CN106638276A - Composite material bridge surface ancillary facility of rail way prestress concrete box girder - Google Patents
Composite material bridge surface ancillary facility of rail way prestress concrete box girder Download PDFInfo
- Publication number
- CN106638276A CN106638276A CN201710060819.0A CN201710060819A CN106638276A CN 106638276 A CN106638276 A CN 106638276A CN 201710060819 A CN201710060819 A CN 201710060819A CN 106638276 A CN106638276 A CN 106638276A
- Authority
- CN
- China
- Prior art keywords
- girder
- box
- handrail
- bridge floor
- railing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/10—Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
- E01D19/103—Parapets, railings ; Guard barriers or road-bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F8/00—Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic
- E01F8/0005—Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic used in a wall type arrangement
- E01F8/0017—Plate-like elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention relates to a composite material bridge surface ancillary facility of a rail way prestress concrete box girder. Cable troughs are formed in the upper surfaces of the two sides of the box girder, walking plates are installed at the tops of the cable troughs, and curtain plates are installed on the outer side of the cable troughs; and handrails or sound barriers are installed on the edges of the two sides of the box girder. Main components of the composite material bridge surface ancillary facility are made of fibre reinforcing composite materials, the materials are light in mass and high in intensity, the secondary permanent load of a bridge girder is little, the geometry size of the bridge girder can be reduced, and distributed bars and prestress bars of the bridge girder are reduced, so that the total weight of the bridge girder is reduced.
Description
Technical field
The present invention relates to a kind of Railway Prestressed Concrete box-girder composite bridge floor affiliated facility.
Background technology
Railway Prestressed Concrete box-girder progressively replaces T beams in railway construction, becomes in railroad bridge construction and applies
Most commonly used beam type.The box-girder is one kind of science of bridge building central sill, and inside is hollow shape, and there are the edge of a wing, class in top both sides
Like chest.Bridge floor affiliated facility is the accessory structure outside bridge main body structural shielding wall, essential, plays important auxiliary
Function, its affiliated facility mainly includes shield, cable trough, straight wall, cable trough cover boards (doubling as foot plank), railing, sound barrier etc..
Wherein, shield be prefabricated reinforced concrete structure, straight wall be cast-in-place or prefabricated reinforced concrete structure, cable trough
Cover plate is precast rc slab or RPC plates, and railing is steel construction or prefabricated reinforced concrete structure, therefore affiliated facility matter
Amount is very big, substantially increases the secondary dead load of box-girder, and box-girder must increase physical dimension or increase with reinforcing bar, increases pre-
Stress rib to bear the load, so as to increase beam body weight.Existing Railway Prestressed Concrete box-girder bridge floor affiliated facility,
Shield, railing, cable trough cover boards are prefabricated, and straight wall is cast-in-place or prefabricated.Box-girder make when on the edge of a wing exposed portion
Reinforcing bar or built-in fitting, also exposed portion reinforcing bar when shield and railing concrete component make, during installation, by prefabricated concrete structure
The reinforcing bar exposed on reinforcing bar that part exposes and box-shaped flange of beam carries out colligation, by cast-in-place model sheetinstallat it is good after, penetration concrete,
Just entirety is formed with box-girder after solidification, process of setting needs to be conserved, and curing time is different because weather is different, general need
Take more than 7 days.Existing box-girder affiliated facility adopts cast in situs armored concrete, needs to experience assembling reinforcement, shuttering, shows
The operations such as pouring concrete, health preserving, form removal, surface treatment, complex process, construction period is longer, increased construction cost,
The requirement of rapid construction can not be met.The production of reinforcing bar and concrete is both needed to consume substantial amounts of fuel, and noxious substance and big
Amount dust emission, neither energy-conservation are also not environmentally.Cast-in-place straight wall constitutes two to three grooves together with the protecting wall on box-girder
As cable trough, after cable laying is finished, prefabricated reinforced concrete or RPC cover plates is shelved (as walking in straight wall upper surface
Plate).The column that shield upper surface arranged for interval has built-in fitting, railing or sound barrier passes through installation of embedded parts on shield.Help
Handss are attached fixation with railing post, and sound barrier is attached fixation with noise barrier stand column.Existing Railway Prestressed Concrete
The beam prefabricated affiliated facility quality of box-shaped is excessive, and the requirement in work progress to construction appliance is again higher, needs during in-site installation
Equipment is hung, so as to increase plant equipment cost, also all peace can be caused to workmen and live material in transport and hoisting process
Full hidden danger.
