CN106639100B - Hollow array cylinder Concrete Thick board construction method - Google Patents

Hollow array cylinder Concrete Thick board construction method Download PDF

Info

Publication number
CN106639100B
CN106639100B CN201611219852.5A CN201611219852A CN106639100B CN 106639100 B CN106639100 B CN 106639100B CN 201611219852 A CN201611219852 A CN 201611219852A CN 106639100 B CN106639100 B CN 106639100B
Authority
CN
China
Prior art keywords
cylinder
concrete
array
plate
array cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611219852.5A
Other languages
Chinese (zh)
Other versions
CN106639100A (en
Inventor
王军强
黄国斌
王艳
陈雪涌
候秦侠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ganzhou Gandong Construction Engineering Co.,Ltd.
Hefei Jiuzhou Longteng Scientific And Technological Achievement Transformation Co ltd
Original Assignee
Jiangsu Institute of Architectural Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Institute of Architectural Technology filed Critical Jiangsu Institute of Architectural Technology
Priority to CN201611219852.5A priority Critical patent/CN106639100B/en
Publication of CN106639100A publication Critical patent/CN106639100A/en
Application granted granted Critical
Publication of CN106639100B publication Critical patent/CN106639100B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements
    • E04B5/36Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements
    • E04B5/36Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
    • E04B5/38Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C1/00Building elements of block or other shape for the construction of parts of buildings
    • E04C1/24Elements for building-up floors, ceilings, roofs, arches, or beams
    • E04C1/34Elements for building-up floors, ceilings, roofs, arches, or beams designed for use as filling elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

A kind of hollow array cylinder Concrete Thick board construction method, method includes the following steps: preparation of construction;Set up supporting frame;Flitch leveling and bed die Pass line adjustment;End template is laid with and absolute altitude review;Array cylinder plate unwrapping wire with bed die;The fixed protrusion fixed underpan of installation;Vertically and horizontally beam steel bar colligation is installed;Fixed kernel cylinder;Concrete embedded inner cylinder is installed;Array cylinder plate configuration process detection with bed die;Envelope construction lid on the hardened structure of array cylinder;The review of cylinder plate structural elevation and adjustment;The hardened structure concreting of cylinder;Cylinder plate structural concrete is closed flat;The hardened structure concrete curing of cylinder;Hollow array cylinder concrete thickness plate is checked and accepted.The hollow array cylinder Concrete Thick board construction method of offer intensively opens the cast-in-place concrete slab construction of cylinder suitable for array, and being melted into cylinder, pre-buried disassembling operations with module, accurate, the mellow and full smooth, absolute altitude of pore-forming controls accurate, flatness and highly polished technical characterstic simply, in place.

