CN106638168A CN201710030971.4A CN201710030971A CN106638168A CN 106638168 A CN106638168 A CN 106638168A CN 201710030971 A CN201710030971 A CN 201710030971A CN 106638168 A CN106638168 A CN 106638168A
Authority
CN
China
Prior art keywords
railway
grouting
reinforcing
drilling
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710030971.4A
Other languages
Chinese (zh)
Inventor
江宏法
查甫周
刘世刚
钱曦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maanshan Iron and Steel Co Ltd
Original Assignee
Maanshan Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maanshan Iron and Steel Co Ltd filed Critical Maanshan Iron and Steel Co Ltd
Priority to CN201710030971.4A priority Critical patent/CN106638168A/en
Publication of CN106638168A publication Critical patent/CN106638168A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way
    • E01B2/006Deep foundation of tracks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/03Injecting, mixing or spraying additives into or onto ballast or underground
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/08Deep or vertical foundation

Abstract

The invention provides a device for treating metallurgy railroad bed defects through reinforcing and grouting and a construction method and relates to the defect treatment and maintenance for a heavy haul railway bed of metallurgy factories and mines. The device is characterized in that cement pillars are uniformly vertical arranged in the form of lattice or plum blossom within a preset scope of a railway bed collapse zone so as to form a grouted compound railway bed. A construction device comprises a railway reinforcing device and a drilling grouting device, wherein the railway reinforcing device is arranged on a stable bed foundation and the drilling grouting device is arranged on one side of the railway. The construction method comprises the following steps of: manufacturing the reinforcing components and the drilling grouting device, preparing the materials, reinforcing the railway, performing drilling grouting and recovering the railway. The drilling grouting is performed in the running gap of the trains, so as to form the grouted compound railway bed. The invention has the advantages that the conception is novel; the device and equipment are simply and conveniently manufactured; the operation is simple, safe and reliable; the device can be reused; the influence of the construction on the railway transportation is small; the grouting railway bed is firm and stable; the bed detect treatment effect and the comprehensive economic benefit are excellent; the device is especially suitable for the treatment of the defects of the railway bed under the state of busy transportation.