The content of the invention
To solve the above problems, it is an object of the invention to provide a kind of novel railway inherent stress concrete box-beam is compound
Material bridge floor affiliated facility, its main member is made using fibre reinforced composites, and makes full use of fiber reinforcement to answer
The railway box-girder bridge floor affiliated facility of condensation material each component material advantages.
The purpose of the present invention is achieved through the following technical solutions:
A kind of Railway Prestressed Concrete box-girder composite bridge floor affiliated facility, the upper surface of box-girder both sides is pacified
Equipped with cable trough, foot plank is installed at the top of the cable trough, the outside of the cable trough is shield;Box-girder both sides of the edge
Railing or sound barrier are installed.
Further, the railing includes several railing posts, upper handrail and lower handrail, wherein, several railings stand
Post is each attached on box-girder both sides of the edge, and the railing post is uniformly provided with from top to bottom multiple holes, and the upper handrail is with
Handrail is horizontally through successively positioned at the hole of railing post.
Further, the sound barrier includes several noise barrier stand columns and acoustic barrier unit board, wherein, several sound-screens
Barrier column is each attached on box-girder both sides of the edge, and the noise barrier stand column is respectively provided on two sides with groove, and the groove is big
The little thickness with acoustic barrier unit board matches, and polylith acoustic barrier unit board inserts from bottom to top the groove of the noise barrier stand column
In.
Further, the railing, foot plank, cable trough, shield, noise barrier stand column are fibre reinforced composites.
Further, the cable trough is integrally formed with shield, and the surface phase of the bottom surface of the cable trough and box-girder
Matching;Cable trough, railing post, noise barrier stand column are connected to box-girder by connector.
Further, the connector includes base and waterproof cover, and the base includes being be arranged in parallel on base plate and base plate
Two clamping plates, it is parallel between one of clamping plate and base plate to be provided with two stiffeners;The base and waterproof cover match, institute
State waterproof cover to wrap up the base plate, and position corresponding on the base and waterproof cover is respectively equipped with four bolts hole.
Further, U bolt sequentially passes through the bolt hole on box beam, cable trough, waterproof cover and base, by box beam
It is fixedly connected with cable trough;
Railing post or noise barrier stand column are installed between two clamping plates of connector base by rivet or bolt.
Further, the lap-joint between the upper handrail and upper handrail, lower handrail and lower handrail is connected by inner sleeve,
The external diameter of the inner sleeve matches with the internal diameter of upper handrail or lower handrail, and the inner sleeve is placed in adjacent two handrail
Between, and by bolt or rivet interlacement between the inner sleeve and two adjacent handrails.
Further, the railing post passes through rivet and gluing connection with upper handrail or lower handrail first and end.
Further, the upper handrail is horizontally through successively the hole positioned at railing post the top, and the lower handrail is one
Layer or multilamellar.
Beneficial effects of the present invention are:
Railway Prestressed Concrete box-girder composite bridge floor affiliated facility of the present invention, in addition to securing member, owns
Component is made using fibre reinforced composites, the characteristics of fibre reinforced composites have high-strength light.By finite element
Analysis, meet the affiliated facility strength and stiffness requirement of railway box-girder and with more than 4 times safety coefficients under the conditions of, product matter
Amount is light, by taking 32 meters of standard railroad box-girders as an example, bilateral bridge floor affiliated facility per linear meter(lin.m.) weight only 109kg or so (railing type) or
176kg or so (sound barrier type, without sound barrier), is intrinsic 9%.And site operation labor intensity is low, construction appliance takes
With low with cost of labor.Meanwhile, the secondary dead load of bridge can be reduced, and then bridge main body geometrical scale can be reduced, subtracted
Few arrangement of reinforcement and deformed bar, reach the purpose for mitigating bridge gross weight.Solve prefabricated RPC foot planks difficult quality control simultaneously
System, the problem for repeatedly occurring rupturing also solves steel construction railing and easily corrodes, and needs make regular check on the problem with application.
