CN106638337A - Prefabricated concrete culvert pipe, prefabricated comprehensive pipe gallery and maintenance method of comprehensive pipe gallery - Google Patents

Prefabricated concrete culvert pipe, prefabricated comprehensive pipe gallery and maintenance method of comprehensive pipe gallery Download PDF

Info

Publication number
CN106638337A
CN106638337A CN201611197776.2A CN201611197776A CN106638337A CN 106638337 A CN106638337 A CN 106638337A CN 201611197776 A CN201611197776 A CN 201611197776A CN 106638337 A CN106638337 A CN 106638337A
Authority
CN
China
Prior art keywords
precast concrete
concrete culvert
culvert pipe
pipe
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611197776.2A
Other languages
Chinese (zh)
Other versions
CN106638337B (en
Inventor
阙良刚
史小军
荣哲
姜素云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Capital Engineering & Research Inc Ltd
Original Assignee
Capital Engineering & Research Inc Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Capital Engineering & Research Inc Ltd filed Critical Capital Engineering & Research Inc Ltd
Priority to CN201611197776.2A priority Critical patent/CN106638337B/en
Publication of CN106638337A publication Critical patent/CN106638337A/en
Application granted granted Critical
Publication of CN106638337B publication Critical patent/CN106638337B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F5/00Draining the sub-base, i.e. subgrade or ground-work, e.g. embankment of roads or of the ballastway of railways or draining-off road surface or ballastway drainage by trenches, culverts, or conduits or other specially adapted means
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Architecture (AREA)
  • Sewage (AREA)

Abstract

The invention provides a precast concrete culvert pipe, a precast comprehensive pipe gallery and a maintenance method of the comprehensive pipe gallery, wherein the annular end surfaces of two ends of the precast concrete culvert pipe are respectively provided with a waterproof drainage structure, the waterproof drainage structure comprises a drainage groove (1) and a sealing rubber strip mounting groove (2) which are arranged along the circumferential direction of the precast concrete culvert pipe, the sealing rubber strip mounting groove (2) is positioned between the drainage groove (1) and the outer surface of the precast concrete culvert pipe, and the distance from the drainage groove (1) to the outer surface of the precast concrete culvert pipe is less than the distance from the drainage groove (1) to the inner surface of the precast concrete culvert pipe. The maintenance method of the precast concrete culvert pipe, the precast comprehensive pipe gallery and the comprehensive pipe gallery solves the waterproof problem of the spliced part, realizes the combination of prevention, drainage and blockage, and after the service life of the material is over, the waterproof interface can be repaired, so that the waterproof effect is ensured.

