CN106638212A - Mine roadway early strength concrete construction method - Google Patents
Mine roadway early strength concrete construction method Download PDFInfo
- Publication number
- CN106638212A CN106638212A CN201510716794.6A CN201510716794A CN106638212A CN 106638212 A CN106638212 A CN 106638212A CN 201510716794 A CN201510716794 A CN 201510716794A CN 106638212 A CN106638212 A CN 106638212A
- Authority
- CN
- China
- Prior art keywords
- early strength
- construction method
- strength concrete
- concrete
- early
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The invention relates to a mine roadway early-strength and high-strength concrete construction method, which comprises: cleaning a mine roadway base surface, paving a hard aggregate, paving early strength concrete, and other steps, wherein the mine roadway base surface cleaning requirements comprise that all impurities including mud, gravel, coal ash and the like are cleaned out until the hard base ground is exposed, the surface water is completely sucked out and no visible water exists on the base surface, the hard aggregate paving step comprises that a layer of stones with a particle size of 2-4 cm is uniformly paved on the cleaned base surface, and the early strength concrete paving step comprises that the paved early strength concrete is the concrete added with an early strength admixture and can achieve C20 after 24 h. With the construction method of the present invention, the tunneling speed in the mine roadway can be substantially improved.
Description
Patent of the present invention provides a kind of construction method of mine laneway early strengthening and high strengthening concrete, belongs to concrete works technical field.Institute
Stating a kind of mine laneway early strength concrete construction method is:The cleaning of mine laneway basal plane, laying tough aggregate, the early strong coagulation of laying
The steps such as soil are constituted.The cleaning of described mine laneway basal plane requires basal plane all of impurity in tunnel to include mud, rubble, coal
Ash etc. is all disposed, until spilling hard base, silt water is drained only, and basal plane can not have open fire;Described laying tough aggregate be
The stone of one layer of particle diameter 2-4cm is uniformly laid on basal plane after cleaning, described laying early strength concrete is added outside early strong
Plus the concrete of agent, the concrete can reach C20 in 24 hours.
Patent of the present invention is related to a kind of structure material, more particularly to a kind of construction method of mine laneway early strengthening and high strengthening concrete.
Background technology
Typically all lay concrete road surface in mine laneway each at home at present, but because the early strength of concrete is low, typically spread
If after the moisture-keeping maintaining of 14~21 days is needed after concrete, intensity can be only achieved the use requirement of road traffic, vehicle in curing period
Transport cannot pass through, and to the excavation speed for making follow-up equipment to keep up with development machine, the speed and depth of mine development end be delayed significantly
Degree, to production very big inconvenience is brought, and how to make the early strength of raising cement concrete pavement, to shorten its curing time, is subtracted
Few impact to producing is problem demanding prompt solution.
Patent of invention content
For the defect that prior art is present, the purpose of patent of the present invention is to provide a kind of construction of mine laneway early strengthening and high strengthening concrete
Method, this construction method can be to make concrete that C20 was reached in 24 hours, and the performance of concrete each side is not less than commonly
The performance indications of concrete, so as to improve the driving speed of mine laneway.
The construction method purpose of patent of the present invention is achieved by the following scheme:
A kind of construction method of mine laneway early strengthening and high strengthening concrete, its construction method is as follows:
Carry out basal plane cleaning to mine laneway first, the cleaning of described mine laneway basal plane requires basal plane all of impurity in tunnel to include
Mud, rubble, coal ash etc. are all disposed, until spilling hard substrate, silt water is drained only, and basal plane can not have open fire;
And then lay one layer of stone on the basal plane after cleaning, described laying tough aggregate is uniform laying one on basal plane after the cleaning
The stone of layer particle diameter 2-4cm,
Early strength concrete is finally laid, described laying early strength concrete is the concrete for adding early strong additive, and its concrete is 24
C20 is can reach in hour.
Patent of the present invention is processed by the basal plane to mine laneway, then re-lays one layer of stone, then re-lays early strength concrete
Method making the concrete in mine laneway reach early strong purpose, the curing time of concrete is substantially reduced, so as to save
Make an appointment, to accelerate driving speed in mine facility is provided.
Further illustrate how patent of the present invention is realized with reference to specific embodiment:
Embodiment 1
First the basal plane of mine laneway cleared up first, all of impurity is included that mud, rubble, coal ash etc. are all disposed, directly
To hard base is spilt, silt water is drained only, and basal plane can not have open fire;Afterwards the basal plane after cleaning out lays one with uniform
The stone of layer particle diameter 2-4cm;Then again adding early, by force the concrete of additive is routed to above stone layer, and uses vibrating spear
Vibrated, last floating, receipts light.
Claims (4)
1. a kind of mine laneway early strength concrete construction method:The step of its special type is the construction method for mine laneway basal plane cleaning, laying tough aggregate, laying early strength concrete etc. step composition.
2. a kind of mine laneway early strength concrete construction method according to claim 1, it is characterized in that the cleaning of described mine laneway basal plane requires basal plane all of impurity in tunnel to include that mud, rubble, coal ash etc. are all disposed, until spilling hard base, silt water is drained only, and basal plane can not have open fire.
3. a kind of mine laneway early strength concrete construction method according to claim 1, it is characterised in that described laying tough aggregate is the uniform stone of one layer of particle diameter 2-4cm of laying on basal plane after the cleaning.
4. a kind of mine laneway early strength concrete construction method according to claim 1, it is characterised in that described laying early strength concrete is the concrete for adding early strong additive, the concrete can reach C20 in 24 hours.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510716794.6A CN106638212A (en) | 2015-10-30 | 2015-10-30 | Mine roadway early strength concrete construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510716794.6A CN106638212A (en) | 2015-10-30 | 2015-10-30 | Mine roadway early strength concrete construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106638212A true CN106638212A (en) | 2017-05-10 |
Family
ID=58829979
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510716794.6A Pending CN106638212A (en) | 2015-10-30 | 2015-10-30 | Mine roadway early strength concrete construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106638212A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU586031B2 (en) * | 1985-10-04 | 1989-06-29 | Minnesota Mining And Manufacturing Company | Catalysts for the curing of a water-curable isocyanate- functional prepolymer |
CN202031003U (en) * | 2010-07-29 | 2011-11-09 | 上海园林绿化建设有限公司 | Pervious concrete park pavement layer structure |
CN203174456U (en) * | 2013-04-28 | 2013-09-04 | 重庆大学 | Pavement structure suitable for road runnel |
CN203373949U (en) * | 2013-06-06 | 2014-01-01 | 江苏南通三建集团有限公司 | Concrete superflat floor |
CN104609805A (en) * | 2015-01-22 | 2015-05-13 | 江苏苏博特新材料股份有限公司 | Half-flexible pavement material for rapid traffic opening and method of half-flexible pavement material for paving pavement |
-
2015
- 2015-10-30 CN CN201510716794.6A patent/CN106638212A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU586031B2 (en) * | 1985-10-04 | 1989-06-29 | Minnesota Mining And Manufacturing Company | Catalysts for the curing of a water-curable isocyanate- functional prepolymer |
CN202031003U (en) * | 2010-07-29 | 2011-11-09 | 上海园林绿化建设有限公司 | Pervious concrete park pavement layer structure |
CN203174456U (en) * | 2013-04-28 | 2013-09-04 | 重庆大学 | Pavement structure suitable for road runnel |
CN203373949U (en) * | 2013-06-06 | 2014-01-01 | 江苏南通三建集团有限公司 | Concrete superflat floor |
CN104609805A (en) * | 2015-01-22 | 2015-05-13 | 江苏苏博特新材料股份有限公司 | Half-flexible pavement material for rapid traffic opening and method of half-flexible pavement material for paving pavement |
Non-Patent Citations (1)
Title |
---|
李泽民: "《城市道路路面铺筑与维修》", 31 January 1975 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104878678A (en) | Construction method for water-permeable and water-retaining water-permeable pavement structure | |
CN106759126B (en) | Construction method of side slope support drainage channel | |
CN102493308A (en) | Bio-enzyme modified roller compacted concrete road engineering construction technology | |
CN104631274A (en) | Temporary road pavement technology | |
CN107352904A (en) | A kind of spoil base gunite material for coal mine roadway gunite | |
US20190084883A1 (en) | Dry Mix and Concrete Composition Containing Bed Ash and Related Methods | |
JP2005068887A (en) | Water permeable pavement structure | |
CN107032660B (en) | Preparation method of composite material for paving permeable pavement | |
CN1304471A (en) | Method of stabilising ground in road construction work | |
CN108101449A (en) | Permeable recycled cement stabilization gravel and its construction method | |
CN106638212A (en) | Mine roadway early strength concrete construction method | |
CN108191309B (en) | Modified roadbed silty soil and method for roadbed filling by using same | |
CN106517944A (en) | Solidified granular soil produced by utilizing waste and old materials from building project | |
CN110878502A (en) | Soft soil matrix pavement asphalt concrete construction method | |
CN104818659A (en) | Cement slab scene granulation regeneration construction process | |
JP4030574B1 (en) | Earth-based paving material | |
CN104234067A (en) | Method for treating coast weak soil unconsolidated soil | |
RU2685585C1 (en) | Mixture for paying layers for transport infrastructure | |
KR100698587B1 (en) | The improved pavement | |
CN110776280A (en) | Roadbed material and preparation method thereof | |
CN204690908U (en) | There is the rain inlet structure getting rid of subgrade and pavement inner product water function | |
CN203700897U (en) | Pervious concrete ground | |
CN220746471U (en) | Roadbed treatment structure for geological region of soft mud layer | |
EP4001377B1 (en) | A method of preparing a construction site and soil stabilizer | |
CN214061571U (en) | Steel slag doped composite foundation structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170510 |