Description of the drawings
Fig. 1 is the structural representation of Railway Prestressed Concrete box-girder composite bridge floor affiliated facility of the present invention
Figure;
Fig. 2 is the rail structure schematic diagram of bridge floor affiliated facility of the present invention;
Fig. 3 is the noise barrier structure schematic diagram of bridge floor affiliated facility of the present invention;
Fig. 4 is the scheme of installation of the railing of bridge floor affiliated facility of the present invention;
Fig. 5 is the sound barrier scheme of installation of bridge floor affiliated facility of the present invention;
Fig. 6 is the cable trough and shield structure schematic diagram of bridge floor affiliated facility of the present invention;
Fig. 7 is the structural representation of connector of the present invention;
Fig. 8 is the waterproof cover structural representation of connector of the present invention;
Fig. 9 is the structural representation of the base of connector of the present invention;
Wherein, 1- railing posts, the upper handrails of 2-, 3- cable troughs, 4- foot planks, 5- connectors, 51-U shape bolts, 52- bottoms
Seat, 53- waterproof covers, 521- base plates, 522- clamping plates, 523- stiffeners, 6- noise barrier stand columns, 7- acoustic barrier unit boards are helped under 8-
Handss, 9- box-girders, 10- shields.
Specific embodiment
In order that the objects, technical solutions and advantages of the present invention become more apparent, it is right below in conjunction with drawings and Examples
The present invention is further elaborated.It should be appreciated that specific embodiment described herein is only to explain the present invention, not
For limiting the present invention.
As shown in figure 1, a kind of Railway Prestressed Concrete box-girder composite bridge floor affiliated facility, the both sides of box-girder 9
Upper surface be mounted on cable trough 3, the top of the cable trough 3 is provided with foot plank 4, and the foot plank 4 is used as electricity simultaneously
Cable tank cover plate, the outside of the cable trough 3 is shield 10.As shown in fig. 6, the cable trough 3 is integrally formed with shield 10, and institute
The bottom surface and the surface of box-girder 9 for stating cable trough 3 matches.The both sides of box-girder 9 are provided with railing or sound barrier.
As shown in Fig. 2 the railing includes several railing posts 1, upper handrail 2 and lower handrail 8, wherein, several hurdles
Bar column 1 is each attached on box-girder edge, and the railing post 1 is uniformly provided with from top to bottom multiple holes, the He of upper handrail 2
Lower handrail 8 is horizontally through successively positioned at the hole of railing post 1.The upper handrail 2 is horizontally through successively most to be gone up positioned at railing post 1
The hole of side, the lower handrail 8 is one or more layers.Lower handrail 8 is preferably 2 layers in the present embodiment.The upper handrail 2 and upper handrail
2nd, the lap-joint between lower handrail 8 and lower handrail 8 is connected by inner sleeve, the external diameter of the inner sleeve and upper handrail 2 or under help
The internal diameter of handss 8 matches, and the inner sleeve is placed in the middle of adjacent two handrail, and the inner sleeve and two adjacent handrails
Between by bolt or rivet interlacement.The railing post 1 is with upper handrail 2 or the first and end of lower handrail 8 by rivet and gluing company
Connect.
As shown in figure 3, the sound barrier includes several noise barrier stand columns 6 and acoustic barrier unit board 7, wherein, several
Noise barrier stand column 6 is each attached on box-girder edge, and the noise barrier stand column 6 is respectively provided on two sides with groove, and the groove
Size matches with the thickness of acoustic barrier unit board 7, and polylith acoustic barrier unit board 7 inserts from bottom to top the noise barrier stand column 6
Groove in.
As shown in Figure 4, Figure 5, cable trough 3, railing post 1, noise barrier stand column 6 connect box-girder 9 by connector 5.
With reference to Fig. 7~Fig. 9, the connector 5 includes base 52 and waterproof cover 53, and the base includes base plate 521 and bottom
Two clamping plates 522 be arrangeding in parallel on plate, it is parallel between one of clamping plate 522 and base plate to be provided with two stiffeners 523;It is described
Base 52 and waterproof cover 53 match, and the waterproof cover 53 wraps up the base plate, and phase on the base 52 and waterproof cover 53
Corresponding position is respectively equipped with four bolts hole.
U bolt 51 sequentially passes through the bolt hole on box beam 9, cable trough 3, waterproof cover 53 and base 52, by box beam 9
It is fixedly connected with cable trough 3.The U bolt is the built-in fitting on box-girder.