Description

The method for maintaining of precast concrete culvert pipe, prefabricated pipe gallery and pipe gallery
Technical field
The present invention relates to a kind of precast concrete culvert pipe, further relates to a kind of prefabricated synthesis containing the precast concrete culvert pipe Piping lane, further relates to a kind of method for maintaining of prefabricated pipe gallery.
Background technology
As Urban Underground pipe gallery builds the quickening of rhythm, and the active demand that local economy is upgraded to industrialization The needs built with environmental protection, assembly concrete pipe gallery is thus lifted to unprecedented height, is built single by each Position, design institute, the extensive concern of unit in charge of construction, assembly concrete pipe gallery will become Urban Underground with its Inherent advantage The tendency product that pipe gallery is built.
Assembled underground pipe gallery adopts prefabrication tube coupling, the quality of component to be well controlled, but existing Field is assembled using machinery, and seaming position is waterproof weak spot, and underground pipe gallery is 100 years engineerings, therefore, the research in industry Mechanism is all using assembled piping lane interface waterproof as important research topic.In order to solve the problem, the scientific worker of China Hereinafter make great efforts.
Such as Chinese patent CN 105525628A, on April 27 2016 publication date, disclose《A kind of piping lane sealing joint Device》.Its structure includes being arranged under earth's surface and its middle part is set to the waterproof sealing band of V-arrangement, the V-arrangement of the waterproof sealing band Two ends are respectively arranged with upper grooves and lower boss, are provided with described groove and withhold module and be fixed in groove Elastic layering, in the cement components at piping lane interface plane position of the waterproof sealing with both sides pre-buried shaped steel is respectively arranged with, It is provided with matched spinner in the groove of the pre-buried shaped steel, the top of the spinner is bumped into described withholds mould Block, withholds described in two and the seam cover plate concordant with earth's surface is provided with the top of module, and described seam cover plate passes through its two ends Module is withheld described in respectively penetrating and two bolts of spinner are fixed.
Such as Chinese patent CN205502066U, 2016 publication dates August 24 days discloses one kind《Piping lane prefabricated component and Assembled rectangle pipe gallery》, refer to that " sealing structure is arranged on grafting and coordinates along spool piece body circumference ring seal in the patent On face ".
Such as Chinese patent CN204098065U, on January 14 2015 publication date, one kind is disclosed《One kind can open in vivo The precast assembly pipe gallery of drawing》, refer in the patent and " be provided with waterstop between contiguous prefabricated sections component, it is ensured that comprehensive Close the waterproof sealing performance of piping lane ".
《Technical code for water proof in underground engineering》(GB50108-2008) " design and construction of 1.0.3 underground project waterproofs should Follow " anti-, row, cut, it is stifled combine, temper toughness with gentleness, suit measures to local conditions, the comprehensive regulation " principle ", the shortcoming of existing technology is Only focus on " anti-", and do not focus on the mode of " prevent, arrange, cutting, bridging is closed ", because the design life of Pipe rack is 100 years, Due to the many-side reason such as quality of materials, construction quality and material aging, seepage is caused, it is hard to guard against, then just formed The way of current multi layer waterproof measure, both increased cost, can not thoroughly solve leakage problems again.
The content of the invention
For the easy seepage in the junction for solving the problems, such as existing pipe gallery, the invention provides a kind of precast concrete The method for maintaining of culvert pipe, prefabricated pipe gallery and pipe gallery, the precast concrete culvert pipe, prefabricated pipe gallery and pipe gallery Method for maintaining solve the waterproof problem at splicing position, realize the combination of " anti-, row, stifled ", after material lifetime expires, waterproof connects Mouth can also be repaired, it is ensured that waterproof effect.
The technical solution adopted for the present invention to solve the technical problems is:A kind of precast concrete culvert pipe, the concrete Contain water-proof drainage structure on the annular end face at the two ends of native culvert pipe, the water-proof drainage structure includes containing along the precast concrete The circumferentially disposed rhone and sealing joint strip mounting groove of pipe, sealing joint strip mounting groove is located at rhone and the precast concrete is contained Between the outer surface of pipe, the distance of rhone to the outer surface of the precast concrete culvert pipe is less than rhone to the precast concrete The distance of the inner surface of culvert pipe.
The section of the precast concrete culvert pipe is three-back-shaped, is provided with solid for connecting in the two ends of the precast concrete culvert pipe Fixed tensioning connecting hole.
The center line of the precast concrete culvert pipe is horizontally disposed, the bottom of the inner surface of the precast concrete culvert pipe It is provided with piping lane gutter, piping lane gutter is arranged along the centerline direction of the precast concrete culvert pipe, rhone and piping lane draining Ditch is connected.
The wall thickness of the precast concrete culvert pipe be 200mm~300mm, inner surface of the rhone to the precast concrete culvert pipe Distance be 110mm~160mm.
The wall thickness of the precast concrete culvert pipe be 250mm, distance of the rhone to the inner surface of the precast concrete culvert pipe For 125mm, the width of rhone is 30mm, and the depth of rhone is 30mm.
The section of sealing joint strip mounting groove is made up of the connection of first side, base and second side, and base is one and is somebody's turn to do The parallel line segment of the end face of precast concrete culvert pipe, first side and second side base both sides mirror image each other, the first side Side and second side are a camber line or straightway.
