CN106639050A - 钢筋混凝土剪力墙与钢连梁的连接结构 - Google Patents
钢筋混凝土剪力墙与钢连梁的连接结构 Download PDFInfo
- Publication number
- CN106639050A CN106639050A CN201710077902.9A CN201710077902A CN106639050A CN 106639050 A CN106639050 A CN 106639050A CN 201710077902 A CN201710077902 A CN 201710077902A CN 106639050 A CN106639050 A CN 106639050A
- Authority
- CN
- China
- Prior art keywords
- coupling beam
- steel coupling
- shear wall
- reinforced concrete
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Reinforcement Elements For Buildings (AREA)
Abstract
本发明公开了钢筋混凝土剪力墙与钢连梁的连接结构,包括二个剪力墙和钢连梁,所述二个剪力墙通过所述钢连梁互相连接在一起;所述二个剪力墙设有网格状的纵筋和箍筋,并通过混凝土浇筑成型;所述钢连梁的二端设有U形锁接板,该U形锁接板具有U形卡槽,且该二个U形锁接板的U形卡槽可与所述剪力墙的端面卡接配合;且该二个U形锁接板通过垂直于二组垂直交错的长螺栓锁接固定于所述第一剪力墙或所述第二剪力墙的墙体。本发明提供了钢筋混凝土剪力墙与钢连梁的连接结构,不影响剪力墙本身的纵筋和箍筋结构,进而保证剪力墙的抗震性能,缩短了施工周期。
Description
技术领域
本发明涉及一种连梁结构,特别是涉及钢筋混凝土剪力墙与钢连梁的连接结构。
背景技术
在剪力墙结构体系中,连梁是重要的耗能构件;但由于连梁的跨高比一般较小,受剪力作用明显,普通配筋的钢筋混凝土连梁很难满足结构对其延性和耗能能力的要求。基于这个不足,国内外学者提出了用钢连梁来代替传统钢筋混凝土联肢剪力墙结构中的钢筋混凝土连梁,形成了混合联肢剪力墙结构。在混合联肢剪力墙结构中,钢连梁与钢筋混凝土剪力墙的连接节点起着至关重要的作用。
现有技术中的钢连梁与钢筋混凝土剪力墙的连接结构为,将二侧的剪力墙的纵筋和箍筋中断,形成供钢连梁置入的让位空间,再通过混凝土浇筑成型。由于,钢连梁中断了剪力墙边缘构件内的纵筋和箍筋,使得剪力墙的抗震性能受到了不利影响;另外,剪力墙内中断的纵筋和箍筋的端部,需要另外焊接在对应的钢连梁的翼缘和腹板上,伸入钢筋混凝土剪力墙肢内部的钢连梁的翼缘和腹板需焊接有锚固栓钉,也增加了施工难度。
发明内容
本发明的目的在于克服现有技术之不足,提供了钢筋混凝土剪力墙与钢连梁的连接结构,不影响剪力墙本身的纵筋和箍筋结构,进而保证剪力墙的抗震性能不会受到影响,同时减少了现场安装的难度,缩短了施工周期。
本发明解决其技术问题所采用的技术方案是:钢筋混凝土剪力墙与钢连梁的连接结构,包括二个剪力墙和钢连梁,所述二个剪力墙并列设置,并通过所述钢连梁互相连接在一起,形成矩形的承力结构;
所述二个剪力墙设有网格状的纵筋和箍筋,并通过混凝土浇筑成型;所述钢连梁的二端设有U形锁接板,该U形锁接板具有U形卡槽,且该二个U形锁接板的U形卡槽可与所述剪力墙的端面卡接配合;且该二个U形锁接板通过垂直于二组垂直交错的长螺栓锁接固定于所述第一剪力墙或所述第二剪力墙的墙体。
作为一种优选,所述钢连梁为工字型横梁。
作为一种优选,所述U形锁接板与所述钢连梁互相焊接,且该U形锁接板与钢连梁的焊接位置处设有若干个强化筋板。
作为一种优选,所述二组长螺栓与所述剪力墙内部的纵筋和箍筋互相交错搭接,并通过锁紧件互相锁接固定。由于二组长螺栓互相垂直交错,而所述剪力墙的纵筋和箍筋也形成网状结构,二个交错的结构可互相搭接并形成支撑,形成沿竖直方向的承力结构。
作为一种优选,还包括剪切耗能板,所述剪切耗能板锁接于所述钢连梁的表面。该剪切耗能板用于在钢连梁弯曲变形时,或受到剪切力的过程中,消耗能量。