Railing post 1 or noise barrier stand column 6 by rivet or bolt be installed on connector base two clamping plates 522 it
Between.
The railing, foot plank 4, cable trough 3, shield 10, noise barrier stand column 6 are fibre reinforced composites and make,
The characteristics of fibre reinforced composites have high-strength light, and also there is acidproof, alkaline-resisting, corrosion resistant feature, can be applicable to sea
After the strong environment of the corrosivity such as side, addition UV resistant additive and surface anticorrosion are processed, weather resistance is also very high, therefore,
The maintenance cycle that can greatly extend during operation, reduces maintaining cost, also reduces maintaining and circuit is transported
The interference of battalion, life cycle cost is low.
Bridge floor affiliated facility structure connection of the present invention is simple, reliable, and its component is entirely factory-made component,
Quality is ensure that, scene is based on bolt connection, and installation workload is minimum, installation effectiveness is high, short construction period.In addition, this
Invent that energy consumption in the affiliated facility production process is little, noxious substance discharge is few, the characteristics of with energy-conservation, environmental friendliness.
The preferred embodiments of the present invention are the foregoing is only, the present invention is not limited to, for the skill of this area
For art personnel, the present invention can have various modifications and variations.It is all within the spirit and principles in the present invention, made any repair
Change, equivalent, improvement etc., should be included within the scope of the present invention.
Claims (10)
1. a kind of Railway Prestressed Concrete box-girder composite bridge floor affiliated facility, it is characterised in that box-girder (9) both sides
Upper surface be mounted on cable trough (3), foot plank (4) is installed at the top of the cable trough (3), the cable trough (3)
Outside is shield (10);Box-girder (9) both sides of the edge are provided with railing or sound barrier.
2. Railway Prestressed Concrete box-girder composite bridge floor affiliated facility according to claim 1, its feature exists
In, the railing includes several railing posts (1), upper handrail (2) and lower handrail (8), wherein, several railing posts (1)
Be each attached to box-girder both sides of the edge, the railing post (1) is uniformly provided with from top to bottom multiple holes, the upper handrail (2) and
Lower handrail (8) is horizontally through successively the hole positioned at railing post (1).
3. Railway Prestressed Concrete box-girder composite bridge floor affiliated facility according to claim 1, its feature exists
In, the sound barrier includes several noise barrier stand columns (6) and acoustic barrier unit board (7), wherein, several noise barrier stand columns
(6) box-girder both sides of the edge are each attached to, the noise barrier stand column (6) is respectively provided on two sides with groove, and the size of the groove
Match with the thickness of acoustic barrier unit board (7), polylith acoustic barrier unit board (7) inserts from bottom to top the noise barrier stand column
(6) in groove.
4. Railway Prestressed Concrete box-girder composite bridge floor affiliated facility according to claim 3, its feature exists
In the railing, foot plank (4), cable trough (3), shield (10), noise barrier stand column (6) adopt fibre reinforced composites
Make.
5. the Railway Prestressed Concrete box-girder composite bridge floor affiliated facility according to Claims 2 or 3, its feature
It is that the cable trough (3) is integrally formed with shield (10), and the surface phase of the bottom surface of the cable trough (3) and box-girder (9)
Matching;Cable trough (3), railing post (1), noise barrier stand column (6) are connected to box-girder (9) by connector (5).
6. Railway Prestressed Concrete box-girder composite bridge floor affiliated facility according to claim 5, its feature exists
In the connector (5) includes base (52) and waterproof cover (53), and the base includes that base plate (521) is parallel with base plate and sets
Two clamping plates (522) put, one of clamping plate (522) is provided with stiffener (523) with base plate;The base (52) and waterproof cover
(53) match, the waterproof cover (53) wraps up the base plate, and corresponding on the base (52) and waterproof cover (53)
Position is respectively equipped with four bolts hole.
7. Railway Prestressed Concrete box-girder composite bridge floor affiliated facility according to claim 6, its feature exists
In,
U bolt (51) sequentially passes through the bolt hole on box beam (9), cable trough (3), waterproof cover (53) and base (52), will
Box beam (9) is fixedly connected with cable trough (3);
Railing post (1) or noise barrier stand column (6) by rivet or bolt be installed on connector base two clamping plates (522) it
Between.
