CN106638212A - Mine roadway early strength concrete construction method - Google Patents

Mine roadway early strength concrete construction method Download PDF

Info

Publication number
CN106638212A
CN106638212A CN201510716794.6A CN201510716794A CN106638212A CN 106638212 A CN106638212 A CN 106638212A CN 201510716794 A CN201510716794 A CN 201510716794A CN 106638212 A CN106638212 A CN 106638212A
Authority
CN
China
Prior art keywords
early strength
construction method
strength concrete
concrete
early
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510716794.6A
Other languages
Chinese (zh)
Inventor
吴龙泉
朱友恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510716794.6A priority Critical patent/CN106638212A/en
Publication of CN106638212A publication Critical patent/CN106638212A/en
Pending legal-status Critical Current

Links

Abstract

The invention relates to a mine roadway early-strength and high-strength concrete construction method, which comprises: cleaning a mine roadway base surface, paving a hard aggregate, paving early strength concrete, and other steps, wherein the mine roadway base surface cleaning requirements comprise that all impurities including mud, gravel, coal ash and the like are cleaned out until the hard base ground is exposed, the surface water is completely sucked out and no visible water exists on the base surface, the hard aggregate paving step comprises that a layer of stones with a particle size of 2-4 cm is uniformly paved on the cleaned base surface, and the early strength concrete paving step comprises that the paved early strength concrete is the concrete added with an early strength admixture and can achieve C20 after 24 h. With the construction method of the present invention, the tunneling speed in the mine roadway can be substantially improved.

Description

A kind of mine laneway early strength concrete construction method
Patent of the present invention provides a kind of construction method of mine laneway early strengthening and high strengthening concrete, belongs to concrete works technical field.Institute Stating a kind of mine laneway early strength concrete construction method is:The cleaning of mine laneway basal plane, laying tough aggregate, the early strong coagulation of laying The steps such as soil are constituted.The cleaning of described mine laneway basal plane requires basal plane all of impurity in tunnel to include mud, rubble, coal Ash etc. is all disposed, until spilling hard base, silt water is drained only, and basal plane can not have open fire;Described laying tough aggregate be The stone of one layer of particle diameter 2-4cm is uniformly laid on basal plane after cleaning, described laying early strength concrete is added outside early strong Plus the concrete of agent, the concrete can reach C20 in 24 hours.
Patent of the present invention is related to a kind of structure material, more particularly to a kind of construction method of mine laneway early strengthening and high strengthening concrete.
Background technology
Typically all lay concrete road surface in mine laneway each at home at present, but because the early strength of concrete is low, typically spread If after the moisture-keeping maintaining of 14~21 days is needed after concrete, intensity can be only achieved the use requirement of road traffic, vehicle in curing period Transport cannot pass through, and to the excavation speed for making follow-up equipment to keep up with development machine, the speed and depth of mine development end be delayed significantly Degree, to production very big inconvenience is brought, and how to make the early strength of raising cement concrete pavement, to shorten its curing time, is subtracted Few impact to producing is problem demanding prompt solution.
Patent of invention content
For the defect that prior art is present, the purpose of patent of the present invention is to provide a kind of construction of mine laneway early strengthening and high strengthening concrete Method, this construction method can be to make concrete that C20 was reached in 24 hours, and the performance of concrete each side is not less than commonly The performance indications of concrete, so as to improve the driving speed of mine laneway.
The construction method purpose of patent of the present invention is achieved by the following scheme:
A kind of construction method of mine laneway early strengthening and high strengthening concrete, its construction method is as follows:
Carry out basal plane cleaning to mine laneway first, the cleaning of described mine laneway basal plane requires basal plane all of impurity in tunnel to include Mud, rubble, coal ash etc. are all disposed, until spilling hard substrate, silt water is drained only, and basal plane can not have open fire;
And then lay one layer of stone on the basal plane after cleaning, described laying tough aggregate is uniform laying one on basal plane after the cleaning The stone of layer particle diameter 2-4cm,
Early strength concrete is finally laid, described laying early strength concrete is the concrete for adding early strong additive, and its concrete is 24 C20 is can reach in hour.
Patent of the present invention is processed by the basal plane to mine laneway, then re-lays one layer of stone, then re-lays early strength concrete Method making the concrete in mine laneway reach early strong purpose, the curing time of concrete is substantially reduced, so as to save Make an appointment, to accelerate driving speed in mine facility is provided.
Further illustrate how patent of the present invention is realized with reference to specific embodiment:
Embodiment 1
First the basal plane of mine laneway cleared up first, all of impurity is included that mud, rubble, coal ash etc. are all disposed, directly To hard base is spilt, silt water is drained only, and basal plane can not have open fire;Afterwards the basal plane after cleaning out lays one with uniform The stone of layer particle diameter 2-4cm;Then again adding early, by force the concrete of additive is routed to above stone layer, and uses vibrating spear Vibrated, last floating, receipts light.