The distance between sealing joint strip mounting groove and rhone are less than sealing joint strip mounting groove and the precast concrete culvert pipe The distance between outer surface, the depth of sealing joint strip mounting groove is 10mm, the width of sealing joint strip mounting groove be 35mm~ 45mm。
A kind of prefabricated pipe gallery, the above-mentioned precast concrete culvert pipe containing multiple series connection, adjacent two are prefabricated mixed The position of the water-proof drainage structure of solidifying soil culvert pipe is corresponding, and the sealing joint strip of two adjacent precast concrete culvert pipe is installed The first water expandable waterstop is provided between groove, the second water-swellable is additionally provided between two adjacent precast concrete culvert pipe and is stopped Water bar, the first water expandable waterstop and the second water expandable waterstop along the circumferentially disposed of the precast concrete culvert pipe, Two water expandable waterstops to the distance of rhone is less than the second water expandable waterstop to the inner surface of precast concrete culvert pipe Distance.
The distance between two adjacent precast concrete culvert pipe are 20mm~30mm, and two adjacent precast concretes are contained The 3rd water expandable waterstop is additionally provided between pipe, the 3rd water expandable waterstop sets along the circumference of the precast concrete culvert pipe Put, the 3rd water expandable waterstop is located between the second water expandable waterstop and the inner surface of precast concrete culvert pipe.
A kind of method for maintaining of prefabricated pipe gallery, the method for maintaining of the prefabricated pipe gallery is comprised the following steps:
Step 1, when there is seepage in the junction for finding adjacent two precast concrete culvert pipe, to the second water-swellable The 3rd water expandable waterstop, the 3rd water expandable waterstop edge are put between the inner surface of sealing rod and precast concrete culvert pipe The precast concrete culvert pipe it is circumferentially disposed, the 3rd water expandable waterstop is located at the second water expandable waterstop and concrete Between the inner surface of native culvert pipe.
The invention has the beneficial effects as follows:
1st, water expandable waterstop can well play stagnant water effect due to the compaction of left and right sides tube coupling;
2nd, when due to product quality, construction or other reasonses cause seepage when, can by rhone in time will infilter come water Piping lane base plate gutter is drained into, while water expandable waterstop is due to expanding compaction, next water can will be infiltered and be terminated in draining In groove;
If the 3, water expandable waterstop is also because other reasonses cause leak source, when causing water directly to penetrate into piping lane inside, this is It is new that water expandable waterstop is set, it is compacted after water-swellable, sealing effect is played, realize the repair function of operation phase.So as to reality The combination now " preventing, arrange, blocking up ", moreover it is possible to carry out the reparation of leak.
Description of the drawings
The Figure of description for constituting the part of the application is used for providing a further understanding of the present invention, and the present invention's shows Meaning property embodiment and its illustrated for explaining the present invention, does not constitute inappropriate limitation of the present invention.
Fig. 1 is structural representation when water expandable waterstop is not installed in the end of precast concrete culvert pipe of the present invention Figure.
Fig. 2 is that the end of a precast concrete culvert pipe is mounted with the structural representation after water expandable waterstop.
Fig. 3 is that the structural representation after water expandable waterstop is repeatedly installed in the end of adjacent two precast concrete culvert pipe Figure.
1st, rhone;2nd, sealing joint strip mounting groove;3rd, tensioning connecting hole;4th, piping lane gutter;5th, the first water-swellable stops Water bar;6th, the second water expandable waterstop;7th, the 3rd water expandable waterstop;8th, the 4th water expandable waterstop;9th, the 5th meet Water expansion sealing strip;
10th, precast concrete culvert pipe;
21st, first side;22nd, base;23rd, second side.
Specific embodiment
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the application can phase Mutually combination.Below with reference to the accompanying drawings and in conjunction with the embodiments describing the present invention in detail.
A kind of precast concrete culvert pipe, ties on the annular end face at the two ends of the precast concrete culvert pipe containing water-proof drainage Structure, the water-proof drainage structure includes the circumferentially disposed rhone 1 and sealing joint strip mounting groove 2 along the precast concrete culvert pipe, I.e., along the circumferentially disposed of the precast concrete culvert pipe, sealing joint strip mounting groove 2 is located at for rhone 1 and sealing joint strip mounting groove 2 Between the outer surface of rhone 1 and the precast concrete culvert pipe, the distance of the outer surface of rhone 1 to the precast concrete culvert pipe Less than rhone 1 to the precast concrete culvert pipe inner surface distance, as shown in Figure 1.
In the present embodiment, the section of the precast concrete culvert pipe is three-back-shaped, in the two ends of the precast concrete culvert pipe It is provided with the tensioning connecting hole 3 for being connected.The center line of the precast concrete culvert pipe is horizontally disposed, and this is prefabricated mixed The bottom of the inner surface of solidifying soil culvert pipe is provided with piping lane gutter 4, and piping lane gutter 4 is along the center line side of the precast concrete culvert pipe Arrange to (perpendicular to the direction of Fig. 1 papers), rhone 1 is connected with piping lane gutter 4.
In the present embodiment, the wall thickness of the precast concrete culvert pipe is 200mm~300mm, and rhone 1 arrives the concrete The distance of the inner surface of native culvert pipe is 110mm~160mm.Specifically, the wall thickness of the precast concrete culvert pipe be 250mm, draining Groove 1 to the distance of the inner surface of the precast concrete culvert pipe is 125mm, and rhone 1 to the precast concrete culvert pipe is surface Distance be 95mm, the width of rhone 1 is 30mm, and the depth of rhone 1 is 30mm.Wherein, the width of rhone 1 is along figure The size of above-below direction in 3, the depth of rhone 1 is the size of the left and right directions along Fig. 3.