Description

Consolidation grouting renovates metallurgic railway subgrade defect device and construction method
Technical field
The invention belongs to metallurgic railway technical field, more particularly to metallurgical factories and miness Subgrade of Heavy-haul Railway Disease Treatment, maintenance.
Background technology
Smelter heavy haul railway is the main artery of smelter production, mainly undertakes the special cargos such as high-temp liquid fortune Defeated, transportation load is big, and railroad track and roadbed technology status are had high demands.Heavy haul railway is metallurgical extraordinary due to the big axle weight of day-to-day operation Vehicle, it is big to track and roadbed facility damageability, especially for plant area's earth's surface and underground water plentiful ground section of railway track, easily produce iron Road roadbed deep layer is risen soil and Subgrade Subsidence disease, and causes track geometry status to be difficult to keep stable, track structure part A series of generation of railway diseases such as spoilage is big, seriously jeopardizes heavy haul railway traffic safety, for this reason, it may be necessary to put into substantial amounts of dimension Repair strength to be renovated.
It is existing regulation railway bed deep layer rise soil and Subgrade Subsidence disease using excavate cushion, railway block, in Line-break car, takes off(Dig)Except the frost boiling mud tiny fragments of stone, coal, etc. and the roadbed soft layer of certain depth, backfill improvement mixed fillers, to improve roadbed carrying Power.Existing defects are to cut off traffic, very big to railway transportation, iron and steel Influence of production;Construction work amount is big, should excavate the mud tiny fragments of stone, coal, etc. Cubic metre of earth, change fill out roadbed filling again, also safety precautions etc. is taken to underground utilities and neighbouring construction of structures facility, cause Integrated construction high cost;The transport mud tiny fragments of stone, coal, etc. earthwork and filler can also cause environmental pollution.
The content of the invention
To overcome the defect of prior art presence, it is an object of the present invention to provide a kind of consolidation grouting regulation metallurgic railway roadbed Disease device and construction method, it is simple to operate, safe and reliable, can solve the problems, such as that roadbed deep layer is risen soil and collapse disease.
The grouting and reinforcing roadbed of metallurgic railway collapse disease regulation, including railway ground, are characterized in:Collapse in railway bed In the setting range in sunken disease section and edge transition area, by parallel grid shape or plum blossom-shaped cement pile, concrete stake are uniformly laid Column diameter is not less than 3.5m, stake 1 ~ 1.5m of intercolumnar distance not less than 70mm, length, in being vertically set on firm ground, constitutes water Mud pile and soil are composite road bed;Backfill 150mm thickness yellow sand filter protection layers and 200mm thickness rubble railway ballasts on bedding of roadbed successively Layer.
Further improve, described cement pile is by the drilling being vertical under road bed in soil, and boring aperture is not little In 70mm, depth is not less than 3.5m, sets in the cement mortar injection hole of pressure and the ratio of mud, and Jing diffusions are frozen into concrete stake Post.
The constructing device of metallurgic railway Subgrade Subsidence Disease Treatment, including railway bed, railroad track part, are characterized in The device also includes railway reinforced device and bored grouting equipment;Described bracing means by longitudinal direction just beam, cross-arm beam, simple Seat is connected and composed, and just beam is symmetrically placed in reinforcing lengths of rail outside for longitudinal direction, and two ends are fixed on simple bearing by railway spike, simple bearing It is placed on firm roadbed ground;At least 5 cross-arm beams are located in rail lower section by setting interval, and two ends are erected at longitudinal direction just beam On, by drift-pin type anticreeper, respectively just beam is fixed with rail and longitudinal direction, when train is by with reinforcing longitudinal just beam lengths of rail, train Dynamic load is effectively transferred on bearing ground, and railway operation and boring grouting reinforcing roadbed operation is guaranteed so as to reach not interrupt Implement;Described bored grouting equipment includes drilling machine, pulping device and pressure grouting device for overall, is placed in the side of railway, Train operation gap, by setting hole position carry out being drilled with drilling, after pore-forming immediately general made by cement mortar pressure injection hole Interior, Jing diffusions are frozen into cement pile, in being permanently disposed on ground, constitute slip casting composite road bed.
Further improve, just beam includes two for described longitudinal direction, and per root, longitudinal just beam is formed by H profile steel processing and fabricating, is indulged To the selection of just beam length and H profile steel model, calculate by reinforcing span and current train load and determine;To increase its bending strength And rigidity, in H profile steel web both sides setting position welding floor, hole for hoist is set on floor, dismounting is easily installed, it is vertical in H profile steel To just beam two ends wing plate Shang She roads nail, for nail connection holder base plate, fixed longitudinal just beam position, its effect is by cross-arm beam lotus Load is transferred to bearing.
Further improve, described cross-arm beam adopts 50Kg/m rail processing and fabricatings, its joint length is 5m, and cross-arm beam sets Interval is put by span and the calculating determination of current train load is reinforced, its effect is that railroad track Train induced load is transferred into longitudinal direction Just beam.
Further improve, described simple bearing includes holder base plate and chock;Holder base plate is using 20mm thickness ordinary steels Plate processing and fabricating, backing plate is provided with shoulder block and road nail, for controlling longitudinal just beam lateral displacement and joining chock using railway spike nail Need;Using the rail track class of standard I oil sleeper processing, its length is 1.25m to chock, and two ends are firm using 8# galvanized wires Tie up, with crack resistence, each bearing is spelled with dog and unified with no less than 4 chocks point two superimposed;Bearing is placed in firm Railway shoulder on, its effect be by longitudinal direction just beam load be transferred to roadbed body.