Claims (4)

1. a kind of mine laneway early strength concrete construction method:The step of its special type is the construction method for mine laneway basal plane cleaning, laying tough aggregate, laying early strength concrete etc. step composition.
2. a kind of mine laneway early strength concrete construction method according to claim 1, it is characterized in that the cleaning of described mine laneway basal plane requires basal plane all of impurity in tunnel to include that mud, rubble, coal ash etc. are all disposed, until spilling hard base, silt water is drained only, and basal plane can not have open fire.
3. a kind of mine laneway early strength concrete construction method according to claim 1, it is characterised in that described laying tough aggregate is the uniform stone of one layer of particle diameter 2-4cm of laying on basal plane after the cleaning.
4. a kind of mine laneway early strength concrete construction method according to claim 1, it is characterised in that described laying early strength concrete is the concrete for adding early strong additive, the concrete can reach C20 in 24 hours.
CN201510716794.6A 2015-10-30 2015-10-30 Mine roadway early strength concrete construction method Pending CN106638212A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510716794.6A CN106638212A (en) 2015-10-30 2015-10-30 Mine roadway early strength concrete construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510716794.6A CN106638212A (en) 2015-10-30 2015-10-30 Mine roadway early strength concrete construction method

Publications (1)

Publication Number Publication Date
CN106638212A true CN106638212A (en) 2017-05-10

Family

ID=58829979

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510716794.6A Pending CN106638212A (en) 2015-10-30 2015-10-30 Mine roadway early strength concrete construction method

Country Status (1)

Country Link
CN (1) CN106638212A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU586031B2 (en) * 1985-10-04 1989-06-29 Minnesota Mining And Manufacturing Company Catalysts for the curing of a water-curable isocyanate- functional prepolymer
CN202031003U (en) * 2010-07-29 2011-11-09 上海园林绿化建设有限公司 Pervious concrete park pavement layer structure
CN203174456U (en) * 2013-04-28 2013-09-04 重庆大学 Pavement structure suitable for road runnel
CN203373949U (en) * 2013-06-06 2014-01-01 江苏南通三建集团有限公司 Concrete superflat floor
CN104609805A (en) * 2015-01-22 2015-05-13 江苏苏博特新材料股份有限公司 Half-flexible pavement material for rapid traffic opening and method of half-flexible pavement material for paving pavement

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU586031B2 (en) * 1985-10-04 1989-06-29 Minnesota Mining And Manufacturing Company Catalysts for the curing of a water-curable isocyanate- functional prepolymer
CN202031003U (en) * 2010-07-29 2011-11-09 上海园林绿化建设有限公司 Pervious concrete park pavement layer structure
CN203174456U (en) * 2013-04-28 2013-09-04 重庆大学 Pavement structure suitable for road runnel
CN203373949U (en) * 2013-06-06 2014-01-01 江苏南通三建集团有限公司 Concrete superflat floor
CN104609805A (en) * 2015-01-22 2015-05-13 江苏苏博特新材料股份有限公司 Half-flexible pavement material for rapid traffic opening and method of half-flexible pavement material for paving pavement

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李泽民: "《城市道路路面铺筑与维修》", 31 January 1975 *

Similar Documents

Publication Publication Date Title
CN104878678A (en) Construction method for water-permeable and water-retaining water-permeable pavement structure
CN106759126B (en) Construction method of side slope support drainage channel
CN102493308A (en) Bio-enzyme modified roller compacted concrete road engineering construction technology
CN104631274A (en) Temporary road pavement technology
CN107352904A (en) A kind of spoil base gunite material for coal mine roadway gunite
US20190084883A1 (en) Dry Mix and Concrete Composition Containing Bed Ash and Related Methods
JP2005068887A (en) Water permeable pavement structure
CN107032660B (en) Preparation method of composite material for paving permeable pavement
CN1304471A (en) Method of stabilising ground in road construction work
CN108101449A (en) Permeable recycled cement stabilization gravel and its construction method
CN106638212A (en) Mine roadway early strength concrete construction method
CN108191309B (en) Modified roadbed silty soil and method for roadbed filling by using same
CN106517944A (en) Solidified granular soil produced by utilizing waste and old materials from building project
CN110878502A (en) Soft soil matrix pavement asphalt concrete construction method
CN104818659A (en) Cement slab scene granulation regeneration construction process
JP4030574B1 (en) Earth-based paving material
CN104234067A (en) Method for treating coast weak soil unconsolidated soil
RU2685585C1 (en) Mixture for paying layers for transport infrastructure
KR100698587B1 (en) The improved pavement
CN110776280A (en) Roadbed material and preparation method thereof
CN204690908U (en) There is the rain inlet structure getting rid of subgrade and pavement inner product water function
CN203700897U (en) Pervious concrete ground
CN220746471U (en) Roadbed treatment structure for geological region of soft mud layer
EP4001377B1 (en) A method of preparing a construction site and soil stabilizer
CN214061571U (en) Steel slag doped composite foundation structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170510