Description

Hollow array cylinder Concrete Thick board construction method
Technical field
The present invention relates to hollow array cylinder Concrete Thick board construction methods, and it is porous to be particularly suitable for array two-way beam The concrete construction of slab.
Background technique
In the opto-electronics mill construction of new and high technology, it is desirable that have high cleanliness, stability, meet ventilation, air Circulation, preventing fines includes covering for dust floating dust, the cast-in-place concrete floor between producing have thickness is larger, aperture compared with The more demanding feature of the working performances such as more, flatness.
There are form bracing system and mass concrete construction problem, arrays to arrange porous knot for slab concrete construction Structure, there are the how accurate indwelling of array circular hole, how when construction guarantees that the performance of its template and support system is stablized, array Formula is porous and its matching and construction of template, and concreting, which finishes, to keep flatness between slab surfaces and hole and coincide The technologies such as degree, the hole indwelling of the porous regular property of array and cross construction process and the control of the quality of later period concrete are asked Topic.
The construction for how solving the porous slab of array is related to the porous precisely reserved, sealing of array, porous condition Under reinforcement installation, the arrangement of superstructure support system, the strict control and tolerance of slab flatness are one-time formed Flatness control is more demanding, these have very big difference with conventional floors work progress.
Cleanliness and flatness are critical function condition and conventional floors construction after the porous slab construction of array In do not need or do not need emphasis consider the technical issues of.
How a large amount of array cylinder is quickly reserved, and modular organisation is not convenient in spillage, construction, and working procedure is simply high Effect, it is convenient to remove, and pore-forming stability and high efficiency is convenient for worker operation, is convenient for loop organization cross construction, and determine whether it is feasible An important factor for.
Summary of the invention
The present invention provides hollow array cylinder Concrete Thick board construction method, it is therefore an objective to develop one kind and be suitable for array The slab construction method of formula cylinder indwelling, convenient for the modularization cross construction of porous slab.
To achieve the above object, hollow array cylinder Concrete Thick board construction method is realized by following technical scheme:
A kind of hollow array cylinder Concrete Thick board construction method, this approach includes the following steps,
Step 1: preparation of construction and datum grade pilot measurement;
Step 2: supporting frame is set up;
Step 3: flitch leveling and bed die Pass line adjustment;
Step 4: end template is laid with and absolute altitude review;
Step 5: the array cylinder plate unwrapping wire with bed die;
Step 6: the fixed protrusion fixed underpan of installation;
Step 7: vertically and horizontally beam steel bar colligation is installed;
Step 8: fixed kernel cylinder;
Step 9: concrete embedded inner cylinder is installed;
Step 10: the array cylinder plate configuration process detection with bed die;
Step 11: envelope construction lid on the hardened structure of array cylinder;
Step 12: the review of array cylinder plate structural elevation and adjustment;
Step 13: the hardened structure concreting of array cylinder;
Step 14: array cylinder plate structural concrete is closed flat;
Step 15: the hardened structure concrete curing of array cylinder;
Step 10 six: the hollow array cylinder concrete thickness plate of array is checked and accepted.
Preferably, the step 1 specifically: preparation of construction and datum grade pilot measurement key point include vertical member column Construction and elevation control point pilot measurement are in place, and carry out apparent mark.
Preferably, the step 2 sets up supporting frame, and specially vertical upright bar spacing is no more than 900mm, horizontal direction Flat distance between tie rods is no more than 1200mm, and the adjustable free spacing of support is no more than 300mm, and frame body is stablized, and deflection is no more than 1mm.
Preferably, the step 3 flitch leveling and bed die Pass line adjustment, specially primary and secondary skeletal frame mounting and adjusting are horizontal flat Vertically, then end template is installed, absolute altitude meets control error requirements, and cumulative measurement control errors meet the requirements.
Preferably, the step 4 end template is laid with and absolute altitude review, end template are the special-shaped bed die for having porous plate Plate.End template carries out module assembly, the control of end template absolute altitude and column according to the arrangement of design typesetting figure and array porous tube The control of net interval error is no more than 1mm.
Preferably, array cylinder plate unwrapping wire of the step 5 with bed die, specifically includes array cylinder plate center Line pilot measurement, protrusion fixed underpan modified line pilot measurement, two-way beam longitudinal reinforcement install sideline, plate top surface absolute altitude control line.
