertical shaft duct piece assembling machine system is carried Section of jurisdiction is moved at emergent section of jurisdiction parking system stops the rotation, and section of jurisdiction is placed on emergent section of jurisdiction and is stopped by vertical shaft duct piece assembling machine system On place system;Emergent section of jurisdiction parking system is usually located at platform inner side, against column, can avoid freeing dry with other equipment Relate to;
After the completion of pipe sheet assembling, anchoring of the vertical shaft anchor pole drill system by slew gear, elevating mechanism to reserving on section of jurisdiction Hole is positioned, is crept into, is anchored work, plays a part of to reinforce section of jurisdiction;
Before shaft excavation machine is excavated downwards, the advanced drill system of the first vertical shaft and the advanced drill system of the second vertical shaft are by rising Descending mechanism adjusts height, and by slew gear regulating circumferential position, after position determines, the advanced drill system of the first vertical shaft and second is erected The advanced drill system of well carries out the exploration of geology, and Underground water provides injected hole for grouting equipment, consolidates bottom.
The invention has the beneficial effects as follows:Present invention excavator different from the past excavates small-sized vertical shaft, and the present invention uses TBM Straight down excavating shaft, adapts in a range of borehole wall diameter, simultaneously to borehole wall lining segment, excavating shaft in driving One-shot forming, the plateform system is one of core component of the shaft excavation machine, the vertical shaft pipe being integrated with needed for shaft sinking Piece assembling machine system, the spacing centralizing tool in section of jurisdiction, emergent section of jurisdiction parking system, the advanced drill system of vertical shaft, vertical shaft anchor pole drill system. Requirement possesses very high positioning precision, is a set of complicated mechanical, electrical, liquid integrated system.
Present configuration is compact, can meet the expansible requirement of borehole wall diameter, integrates probing, anchoring, pipe sheet assembling.By The equipment placed in the plateform system is more, limited space, it is desirable to design compression stroke of trying one's best.The plateform system meets section of jurisdiction spelling Dress, anchoring, the requirement of Advance Drilling, positioning precision is high;The requirement of achievable borehole wall extension, and possess very high intensity and just Degree.
Numerous integration of equipments together, are saved the space of a large amount of preciousnesses by the present invention;Multiple equipment shares a set of revolution Mechanism, elevating mechanism, alleviate weight, have saved great amount of cost;Using Telescopic boom mechanism, the extension of the shaft drilling machine is realized Property require, improve versatility, can for enterprise it is cost-effective, have certain economic benefit;Using remote controller operation, work is improve The security of people;Each equipment together, is easy to safeguard using modular assembly, present invention decreases spatial volume, while Greatly reduce cost.
To realize that high pulling torque drives, using hydraulic system power;To realize expansible requirement, be vertical shaft duct piece assembling machine, Vertical shaft anchor pole drill system, the advanced drill system of the first vertical shaft, the second vertical shaft advance drilling system configuration Telescopic boom mechanism, telescopic arm is adopted Hydraulic cylinder precise control, by displacement transducer position is accurately monitored;For save space and cost, vertical shaft duct piece assembling machine system System, vertical shaft anchor pole drill system, the advanced drill system of the first vertical shaft, the advanced drill system of the second vertical shaft share a set of slew gear and lifting Mechanism;To ensure positioning requirements and operating efficiency, all hydraulic cylinder configuration balanced valve, proportioning valve.In order to ensure personal security, adopt With the equipment on the remote control control platform, and standby a set of straight control operating desk system, use in the case of remote control failure.For Guarantee personnel and equipment safety, configure cage guide well lid, and cage guide is only just opened when needing and transporting goods and materials, maintenance downwards, flat When be all to be sealed by well lid.To prevent from having a power failure, emergent section of jurisdiction parking system is set.