作为一种优选,所述钢连梁的壁厚为30mm~60mm。
作为一种优选,所述U形锁接板的厚度为30mm~60mm。
作为一种优选,所述剪切耗能板的厚度为20mm~50mm。
本发明的有益效果是:本发明的钢筋混凝土剪力墙与钢连梁的连接结构改变了现有结构中,需要中断剪力墙内纵筋和箍筋的结构,并通过U形锁接板将钢连梁之间锁接于剪力墙的墙体表面,不会影响剪力墙的抗震性能。另外钢连梁可在工厂中提前预制,而后送到现场组装,极大缩减了施工周期。
以下结合附图及实施例对本发明作进一步详细说明;但本发明的钢筋混凝土剪力墙与钢连梁的连接结构不局限于实施例。
附图说明
图1是本发明的结构示意图;
图2是本发明的正面剖视图;
图3是本发明的A-A剖面图;
图4是本发明的B-B剖面图;
图5是本发明的C-C剖面图。
具体实施方式
实施例:
参见图1至图5所示,本发明的一种钢筋混凝土剪力墙3与钢连梁1的连接结构,包括二个剪力墙3和钢连梁1,所述二个剪力墙3并列设置,并通过所述钢连梁1互相连接在一起,形成矩形的承力结构;所述二个剪力墙3设有网格状的纵筋31和箍筋32,并通过混凝土浇筑成型;所述钢连梁1的二端设有U形锁接板2,该U形锁接板2具有U形卡槽,且该二个U形锁接板2的U形卡槽可与所述剪力墙3的端面卡接配合;且该二个U形锁接板2通过垂直于二组垂直交错的长螺栓21、22锁接固定于所述第一剪力墙3或所述第二剪力墙3的墙体。
所述钢连梁1为工字型横梁。所述U形锁接板2与所述钢连梁1互相焊接,且该U形锁接板2与钢连梁1的焊接位置处设有若干个强化筋板。所述二组长螺栓21、22与所述剪力墙3内部的纵筋31和箍筋32互相交错搭接,并通过锁紧件互相锁接固定。还包括剪切耗能板,所述剪切耗能板锁接于所述钢连梁1的表面。
工字形钢连梁1通过U形锁接板2和螺栓与钢筋混凝土剪力墙3肢相连,如图3所示。U形锁接板2板由端板和左右侧板焊接而成,U形锁接板2的端板和侧板需预留螺栓孔用以安装螺栓。工字形钢连梁1由上下翼缘12和腹板11焊接而成,钢连梁1两端焊接U形锁接板2的端板,使钢连梁1和U形锁接板2组成一个整体。螺栓由端板螺栓22和侧板螺栓21组成,其中,端板螺栓22埋设于钢筋混凝土剪力墙3中,其作用是锚固钢连梁1,抵抗梁端的弯矩和剪力;侧板螺栓21贯穿U形锁接板2的两块侧板并通过螺母加固,其作用是对连接区混凝土提供约束作用,提高锚固螺栓在混凝土中的锚固性能。所述的U形锁接板2的侧板长度可为工字形钢连梁1高度的1~2倍。
本发明的施工方法为:
先加工完成钢结构部分,即将端板和两块侧板焊接制成U形锁接板2,并在U形锁接板2上预留螺栓孔;将上下翼缘12、腹板11焊接成工字形钢连梁1,在钢连梁1两端焊接U形锁接板2的端板,使钢连梁1和U形锁接板2组成一个整体;就位上述钢结构部分,分别安装端板螺栓22和侧板螺栓21,端板螺栓22锚固在钢筋混凝土剪力墙3中,侧板螺栓21贯穿侧板;施工钢筋混凝土剪力墙3肢内的纵筋31、箍筋32;支模,浇筑钢筋混凝土剪力墙3的混凝土,待混凝土达到强度要求后,拧紧螺栓。
上述实施例仅用来进一步说明本发明的钢筋混凝土剪力墙与钢连梁的连接结构,但本发明并不局限于实施例,凡是依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均落入本发明技术方案的保护范围内。
Claims (8)
1.钢筋混凝土剪力墙与钢连梁的连接结构,包括二个剪力墙和钢连梁,所述二个剪力墙并列设置,并通过所述钢连梁互相连接在一起,形成矩形的承力结构;其特征在于:
所述二个剪力墙设有网格状的纵筋和箍筋,并通过混凝土浇筑成型;所述钢连梁的二端设有U形锁接板,该U形锁接板具有U形卡槽,且该二个U形锁接板的U形卡槽可与所述剪力墙的端面卡接配合;且该二个U形锁接板通过垂直于二组垂直交错的长螺栓锁接固定于所述第一剪力墙或所述第二剪力墙的墙体。
2.根据权利要求1所述的钢筋混凝土剪力墙与钢连梁的连接结构,其特征在于:所述钢连梁为工字型横梁。
3.根据权利要求1所述的钢筋混凝土剪力墙与钢连梁的连接结构,其特征在于:所述U形锁接板与所述钢连梁互相焊接,且该U形锁接板与钢连梁的焊接位置处设有若干个强化筋板。
4.根据权利要求1所述的钢筋混凝土剪力墙与钢连梁的连接结构,其特征在于:所述二组长螺栓与所述剪力墙内部的纵筋和箍筋互相交错搭接,并通过锁紧件互相锁接固定。
5.根据权利要求1所述的钢筋混凝土剪力墙与钢连梁的连接结构,其特征在于:还包括剪切耗能板,所述剪切耗能板锁接于所述钢连梁的表面。
6.根据权利要求1所述的钢筋混凝土剪力墙与钢连梁的连接结构,其特征在于:所述钢连梁的壁厚为30mm~60mm。
7.根据权利要求1所述的钢筋混凝土剪力墙与钢连梁的连接结构,其特征在于:所述U形锁接板的厚度为30mm~60mm。
8.根据权利要求5所述的钢筋混凝土剪力墙与钢连梁的连接结构,其特征在于:所述剪切耗能板的厚度为20mm~50mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710077902.9A CN106639050A (zh) | 2017-02-14 | 2017-02-14 | 钢筋混凝土剪力墙与钢连梁的连接结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710077902.9A CN106639050A (zh) | 2017-02-14 | 2017-02-14 | 钢筋混凝土剪力墙与钢连梁的连接结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106639050A true CN106639050A (zh) | 2017-05-10 |
Family
ID=58845025
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710077902.9A Pending CN106639050A (zh) | 2017-02-14 | 2017-02-14 | 钢筋混凝土剪力墙与钢连梁的连接结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106639050A (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108331261A (zh) * | 2018-04-26 | 2018-07-27 | 华南理工大学建筑设计研究院 | 钢管高强混凝土剪力墙连梁纵筋锚固结构 |
CN110453850A (zh) * | 2019-07-22 | 2019-11-15 | 重庆大学 | 一种装配式钢混凝土组合连梁 |
CN112575908A (zh) * | 2020-12-21 | 2021-03-30 | 合肥工业大学 | 用于装配式混合结构住宅的钢梁与钢筋混凝土剪力墙节点 |
CN113431411A (zh) * | 2021-05-31 | 2021-09-24 | 北京建筑大学 | 耗能干式连接混凝土剪力墙系统及施工方法 |
CN113756447A (zh) * | 2021-09-14 | 2021-12-07 | 江苏海洋大学 | 一种预制剪力墙与连梁连接用耗能节点及其装配方法 |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100671429B1 (ko) * | 2005-12-28 | 2007-01-19 | 주식회사 포스코건설 | 전단벽 수평지지 구조 |
CN202483027U (zh) * | 2012-03-23 | 2012-10-10 | 重庆大学 | 一种端板螺栓钢连梁联肢剪力墙 |
CN203113554U (zh) * | 2013-03-01 | 2013-08-07 | 金天德 | 组合型钢箱形钢板剪力墙与钢梁的刚接节点 |
CN103290952A (zh) * | 2013-05-13 | 2013-09-11 | 东南大学 | 装配整体式混凝土框架-剪力墙连接结构及其施工方法 |
WO2014204419A2 (en) * | 2013-06-19 | 2014-12-24 | Süleyman Bahadir Yüksel | Coupling beam to coupled shear (hollow) wall connection system |
CN104251038A (zh) * | 2013-06-29 | 2014-12-31 | 清华大学 | 一种外包钢板-混凝土组合连梁及其施工方法 |
CN104251039A (zh) * | 2013-06-29 | 2014-12-31 | 清华大学 | 一种钢骨混凝土-钢梁混合连梁及其施工方法 |
CN104895213A (zh) * | 2015-06-26 | 2015-09-09 | 上海赛弗工程减震技术有限公司 | 一种连梁型金属阻尼器 |
CN204781435U (zh) * | 2015-07-15 | 2015-11-18 | 宿迁学院 | 一种新型剪力墙结构 |
CN105971146A (zh) * | 2016-07-01 | 2016-09-28 | 上海赛弗工程减震技术有限公司 | 一种新型的消能阻尼器 |
KR20160123688A (ko) * | 2015-04-16 | 2016-10-26 | 한양대학교 산학협력단 | 확대 헤드가 형성된 분기형 정착철근을 이용한 병렬 전단벽 연결보 보강 구조 |
CN206554325U (zh) * | 2017-02-14 | 2017-10-13 | 华侨大学 | 一种钢筋混凝土剪力墙与钢连梁的连接结构 |
-
2017
- 2017-02-14 CN CN201710077902.9A patent/CN106639050A/zh active Pending
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100671429B1 (ko) * | 2005-12-28 | 2007-01-19 | 주식회사 포스코건설 | 전단벽 수평지지 구조 |
CN202483027U (zh) * | 2012-03-23 | 2012-10-10 | 重庆大学 | 一种端板螺栓钢连梁联肢剪力墙 |
CN203113554U (zh) * | 2013-03-01 | 2013-08-07 | 金天德 | 组合型钢箱形钢板剪力墙与钢梁的刚接节点 |
CN103290952A (zh) * | 2013-05-13 | 2013-09-11 | 东南大学 | 装配整体式混凝土框架-剪力墙连接结构及其施工方法 |
WO2014204419A2 (en) * | 2013-06-19 | 2014-12-24 | Süleyman Bahadir Yüksel | Coupling beam to coupled shear (hollow) wall connection system |
CN104251038A (zh) * | 2013-06-29 | 2014-12-31 | 清华大学 | 一种外包钢板-混凝土组合连梁及其施工方法 |
CN104251039A (zh) * | 2013-06-29 | 2014-12-31 | 清华大学 | 一种钢骨混凝土-钢梁混合连梁及其施工方法 |
KR20160123688A (ko) * | 2015-04-16 | 2016-10-26 | 한양대학교 산학협력단 | 확대 헤드가 형성된 분기형 정착철근을 이용한 병렬 전단벽 연결보 보강 구조 |
CN104895213A (zh) * | 2015-06-26 | 2015-09-09 | 上海赛弗工程减震技术有限公司 | 一种连梁型金属阻尼器 |
CN204781435U (zh) * | 2015-07-15 | 2015-11-18 | 宿迁学院 | 一种新型剪力墙结构 |
CN105971146A (zh) * | 2016-07-01 | 2016-09-28 | 上海赛弗工程减震技术有限公司 | 一种新型的消能阻尼器 |
CN206554325U (zh) * | 2017-02-14 | 2017-10-13 | 华侨大学 | 一种钢筋混凝土剪力墙与钢连梁的连接结构 |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108331261A (zh) * | 2018-04-26 | 2018-07-27 | 华南理工大学建筑设计研究院 | 钢管高强混凝土剪力墙连梁纵筋锚固结构 |
CN108331261B (zh) * | 2018-04-26 | 2023-10-20 | 华南理工大学建筑设计研究院有限公司 | 钢管高强混凝土剪力墙连梁纵筋锚固结构 |
CN110453850A (zh) * | 2019-07-22 | 2019-11-15 | 重庆大学 | 一种装配式钢混凝土组合连梁 |
CN112575908A (zh) * | 2020-12-21 | 2021-03-30 | 合肥工业大学 | 用于装配式混合结构住宅的钢梁与钢筋混凝土剪力墙节点 |
CN113431411A (zh) * | 2021-05-31 | 2021-09-24 | 北京建筑大学 | 耗能干式连接混凝土剪力墙系统及施工方法 |
CN113756447A (zh) * | 2021-09-14 | 2021-12-07 | 江苏海洋大学 | 一种预制剪力墙与连梁连接用耗能节点及其装配方法 |
CN113756447B (zh) * | 2021-09-14 | 2022-06-14 | 江苏海洋大学 | 一种预制剪力墙与连梁连接用耗能节点及其装配方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106639050A (zh) | 钢筋混凝土剪力墙与钢连梁的连接结构 | |
KR101499343B1 (ko) | 보강형 조립 강재 보, 이를 포함하는 하이브리드 합성보 및 이를 이용한 구조물 | |
CN108331158A (zh) | 一种预制钢筋混凝土梁柱的现场连接方法 | |
CN109440973A (zh) | 一种装配式剪力墙竖向连接耗能结构及其施工方法 | |
CN211037273U (zh) | 一种装配式混凝土结构主次梁连接钢节点 | |
KR101920417B1 (ko) | 철근콘크리트 프레임 내진 보강 구조 | |
CN103741811A (zh) | 暗柱式预制钢筋混凝土构件节点 | |
CN110512765A (zh) | 一种具有钢板栓钉组合式斜撑的装配式剪力墙及施工方法 | |
CN107217787A (zh) | 一种内置压型钢板凹槽结构的装配式连梁 | |
CN103437493B (zh) | 预制钢筋混凝土梁的连接节点及施工方法 | |
CN110392758B (zh) | 倒t形截面混合型预应力混凝土梁及利用其的面板施工方法 | |
CN203440993U (zh) | 预制钢筋混凝土梁的连接节点 | |
CN205024833U (zh) | 一种钢骨混凝土组合预制构件 | |
CN110439142A (zh) | 一种具有h型钢斜撑的装配式混凝土剪力墙及施工方法 | |
KR101697004B1 (ko) | 대각 앵글을 이용한 병렬 전단벽 연결보 보강 구조 | |
CN107447873B (zh) | 连接预制叠合连梁与预制剪力墙的装置与安装方法 | |
CN210685008U (zh) | 一种主次梁连接结构 | |
CN206554325U (zh) | 一种钢筋混凝土剪力墙与钢连梁的连接结构 | |
CN210767266U (zh) | 预制装配式劲性混凝土柱构件节点连接结构 | |
CN209760544U (zh) | 一种外伸矩形筋的楼板和剪力墙结构 | |
CN103806537A (zh) | 暗柱式预制混凝土构件连接方法 | |
CN104563303A (zh) | 一种屈曲约束支撑与混凝土框架梁连接节点 | |
CN104032862B (zh) | 装配式钢梁接缝l形混合连肢墙及其施工方法 | |
CN106351235A (zh) | 装配式四根组合圆钢管混凝土内支撑结构及制作方法 | |
KR101513595B1 (ko) | 복합트러스 거더교의 격점부 연결구조를 향상시키기 위한 복부재 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170510 |