In the present embodiment, the section of sealing joint strip mounting groove 2 is connected by first side 21, base 22 and second side 23 Composition, base 22 is a line segment parallel with the end face of the precast concrete culvert pipe, and first side 21 and second side 23 exist The both sides on base 22 mirror image each other, first side 21 and second side 23 are a camber line or straightway, as shown in Figure 3.
In the present embodiment, the distance between sealing joint strip mounting groove 2 and rhone 1 less than sealing joint strip mounting groove 2 with The distance between outer surface of the precast concrete culvert pipe, the depth of sealing joint strip mounting groove 2 is 10mm, sealing joint strip mounting groove 2 width is 35mm~45mm.The annular end face of precast concrete culvert pipe 10 should try one's best flat smooth.
A kind of prefabricated pipe gallery is described below, the above-mentioned precast concrete that the prefabricated pipe gallery contains multiple series connection is contained Pipe 10, the end of two adjacent precast concrete culvert pipe 10 is docked, and adjacent the described of two precast concrete culvert pipe 10 prevents The position of water discharge structure is corresponding, and as shown in Figures 2 and 3, the sealing joint strip of two adjacent precast concrete culvert pipe 10 is pacified It is provided with the first water expandable waterstop 5, i.e. a part for the first water expandable waterstop 5 between tankage 2 to pacify positioned at sealing joint strip In tankage 2, between two adjacent precast concrete culvert pipe 10 the second water expandable waterstop 6, the first water-swellable are additionally provided with The water expandable waterstop 6 of sealing rod 5 and second is along the circumferentially disposed of the precast concrete culvert pipe, the second water expandable waterstop The distance of 6 to rhone 1 is less than the second water expandable waterstop 6 to the distance of the inner surface of precast concrete culvert pipe 10.
The distance between two adjacent precast concrete culvert pipe 10 be 20mm~30mm, two adjacent precast concretes The 3rd water expandable waterstop 7 is also provided between culvert pipe 10, the 3rd water expandable waterstop 7 is along the precast concrete culvert pipe It is circumferentially disposed, the 3rd water expandable waterstop 7 is located at the interior table of the second water expandable waterstop 6 and precast concrete culvert pipe 10 Between face, as shown in Figure 3.According to service condition, the inner surface of the 3rd water expandable waterstop 7 and precast concrete culvert pipe 10 it Between the 4th water expandable waterstop 8 and/or the 5th water expandable waterstop 9 can also be set.
The installation method of the prefabricated pipe gallery is described below:
The end of two adjacent precast concrete culvert pipe 10 is arranged into the first water expandable waterstop 5 and the second chance water is swollen Swollen sealing rod 6, then docks the end of adjacent two piece precast concrete culvert pipe 10 by lifting, and adjacent two are prefabricated mixed The position of the water-proof drainage structure of solidifying soil culvert pipe 10 is corresponding, and two adjacent precast concrete culvert pipe 10 pass through prestressing force Rod iron is connected, as shown in Figures 2 and 3.
Make the UNICOM of piping lane gutter 4 of rhone 1 and piping lane bottom.
A kind of method for maintaining of prefabricated pipe gallery is described below, i.e., needs dimension when above-mentioned prefabricated pipe gallery goes wrong When repairing, the method for maintaining of the prefabricated pipe gallery is comprised the following steps:
Step 1, when there is seepage in the junction for finding adjacent two precast concrete culvert pipe 10, meet water to second swollen The 3rd water expandable waterstop 7 is put between the inner surface of swollen sealing rod 6 and precast concrete culvert pipe 10, the 3rd water-swellable stops Water bar 7 is circumferentially disposed along the precast concrete culvert pipe, and the 3rd water expandable waterstop 7 is located at the second water expandable waterstop 6 And the inner surface of precast concrete culvert pipe 10 between.
If after using one section, above-mentioned prefabricated pipe gallery goes wrong when needing repairing, the prefabricated pipe gallery Method for maintaining is further comprising the steps of:
Step 2, when there is seepage in the junction for finding adjacent two precast concrete culvert pipe 10, meet water to the 3rd swollen The 4th water expandable waterstop 8 is put between the inner surface of swollen sealing rod 7 and precast concrete culvert pipe 10, the 4th water-swellable stops Water bar 8 is circumferentially disposed along the precast concrete culvert pipe, and the 4th water expandable waterstop 8 is located at the 3rd water expandable waterstop 7 And the inner surface of precast concrete culvert pipe 10 between, as shown in Figure 3.
If after using one section, above-mentioned prefabricated pipe gallery goes wrong when needing repairing, can be swollen to meet water to the 4th The 5th water expandable waterstop 9 etc. is put between the inner surface of swollen sealing rod 8 and precast concrete culvert pipe 10 (in this manner also Can continue to be put into water expandable waterstop in the junction of two adjacent precast concrete culvert pipe 10), as shown in figure 3, logical Cross and be repeatedly put into water expandable waterstop, can easily and fast solve leakage problems.The consumption ability of water expandable waterstop The technical staff in domain can be adjusted as needed, be advisable with occurring without seepage.
The above, specific embodiment only of the invention, it is impossible to the scope that its restriction invention is implemented, so its equivalent The displacement of component, or the equivalent variations made according to scope of patent protection of the present invention and modification, should all still fall within what this patent was covered Category.In addition, between the technical characteristic and technical characteristic in the present invention, between technical characteristic and technical scheme, technical scheme with Can be used with independent assortment between technical scheme.