Further improve, described connection parts include railway spike, dog, drift-pin type anticreeper;Wherein railway spike adopts standard Common railway railway spike, for by longitudinal direction, just beam nail connection to be fixed on simple bearing, each bearing nail connection railway spike is no less than 4;Take off Follow closely for spelling connection chock, processing and fabricating can be forged using the round steel of φ 12;Drift-pin type anticreeper is used to control cross-arm beam and circuit steel The relative position of rail and longitudinal just beam, convenient dismounting and adjustment, are the special anti-creep equipment of railway.
Further improve, described mechanical drilling devices include crawler type voluntarily rig and supporting drilling rod, its effect It is the drilling for drilling certain depth;Described pulping device is made up of mash vessel and mixer, for cement paste processed;Institute The pressure grouting device for overall stated is made up of compression pump and grouting pipe, and its effect is cement mortar to be injected in roadbed.
Further improve, described mechanical drilling devices adopt crawler type voluntarily rig, and its EEF bogie is using compound Rubber belt track, is particularly well-suited to live track travel;Drill bit selects φ 70mm, run of steel to be equipped with demand.
Further improve, mash vessel is cylindrical shape in described pulping device, is easy to Stirring, and its volume will ensure The cement mortar of preparation meets single slip casting needs;Mixer is driven rotating vane mix using 0.8kw power motors, for preparing The cement mortar of homogeneous consistency.
Further improve, compression pump is used to for the cement mortar in mash vessel to pass through conduit in described pressure grouting device for overall In injection roadbed body, the grouting pressure that compression pump is provided can be adjusted on demand, until it reaches promising result, grouting pipe is adopted With caliber be 55mm can pressure-bearing flexible pipe.
Consolidation grouting renovates the construction method of metallurgic railway subgrade defect, carries out according to the following steps:
1st, railway reinforced part makes
(1), make complete set railway reinforced device, comprising two longitudinal directions just beam, 4 pieces of holder base plates, chock no less than 16, Cross-arm beam is no less than 5, and railway spike, dog and drift-pin type anticreeper are equipped with by certain amount;
(2), longitudinal direction just beam make from model meet require hot rolled H-shaped processing, floor from 18mm steel plates processing, rib Plate and H profile steel web and lower wing plate full weld;
(3), cross-arm beam from 50Kg/m rail process, its length be 5m;
(4), holder base plate using 20mm steel plates process, its shoulder block welding position matches with H profile steel wing plate width;
(5), chock from the general oily sleeper processing of I class, length is 1.25m, is firmly tied up using the zinc-plated railways of 8# at its two ends, with Crack resistence;
(6), dog in connection parts, processing is forged using the round steel of φ 12, drift-pin type anticreeper is using 50Kg/m rail lines Road anticreeper;
2nd, bored grouting equipment and injecting paste material prepare
(1), bored grouting equipment choosing specialty approved product;
(2), injecting paste material select Portland cement, water for industrial use, waterglass early strength agent;
3rd, railway reinforced construction
(1), field investigation analysis delimit subgrade defect regulation scope, railway reinforced protective position is determined, during using running interval Between carry out railway reinforced construction;
(2), bearing is arranged and just erection on the railway shoulder that distance needs at the outer 1.5m of range of grouting, is symmetrically set up for longitudinal direction Simple bearing at 4, everywhere bearing is combined using two-layer chock, is fixed with dog, and bearing chock substrate needs smooth compacting, bearing Backing plate nail is associated on chock, and bearing absolute altitude requires that adjustment is consistent and meets after reinforcement criteria at 4, using hand fit's track lifting Equipment, lifting sets up longitudinal direction, and just beam is accurately in place;
(3), cross-arm erection and to be connected and fixed and share train load principle by equilibrium, cross-arm beam, cross-arm beam and longitudinal direction are set Just beam is freely overlapped, and between cross-arm beam and railroad track rail insulated buffer plate is arranged, in case track circuit is short-circuit, completes above-mentioned After operation, then local directed complete set is carried out, positioned using the locking of drift-pin type anticreeper;
(4), check that train when passing through, reinforces facility changing condition, and carry out trickle adjustment, reach and listed by reinforcing facility and unload The purpose of vehicle-mounted lotus;
4th, bored grouting construction
(1)The every preparation before slip casting is carried out, including:Construction water, electricity consumption are implemented, injecting paste material is live in place, slurrying Container, mixer, grouting pressure pump and conduit installing connection are finished, and are debugged using normal;
(2), according to subgrade defect renovate scope, scene is preliminary to lay bore position, according to parallel grid shape or plum blossom-shaped principle Cloth hole, pitch-row 1-1.5m, accordingly, using manually verifying underground utilities situation and be protected by;
(3), bored grouting test and select adjacent 2 drilling positions in outside, drilling work is carried out using crawler self rig Industry, by analyzing boring extracting soil soil sample, formulates bored grouting depth, at the same time carries out cement mortar preparation, and ratio of mud control exists 0.4:1~0.6:1, drilling construction is once completed, and grouting pipe is inserted immediately carries out slip casing by pressure, in this operation, grouting pressure In 0.2Mpa ~ 0.4Mpa, hell need to be blocked tightly for control, when slurries leak, stop slip casting, moved to next hole position and made Industry, after 2 test hole position slip castings are completed, Suspend Job after cement mortar initial set, is chosen two hole position centre positions and is drilled Sampling, Inspection and analysis slip casting osmotic effect determines therefrom that follow-up slip casting cloth pitch of holes and grouting pressure;
(4), bored grouting construction using railways train operation interval time implement bored grouting construction, according to first outside and then inside order Carry out, i.e., first complete peripheral bored grouting, after slip casting final set forms seepage proof curtain, then drilling on inner side slip casting is carried out, until complete Into the construction of whole bored groutings;
5th, reinforce section of railway track to recover under construction normal temperature 10 days after mortar depositing construction is completed, slip casting roadbed complex intensity can reach To more than 85%, using the artificial railway roadbed mud tiny fragments of stone, coal, etc. of hole-specifically removing to road bed absolute altitude, backfill successively 0.15m thickness yellow sand filter protection layers, 0.2m thickness rubble ballast layers, make firm by ramming, implementing track maintenance operations, after reaching basic train-passing through conditions, railway reinforced device are removed successively, add The tiny fragments of stone, coal, etc., carries out Comprehensive trimming, recovers railway original technology standard.