8. Railway Prestressed Concrete box-girder composite bridge floor affiliated facility according to claim 2, its feature exists
In the upper handrail (2) is connected with the lap-joint between lower handrail (8) with upper handrail (2), lower handrail (8) by inner sleeve, institute
The external diameter and the internal diameter of upper handrail (2) or lower handrail (8) for stating inner sleeve matches, and the inner sleeve is placed in adjacent two handrail
By bolt or rivet interlacement between centre, and the inner sleeve and two adjacent handrails.
9. Railway Prestressed Concrete box-girder composite bridge floor affiliated facility according to claim 2, its feature exists
In the railing post (1) is with upper handrail (2) or lower handrail (8) first and end by rivet and gluing connection.
10. Railway Prestressed Concrete box-girder composite bridge floor affiliated facility according to claim 2, its feature exists
In the upper handrail (2) is horizontally through successively the hole positioned at railing post (1) the top, and the lower handrail (8) is one layer or many
Layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710060819.0A CN106638276A (en) | 2017-01-25 | 2017-01-25 | Composite material bridge surface ancillary facility of rail way prestress concrete box girder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710060819.0A CN106638276A (en) | 2017-01-25 | 2017-01-25 | Composite material bridge surface ancillary facility of rail way prestress concrete box girder |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106638276A true CN106638276A (en) | 2017-05-10 |
Family
ID=58842346
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710060819.0A Pending CN106638276A (en) | 2017-01-25 | 2017-01-25 | Composite material bridge surface ancillary facility of rail way prestress concrete box girder |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106638276A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109537437A (en) * | 2018-11-30 | 2019-03-29 | 中铁建南方建设投资有限公司 | A kind of prestressed steel reinforced concrete beam device and its implementation |
CN110387808A (en) * | 2019-08-16 | 2019-10-29 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | A kind of prefabricated bridge floor affiliated facility ground connections |
CN110424239A (en) * | 2019-08-06 | 2019-11-08 | 中铁第四勘察设计院集团有限公司 | A kind of overhead interval structure of administrative region of a city railway |
CN110438888A (en) * | 2019-08-20 | 2019-11-12 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | Cable trough is located at the beams of concrete composite material pavement below horizontal foot plank |
CN112482214A (en) * | 2020-11-20 | 2021-03-12 | 天津市公路工程总公司 | Viaduct communication-maintaining working condition sound barrier rapid installation structure and construction method thereof |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH641860A5 (en) * | 1981-05-27 | 1984-03-15 | Igeco Sa | Concrete parapet for a road or bridge |
EP0384996A1 (en) * | 1989-02-10 | 1990-09-05 | Octatube Space Structures B.V. | Sound screen |
KR20060004588A (en) * | 2004-07-09 | 2006-01-12 | 주식회사 에이브이티 | Structure for fixing base-plate on a central separating stand of a bridge |
CN203065950U (en) * | 2012-11-29 | 2013-07-17 | 中铁工程设计咨询集团有限公司 | Railway bridge composed of simply-supported T-shaped beams |
CN204112248U (en) * | 2014-09-25 | 2015-01-21 | 刘兴和 | A kind of mounting seat support of sound barrier |
CN204492337U (en) * | 2015-03-18 | 2015-07-22 | 熊承勇 | A kind of base construction of enclosing |
CN204703066U (en) * | 2015-06-09 | 2015-10-14 | 中铁第四勘察设计院集团有限公司 | The built-in cable channel in inter-city passenger rail T beam sidewalk |
CN204753357U (en) * | 2015-06-24 | 2015-11-11 | 中铁第四勘察设计院集团有限公司 | Cast -in -place pavement of voiced protective screen of inter -city railway |
CN105525564A (en) * | 2016-01-25 | 2016-04-27 | 衡水冀军工程技术有限公司 | Sidewalk bracket for simply supported T beam |
CN106223187A (en) * | 2016-08-30 | 2016-12-14 | 株洲时代新材料科技股份有限公司 | Shield for mining under railways |
-
2017
- 2017-01-25 CN CN201710060819.0A patent/CN106638276A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH641860A5 (en) * | 1981-05-27 | 1984-03-15 | Igeco Sa | Concrete parapet for a road or bridge |
EP0384996A1 (en) * | 1989-02-10 | 1990-09-05 | Octatube Space Structures B.V. | Sound screen |