Preferably, the fixed protrusion fixed underpan of step 6 installation, fixed protrusion chassis use symmetrical fixed form, It is smooth to protrude chassis surface.
Preferably, the step 7 vertically and horizontally install by beam steel bar colligation, specifically includes and is demonstrated using template, machinery connects Head, vertically and horizontally reinforcing bar level is distinguished, and muscle is indulged in first top and the bottom, and rear waist muscle, using improving bud grafting is hung outside beam body, first length is short backward To organizing and implementing.
Preferably, the fixed kernel cylinder of the step 8, is fastened using lock card mode, rotates counterclockwise and hear lock card sound Until, fixed kernel cylinder is aluminium alloy cylindrical body, and overall diameter is 20mm-40mm smaller than concrete embedded inner cylinder interior diameter, and centre is set Grid ribs is set, aluminium alloy cylindrical body is to guarantee that concrete embedded inner cylinder is in place and the reliable support cylinder of construction.
Preferably, the step 9 installs concrete embedded inner cylinder, and the concrete embedded inner cylinder is to pour coagulation Pre-buried cylinder is not demoulded when native, after concrete demoulding is retained in concrete, forms array cylinder board, it is straight Diameter and thickness should meet design requirement, and regular size diameter takes 200mm-600mm, with a thickness of 400mm-1000mm, cylinder inboard wall Smooth, without burr, after form removable, concrete embedded inner cylinder is retained in concrete, forms reserved deep hole cylinder, concrete Pre-buried inner cylinder is the reserved cylinder being shelved on fixed kernel cylinder.
Preferably, array cylinder plate configuration process detection of the step 10 with bed die, specifically includes array circle The cylinder installation deviation of plate, position, absolute altitude and array cylinder plate fastener, leakproofness, intracavitary sundries, cleanliness etc. Process inspection and record of acceptance.
Preferably, envelope construction lid on the hardened structure of step 11 array cylinder, specifically includes capping and sealing. Upper envelope construction lid can bear construct during concreting live load, not less than 2.5kN/m2, before closure body is installed, check The integrity of upper envelope construction lid, the size and leakproofness of circular seal lid with the edge of a wing.
Preferably, the step 12 array cylinder plate structural elevation review and adjustment, specifically include array circle The review of cylinder top surface absolute altitude, floor top surface absolute altitude, upper envelope construction lid absolute altitude.
Preferably, the hardened structure concreting of the step 13 array cylinder, concrete is using good fluidity, receipts The small self-compacting concrete of contracting, placement layer by layer, slicing stoping cloth, cloth ulking thickness maximum vertical deviation are not to be exceeded 300mm, lift height are no more than 200mm, and interlayer interval is no more than the presetting period, pours sequence continuous-stable, shaking concrete When distance of the strict control insertion point apart from cylinder 50mm is not to be exceeded, concrete formation face is higher by than structure floor elevation control 3mm-5mm。
Preferably, the step 14 array cylinder plate structural concrete is closed flat, and concreting, which finishes, to be carried out Receipts face and floating receive face and use asperities, and the completion before concrete coagulation hardens combs out scored surface with whisk broom, then carries out essence Thin to smooth out, using manually carrying out with by the way of mechanical bond, including sectional repair, dry powder spill painting, machinery polishes.
Preferably, the hardened structure concrete curing of the step 15 array cylinder, using watering film maintenance method It carries out.
Preferably, the hollow array cylinder concrete thickness plate finished product protection of six array of step 10 and examination, tool Body includes the inspection of quality of the finished product protection, array cylinder slab of reserved cylinder slab.
The invention has the advantages that:
The hollow array cylinder Concrete Thick board construction method of the present invention, emphasis surround cast-in-situ floor system specific use function Energy demand, comprising: cleanliness high request, flatness high request reserve more high requests, absolute altitude control high request, Deformation control High request.Using the array cylinder sheet metal forming structure with bed die, more of array element module once mounting realizes that modularization is applied Work, inner cylinder is in conjunction with the reserved cylinder bitubular, easy disassembly and pore-forming, guarantees hole quality and efficiency, institute is at the round and smooth smoothness of cylinder, rule Then unify, outer perception is good.Four cores, strict control accumulated error are surveyed in absolute altitude control four.Concrete, which uses, to be poured layering, shrinks control System, the floating of receipts face etc. ensure that the high request control of concrete high-flatness and absolute altitude.Sky array cylinder proposed by the present invention Concrete Thick board construction method, advantageously account for large area, slab, porous indwelling modularization cross construction, high construction efficiency is just Victory, hole quality is high, and impression quality and flatness are easily guaranteed that.