Claims (10)

1. a kind of precast concrete culvert pipe, it is characterised in that contain on the annular end face at the two ends of the precast concrete culvert pipe Water-proof drainage structure, the water-proof drainage structure includes the circumferentially disposed rhone (1) along the precast concrete culvert pipe and sealing Adhesive tape mounting groove (2), sealing joint strip mounting groove (2) is arranged between rhone (1) and the outer surface of the precast concrete culvert pipe Tank (1) to the distance of the outer surface of the precast concrete culvert pipe is less than rhone (1) to the interior table of the precast concrete culvert pipe The distance in face.
2. precast concrete culvert pipe according to claim 1, it is characterised in that the section of the precast concrete culvert pipe is back Font, is provided with the tensioning connecting hole (3) for being connected in the two ends of the precast concrete culvert pipe.
3. precast concrete culvert pipe according to claim 1, it is characterised in that the center line edge of the precast concrete culvert pipe Horizontally arranged, the bottom of the inner surface of the precast concrete culvert pipe is provided with piping lane gutter (4), piping lane gutter (4) edge The centerline direction of the precast concrete culvert pipe is arranged, and rhone (1) is connected with piping lane gutter (4).
4. precast concrete culvert pipe according to claim 1, it is characterised in that the wall thickness of the precast concrete culvert pipe is 200mm~300mm, the distance of rhone (1) to the inner surface of the precast concrete culvert pipe is 110mm~160mm.
5. precast concrete culvert pipe according to claim 1, it is characterised in that the wall thickness of the precast concrete culvert pipe is 250mm, the distance of rhone (1) to the inner surface of the precast concrete culvert pipe is 125mm, and the width of rhone (1) is 30mm, The depth of rhone (1) is 30mm.
6. precast concrete culvert pipe according to claim 1, it is characterised in that the section of sealing joint strip mounting groove (2) by First side (21), base (22) and second side (23) connection composition, base (22) are one and the precast concrete culvert pipe The parallel line segment of end face, first side (21) and second side (23) base (22) both sides mirror image each other, first side And second side (23) are a camber line or straightway (21).
7. precast concrete culvert pipe according to claim 6, it is characterised in that sealing joint strip mounting groove (2) and rhone The distance between (1) less than the distance between sealing joint strip mounting groove (2) and outer surface of the precast concrete culvert pipe, fluid sealant The depth of bar mounting groove (2) is 10mm, and the width of sealing joint strip mounting groove (2) is 35mm~45mm.
8. a kind of prefabricated pipe gallery, it is characterised in that the prefabricated pipe gallery contains described in the claim 1 of multiple series connection Precast concrete culvert pipe (10), the position of the water-proof drainage structure of adjacent two precast concrete culvert pipe (10) is relative Should, it is provided with the first water expandable waterstop between the sealing joint strip mounting groove (2) of adjacent two precast concrete culvert pipe (10) (5) the second water expandable waterstop (6), the first water-swellable are additionally provided between two, adjacent precast concrete culvert pipe (10) , along the circumferentially disposed of the precast concrete culvert pipe, the second water-swellable stops for sealing rod (5) and the second water expandable waterstop (6) Water bar (6) to the distance of rhone (1) is less than the second water expandable waterstop (6) to the inner surface of precast concrete culvert pipe (10) Distance.
9. prefabricated pipe gallery according to claim 8, it is characterised in that two adjacent precast concrete culvert pipe (10) The distance between be 20mm~30mm, be additionally provided with the 3rd water-swellable sealing between two adjacent precast concrete culvert pipe (10) Bar (7), the 3rd water expandable waterstop (7) along the circumferentially disposed of the precast concrete culvert pipe, the 3rd water expandable waterstop (7) Between the inner surface of the second water expandable waterstop (6) and precast concrete culvert pipe (10).
10. a kind of method for maintaining of prefabricated pipe gallery, it is characterised in that the prefabricated pipe gallery is described in claim 8 Prefabricated pipe gallery, the method for maintaining of the prefabricated pipe gallery comprises the following steps:
Step 1, when there is seepage in the junction for finding adjacent two precast concrete culvert pipe (10), to the second water-swellable The 3rd water expandable waterstop (7) is put between the inner surface of sealing rod (6) and precast concrete culvert pipe (10), the 3rd chance water is swollen , along the circumferentially disposed of the precast concrete culvert pipe, the 3rd water expandable waterstop (7) is positioned at the second water-swellable for swollen sealing rod (7) Between the inner surface of sealing rod (6) and precast concrete culvert pipe (10).
CN201611197776.2A 2016-12-22 2016-12-22 Prefabricated concrete culvert pipe, prefabricated comprehensive pipe gallery and maintenance method of comprehensive pipe gallery Active CN106638337B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611197776.2A CN106638337B (en) 2016-12-22 2016-12-22 Prefabricated concrete culvert pipe, prefabricated comprehensive pipe gallery and maintenance method of comprehensive pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611197776.2A CN106638337B (en) 2016-12-22 2016-12-22 Prefabricated concrete culvert pipe, prefabricated comprehensive pipe gallery and maintenance method of comprehensive pipe gallery

Publications (2)

Publication Number Publication Date
CN106638337A true CN106638337A (en) 2017-05-10
CN106638337B CN106638337B (en) 2022-06-07

Family

ID=58835200

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611197776.2A Active CN106638337B (en) 2016-12-22 2016-12-22 Prefabricated concrete culvert pipe, prefabricated comprehensive pipe gallery and maintenance method of comprehensive pipe gallery

Country Status (1)

Country Link
CN (1) CN106638337B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107237348A (en) * 2017-06-16 2017-10-10 上海二十冶建设有限公司 The temporary punching and restorative procedure of industrial underground pipe gallery
CN107313455A (en) * 2017-09-05 2017-11-03 北京建工土木工程有限公司 Cast-in-place single storehouse pipe gallery node and construction method with prefabricated combination
CN108867697A (en) * 2018-08-31 2018-11-23 江苏金贸科技发展有限公司 A kind of concrete prefabricated piping lane with antiseep preset structure
CN110499778A (en) * 2019-06-28 2019-11-26 盐城工学院 A kind of novel piping lane component and its installation method
CN112695807A (en) * 2020-12-11 2021-04-23 中国二十冶集团有限公司 Post-planting installation method for rubber water stop
CN114439039A (en) * 2022-02-24 2022-05-06 中冶建筑研究总院有限公司 Light prefabricated underground comprehensive pipe gallery

Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010045797A (en) * 1999-11-08 2001-06-05 전형진 Method for coupling concrete culvert
NL1018638C2 (en) * 2001-07-26 2003-01-28 Nijmeegse Betonindustrie De Ha Seal for joint between construction elements, especially culvert sections, comprises elastic profile with reinforcing core and protruding expansion part
KR20090049796A (en) * 2007-11-14 2009-05-19 (주)평화엔지니어링 Box connector and precast concrete box connecting method using the same
KR101054793B1 (en) * 2011-03-10 2011-08-05 최왕기 Upper establishing type precast concret drain culvert unit
CN102345297A (en) * 2011-07-20 2012-02-08 同济大学 Prefabricated and assembled comprehensive pipe gallery with semi-rigid joints
CN102434175A (en) * 2012-01-12 2012-05-02 中国市政工程西北设计研究院有限公司 Tunnel lining self waterproof drainage system
CN202626847U (en) * 2012-04-24 2012-12-26 王改清 Device for inserting concrete precast utility tunnels
CN202706060U (en) * 2012-06-12 2013-01-30 北京市第三建筑工程有限公司 Waterproof structure for base plate deformation joint with width of 50 mm
CN104674847A (en) * 2015-03-05 2015-06-03 东北大学 Novel assembling type precast concrete urban comprehensive pipe gallery and construction method thereof
CN104912099A (en) * 2015-06-16 2015-09-16 李全民 Fabricated precast concrete box culvert
CN105507346A (en) * 2016-02-02 2016-04-20 济南汇富住宅工业有限公司 Prefabricated underground pipe gallery
CN105525632A (en) * 2016-02-05 2016-04-27 青岛润国生态科技发展有限公司 Waterproof structure for bellmouths and sockets of fabricated prefabricated composite pipe gallery
CN105780808A (en) * 2016-03-14 2016-07-20 青岛润国生态科技发展有限公司 Assembly type precast comprehensive pipe gallery
CN205474887U (en) * 2015-12-31 2016-08-17 长安大学 Large aperture high density polyethylene pipe winding reinforced pipe culvert
CN205502066U (en) * 2016-02-20 2016-08-24 深圳华瀚城市综合管廊技术研究开发有限公司 Piping lane prefab and assembled rectangle utility tunnel
CN105951876A (en) * 2016-05-04 2016-09-21 东北大学 Cover plate type precast concrete urban comprehensive pipe gallery and construction method thereof
CN106049551A (en) * 2016-07-12 2016-10-26 中国电建集团昆明勘测设计研究院有限公司 Utility tunnel boss seal structure
CN106049530A (en) * 2016-05-27 2016-10-26 俞晓东 Urban comprehensive pipe gallery and construction method
CN205804421U (en) * 2016-07-19 2016-12-14 上海市城市排水有限公司 Pipeline box culvert movement joint Quick leak stoppage apparatus
CN206308631U (en) * 2016-12-22 2017-07-07 中冶京诚工程技术有限公司 Precast concrete culvert pipe and precast comprehensive pipe gallery

Patent Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010045797A (en) * 1999-11-08 2001-06-05 전형진 Method for coupling concrete culvert
NL1018638C2 (en) * 2001-07-26 2003-01-28 Nijmeegse Betonindustrie De Ha Seal for joint between construction elements, especially culvert sections, comprises elastic profile with reinforcing core and protruding expansion part
KR20090049796A (en) * 2007-11-14 2009-05-19 (주)평화엔지니어링 Box connector and precast concrete box connecting method using the same
KR101054793B1 (en) * 2011-03-10 2011-08-05 최왕기 Upper establishing type precast concret drain culvert unit
CN102345297A (en) * 2011-07-20 2012-02-08 同济大学 Prefabricated and assembled comprehensive pipe gallery with semi-rigid joints
CN102434175A (en) * 2012-01-12 2012-05-02 中国市政工程西北设计研究院有限公司 Tunnel lining self waterproof drainage system
CN202626847U (en) * 2012-04-24 2012-12-26 王改清 Device for inserting concrete precast utility tunnels
CN202706060U (en) * 2012-06-12 2013-01-30 北京市第三建筑工程有限公司 Waterproof structure for base plate deformation joint with width of 50 mm
CN104674847A (en) * 2015-03-05 2015-06-03 东北大学 Novel assembling type precast concrete urban comprehensive pipe gallery and construction method thereof
CN104912099A (en) * 2015-06-16 2015-09-16 李全民 Fabricated precast concrete box culvert
CN205474887U (en) * 2015-12-31 2016-08-17 长安大学 Large aperture high density polyethylene pipe winding reinforced pipe culvert
CN105507346A (en) * 2016-02-02 2016-04-20 济南汇富住宅工业有限公司 Prefabricated underground pipe gallery
CN105525632A (en) * 2016-02-05 2016-04-27 青岛润国生态科技发展有限公司 Waterproof structure for bellmouths and sockets of fabricated prefabricated composite pipe gallery
CN205502066U (en) * 2016-02-20 2016-08-24 深圳华瀚城市综合管廊技术研究开发有限公司 Piping lane prefab and assembled rectangle utility tunnel
CN105780808A (en) * 2016-03-14 2016-07-20 青岛润国生态科技发展有限公司 Assembly type precast comprehensive pipe gallery
CN105951876A (en) * 2016-05-04 2016-09-21 东北大学 Cover plate type precast concrete urban comprehensive pipe gallery and construction method thereof
CN106049530A (en) * 2016-05-27 2016-10-26 俞晓东 Urban comprehensive pipe gallery and construction method
CN106049551A (en) * 2016-07-12 2016-10-26 中国电建集团昆明勘测设计研究院有限公司 Utility tunnel boss seal structure
CN205804421U (en) * 2016-07-19 2016-12-14 上海市城市排水有限公司 Pipeline box culvert movement joint Quick leak stoppage apparatus
CN206308631U (en) * 2016-12-22 2017-07-07 中冶京诚工程技术有限公司 Precast concrete culvert pipe and precast comprehensive pipe gallery

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107237348A (en) * 2017-06-16 2017-10-10 上海二十冶建设有限公司 The temporary punching and restorative procedure of industrial underground pipe gallery
CN107313455A (en) * 2017-09-05 2017-11-03 北京建工土木工程有限公司 Cast-in-place single storehouse pipe gallery node and construction method with prefabricated combination
CN108867697A (en) * 2018-08-31 2018-11-23 江苏金贸科技发展有限公司 A kind of concrete prefabricated piping lane with antiseep preset structure
CN110499778A (en) * 2019-06-28 2019-11-26 盐城工学院 A kind of novel piping lane component and its installation method
CN112695807A (en) * 2020-12-11 2021-04-23 中国二十冶集团有限公司 Post-planting installation method for rubber water stop
CN112695807B (en) * 2020-12-11 2022-07-01 中国二十冶集团有限公司 Post-planting installation method for rubber water stop
CN114439039A (en) * 2022-02-24 2022-05-06 中冶建筑研究总院有限公司 Light prefabricated underground comprehensive pipe gallery
CN114439039B (en) * 2022-02-24 2022-09-02 中冶建筑研究总院有限公司 Light prefabricated underground comprehensive pipe gallery

Also Published As

Publication number Publication date
CN106638337B (en) 2022-06-07

Similar Documents

Publication Publication Date Title
CN106638337A (en) Prefabricated concrete culvert pipe, prefabricated comprehensive pipe gallery and maintenance method of comprehensive pipe gallery
CN110878700B (en) Tunnel waterproof structure and construction method thereof
CN109026079B (en) Tunnel joint waterproof structure and waterproof construction method
CN202139608U (en) Later casting zone water stopping structure of basement
CN215562824U (en) Bottom plate U type deformation seam structure
CN109440951A (en) New-old concrete works intersection stitches waterproof construction and construction technology
CN206308631U (en) Precast concrete culvert pipe and precast comprehensive pipe gallery
CN103205986A (en) Concrete raft foundation construction-joint grouting device and construction method
CN106088758B (en) A kind of bilayer assembled underground granary
CN209397743U (en) New-old concrete works intersection stitches waterproof construction
CN217579825U (en) Prefabricated pin-connected panel rainwater box culvert suitable for integrative machine of strutting
CN110747763A (en) Box culvert settlement joint waterproof structure and construction method thereof
CN214614184U (en) Steel-edged rubber water stop and pipe gallery splicing structure with improved splicing part
CN209873861U (en) Sealing device for lap joint of steel corrugated plate pipe gallery plates
CN211446883U (en) Underground continuous wall antiseep connection structure
CN108729475A (en) Underground structure multi-layer combined type expansion joint waterproof construction method
CN106013911A (en) Internal steel plate assembly type circular underground granary with prefabricated caulking strips
CN219432708U (en) Anti-seepage device
CN206053490U (en) A kind of stepped prefabricated assembled rectangular underground granary of interior encased steel plate
CN103774620A (en) Concrete engineering expansion joint vertical sealing up structure fixing member and application thereof
CN217267626U (en) Connecting structure between new pipe gallery and old pipe gallery
CN220203027U (en) Advanced closing device for post-pouring belt in sedimentation
CN104727275A (en) Method for application of concrete work expansion joint vertical water sealing structure fixing element
CN214383906U (en) Assembly type revetment with semicircular grooves
CN220868295U (en) Subway station side wall waterproof construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant