CN106638454B - 粘性泥石流v型排导槽流速的计算方法 - Google Patents
粘性泥石流v型排导槽流速的计算方法 Download PDFInfo
- Publication number
- CN106638454B CN106638454B CN201710037839.6A CN201710037839A CN106638454B CN 106638454 B CN106638454 B CN 106638454B CN 201710037839 A CN201710037839 A CN 201710037839A CN 106638454 B CN106638454 B CN 106638454B
- Authority
- CN
- China
- Prior art keywords
- drainage groove
- flow
- mud
- viscous
- flow velocity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B1/00—Equipment or apparatus for, or methods of, general hydraulic engineering, e.g. protection of constructions against ice-strains
- E02B1/02—Hydraulic models
Abstract
本发明公开了一种粘性泥石流V型排导槽流速的计算方法,适用于V型排导槽结构设计中粘性泥石流的平均流速计算,提高粘性泥石流平均流速计算方法的可靠性,解决V型排导槽中粘性泥石流流速计算值偏大而造成的淤积堵塞问题。所述计算方法根据室内模型试验对V型排导槽粘性泥石流流速的影响因素研究,提出基于不同权重的纵比降Iy和横比降Ix的V型排导槽粘性泥石流平均流速计算方法,避免现阶段Ix、Iy权重相等导致计算值偏大发生泥石流输移能力不够而淤积堵塞的问题,为粘性泥石流V型排导槽的结构设计提供了科学依据。
Description
技术领域
本发明涉及一种山洪泥石流流速的计算方法,特别是涉及一种粘性泥石流在V型排导槽结构中的平均流速计算方法。
背景技术
泥石流V型排导槽于1996年提出,通过V型尖底断面形成三维束流,增大泥石流流速而提高过流能力,起到防淤的作用,在成昆铁路沿线的泥石流治理中发挥了巨大成效。现阶段,粘性泥石流排导槽流速计算尚属空白,主要借鉴以下两个计算公式进行联合求解:
式中,v—泥石流平均流速,m/s;—粘性泥石流糙率系数,根据流体特征、沟床特征和纵坡比降查表确定;Hc—水力半径,m;Iv—排导槽综合比降;Ix—排导槽横比降;Iy—排导槽纵比降,根据成昆及川滇经验值:350‰≥Iv≥200‰,Ix=1:3~1:10,Iy=100‰~350‰。
从现阶段的计算方法(公式2)可以看出,横比降Ix和纵比降Iy在排导槽综合比降Iv计算模型中的权重相等,是现阶段V型排导槽流速计算方法存在的主要问题。例如,相同流体特征和水力半径前提下,假设横比降Ix趋于0、纵比降Iy=0.3与横比降Ix=0.3、纵比降Iy趋于0两种工况条件,根据公式(2)计算得到相等的排导槽综合比降Iv,并根据公式(1)计算得到相等的泥石流平均流速,然而实际情况是前一种工况条件下泥石流流速远大于后一种,与计算结果差异巨大。因此,横比降Ix在排导槽综合比降Iv计算模型中的权重影响低于纵比降Iy,公式(1和2)的泥石流流速计算值偏高,导致V型排导槽仍存在输移能力不足而发生淤积堵塞的情况。
有鉴于上述的缺陷,本设计人积极加以研究创新,以期创设一种粘性泥石流V型排导槽流速的计算方法,使其更具有产业上的利用价值。
发明内容
为解决上述技术问题,本发明的目的是提供一种基于不同权重的纵比降Iy和横比降Ix的V型排导槽粘性泥石流平均流速计算方法。
本发明粘性泥石流V型排导槽流速的计算方法,包括:
根据现场实际地形,采用室内试验模型获取排导槽横比降Ix、排导槽纵比降Iy和泥石流水力半径Hc3个计算因子的值;
泥石流平均流速通过下述公式,计算得到:
式中,v—泥石流平均流速,m/s;Hc—泥石流水力半径,m;
Ix—排导槽横比降;Iy—排导槽纵比降。
进一步地,横比降Ix在计算模型中的权重影响低于纵比降Iy。
进一步地,泥石流水力半径Hc的计算方法满足下式:
式中,Hc—泥石流水力半径,m;b—排导槽一半宽度,即槽底至墙身宽度,m;h—排导槽高度,m;Ix—排导槽横比降。
借由上述方案,本发明粘性泥石流在V型排导槽结构中的平均流速计算方法至少具有以下优点:
本发明通过室内模型试验研究分析,确定了影响V型排导槽中粘性泥石流平均流速的3个主要因子,分别是:排导槽横比降、排导槽纵比降和泥石流水力半径,提出基于不同权重的纵比降和横比降的V型排导槽粘性泥石流平均流速计算方法,避免现阶段横纵权重相等导致计算值偏大发生泥石流输移能力不够而淤积堵塞的问题,优化了粘性泥石流V型排导槽结构设计的计算依据。
上述说明仅是本发明技术方案的概述,为了能够更清楚了解本发明的技术手段,并可依照说明书的内容予以实施,以下以本发明的较佳实施例并配合附图详细说明如后。
附图说明
图1是本发明V型排导槽断面示意图;
b 排导槽槽底至墙身宽度 h排导槽高度
Δh 排导槽V型槽底深度 Ix 排导槽横比降。
具体实施方式
下面结合附图和实施例,对本发明的具体实施方式作进一步详细描述。以下实施例用于说明本发明,但不用来限制本发明的范围。
本发明粘性泥石流V型排导槽流速的计算方法,通过室内模型试验结果中槽横比降Ix与纵比降Iy对粘性泥石流运动特征的研究分析,确定影响V型排导槽中粘性泥石流平均流速v的3个主要因子,分别是:排导槽横比降Ix、排导槽纵比降Iy和泥石流水力半径Hc。将各因子进行组合并消除量纲,与平均流速进行多元回归方程分析,确定各因子式的权重系数,得到粘性泥石流V型排导槽平均流速v的计算公式:
式中,v—泥石流平均流速,m/s;Hc—泥石流水力半径,m;Ix—排导槽横比降;Iy—排导槽纵比降。
确定粘性泥石流V型排导槽平均流速v计算的参数因子如下:
泥石流水力半径Hc:泥石流过流断面面积A与湿周χ的比值,其中过流断面面积A=2bh+b2IX,湿周因此得到:
式中,Hc—泥石流水力半径,m;b—排导槽一半宽度,即槽底至墙身宽度,m;h—排导槽高度,m;Ix—排导槽横比降。
Ix—排导槽横比降,在经验范围Ix=1:3-1:10内,设计V型排导槽横比降Ix。
Iy—排导槽纵比降,在排导槽结构设计时根据实际沟道地形条件确定。
实施例1
如图1所示。四川地震灾区某泥石流治理排导槽工程,粘性泥石流,拟采用V型排导槽增加排导能力。根据现场实际地形调查,拟建排导槽所在的堆积扇沟道纵比降Iy=10%;拟定V型排导槽横比降Ix=0.3;根据堆积扇实际地形的排导条件,确定排导槽高度h=2.75m和排导槽半宽b=2.04m。
采用本发明提出的计算方法,首先得到泥石流水力半径Hc=1.28m,然后将排导槽横比降Ix、排导槽纵比降Iy和泥石流水力半径Hc计算因子值代入流速计算方法中,得到粘性泥石流V型排导槽平均流速v=3.02m/s。
实施例2
如图1所示。云南小江地区某泥石流治理排导槽工程,粘性泥石流,拟采用V型排导槽增加排导能力。根据现场实际地形调查,拟建排导槽所在的堆积扇沟道纵比降Iy=12%;拟定V型排导槽横比降Ix=0.25;根据堆积扇实际地形的排导条件,确定排导槽高度h=3.00m和排导槽半宽b=1.50m。
采用本发明提出的计算方法,首先得到泥石流水力半径Hc=1.05m,然后将排导槽横比降Ix、排导槽纵比降Iy和泥石流水力半径Hc计算因子值代入流速计算方法中,得到粘性泥石流V型排导槽平均流速v=2.92m/s。
以上所述仅是本发明的优选实施方式,并不用于限制本发明,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明技术原理的前提下,还可以做出若干改进和变型,这些改进和变型也应视为本发明的保护范围。
Claims (2)
1.一种粘性泥石流V型排导槽流速的计算方法,其特征在于,包括:
根据现场实际地形,采用室内试验模型获取排导槽横比降Ix、排导槽纵比降Iy和泥石流水力半径Hc3个计算因子的值;
泥石流平均流速通过下述公式,计算得到:
式中,v:泥石流平均流速,m/s;Hc:泥石流水力半径,m;Ix:排导槽横比降;Iy:排导槽纵比降。
2.根据权利要求1所述的粘性泥石流V型排导槽流速的计算方法,其特征在于,泥石流水力半径Hc的计算方法满足下式:
式中,Hc:泥石流水力半径,m;A:泥石流过流断面面积;χ :湿周;b:排导槽一半宽度,即槽底至墙身宽度,m;h:排导槽高度,m;Ix:排导槽横比降。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710037839.6A CN106638454B (zh) | 2017-01-18 | 2017-01-18 | 粘性泥石流v型排导槽流速的计算方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710037839.6A CN106638454B (zh) | 2017-01-18 | 2017-01-18 | 粘性泥石流v型排导槽流速的计算方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106638454A CN106638454A (zh) | 2017-05-10 |
CN106638454B true CN106638454B (zh) | 2018-12-14 |
Family
ID=58841751
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710037839.6A Expired - Fee Related CN106638454B (zh) | 2017-01-18 | 2017-01-18 | 粘性泥石流v型排导槽流速的计算方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106638454B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109916458B (zh) * | 2019-04-12 | 2020-09-15 | 南京亚楠鸿业科技实业有限公司 | 一种分解断面流速法 |
CN111639444B (zh) * | 2020-06-19 | 2023-02-28 | 中国科学院、水利部成都山地灾害与环境研究所 | 泥石流拦挡坝拦砂率测算方法、应用 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101265699A (zh) * | 2008-05-12 | 2008-09-17 | 中国科学院水利部成都山地灾害与环境研究所 | 粘性泥石流三角形底排导槽水力最佳断面设计方法及应用 |
CN101435191A (zh) * | 2008-12-09 | 2009-05-20 | 中国科学院水利部成都山地灾害与环境研究所 | 粘性泥石流斜墙v型排导槽水力最佳断面设计方法及应用 |
CN104111091A (zh) * | 2014-07-18 | 2014-10-22 | 中国科学院、水利部成都山地灾害与环境研究所 | 一种泥石流力学参数监测系统及泥石流预警系统 |
JP2015113567A (ja) * | 2013-12-09 | 2015-06-22 | 一般財団法人砂防・地すべり技術センター | 土石流の移動の解析方法 |
CN104794362A (zh) * | 2015-05-06 | 2015-07-22 | 中国科学院、水利部成都山地灾害与环境研究所 | 一种泥石流断面平均流速的测算方法及应用 |
CN105178255A (zh) * | 2015-08-22 | 2015-12-23 | 中国科学院水利部成都山地灾害与环境研究所 | 阶梯-深潭型泥石流排导槽的深潭段长度测算方法 |
-
2017
- 2017-01-18 CN CN201710037839.6A patent/CN106638454B/zh not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101265699A (zh) * | 2008-05-12 | 2008-09-17 | 中国科学院水利部成都山地灾害与环境研究所 | 粘性泥石流三角形底排导槽水力最佳断面设计方法及应用 |
CN101435191A (zh) * | 2008-12-09 | 2009-05-20 | 中国科学院水利部成都山地灾害与环境研究所 | 粘性泥石流斜墙v型排导槽水力最佳断面设计方法及应用 |
JP2015113567A (ja) * | 2013-12-09 | 2015-06-22 | 一般財団法人砂防・地すべり技術センター | 土石流の移動の解析方法 |
CN104111091A (zh) * | 2014-07-18 | 2014-10-22 | 中国科学院、水利部成都山地灾害与环境研究所 | 一种泥石流力学参数监测系统及泥石流预警系统 |
CN104794362A (zh) * | 2015-05-06 | 2015-07-22 | 中国科学院、水利部成都山地灾害与环境研究所 | 一种泥石流断面平均流速的测算方法及应用 |
CN105178255A (zh) * | 2015-08-22 | 2015-12-23 | 中国科学院水利部成都山地灾害与环境研究所 | 阶梯-深潭型泥石流排导槽的深潭段长度测算方法 |
Also Published As
Publication number | Publication date |
---|---|
CN106638454A (zh) | 2017-05-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106638454B (zh) | 粘性泥石流v型排导槽流速的计算方法 | |
CN103485353B (zh) | 基于全局最优化的边坡稳定性分析条分法 | |
CN105756654B (zh) | 水驱油藏井网优化设计方法 | |
CN103761583A (zh) | 一种水库排沙发电多目标优化调度方法 | |
CN102852114A (zh) | 一种水库泥沙淤积的计算方法 | |
CN103500259B (zh) | 一种岩土模型的建模方法 | |
CN104631392B (zh) | 一种基于河相关系的航道整治设计方法 | |
CN105787225A (zh) | 一种梯形截面旋流沉砂池进水渠设计方法 | |
CN106640076A (zh) | 一种潜水含水层水位水量协同控制的保水采煤方法 | |
CN115062389B (zh) | 一种面向坝前泥沙减淤的水库闸门调度方法、装置和设备 | |
CN108797533B (zh) | 一种泥石流拦砂坝圆形泄流孔的设计方法 | |
CN108334665A (zh) | 一种辫状河储层构型单元定量表征方法 | |
CN109555514B (zh) | 缝洞型油藏的示踪剂解释模型及其构建方法与应用 | |
CN110472367B (zh) | 一种多沙河流干支流水沙全交互模拟方法及系统 | |
CN104533519B (zh) | 立井井筒通过强含水厚岩层时涌水水害的治理方法 | |
CN111241467A (zh) | 一种多沙河流水库排沙比的计算方法 | |
CN106484930A (zh) | 用于确定非均质油藏复杂结构井产量的方法及系统 | |
CN105160178B (zh) | 一种考虑降雨空间分布特征的水库流域子流域划分方法 | |
CN110242261A (zh) | 垂向注气孔隙油气水微观渗流规律的预测方法及系统 | |
CN114428989A (zh) | 一种游荡分汊河道洪峰流量分配方法及系统 | |
CN113236203B (zh) | 一种碳酸盐岩有水气藏的水侵动态配产方法 | |
CN110158551A (zh) | 一种泄洪洞多通气孔供气系统的优化设计方法 | |
CN108330919A (zh) | 阶梯-深潭型泥石流排导槽的深潭段深度测算方法 | |
Mohamed et al. | Hydraulics of clear and submerged overfall weirs with bottom circular-openings | |
CN107130560A (zh) | 一种基于定量指标的航道联动治理方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181214 Termination date: 20210118 |
|
CF01 | Termination of patent right due to non-payment of annual fee |