Detailed description of the invention
Fig. 1 is a kind of array cylinder sheet metal forming structure with bed die;
Fig. 2 is a kind of 4 hole array arrangements of array cylinder sheet metal forming structure with bed die;
Fig. 3 is hollow array cylinder Concrete Thick board construction method process flow diagram;
In figure: 1-porous plate end template;2-protrusion fixed underpans;3-chassis firmwares;4-fixed kernel cylinders;5-is mixed The solidifying pre-buried inner cylinder of soil;6-kernel cylinder reinforcing members;7-upper envelope construction lids.
Specific embodiment
Below in conjunction with attached drawing, by specific embodiment, the present invention is further illustrated.
Embodiment:
As shown in Figure 1 and Figure 2, a kind of array cylinder sheet metal forming structure with bed die has the bottom of porous plate including one piece Template 1 is equipped with multiple protrusion fixed underpans 2 on end template 1, and the center of each protrusion fixed underpan 2 is further through one A chassis firmware 3 is fixed;A fixed kernel cylinder 4,4 bottom of fixation kernel cylinder are set on each protrusion 2 outer wall of fixed underpan Portion's position of fixity is equipped with a circle broached-tooth design I, is provided with and broached-tooth design I at the position that end template 1 is in contact with fixed kernel cylinder 4 Fixed kernel cylinder 4 is fixed on protrusion fixation with being engaged for broached-tooth design II by broached-tooth design I by compatible broached-tooth design II On chassis 2;Middle position in fixed kernel cylinder 4 is equipped with kernel cylinder reinforcing member 6;One is set on the outer wall of fixed kernel cylinder 4 Concrete embedded inner cylinder 5, which is equipped with a circle broached-tooth design I at bottom, in kernel cylinder reinforcing member 6 The position being in contact with fixed kernel cylinder 4 is provided with broached-tooth design II compatible with broached-tooth design I, by broached-tooth design I with Kernel cylinder reinforcing member 6 is fixed on fixed kernel cylinder 4 by the occlusion of broached-tooth design II;Fixed kernel cylinder 4 and concrete embedded interior Envelope construction lid 7 in the top setting of cylinder 5.
Work progress:
Case study on implementation is that certain photoelectricity produces room, it is desirable that very clean, dust is no more than 100 in every cubic metres of air, Ask indoor component surface cleaning, secured, non-scale, dust stratification.The nearly 60000m of the area of open-celled structure floor2, wherein floor is thick 600-900mm, it is more than 12000 that cylinder quantity is opened on floor, and hole is the circular hole of diameter 380mm on plate, and girder is wide 500mm, waffle beam wide 240mm and 260mm, deck-molding is 750mm.
Case study on implementation uses hollow array cylinder Concrete Thick board construction method, as shown in figure 3, the construction procedure used Are as follows:
This approach includes the following steps,
Step 1: preparation of construction and datum grade pilot measurement;
Step 2: supporting frame is set up;
Step 3: flitch leveling and bed die Pass line adjustment;
Step 4: end template is laid with and absolute altitude review;
Step 5: the array cylinder plate unwrapping wire with bed die;
Step 6: the fixed protrusion fixed underpan of installation;
Step 7: vertically and horizontally beam steel bar colligation is installed;
Step 8: fixed kernel cylinder;
Step 9: concrete embedded inner cylinder is installed;
Step 10: the array cylinder plate configuration process detection with bed die;
Step 11: envelope construction lid on the hardened structure of array cylinder;
Step 12: the review of array cylinder plate structural elevation and adjustment;
Step 13: the hardened structure concreting of array cylinder;
Step 14: array cylinder plate structural concrete is closed flat;
Step 15: the hardened structure concrete curing of array cylinder;
Step 10 six: the hollow array cylinder concrete thickness plate of array is checked and accepted.
Step 1: preparation of construction and datum grade pilot measurement key point include the construction of vertical member column and elevation control point pilot measurement In place, and apparent mark is carried out.
Step 2 specifically uses the rim of a bowl scaffold, and vertical upright bar spacing is no more than 900mm, and the flat distance between tie rods of horizontal direction is no more than 1200mm, the adjustable free spacing of support are no more than 300mm, and frame body is stablized, and deflection is no more than 1mm, actual monitoring frame body deflection It is up to 0.83mm.
Step 3 is specially primary and secondary skeletal frame mounting and adjusting, smooth vertical and horizontal, then installs end template, and absolute altitude meets control error It is required that cumulative measurement control errors meet the requirements.Use keel for the main joist of 100mm square section, 50mm × 100mm square Tee section secondary joist.Keel section deviation is no more than 5m.Absolute altitude control in keel top surface is no more than 1mm, and 2m flatness is no more than 1mm。
Step 4 is specially that end template is the special-shaped end template for having porous plate.End template according to design typesetting figure and The arrangement of array porous tube carries out module assembly, and the control of end template absolute altitude and the control of column net interval error are no more than 1mm.
It is longitudinal that step 5 specifically includes array cylinder plate center line pilot measurement, protrusion fixed underpan modified line pilot measurement, two-way beam Reinforcement installation sideline, plate top surface absolute altitude control line.
Step 6 is specially that fixed protrusion chassis uses symmetrical fixed form, and protrusion chassis surface is smooth.Fixed protrusion bottom Disk is that indwelling mode, 4 cylinder compositions of a bed die band are combined in 4 holes.Matrix arrangement is 4 × 4,4 in column net interval × 3 modes.
Step 7 is specifically included is demonstrated using template, mechanical splice, and vertically and horizontally reinforcing bar level is distinguished, and muscle is indulged in first top and the bottom, Rear waist muscle, using improving bud grafting is hung outside beam body, first long short backward is organized and implemented.Longitudinal reinforcement is outer outstanding using flitch support It binds outside mould, is then installed in place in mould.
Step 8 specifically uses lock card mode to fasten, and rotates counterclockwise until hearing lock card sound.Fixed kernel cylinder is aluminium Alloy cylinder, overall diameter are 20mm-40mm smaller than concrete embedded inner cylinder interior diameter, centre setting grid ribs, aluminium alloy Cylinder is to guarantee that concrete embedded inner cylinder is in place and the reliable support cylinder of construction.In case, aluminium alloy cylindrical body overall diameter 350mm, 30mm smaller than concrete embedded inner cylinder interior diameter, centre setting grid ribs, aluminium alloy cylindrical body is to guarantee concrete Pre-buried inner cylinder is in place and construction is reliable supports cylinder.
Step 9, which is specially concrete embedded inner cylinder, does not demould pre-buried cylinder when being casting concrete, tears open in concrete It after mould is retained in concrete, forms array cylinder board, diameter and thickness should meet design requirement, and format diameter takes 380mm-400mm is highly 650mm-800mm, and cylinder inboard wall is smooth, without burr, after form removable, and concrete embedded inner cylinder It is retained in concrete, forms reserved deep hole cylinder.Concrete embedded inner cylinder is the reserved cylinder being shelved on fixed kernel cylinder Body.
Step 10 specifically includes the fastening of the installation deviation, position, absolute altitude and array cylinder plate of array cylinder plate The process inspection and record of acceptance of part, leakproofness, intracavitary sundries, cleanliness etc..
Step 11 specifically includes capping and sealing.Upper envelope construction lid can bear lotus living of constructing during concreting It carries, not less than 2.5kN/m2.Before closure body is installed, integrity, the circular seal with the edge of a wing of envelope construction lid in inspection The size and leakproofness of lid.
Step 12 specifically includes array cylinder top surface absolute altitude, floor top surface absolute altitude, upper envelope construction lid absolute altitude and answers Core.
The self-compacting concrete that concrete in step 13 uses good fluidity, shrinkage small, placement layer by layer, layering push away 300mm is not to be exceeded in cloth feeding material, cloth ulking thickness maximum vertical deviation, and lift height is no more than 200mm, and interlayer interval does not surpass The presetting period is spent, pours sequence continuous-stable, distance of the strict control insertion point apart from cylinder is not to be exceeded when shaking concrete 50mm.Concrete formation face is higher by 3mm-5mm than structure floor elevation control.
Step 14 array cylinder plate structural concrete is closed flat, and concreting finishes receipts face to be carried out and smoothes out.It receives Face uses asperities, completes before concrete coagulation hardens, combs out scored surface with Special broom.Then it is finely smoothed out, is adopted It is manually carried out with the mode of mechanical bond, including sectional repair, dry powder spill painting, machinery polishes.Flatness 2mm/3m, between cylinder Flatness 1mm/1.2m.
The hardened structure concrete curing of step 15 array cylinder is carried out using watering film maintenance method.Class coating material Using aqueous soluble material, plastic film should not be used, inseparable disintegration is formed.
The hollow array cylinder concrete thickness plate finished product protection of six array of step 10 and examination, it is thick to specifically include reserved cylinder The inspection of quality of the finished product protection, array cylinder slab of plate.
The above is only design scheme of the invention, is not intended to limit the present invention in any form, although this hair Bright to have been disclosed in a preferred embodiment above, however, it is not intended to limit the invention, any person skilled in the art, not It is detached within the scope of technical solution of the present invention, when the technology contents using the disclosure above are modified or are modified to equivalent change The equivalent embodiment of change, but anything that does not depart from the technical scheme of the invention content, according to the technical essence of the invention to the above reality Simple modification, equivalent change and modification any made by example is applied, all of which are still within the scope of the technical scheme of the invention.

Claims (8)

1. a kind of hollow array cylinder Concrete Thick board construction method, it is characterised in that: this approach includes the following steps,
Step 1: preparation of construction and datum grade pilot measurement;
Step 2: supporting frame is set up;
Step 3: flitch leveling and bed die Pass line adjustment;
Step 4: end template is laid with and absolute altitude review;
Step 5: the array cylinder plate unwrapping wire with bed die;
Step 6: the fixed protrusion fixed underpan of installation;
Step 7: vertically and horizontally beam steel bar colligation is installed;
Step 8: fixed kernel cylinder;
Step 9: concrete embedded inner cylinder is installed;
Step 10: the array cylinder plate configuration process detection with bed die;
Step 11: envelope construction lid on the hardened structure of array cylinder;
Step 12: the review of array cylinder plate structural elevation and adjustment;
Step 13: the hardened structure concreting of array cylinder;
Step 14: array cylinder plate structural concrete is closed flat;
Step 15: the hardened structure concrete curing of array cylinder;
Step 10 six: the hollow array cylinder concrete thickness plate of array is checked and accepted;
The step 7 vertically and horizontally install by beam steel bar colligation, specifically includes and is demonstrated using template, mechanical splice, vertically and horizontally steel bar layer Muscle is indulged in secondary differentiation, first top and the bottom, and rear waist muscle, using improving bud grafting is hung outside beam body, first long short backward is organized and implemented;
The fixed kernel cylinder of the step 8, is fastened using lock card mode, is rotated counterclockwise until hearing lock card sound, fixed kernel Cylinder is aluminium alloy cylindrical body, and overall diameter is 20mm-40mm smaller than concrete embedded inner cylinder interior diameter, centre setting grid ribs, Aluminium alloy cylindrical body is to guarantee that concrete embedded inner cylinder is in place and the reliable support cylinder of construction;
The step 9 installs concrete embedded inner cylinder, and not demoulding when the concrete embedded inner cylinder is casting concrete is pre- Cylinder is buried, after concrete demoulding is retained in concrete, forms array cylinder board, diameter and thickness should meet Design requirement, regular size diameter take 200mm-600mm, and with a thickness of 400mm-1000mm, cylinder inboard wall is smooth, without burr, After form removable, concrete embedded inner cylinder is retained in concrete, forms reserved deep hole cylinder, and concrete embedded inner cylinder is to shelve Reserved cylinder on fixed kernel cylinder.
2. hollow array cylinder Concrete Thick board construction method according to claim 1, it is characterised in that: the step One preparation of construction and datum grade pilot measurement include that the construction of vertical member column and elevation control point pilot measurement are in place, and carry out apparent mark Note;
The step 2 sets up supporting frame, and specially vertical upright bar spacing is no more than 900mm, and the flat distance between tie rods of horizontal direction is no more than 1200mm, the adjustable free spacing of support are no more than 300mm, and frame body is stablized, and deflection is no more than 1mm.
3. hollow array cylinder Concrete Thick board construction method according to claim 1, it is characterised in that: the step The leveling of three flitches and bed die Pass line adjustment, specially primary and secondary skeletal frame mounting and adjusting, it is smooth vertical and horizontal, then end template, absolute altitude are installed Meet control error requirements, cumulative measurement control errors meet the requirements;
The step 4 end template is laid with and absolute altitude review, and end template is the special-shaped end template for having porous plate, end template according to The arrangement for designing typesetting figure and array porous tube carries out module assembly, the control of end template absolute altitude and column net interval error control System is no more than 1mm.
4. hollow array cylinder Concrete Thick board construction method according to claim 1, it is characterised in that:
It is solid to specifically include array cylinder plate center line pilot measurement, protrusion for array cylinder plate unwrapping wire of the step 5 with bed die Determine chassis modified line pilot measurement, the installation of two-way beam longitudinal reinforcement sideline, plate top surface absolute altitude control line;
The fixed protrusion fixed underpan of step 6 installation, fixed protrusion chassis use symmetrical fixed form, protrude chassis surface It is smooth.
5. hollow array cylinder Concrete Thick board construction method according to claim 1, it is characterised in that:
Array cylinder plate configuration process detection of the step 10 with bed die, the installation for specifically including array cylinder plate are inclined Difference, position, absolute altitude and array cylinder plate fastener, leakproofness, intracavitary sundries, cleanliness process inspection and examination Record;
Envelope construction lid on the hardened structure of step 11 array cylinder specifically includes capping and sealing, upper envelope construction lid It can bear construct during concreting live load, not less than 2.5kN/m2, before closure body is installed, envelope construction lid in inspection Integrity, the size and leakproofness of circular seal lid with the edge of a wing;
The step 12 array cylinder plate structural elevation review and adjustment, specifically include array cylinder top surface absolute altitude, building The review of plate top surface absolute altitude, upper envelope construction lid absolute altitude.
6. hollow array cylinder Concrete Thick board construction method according to claim 1, it is characterised in that:
The hardened structure concreting of step 13 array cylinder, concrete use self-compacting concrete, and placement layer by layer divides Layer promotes cloth, and 300mm is not to be exceeded in cloth ulking thickness maximum vertical deviation, and lift height is no more than 200mm, interlayer interval No more than the presetting period, sequence continuous-stable is poured, distance of the strict control insertion point apart from cylinder is not answered when shaking concrete More than 50mm, concrete formation face is higher by 3mm-5mm than structure floor elevation control.
7. hollow array cylinder Concrete Thick board construction method according to claim 1, it is characterised in that:
The step 14 array cylinder plate structural concrete is closed flat, and concreting finishes receipts face to be carried out and smoothes out, and is received Face uses asperities, completes before concrete coagulation hardens, combs out scored surface with whisk broom, then finely smoothed out, using people The mode of work and mechanical bond carries out, including sectional repair, dry powder spill painting, machinery polishes.
8. hollow array cylinder Concrete Thick board construction method according to claim 1, it is characterised in that: the step The hardened structure concrete curing of 15 array cylinders is carried out using watering film maintenance method;
The hollow array cylinder concrete thickness plate finished product protection of six array of step 10 and examination, it is thick to specifically include reserved cylinder The inspection of quality of the finished product protection, array cylinder slab of plate.
CN201611219852.5A 2016-12-26 2016-12-26 Hollow array cylinder Concrete Thick board construction method Active CN106639100B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611219852.5A CN106639100B (en) 2016-12-26 2016-12-26 Hollow array cylinder Concrete Thick board construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611219852.5A CN106639100B (en) 2016-12-26 2016-12-26 Hollow array cylinder Concrete Thick board construction method

Publications (2)

Publication Number Publication Date
CN106639100A CN106639100A (en) 2017-05-10
CN106639100B true CN106639100B (en) 2019-02-05

Family

ID=58827557

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611219852.5A Active CN106639100B (en) 2016-12-26 2016-12-26 Hollow array cylinder Concrete Thick board construction method

Country Status (1)

Country Link
CN (1) CN106639100B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107023104A (en) * 2017-06-05 2017-08-08 中建八局第建设有限公司 A kind of wafer board construction technology for clean room

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002180582A (en) * 2000-12-13 2002-06-26 Yuka Sansho Kk Embedded member for concrete slab, precast concrete board, and hollow concrete slab
JP2002188236A (en) * 2000-12-22 2002-07-05 Yuka Sansho Kk Embedded material for concrete slab, precast concrete slab and void concrete slab
CN102359272A (en) * 2011-08-15 2012-02-22 中国建筑第八工程局有限公司 Construction method for waffle slab by using veitch cylinder as hole reservation die
CN203145268U (en) * 2012-07-30 2013-08-21 林三荣 Lattice beam mould
CN205329988U (en) * 2016-02-03 2016-06-22 深圳卓诺中科科技发展有限公司 Wafer board 's construction structures
CN205558270U (en) * 2016-01-25 2016-09-07 中国建筑第二工程局有限公司 Square waffle slab inner support reinforcing device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002180582A (en) * 2000-12-13 2002-06-26 Yuka Sansho Kk Embedded member for concrete slab, precast concrete board, and hollow concrete slab
JP2002188236A (en) * 2000-12-22 2002-07-05 Yuka Sansho Kk Embedded material for concrete slab, precast concrete slab and void concrete slab
CN102359272A (en) * 2011-08-15 2012-02-22 中国建筑第八工程局有限公司 Construction method for waffle slab by using veitch cylinder as hole reservation die
CN203145268U (en) * 2012-07-30 2013-08-21 林三荣 Lattice beam mould
CN205558270U (en) * 2016-01-25 2016-09-07 中国建筑第二工程局有限公司 Square waffle slab inner support reinforcing device
CN205329988U (en) * 2016-02-03 2016-06-22 深圳卓诺中科科技发展有限公司 Wafer board 's construction structures

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
圆孔钢模在大型电子厂房华夫板中的应用;宋煜等;《施工技术》;20131031;第42卷(第20期);第73-76页

Also Published As

Publication number Publication date
CN106639100A (en) 2017-05-10

Similar Documents

Publication Publication Date Title
CN104895318B (en) Aluminum alloy template system and construction method of same
CN202194317U (en) Guide rail structure for cast-in-site concrete slope surface
CN109441098B (en) Early-dismantling formwork system and construction method thereof
CN106988525A (en) A kind of skyscraper aluminum alloy mould plate construction method
CN109577534A (en) Tool-based hanging die assembly type composite floor slab and construction method
CN104652830B (en) The construction method that a kind of Prefabricated construction panel and prefabricated panel are built
EP3670774B1 (en) Prefabricated bathroom and methods for constructing and installing the same
CN101294419A (en) Novel method for quickly assembling low-cost energy-saving house with prefabricated pole, beam, plate
CN108643428B (en) But height-adjusting's assembled precast concrete coincide floor
CN206607863U (en) A kind of post-cast strip temporary support structure
CN103526929A (en) Super high-rise steel pipe column interior concrete pouring construction method
CN105178604A (en) Construction method of assembly type superimposed floor slab
CN110905113A (en) Construction method of large-span concrete dome structure
CN108755972B (en) Foot pad for prefabricated part and using method thereof
CN106639100B (en) Hollow array cylinder Concrete Thick board construction method
CN107345439A (en) A kind of making of precast stair component and installation method
CN207110214U (en) A kind of prefabricated interior fill concrete wallboard
CN109112903A (en) Solid concrete roabed trackless construction technology is cheated in a kind of phase library inner column formula inspection
CN108661224B (en) But height-adjusting's assembled concrete coincide floor
CN107237448A (en) A kind of prefabricated interior fill concrete wallboard and its manufacture method
CN110847598A (en) Thin-wall hollow pier diaphragm plate bottom formwork and construction method
CN110348142B (en) Method for forming curve bridge based on BIM combined template support process
CN111379337B (en) Secondary structure anti-seepage and anti-leakage construction method
CN112832112A (en) Pouring and vibrating process for railway machine-made sand concrete box girder
CN203080767U (en) Cast-in-situ densely-ribbed beam assembly box hollow floor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230506

Address after: 341000 Shuidong Yan'ao Shang, Zhanggong District, Ganzhou City, Jiangxi Province

Patentee after: Ganzhou Gandong Construction Engineering Co.,Ltd.

Address before: 230000 Room 203, building 2, phase I, e-commerce Park, Jinggang Road, Shushan Economic Development Zone, Hefei City, Anhui Province

Patentee before: Hefei Jiuzhou Longteng scientific and technological achievement transformation Co.,Ltd.

Effective date of registration: 20230506

Address after: 230000 Room 203, building 2, phase I, e-commerce Park, Jinggang Road, Shushan Economic Development Zone, Hefei City, Anhui Province

Patentee after: Hefei Jiuzhou Longteng scientific and technological achievement transformation Co.,Ltd.

Address before: 221116 Jiangsu city of Xuzhou Province Academy of Quanshan District Road No. 26

Patentee before: JIANGSU VOCATIONAL INSTITUTE OF ARCHITECTURAL TECHNOLOGY