Compared with prior art, it is an advantage of the invention that novel, equipment therefor equipment making is easy, simple to operate, Can repeatedly use, it is safe and reliable, during regulation subgrade defect, construct little to railway transportation Influence of production;Slip casting railway road Base is firm, stable, and regulation subgrade defect effect and overall economic efficiency are good, are particularly suited for transporting busy Railway Roadbed Improvement, can promote the use of in the field from now on.
Description of the drawings
Below in conjunction with the accompanying drawings the invention will be further described.
Fig. 1 is consolidation grouting regulation metallurgic railway subgrade defect apparatus structure schematic diagram.
Fig. 2 is the A-A generalized sections of Fig. 1.
Fig. 3 is the B-B generalized sections of Fig. 1.
In figure:1. longitudinal just dog 7. of 2. cross-arm beam of beam, 3. holder base plate, 4. chock, 5. railway spike 6. wears pin The pressure grouting device for overall 11. of 8. mechanical drilling devices of formula anticreeper, 9. pulping device 10. drills the/tunnel of cement pile 12. The rubble ballast layer of 16. yellow sand bed course of composite road bed 14. railroad rail, 15. railroad sleeper of the slip casting of base disease 13. 17..
Specific embodiment
With reference to specific embodiment, the invention will be further described.
The grouting and reinforcing roadbed of metallurgic railway collapse disease regulation, including railway ground can be seen that by Fig. 1, Fig. 2, Fig. 3 Base, on the road bed in the setting range in railway bed collapse disease section and edge transition area, by parallel grid shape or plum blossom Shape uniformly lays cement pile 11, and cement pile diameter 70mm, length 3.5m, stake intercolumnar distance 1.2m is vertically set on steady Gu in the base of base, into cement pile and soil composite road bed 13;Backfill 150mm thickness yellow sand filter protection layers on bedding of roadbed successively 16 and 200mm thick rubble ballast layers 17.
By Fig. 1, Fig. 2, Fig. 3 can be seen that cement pile by vertical road bed drilling and hole in casting cement constitute, drilling hole Footpath 70mm, depth 3.5m, the cement mortar for setting pressure and the ratio of mud is injected into drilling, and after diffusion solidification cement pile is formed.
The constructing device of metallurgic railway Subgrade Subsidence Disease Treatment can be seen that by Fig. 1, Fig. 2, Fig. 3, including railway bed, Railroad track part, railway reinforced device and bored grouting equipment;Described bracing means is by longitudinal direction just beam 1, cross-arm beam 2, letter Easily bearing is connected and composed, and just beam is symmetrically placed in the outside of reinforcing lengths of rail 14 for longitudinal direction, and two ends are fixed on simple bearing by railway spike 5, Simple bearing is placed on firm roadbed ground;6 cross-arm beams are located in rail lower section by setting interval, and two ends ride upon longitudinal direction Just on beam 1, by drift-pin type anticreeper 7, respectively just beam 1 is fixed with rail 14 and longitudinal direction, and train is arranged by reinforcing during ground lengths of rail Car dynamic load is effectively transferred on bearing ground, and railway operation and boring grouting reinforcing roadbed operation is guaranteed so as to reach do not interrupt Enforcement;Described bored grouting equipment includes drilling machine 8, pulping device 9 and pressure grouting device for overall 10, is placed in the one of railway Side, in train operation gap, by the hole position of setting drilling 11 is drilled with, and immediately cement mortar made by general is bored with pressure injection after pore-forming In hole, Jing diffusions are frozen into cement pile, in being permanently disposed on ground, constitute slip casting composite road bed 13.
Described longitudinal direction is can be seen that by Fig. 1, Fig. 2, Fig. 3, and just 1 two combinations of beam are constituted, and per root, longitudinal just beam is by H profile steel Processing and fabricating is formed, the selection of longitudinal just beam length and H profile steel model, is calculated by reinforcing span and current train load and is determined; To increase its bending strength and rigidity, in H profile steel web both sides setting position welding floor(Do not mark in figure), set on floor and hang Dress hole(Do not mark in figure), dismounting is easily installed, in the longitudinal just beam two ends wing plate Shang She roads nail of H profile steel(Do not mark in figure), For nail connection holder base plate, fixed longitudinal just beam, cross-arm beam load is transferred into bearing.
Described cross-arm beam 2 can be seen that using 50Kg/m rail processing and fabricatings, its joint length by Fig. 1, Fig. 2, Fig. 3 For 5m, cross-arm beam setting interval, by span and the calculating determination of current train load is reinforced, its effect is to move on railroad track train Load is transferred to longitudinal direction just beam.
Can be seen that into described simple bearing includes holder base plate 3 and chock 4 by Fig. 1, Fig. 2, Fig. 3.Holder base plate is adopted With 20mm thickness general steel plate processing and fabricatings, backing plate is provided with shoulder block and road nail(Do not mark in figure), for controlling longitudinal direction just beam Lateral displacement and using railway spike nail connection chock need;Chock is processed using rail track with the class of standard I oil sleeper, and its length is 1.25m, two ends are firmly tied up using 8# galvanized wires, with crack resistence, each bearing 4 chocks point two superimposed, with dog 6 Spelling unifies;Bearing is placed on firm railway shoulder, and its effect is that just beam load is transferred to roadbed body by longitudinal direction.
Described connection parts can be seen that including railway spike 5, dog 6, drift-pin type anticreeper 7 by Fig. 1, Fig. 2, Fig. 3.Its Middle railway spike adopts standard common railway railway spike, for by longitudinal direction, just beam nail connection to be fixed on simple bearing, each bearing Ding Lian roads Nail 4;Dog is used to spell connection chock, can forge processing and fabricating using the round steel of φ 12;Drift-pin type anticreeper is used to control cross-arm beam With circuit rail and the relative position of longitudinal just beam, conveniently dismounting and adjustment, are the special anti-creep equipment of railway.
Described mechanical drilling devices 8 can be seen that including crawler type voluntarily rig and supporting by Fig. 1, Fig. 2, Fig. 3 Drilling rod(Do not mark in figure), its effect is the drilling for drilling certain depth;Described pulping device 9 is by mash vessel and stirring Machine is constituted, for cement paste processed;Described pressure grouting device for overall 10 is made up of compression pump and grouting pipe, its effect be by In cement mortar injection roadbed.
Crawler type that described mechanical drilling devices 8 adopt voluntarily rig can be seen that by Fig. 1, Fig. 2, Fig. 3, its EEF bogie adopts compounded rubber crawler belt(Do not mark in figure), it is particularly well-suited to live track travel;Drill bit selects φ 70mm, drilling rod Length is equipped with demand.
Can be seen that mash vessel in described pulping device 9 by Fig. 1, Fig. 2, Fig. 3 is cylindrical shape, is easy to Stirring, Its volume will ensure that the cement mortar prepared meets single slip casting needs;Mixer is driven rotating vane using 0.8kw power motors Mix, for preparing the cement mortar of homogeneous consistency.
Can be seen that compression pump in described pressure grouting device for overall 10 by Fig. 1, Fig. 2, Fig. 3 is used in mash vessel Cement mortar is injected in roadbed body by conduit, and the grouting pressure that compression pump is provided can be adjusted on demand, until it reaches satisfied Effect, what grouting pipe adopted caliber for 55mm can pressure-bearing flexible pipe.
Consolidation grouting renovates the construction method of metallurgic railway subgrade defect, carries out according to the following steps:
1st, railway reinforced part makes
(1), complete set railway reinforced device is made, comprising two longitudinal directions just beam, 4 pieces of holder base plates, chock 16, cross-arm beams 6, railway spike, dog and drift-pin type anticreeper are equipped with by certain amount;
(2), longitudinal direction just beam 1 make from model meet require hot rolled H-shaped processing, floor from 18mm steel plates processing, Floor and H profile steel web and lower wing plate full weld,;
(3), cross-arm beam 2 from 50Kg/m rail process, its length be 5m;
(4), holder base plate 3 using 20mm steel plates process, its shoulder block welding position matches with H profile steel wing plate width;
(5), chock 4 from the general oily sleeper processing of I class, length is 1.25m, is firmly tied up using the zinc-plated railways of 8# at its two ends, With crack resistence;
(6), dog 6 in connection parts, processing is forged using the round steel of φ 12, drift-pin type anticreeper 7 is used using 50Kg/m rail Circuit anticreeper;
2nd, bored grouting equipment and injecting paste material prepare:
(1), bored grouting equipment 10 is from professional approved product;
(2), injecting paste material select Portland cement, water for industrial use, waterglass early strength agent;
3rd, railway reinforced construction
(1), field investigation analysis delimit subgrade defect regulation scope, railway reinforced protective position is determined, during using running interval Between carry out railway reinforced construction;
(2), bearing is arranged and just erection on the railway shoulder that distance needs at the outer 1.5m of range of grouting, is symmetrically set up for longitudinal direction Simple bearing at 4, everywhere bearing is combined using two-layer chock 4, is fixed with dog, and bearing chock substrate needs smooth compacting, The nail of seat board 3 is associated on chock, and bearing absolute altitude requires that adjustment is consistent and meets after reinforcement criteria at 4, using hand fit's track Crane gear, lifting sets up longitudinal direction, and just beam is accurately in place;
(3), cross-arm erection and to be connected and fixed and share train load principle by equilibrium, cross-arm beam 2, cross-arm beam and longitudinal direction are set Just beam 1 is freely overlapped, and between cross-arm beam and railroad track rail 14 insulated buffer plate is arranged(Do not mark in figure), in case track is electric Short out road, after completing above-mentioned operation, then carries out local directed complete set, is positioned using the locking of drift-pin type anticreeper;
(4), check that train when passing through, reinforces facility changing condition, and carry out trickle adjustment, reach and listed by reinforcing facility and unload The purpose of vehicle-mounted lotus;
4th, bored grouting construction
(1)The every preparation before slip casting is carried out, including:Construction water, electricity consumption are implemented, injecting paste material is live in place, slurrying Container, mixer, grouting pressure pump and conduit installing connection are finished, and are debugged using normal;
(2), according to subgrade defect renovate scope, scene is preliminary to lay bore position, can be former according to parallel grid shape or plum blossom-shaped Then cloth hole, pitch-row 1.3m, accordingly, using manually verifying underground utilities situation and be protected by;
(3), bored grouting test and select adjacent 2 drilling positions in outside, drilling work is carried out using crawler self rig Industry, by analyzing boring extracting soil soil sample, formulates bored grouting depth, at the same time carries out cement mortar preparation ratio of mud control and exists 0.4:1~0.6:1, drilling construction is once completed, and grouting pipe is inserted immediately carries out slip casing by pressure, in this operation, grouting pressure In 0.2Mpa ~ 0.4Mpa, hell need to be blocked tightly for control, when slurries leak, stop slip casting, moved to next hole position and made Industry, after two test hole position slip castings are completed, Suspend Job after cement mortar initial set, is chosen two hole position centre positions and is bored Sampling is visited, Inspection and analysis slip casting osmotic effect determines therefrom that follow-up slip casting cloth pitch of holes and grouting pressure;
(4), bored grouting construction using railways train operation interval time implement bored grouting construction, according to first outside and then inside order Carry out, i.e., first complete peripheral bored grouting, after slip casting final set forms seepage proof curtain, then drilling on inner side slip casting is carried out, until complete Into the construction of whole bored groutings;
5th, reinforce section of railway track to recover under construction normal temperature 10 days after mortar depositing construction is completed, slip casting roadbed complex intensity can reach To more than 85%, using the artificial railway roadbed mud tiny fragments of stone, coal, etc. of hole-specifically removing to road bed absolute altitude, backfill successively 0.15m thickness yellow sand filter protection layers, 0.2m thickness rubble ballast layers, make firm by ramming, implementing track maintenance operations, after reaching basic train-passing through conditions, railway reinforced device are removed successively, add The tiny fragments of stone, coal, etc., carries out Comprehensive trimming, recovers railway original technology standard.

Claims (9)

1. the grouting and reinforcing roadbed of metallurgic railway Subgrade Subsidence Disease Treatment, including railway ground, it is characterised in that on railway road On road bed in the setting range in base collapse disease section and edge transition area, by parallel grid shape or plum blossom-shaped water is uniformly laid Mud pile (11), cement pile diameter is not less than 3.5m, stake 1~1.5m of intercolumnar distance not less than 70mm, length, is vertically set on In firm ground, cement pile and soil composite road bed (13) are constituted;Backfill 150mm thickness yellow sand anti-filters on bedding of roadbed successively to protect Sheath (16) and 200mm thickness rubble ballast layer (17).
2. the grouting and reinforcing roadbed of metallurgic railway Subgrade Subsidence Disease Treatment according to claim 1, it is characterised in that institute The cement pile stated is made up of casting cement in the drilling and hole that are vertical under road bed in soil, and boring aperture is not less than 70mm, depth is not less than 3.5m, and the cement mortar for setting pressure and the ratio of mud is injected into drilling, and diffusion is frozen into cement pile (11)。
3. the grouting and reinforcing roadbed of metallurgic railway Subgrade Subsidence Disease Treatment according to claim 1, its constructing device, wrap Include railway bed, railroad track part, it is characterised in that the device also includes railway reinforced device and bored grouting equipment;It is described Bracing means by longitudinal direction just beam (1), cross-arm beam (2), simple bearing connect and compose, longitudinal direction just beam be symmetrically placed in reinforcing lengths of rail (14) outside, two ends are fixed on simple bearing by railway spike (6), and simple bearing is placed on firm roadbed ground;At least 5 horizontal strokes Spreader beam (2) is located in rail lower section by setting interval, and two ends are erected at longitudinal direction just on beam, by drift-pin type anticreeper (7) respectively with Just beam is fixed for rail and longitudinal direction;Described bored grouting equipment includes drilling machine (8), pulping device (9) and slip casing by pressure dress Put (10), be placed in the side of railway, by setting hole position carry out being drilled with drilling, after pore-forming immediately general made by cement mortar pressure In injection hole, formation slip casting is composite road bed (13) Jing after diffusion solidification, is permanently disposed on ground.
4. its constructing device of the grouting and reinforcing roadbed of metallurgic railway Subgrade Subsidence Disease Treatment according to claim 2, It is characterized in that described longitudinal just beam (1) is constituted including two combinations;In H profile steel web both sides setting position welding floor, Hole for hoist, longitudinal just beam two ends wing plate Shang She roads nail (5), for the fixed longitudinal just beam of nail connection holder base plate (3) are set on floor.
5. its constructing device of the grouting and reinforcing roadbed of metallurgic railway Subgrade Subsidence Disease Treatment according to claim 2, It is characterized in that described cross-arm beam (2) is using 50Kg/m rail processing and fabricatings, its joint length is 5m, and cross-arm beam arranges interval Calculate by reinforcing span and current train load and determine.
6. its constructing device of the grouting and reinforcing roadbed of metallurgic railway Subgrade Subsidence Disease Treatment according to claim 2, It is characterized in that described simple bearing includes holder base plate (3) and chock (4), holder base plate is by 20mm thickness general steel plate systems Into backing plate is provided with shoulder block and road nail;Using the rail track class of standard I oil sleeper processing, its length is 1.25m to chock, Two ends are firmly tied up using 8# galvanized wires, and each bearing is unified into whole with no less than 4 chocks point two superimposed with dog spelling Body, simple bearing is placed on firm railway shoulder.
7. its constructing device of the grouting and reinforcing roadbed of metallurgic railway Subgrade Subsidence Disease Treatment according to claim 2, It is characterized in that described connection parts include railway spike (5), dog (6), drift-pin type anticreeper (7), wherein railway spike adopts standard Common railway railway spike, just beam nail connection is fixed on simple bearing for connection longitudinal direction, and each bearing nail connection railway spike is no less than 4;Dog is adopted Forged with the round steel of φ 12 and be processed into, spell connection chock;Drift-pin type anticreeper connection cross-arm beam (2), railroad rail (14) and longitudinal direction Just beam.
8. its constructing device of the grouting and reinforcing roadbed of metallurgic railway Subgrade Subsidence Disease Treatment according to claim 2, It is characterized in that described mechanical drilling devices (8) include crawler type voluntarily rig and supporting drilling rod, EEF bogie is using multiple Close rubber belt track;Drill bit selects φ 70mm, run of steel to be equipped with demand.
9. the construction method of the grouting and reinforcing roadbed of the metallurgic railway Subgrade Subsidence Disease Treatment according to claim 1,2, Carry out according to the following steps:
(1), railway reinforced part makes
(1-1) complete set railway reinforced device, is made, just beam, 4 pieces of holder base plates, chocks are no less than 16 comprising two longitudinal directions Root, cross-arm beam are no less than 5, and railway spike, dog and drift-pin type anticreeper are equipped with by certain amount;
(1-2), the longitudinal direction hot rolled H-shaped processing that just beam (1) making is required from model satisfaction, floor is added from 18mm steel plates Work, floor and H profile steel web and lower wing plate full weld,;
(1-3), cross-arm beam (2) is processed from 50Kg/m rail, and its length is 5m;
(1-4), holder base plate (3) is processed using 20mm steel plates, and its shoulder block welding position matches with H profile steel wing plate width;
(1-5), from the general oily sleeper processing of I class, length is 1.25m to chock (4), is firmly tied using the zinc-plated railways of 8# at its two ends Prick, with crack resistence;
(1-6) dog (6), in connection parts, using the round steel of φ 12 processing is forged, and drift-pin type anticreeper (7) adopts 50Kg/m Rail circuit anticreeper;
(2), bored grouting equipment and injecting paste material prepare
(2-1), bored grouting equipment (10) selects approved product;
(2-2), injecting paste material selects Portland cement, water for industrial use, waterglass early strength agent;
(3), railway reinforced construction
(3-1) subgrade defect regulation scope delimited in, field investigation analysis, railway reinforced protective position determined, using running interval Time carries out railway reinforced construction;
(3-2), bearing is arranged and longitudinal just erection is on the railway shoulder that distance needs at the outer 1.5m of range of grouting, is symmetrically set up Simple at 4, everywhere bearing adopts two-layer chock (4), is fixed with dog, and bearing chock substrate needs smooth compacting, holder base plate Nail is associated on chock, and bearing absolute altitude requires that adjustment is consistent and meets after reinforcement criteria at 4, is risen using hand fit's track and is reseted Standby, lifting sets up longitudinal direction, and just beam is accurately in place;
(3-3), cross-arm erection and to be connected and fixed and share train load principle by equilibrium, cross-arm beam, cross-arm beam and longitudinal direction are set Just beam is freely overlapped, and between cross-arm beam and railroad track rail insulated buffer plate is arranged, in case track circuit is short-circuit, completes above-mentioned After operation, then local directed complete set is carried out, positioned using the locking of drift-pin type anticreeper;
(3-4) when, checking that train passes through, facility changing condition is reinforced, and carries out trickle adjustment, reached by reinforcing facility unloading The purpose of train load;
(4), bored grouting construction
(4-1) the every preparation before slip casting, is carried out, including:Construction water, electricity consumption are implemented, injecting paste material scene in place, is made Slurry container, mixer, grouting pressure pump and conduit installing connection are finished, and are debugged using normal;
(4-2), scope is renovated according to subgrade defect, scene is preliminary to lay bore position, can be according to parallel grid shape or plum blossom-shaped Principle cloth hole, pitch-row presses 1-1.5m, accordingly, using manually verifying underground utilities situation and be protected by;
(4-3), test drilling slip casting selects two adjacent drilling positions in outside, and using crawler self rig drilling work is carried out Industry, by analyzing boring extracting soil soil sample, formulates bored grouting depth, at the same time carries out cement mortar preparation ratio of mud control and exists 0.4:1~0.6:1, drilling construction is once completed, and grouting pipe is inserted immediately carries out slip casing by pressure, in this operation, slip casting pressure Power is controlled in 0.2Mpa~0.4Mpa, and hell need to be blocked tightly, when slurries leak, stops slip casting, moves to next hole position Operation, after 2 test hole position slip castings are completed, Suspend Job after cement mortar initial set, is chosen two hole position centre positions and is bored Sampling is visited, Inspection and analysis slip casting osmotic effect determines therefrom that follow-up slip casting cloth pitch of holes and grouting pressure;
(4-4), bored grouting construction implements bored grouting construction using railways train operation interval time, according to first outside and then inside order Carry out, i.e., first complete peripheral bored grouting, after slip casting final set forms seepage proof curtain, then drilling on inner side slip casting is carried out, until complete Into the construction of whole bored groutings;
(5), reinforce section of railway track to recover under construction normal temperature 10 days after mortar depositing construction is completed, slip casting roadbed complex intensity can reach To more than 85%, using the artificial railway roadbed mud tiny fragments of stone, coal, etc. of hole-specifically removing to road bed absolute altitude, 0.15m thickness yellow sand filter protections are backfilled successively Layer, 0.2m thickness rubble ballast layers, make firm by ramming, implementing track maintenance operations, after reaching basic train-passing through conditions, railway reinforced device are removed successively, mend Railway ballast is filled, Comprehensive trimming is carried out, recovers railway original technology standard.
CN201710030971.4A 2017-01-17 2017-01-17 Device for treating metallurgy railroad bed defects through reinforcing and grouting and construction method Pending CN106638168A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710030971.4A CN106638168A (en) 2017-01-17 2017-01-17 Device for treating metallurgy railroad bed defects through reinforcing and grouting and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710030971.4A CN106638168A (en) 2017-01-17 2017-01-17 Device for treating metallurgy railroad bed defects through reinforcing and grouting and construction method

Publications (1)

Publication Number Publication Date
CN106638168A true CN106638168A (en) 2017-05-10

Family

ID=58840567

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710030971.4A Pending CN106638168A (en) 2017-01-17 2017-01-17 Device for treating metallurgy railroad bed defects through reinforcing and grouting and construction method

Country Status (1)

Country Link
CN (1) CN106638168A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19848846A1 (en) * 1998-10-22 2000-04-27 Huesker Synthetic Gmbh & Co Foundation structure for constructions on soft ground has pillars at regular intervals through into the lower hard ground layer with pillar head caps covered by a geo-plastics reinforcement to take the loose ballast
CN102011351A (en) * 2010-11-04 2011-04-13 北京首钢建设集团有限公司 Railway reinforced construction method
CN105696426A (en) * 2016-04-06 2016-06-22 中铁第四勘察设计院集团有限公司 Construction method for treating adjacent existing railway line soft soil foundation and roadbed structure thereof
CN105908579A (en) * 2016-04-27 2016-08-31 河北钢铁股份有限公司邯郸分公司 Railway track foundation online reinforcing method
CN205576638U (en) * 2016-04-06 2016-09-14 中铁第四勘察设计院集团有限公司 Consolidate roadbed structure who handles newly -built railway karst foundation
CN106192652A (en) * 2016-08-31 2016-12-07 四川省交通运输厅交通勘察设计研究院 A kind of high steep embankment ruggedized construction preventing differential settlement

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19848846A1 (en) * 1998-10-22 2000-04-27 Huesker Synthetic Gmbh & Co Foundation structure for constructions on soft ground has pillars at regular intervals through into the lower hard ground layer with pillar head caps covered by a geo-plastics reinforcement to take the loose ballast
CN102011351A (en) * 2010-11-04 2011-04-13 北京首钢建设集团有限公司 Railway reinforced construction method
CN105696426A (en) * 2016-04-06 2016-06-22 中铁第四勘察设计院集团有限公司 Construction method for treating adjacent existing railway line soft soil foundation and roadbed structure thereof
CN205576638U (en) * 2016-04-06 2016-09-14 中铁第四勘察设计院集团有限公司 Consolidate roadbed structure who handles newly -built railway karst foundation
CN105908579A (en) * 2016-04-27 2016-08-31 河北钢铁股份有限公司邯郸分公司 Railway track foundation online reinforcing method
CN106192652A (en) * 2016-08-31 2016-12-07 四川省交通运输厅交通勘察设计研究院 A kind of high steep embankment ruggedized construction preventing differential settlement

Similar Documents

Publication Publication Date Title
CN106369223B (en) A kind of silt stratum pipe jacking construction method
CN106641440B (en) A kind of transverse crossing railway line underground piping jacking construction method
CN106402490B (en) Silt stratum push pipe jacking construction method based on steel bushing head tool pipe
CN108275573B (en) Hoisting construction method of tunnel boring machine and hoisting and translation combined equipment
CN106437726B (en) Shallow-depth-excavation tunnel crosses ground fissure crushed zone construction method
CN105332710B (en) Suitable for the overlapping tunnel construction method up and down of small interval long range under Unfavorable geology
CN111236957B (en) Mechanical pipe jacking construction process
CN112575670B (en) T-shaped rigid frame bridge suitable for tunnel to pass through giant karst cave and construction technology thereof
CN108915698A (en) A kind of complex condition large diameter pipe curtain construction method
CN107269288A (en) The non-explosion water mill of hard stone section push pipe bores two-way drilling construction method
CN105888675A (en) Construction method for shield crossing railway line
CN111503368A (en) Pipe jacking construction method under sandy gravel geological condition
CN115539095A (en) Waterproof and monitoring method for shield construction
CN106758759B (en) A kind of trestle pile foundation and its anchoring process for deep water drift net riverbed
CN111894641A (en) Treatment and construction process for tunnel to penetrate through super-huge water-containing cavity karst cave
CN109026032B (en) Lower shield translation construction method for limit invasion of downward-turning beam
CN113756825A (en) Mechanical method connecting channel construction method utilizing pipe jacking technology
CN103147435A (en) Method for treating construction engineering foundation in gob
CN103615012B (en) Steel construction self-drilling hollow anchor bars reinforces the most wired gear safeguard structure
CN109024670B (en) Underground comprehensive pipe gallery protection and reinforcement system penetrating through buried high-voltage cable and reinforcement method
CN115681613A (en) Pipe jacking construction method for silt silty clay layer construction
CN106638168A (en) Device for treating metallurgy railroad bed defects through reinforcing and grouting and construction method
RU165963U1 (en) DRILLING RIG SUPPORT USED FOR STRENGTHENING EARTH STRUCTURE
CN212270945U (en) Existing railway line foundation pit supporting system
CN115217487A (en) Earth pressure balance circular pipe jacking construction method for underpass railway roadbed stratum

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170510

WD01 Invention patent application deemed withdrawn after publication