KR20060004588A (en) * | 2004-07-09 | 2006-01-12 | 주식회사 에이브이티 | Structure for fixing base-plate on a central separating stand of a bridge |
CN203065950U (en) * | 2012-11-29 | 2013-07-17 | 中铁工程设计咨询集团有限公司 | Railway bridge composed of simply-supported T-shaped beams |
CN204112248U (en) * | 2014-09-25 | 2015-01-21 | 刘兴和 | A kind of mounting seat support of sound barrier |
CN204492337U (en) * | 2015-03-18 | 2015-07-22 | 熊承勇 | A kind of base construction of enclosing |
CN204703066U (en) * | 2015-06-09 | 2015-10-14 | 中铁第四勘察设计院集团有限公司 | The built-in cable channel in inter-city passenger rail T beam sidewalk |
CN204753357U (en) * | 2015-06-24 | 2015-11-11 | 中铁第四勘察设计院集团有限公司 | Cast -in -place pavement of voiced protective screen of inter -city railway |
CN105525564A (en) * | 2016-01-25 | 2016-04-27 | 衡水冀军工程技术有限公司 | Sidewalk bracket for simply supported T beam |
CN106223187A (en) * | 2016-08-30 | 2016-12-14 | 株洲时代新材料科技股份有限公司 | Shield for mining under railways |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109537437A (en) * | 2018-11-30 | 2019-03-29 | 中铁建南方建设投资有限公司 | A kind of prestressed steel reinforced concrete beam device and its implementation |
CN110424239A (en) * | 2019-08-06 | 2019-11-08 | 中铁第四勘察设计院集团有限公司 | A kind of overhead interval structure of administrative region of a city railway |
CN110387808A (en) * | 2019-08-16 | 2019-10-29 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | A kind of prefabricated bridge floor affiliated facility ground connections |
CN110438888A (en) * | 2019-08-20 | 2019-11-12 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | Cable trough is located at the beams of concrete composite material pavement below horizontal foot plank |
CN110438888B (en) * | 2019-08-20 | 2021-09-28 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | Concrete beam composite material sidewalk with cable trough below transverse walking plate |
CN112482214A (en) * | 2020-11-20 | 2021-03-12 | 天津市公路工程总公司 | Viaduct communication-maintaining working condition sound barrier rapid installation structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106638276A (en) | Composite material bridge surface ancillary facility of rail way prestress concrete box girder | |
CN206553909U (en) | A kind of Railway Prestressed Concrete box-girder composite bridge floor affiliated facility | |
US10041289B2 (en) | Interface between a floor panel and a panel track | |
CN106498844B (en) | A kind of high speed railway box beam bridge floor pre-fabricated electric cables slot | |
CN106639045A (en) | Prefabricated assembly type steel plate-concrete composite shear wall structure system and construction method thereof | |
CN109183614B (en) | Cable trough main bearing T-beam composite sidewalk and installation method thereof | |
US8613172B2 (en) | Composite panel including pre-stressed concrete with support frame, and method for making same | |
CN112900764A (en) | Light assembled stair with steel bar truss | |
US20210396018A1 (en) | Balcony system and method | |
CN106592415A (en) | Concrete beam composite sidewalk | |
CN103015317B (en) | Factory-prefabricated orthotropic steel plate-composite material combined bridge deck structure | |
KR101825587B1 (en) | Temporary prestress deck for steel bridge. | |
KR102208167B1 (en) | Bracket installing structure for bridge and footbridge possible assembied and disassembled and construturing curve of long span | |
CN206581128U (en) | A kind of beams of concrete composite pavement | |
CN105332519A (en) | Added elevator structure using exterior wall cladding panels and its construction method | |
CN115434239A (en) | Module type bridge deck safety protection facility and design method | |
KR101765845B1 (en) | Temporary prestress deck for steel bridge | |
CN210246198U (en) | Composite material cable trough for railway concrete box beam | |
CN205591450U (en) | Suspension type stair | |
CN220724723U (en) | Composite mining sleeper | |
CN205857678U (en) | Detachable discharging platform anchor | |
CN216276560U (en) | Former bamboo stair are striden to multilayer | |
CN218758663U (en) | Subassembly is fixed to I-steel of encorbelmenting | |
CN110344612A (en) | A kind of coke oven booth constructing structure and construction method | |
CN220377691U (en) | Temporary protection structure of step ladder under construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170510 |