The spacing centralizing tool in section of jurisdiction:Due to the particularity of vertical shaft, section of jurisdiction transport is transported downwards by shaft top, when section of jurisdiction is arrived Up to after the specified location of platform, the spacing centralizing tool in section of jurisdiction is started working, and to section of jurisdiction the restriction of position is carried out, and is easy to vertical shaft section of jurisdiction Assembling machine system is operated.The spacing centralizing tool in section of jurisdiction is arranged on cage guide well lid.
Vertical shaft duct piece assembling machine system:The effect of vertical shaft duct piece assembling machine system is quick, safe efficient to carry out section of jurisdiction It is assembled.Achievable borehole wall extension requires that all hydraulic element configures displacement transducer, balanced valve, proportioning valve.
Emergent section of jurisdiction parking system:When unexpected power-off is run into, using stand-by power supply, section of jurisdiction is placed on into emergent section of jurisdiction and is stopped On place system.Emergent section of jurisdiction parking system can be moved on guide rail, and multifunctional platform inner side is placed at ordinary times, against column, this Sample can avoid freeing interference with other equipment.
Vertical shaft anchor pole drill system:The effect of vertical shaft anchor pole drill system is that assembled good section of jurisdiction is anchored, and is reinforced The lining-up of section of jurisdiction.Anchor hole is reserved with section of jurisdiction, the jumbolter of vertical shaft anchor pole drill system is realized positioning by anchor hole, carried out Drilling work.
The advanced drill system of vertical shaft:The effect of the advanced drill system of vertical shaft is that geology is reconnoitred, and Underground water is slip casting Equipment provides injected hole, consolidates stratum.To improve operating efficiency, the plateform system configures 2 sets of advanced rigs.It is wherein a set of advanced Brill is fixed on vertical shaft duct piece assembling machine, and another set of advanced rig can swing certain angle, so be convenient for advanced hole The positioning of position.
Numerous integration of equipments together, are saved the space of a large amount of preciousnesses by the platform;Multiple equipment shares a set of revolution Mechanism, elevating mechanism, alleviate weight, have saved great amount of cost;The extension of the achievable borehole wall, improves versatility, can be enterprise Industry is cost-effective, there is certain economic benefit;Using remote controller operation, the security of workman is improve;Each equipment adopts mould Block is assembled together, and is easy to safeguard.
Description of the drawings
Below in conjunction with the accompanying drawings the invention will be further described:
Fig. 1 is platform general assembly dimensional structure diagram;
Fig. 2 is platform overlooking the structure diagram;
Fig. 1, in 2:The spacing centralizing tool 2 in section of jurisdiction 1, section of jurisdiction, the first well lid 3, vertical shaft duct piece assembling machine system 4, platform 5, Column 6, elevating mechanism 7, guide rail 8, emergent section of jurisdiction parking system 9, slew gear 10, the second well lid 11, vertical shaft anchor pole drill system 12nd, the advanced drill system 13 of the first vertical shaft, the advanced drill system 14 of the second vertical shaft.
Specific embodiment
With reference to embodiment the present invention is described in further detail with specific embodiment:
Embodiment 1
Platform 5 is circle, and the centrally disposed cylinder column 6 of platform 5 is symmetrical arranged cage guide on the platform 5 of the both sides of column 6 Hole, the symmetrical cage guide hole top is correspondingly arranged the first well lid 3 and the second well lid 11, and the side on the first well lid 3 arranges pipe The spacing centralizing tool 2 of piece, the top periphery of column 6 arranges slew gear 10, is uniformly distributed at least between slew gear 10 and platform 5 Four elevating mechanisms 7, vertical shaft duct piece assembling machine system 4 adopts U-shaped structure, vertical shaft duct piece assembling machine system 4 to be arranged on turn-around machine On structure 10, vertical shaft anchor pole drill system 12 is set in the U-shaped mouth of vertical shaft duct piece assembling machine system 4 on corresponding slew gear 10, The top both sides of vertical shaft duct piece assembling machine system 4 are respectively provided with the advanced drill system of the advanced vertical shaft of drill system 13 and second of the first vertical shaft 14, the middle part side of vertical shaft duct piece assembling machine system 4 arranges section of jurisdiction 1, and the initial position of the section of jurisdiction 1 is located at the first well lid 3 Top, arranges a pair of guide rails 8 on the platform 5 of the side of column 6, emergent section of jurisdiction parking system 9, institute are arranged on the pair of guide rail 8 A pair of guide rails 8 is stated perpendicular to the first well lid 3 and the line of centres of the second well lid 11.
Embodiment 2
Section of jurisdiction 1 is transported to after plateform system from ground, the spacing centralizing tool 2 in section of jurisdiction of the upper side of the first well lid 3 gradually with Section of jurisdiction 1 contacts, and the spacing centralizing tool 2 in section of jurisdiction is limited the position of section of jurisdiction 1, makes section of jurisdiction 1 perpendicular to the center of the first well lid 3 Surface, by section of jurisdiction 1 the middle part side of U-shaped vertical shaft duct piece assembling machine system 4 is arranged on, and then the spacing centralizing tool 2 in section of jurisdiction is extensive Position is restored, vertical shaft duct piece assembling machine system 4 controls the height of section of jurisdiction 1 by adjusting the height of elevating mechanism 7, by revolution The top rotation of mechanism 10 to control the operating position of section of jurisdiction 1, vertical shaft duct piece assembling machine system 4 section of jurisdiction 1 is attached to required for Behind position, vertical shaft duct piece assembling machine system 4 sets back, and moves in circles by above step, and section of jurisdiction 1 is installed by the program of design On the borehole wall;
When having a power failure, the stand-by power supply being equipped with by the side of platform 5 makes vertical shaft duct piece assembling machine system 4 carry section of jurisdiction 1 rotates on slew gear 10, and emergent section of jurisdiction parking system 9 is slided to desired location along guide rail 8, treats vertical shaft duct piece assembling machine system System 4 carries section of jurisdiction 1 and is moved at emergent section of jurisdiction parking system 9 and stops the rotation, and vertical shaft duct piece assembling machine system 4 places section of jurisdiction 1 On emergent section of jurisdiction parking system 9;Emergent section of jurisdiction parking system 9 is usually located at the inner side of platform 5, against column 6, can avoid with Other equipment is interfered;
After the completion of the assembly of section of jurisdiction 1, vertical shaft anchor pole drill system 12 is by slew gear 10, elevating mechanism 7 to reserving on section of jurisdiction 1 Anchor hole positioned, crept into, anchored work, play a part of reinforce section of jurisdiction 1;
Before shaft excavation machine is excavated downwards, the advanced drill system 14 of the advanced vertical shaft of drill system 13 and second of the first vertical shaft leads to Cross elevating mechanism 7 and adjust height, by the regulating circumferential position of slew gear 10, after position determines, the advanced drill system of the first vertical shaft 13 and second the advanced drill system 14 of vertical shaft carry out the exploration of geology, Underground water provides injected hole, firmly for grouting equipment Layer.

Claims (2)

1. a kind of shaft excavation machine plateform system, be by:Section of jurisdiction (1), the spacing centralizing tool in section of jurisdiction (2), the first well lid (3), Vertical shaft duct piece assembling machine system (4), platform (5), column (6), elevating mechanism (7), guide rail (8), emergent section of jurisdiction parking system (9), slew gear (10), the second well lid (11), vertical shaft anchor pole drill system (12), the advanced drill system of the first vertical shaft (13), second The advanced drill system of vertical shaft (14) is constituted;It is characterized in that:Platform (5) is circle, the centrally disposed cylinder column (6) of platform (5), Cage guide hole is symmetrical arranged on the platform (5) of column (6) both sides, the symmetrical cage guide hole top is correspondingly arranged the first well lid (3) With the second well lid (11), the side on the first well lid (3) arranges the spacing centralizing tool (2) in section of jurisdiction, the periphery setting of column (6) top Slew gear (10), is uniformly distributed at least four elevating mechanisms (7) between slew gear (10) and platform (5), vertical shaft section of jurisdiction is spelled Installation system (4) adopts U-shaped structure, vertical shaft duct piece assembling machine system (4) to be arranged on slew gear (10), vertical shaft pipe sheet assembling Vertical shaft anchor pole drill system (12), vertical shaft duct piece assembling machine are set on slew gear (10) corresponding in the U-shaped mouth of machine system (4) The top both sides of system (4) are respectively provided with the advanced drill system of the first vertical shaft (13) and the advanced drill system of the second vertical shaft (14), vertical shaft The middle part side of duct piece assembling machine system (4) arranges section of jurisdiction (1), and the initial position of the section of jurisdiction (1) is located at the first well lid (3) Top, arranges a pair of guide rails (8) on the platform (5) of column (6) side, emergent section of jurisdiction is arranged on the pair of guide rail (8) and is parked System (9), the pair of guide rail (8) is perpendicular to the first well lid (3) and the line of centres of the second well lid (11).
2. a kind of method of operating of shaft excavation machine plateform system, it is characterised in that:Section of jurisdiction (1) is transported to plateform system from ground Afterwards, the spacing centralizing tool in the section of jurisdiction (2) at the upper side of the first well lid (3) gradually contacts with section of jurisdiction (1), the spacing centralizing tool in section of jurisdiction (2) position of section of jurisdiction (1) is limited, makes section of jurisdiction (1) directly over the center of the first well lid (3), by section of jurisdiction (1) peace The middle part side of U-shaped vertical shaft duct piece assembling machine system (4) is mounted in, then the spacing centralizing tool in section of jurisdiction (2) sets back, vertical shaft pipe Piece assembling machine system (4) controls the height of section of jurisdiction (1) by adjusting the height of elevating mechanism (7), by slew gear (10) top is rotated to control the operating position of section of jurisdiction (1), needed for vertical shaft duct piece assembling machine system (4) is attached to section of jurisdiction (1) Behind the position wanted, vertical shaft duct piece assembling machine system (4) sets back, and moves in circles by above step, by section of jurisdiction (1) by design Program is arranged on the borehole wall;
When having a power failure, the stand-by power supply being equipped with by platform (5) side makes vertical shaft duct piece assembling machine system (4) carry section of jurisdiction (1) rotate on slew gear (10), emergent section of jurisdiction parking system (9) is slided to desired location along guide rail (8), treats vertical shaft section of jurisdiction Assembling machine system (4) carrying section of jurisdiction (1) is moved to emergent section of jurisdiction parking system (9) place and stops the rotation, vertical shaft duct piece assembling machine system System (4) is placed on section of jurisdiction (1) on emergent section of jurisdiction parking system (9);Emergent section of jurisdiction parking system (9) is usually located at platform (5) Inner side, against column (6), can avoid being interfered with other equipment;
After the completion of the assembly of section of jurisdiction (1), vertical shaft anchor pole drill system (12) is by slew gear (10), elevating mechanism (7) to section of jurisdiction (1) Upper reserved anchor hole is positioned, is crept into, is anchored work, plays a part of to reinforce section of jurisdiction (1);
Before shaft excavation machine is excavated downwards, the advanced drill system of the first vertical shaft (13) and the advanced drill system of the second vertical shaft (14) are logical Cross elevating mechanism (7) and adjust height, by slew gear (10) regulating circumferential position, after position determines, the first vertical shaft advance drilling System (13) and the advanced drill system of the second vertical shaft (14) carry out the exploration of geology, and Underground water provides slip casting for grouting equipment Hole, consolidates stratum.
CN201610898055.8A 2016-10-14 2016-10-14 A kind of shaft excavation machine plateform system and its operating method Active CN106640089B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610898055.8A CN106640089B (en) 2016-10-14 2016-10-14 A kind of shaft excavation machine plateform system and its operating method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610898055.8A CN106640089B (en) 2016-10-14 2016-10-14 A kind of shaft excavation machine plateform system and its operating method

Publications (2)

Publication Number Publication Date
CN106640089A true CN106640089A (en) 2017-05-10
CN106640089B CN106640089B (en) 2018-08-17

Family

ID=58855219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610898055.8A Active CN106640089B (en) 2016-10-14 2016-10-14 A kind of shaft excavation machine plateform system and its operating method

Country Status (1)

Country Link
CN (1) CN106640089B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108590663A (en) * 2018-06-11 2018-09-28 中铁工程装备集团有限公司 A kind of integrated supporting platform of Construction of Silo
CN109653766A (en) * 2018-11-15 2019-04-19 北方重工装备(沈阳)有限公司 A kind of duct piece assembling machine suitable for miniature shield machine
CN112253132A (en) * 2020-09-07 2021-01-22 辽宁三三工业有限公司 Immersed tube guiding system suitable for vertical shield machine

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0525989A (en) * 1991-07-18 1993-02-02 Takenaka Komuten Co Ltd Vertical type shield method
JPH0642283A (en) * 1992-07-22 1994-02-15 Tokyo Electric Power Co Inc:The Erecter device for shaft shield advancing machine
JPH0649593U (en) * 1992-12-03 1994-07-08 株式会社協和エクシオ Simultaneous propulsion assembly type shield excavator
JPH10169391A (en) * 1996-12-13 1998-06-23 Taisei Corp Shaft-segment assembling facility
JPH11229754A (en) * 1998-02-18 1999-08-24 Taisei Corp Pilot drift type shield drilling method and device
CN101705830A (en) * 2009-10-21 2010-05-12 上海隧道工程股份有限公司 Vacuum cup six-degree-of-freedom shield tunnel segment erector

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0525989A (en) * 1991-07-18 1993-02-02 Takenaka Komuten Co Ltd Vertical type shield method
JPH0642283A (en) * 1992-07-22 1994-02-15 Tokyo Electric Power Co Inc:The Erecter device for shaft shield advancing machine
JPH0649593U (en) * 1992-12-03 1994-07-08 株式会社協和エクシオ Simultaneous propulsion assembly type shield excavator
JPH10169391A (en) * 1996-12-13 1998-06-23 Taisei Corp Shaft-segment assembling facility
JPH11229754A (en) * 1998-02-18 1999-08-24 Taisei Corp Pilot drift type shield drilling method and device
CN101705830A (en) * 2009-10-21 2010-05-12 上海隧道工程股份有限公司 Vacuum cup six-degree-of-freedom shield tunnel segment erector

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108590663A (en) * 2018-06-11 2018-09-28 中铁工程装备集团有限公司 A kind of integrated supporting platform of Construction of Silo
CN109653766A (en) * 2018-11-15 2019-04-19 北方重工装备(沈阳)有限公司 A kind of duct piece assembling machine suitable for miniature shield machine
CN112253132A (en) * 2020-09-07 2021-01-22 辽宁三三工业有限公司 Immersed tube guiding system suitable for vertical shield machine
CN112253132B (en) * 2020-09-07 2023-01-20 辽宁三三工业有限公司 Immersed tube guiding system suitable for vertical shield machine

Also Published As

Publication number Publication date
CN106640089B (en) 2018-08-17

Similar Documents

Publication Publication Date Title
CN109139017B (en) Shaft heading machine adopting open caisson method and construction method of shaft heading machine
RU2712866C2 (en) Drilling system with barrel expansion unit
CN105952406B (en) Cut coring bit in a kind of rock bottom
CN109736811B (en) Mechanical tunneling construction method for vertical shaft
CN106640089A (en) Platform system for vertical shaft heading machine
Liu et al. Key technologies of drilling process with raise boring method
CN104481579A (en) Construction method for ground L-shaped roof horizontal well in mining area
CN103835661A (en) Local excavation pre-supporting raise boring technology
CN102562087B (en) Hydraulic drill follow-up pipe-shed construction method
CN102628336A (en) Batter pile construction drilling machine and construction method
CN203716150U (en) Drilling press pile combined type pile machine
CN206844193U (en) Bore support integral type pile hole forming device
CN201802362U (en) Underground gasification passage through device
CN103711125A (en) Hole drilling and pile pressing combined type piling machine
EP2245256B1 (en) Method and device for creating a deep borehole
CN110331936A (en) A kind of combined type drilling base expanding and base expanding plant pile construction method
CN105804649A (en) Power system of long spiral drilling machine
KR101737521B1 (en) Trench shield apparatus of excavating all surface, and rapid construction method for near-surface ground excavation using the same
JP6570184B2 (en) Drilling rig
CN105625424B (en) For control rectangle bracket pile verticality and azimuthal device and construction method
CN202531026U (en) Drilling machine for construction of inclined pile
CN210888815U (en) Special drilling device for preventing and treating water in coal mine tunnel
WO2015100481A1 (en) Surface access borehole resource extraction method
CN109488205B (en) Drilling stroke and pressure control system for sinking method vertical shaft heading machine
CN106351576A (en) All-around deep-hole drill rig under coal mine well

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant