CN106629286A - Falling testing tower - Google Patents

Falling testing tower Download PDF

Info

Publication number
CN106629286A
CN106629286A CN201611149796.2A CN201611149796A CN106629286A CN 106629286 A CN106629286 A CN 106629286A CN 201611149796 A CN201611149796 A CN 201611149796A CN 106629286 A CN106629286 A CN 106629286A
Authority
CN
China
Prior art keywords
oil cylinder
hook
axle
car
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611149796.2A
Other languages
Chinese (zh)
Other versions
CN106629286B (en
Inventor
张晓峰
胡晖
冯宏景
熊伟光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jiaotong University
Original Assignee
Shanghai Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiaotong University filed Critical Shanghai Jiaotong University
Priority to CN201611149796.2A priority Critical patent/CN106629286B/en
Publication of CN106629286A publication Critical patent/CN106629286A/en
Application granted granted Critical
Publication of CN106629286B publication Critical patent/CN106629286B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B5/00Applications of checking, fault-correcting, or safety devices in elevators
    • B66B5/0006Monitoring devices or performance analysers

Landscapes

  • Maintenance And Inspection Apparatuses For Elevators (AREA)

Abstract

The invention provides a falling testing tower which comprises a base, a push oil cylinder, a push vehicle body, a buffering plate, a tower frame, heavy blocks, a testing frame, a guide shoe, an unhooking mechanism, an unhooking mechanism guiding device, guide rails, a lifting steel wire rope, a lifting device and a pump station. The falling testing tower is suitable for falling testing of safety tongs and buffers which have different strokes and different testing quality. The falling testing tower is characterized in that firstly, the unhooking mechanism can remotely released or reset or being connected with or disengaged from a lift car, people do not need to get close to the tower for operation, and due to the fact that a safety pin is adopted, safety can be ensured and operation efficiency is high; secondly, the tested buffers are hydraulically carried and are made to get close to or get away from the gravity center position of the lift car, labor force does not need to be used for carrying, and safety is ensured; and thirdly, the guiding device is provided with a braking device so that the problem that when external weight is released, the suspended steel wire rope is loosened and disengaged from a groove can be solved, the pump stations follows the drive device, and therefore the stroke of the lift car is not limited.

Description

Fall test tower
Technical field
The present invention relates to the experimental rig in elevator safety field, in particular it relates to be used for the test tower for falling, is generally used for Test buffer or safety tongs.
Background technology
Test tower is used for the elevator free falling that simulation loads load, is applicable to the safety of various speed and various quality Pincers or buffer fall test.
Current test tower is typically by pylon, lifting device, tripping gear, the car equipped with load, guide rail and tested Device (such as buffer) is constituted.In use, tripping gear is using Remote triggering and the artificial working method for being close to reset; Tested device is removed to weight lower section using manpower, and security is poor;If test quality is larger, when external weights discharge, hang The energy stored in steel wire rope can cause tripping gear to rebound, and cause the failures such as loose, the de- groove of hanging steel rope.
The content of the invention
For defect of the prior art, the test tower it is an object of the invention to provide one kind is fallen.
Fallen test tower, including pedestal, stand, guide rail, lifting device, car, unhook according to one kind that the present invention is provided Mechanism, steel wire rope, push car body, push oil cylinder, buffer board;
Stand is provided with pedestal, guide rail is provided with stand, stand top is provided with lifting device, energy is provided with the inside of guide rail The car for enough moving along the rail, can load one or more pouring weights in car;
Coupled with uncoupling rigging between lifting device and car, lifting device is coupled with uncoupling rigging using steel wire rope;
Stand bottom is provided with the push car body that can be run in the horizontal direction, and pushing car body can drive Jing by push oil cylinder Cross the center of gravity lower section of car;
Stand bottom is provided with buffer board.
Preferably, the uncoupling rigging includes side plate, first axle, unhook oil cylinder, contiguous block, connecting rod, hook, load-bearing axle;
First axle, unhook oil cylinder, contiguous block, connecting rod, hook are provided between two blocks of side plates;
First axle connects lifting device by steel wire rope;
The piston of unhook oil cylinder is connected with one end of contiguous block, and the other end of contiguous block is hinged one end of two connecting rods, point It is not designated as connecting rod A, connecting rod B;The other end of connecting rod A is hinged a hook, and the other end of connecting rod B is hinged another hook;
Hook is anterior by load-bearing axle hinged side, can rotate around load-bearing axle;
The front end of hook arranges semicircle, and two hooks can merge the 3rd axle of cladding car;
The piston composition quadric chain of hook, connecting rod, contiguous block and unhook oil cylinder, the piston of unhook oil cylinder being capable of band Dynamic opening of hook or closure;After hook closure, two connecting rods are in horizontal level in horizontal level or substantially.
Preferably, safety cylinder is provided with the outside of the side plate, the piston connection safety pin of safety cylinder, side plate is provided with With the via of safety pin Corresponding matching, when uncoupling rigging is closed, safety pin can extend into via gear under the driving of safety cylinder Firmly the piston of unhook oil cylinder, prevents the piston of unhook oil cylinder from returning.
Preferably, including guider;
Guider is arranged between car and lifting device, for the guiding of uncoupling rigging;
Brake apparatus is provided with the guider;Brake apparatus can be triggered with remote controlled manner and answered Position, or using triggering manually and reset.
Preferably, two hooks of the uncoupling rigging, the cavity formed during the two hook closures is a cylinder Or essentially one cylinder;Link up with the 3rd axle for clamping car.
Preferably, the uncoupling rigging includes the second axle, and the second axle is used for the open angle and hook of control hook and closes Carry out during conjunction spacing.
Preferably, the second axle is fastenedly connected side plate, between two hooks, and the piston positioned at unhook oil cylinder and connection The lower section of block;
When hook closure, the piston of unhook oil cylinder promotes contiguous block tight against firmly the second axle.
Preferably, including oil cylinder hydraulic control system;Oil cylinder hydraulic control system is using bidirectional hydraulic lock and 3-position 4-way Valve is controlled.
Compared with prior art, the present invention has following beneficial effect:
Present invention can be suitably applied to falling test in safety tongs and buffer for different strokes difference test qualities, its feature It is:A) uncoupling rigging adopts hydraulic-driven quadric chain action, can remotely discharge or reset, or out of engagement with car, It is not required to very important person's Proximity operation.Hook quadric chain using connecting rod 24 dead-centre position, using safety pin 19 and hydraulic-driven system System is using bidirectional hydraulic lock 34 and three-position four-way valve 35, so safety is able to ensure and operating efficiency is higher.B) tested buffer Carried using hydraulic pressure so as to close to or away from the position of centre of gravity of car 32, it is not necessary to use manpower transport, ensured safely.C) lead Brake apparatus 12 is provided with device 11, is solved when external weights discharge, the problems such as hanging steel rope loose de- groove.Liquid Press pump station 29 is servo-actuated with guider 11, makes the stroke of car 32 unrestricted.
Description of the drawings
The detailed description by reading non-limiting example made with reference to the following drawings, the further feature of the present invention, Objects and advantages will become more apparent upon:
A kind of overall pattern of test tower that falls that Fig. 1 is provided for the present invention;
Fig. 2 is uncoupling rigging overall pattern;
Schematic diagram when Fig. 3 is uncoupling rigging release (opening);
Schematic diagram when Fig. 4 is closed for uncoupling rigging;
Fig. 5 is anti-bouncing device schematic diagram;
Fig. 6 is the control loop schematic diagram of unhook oil cylinder 26;
Fig. 7 is the control loop schematic diagram of safety cylinder 18.
Specific embodiment
With reference to specific embodiment, the present invention is described in detail.Following examples will be helpful to the technology of this area Personnel further understand the present invention, but the invention is not limited in any way.It should be pointed out that the ordinary skill to this area For personnel, without departing from the inventive concept of the premise, some changes and improvements can also be made.These belong to the present invention Protection domain.
As shown in Figures 1 to 5, fall test tower, including pedestal 1 for one kind for providing of the present invention, stand is set on pedestal 1 6, guide rail 13 is provided with stand 6, the top of stand 6 is provided with lifting device 15, is provided with what is can moved along guide rail 13 in the inner side of guide rail 13 A number of pouring weight 7 is provided with car 32, car 32, the quantity of pouring weight 7 can increase and decrease as needed.Lifting device 15 and car Coupled with uncoupling rigging 10 between 32, lifting device 15 is coupled with uncoupling rigging 10 using steel wire rope 14.The bottom of stand 6 is provided with can The push car body 3 for running in the horizontal direction, pushing car body 3 can be driven to the center of gravity lower section away from car 32 by push oil cylinder 2. The bottom of stand 6 is provided with buffer board 5.Electrical control cabinet 16 is also show in Fig. 1, electrical control cabinet 16 is realized to frame for movement Control function.
The matrix of uncoupling rigging 10 is made up of 2 side plates 20 and bolt 36, and in the outside of side plate 20 safety cylinder 18, peace are arranged The full piston first line of a couplet of oil cylinder 18 is connected to safety pin 19.The corresponding position of side plate 20 is provided with the via 31 of safety pin 19, at two First axle 21, unhook oil cylinder 26, contiguous block 25, connecting rod 24, hook 22, load-bearing axle 17 are provided between side plate 20.Hang in two pieces The centre position of hook 22 is provided with the second axle 28, and first axle 21 is connected with hoisting mechanism 15, and unhook oil cylinder 26 is fixed into side plate 20 Integrally, it is spacing by the second axle 28 when hook 22 is opened, prevent connecting rod 24 from forming dead point with hook 22, hook 22 can be around load-bearing axle 17 Rotation, the piston composition quadric chain of hook 22, connecting rod 24, contiguous block 25 and unhook oil cylinder 26, the work of unhook oil cylinder 26 Plug can drive hook 22 to open or close.After linking up with 22 and closing, two pieces connecting rod 24 is in horizontal level or the contact of contiguous block 25 the The top of two axles 28.
Guider 11 is arranged between car 32 and lifting device 15, for the guiding of uncoupling rigging 10, is being oriented to dress Put and be provided with 11 brake apparatus 12, lead boots 37, hydraulic power unit 29, guider 11 is arranged between guide rail 13, car 32 Top.For little load-carrying and the test tower of little stroke, brake apparatus 12 can be not provided with, also hydraulic power unit 29 can be arranged on ground Face.
Fall test tower specific operation process be:Suitable pouring weight 7 is first added in car 32, uncoupling rigging 10 is then made Closure, i.e., after 22 closure is linked up with, two pieces connecting rod 24 contacts the top of the second axle 28, Safety oil in horizontal level or contiguous block 25 Cylinder 18 drives safety pin 19 to keep off on the top of connecting rod 24 by the via 31 on side plate 20, and operation lifting device 15 is with car 32 The position of requirement is risen to, tested buffer 4 is placed on car body 3 is pushed, operation pushes oil cylinder 2 and is sent in tested buffer 4 The center of gravity lower section of car 32, after the execution action of brake apparatus 12 that is directed on device 11 to clamp or be clamped in guide rail 13, so Afterwards safety pin 19 is departed from into side plate 20, uncoupling rigging 10 is opened, the free falling under gravity of car 32 clashes into tested slow Device 4 is rushed, now drop event is completed.During reset, the brake apparatus 12 being directed on device 11 is open and disengaged from guide rail 13, operation Lifting device 15, uncoupling rigging 10 is close to and is arranged on the 3rd axle 23 at the top of car 32, after uncoupling rigging 10 is closed, make Hook 22 in uncoupling rigging 10 embraces the 3rd axle 23, and safe operation oil cylinder 18 drives safety pin 19 to block connecting rod 24, now grasps Make lifting device 15, car 32 lifted, operation afterwards pushes oil cylinder 2, push car body 3 with tested buffer 4 away from car 32, Test process terminates.
More specifically, the two ends of the connecting rod 24 are connected respectively with hook 22, contiguous block 25, and hook 22 is located at when closing Connecting rod 24 omits down position in level, it is ensured that self-locking.Even block block 25 is connected with the piston rod of unhook oil cylinder 26, unhook oil cylinder 26 It is fixed between the cavity of the formation of two pieces side plate 20.Hook 22, connecting rod 24, contiguous block 25 are arranged on the sky that two side plates 20 are formed Between chamber, when contiguous block 25 is moved up and down, the circular port that hook 22 is formed can be opened or closed.Second is provided with side plate Axle 28, is arranged on the inner side of two pieces hook 22, for the angle that hook 22 is opened, prevents hook 22 and connecting rod 24 from forming dead point.When When connecting rod 24 is horizontally situated, by safety pin insert side plate 20 after can the anti-piston of locking hook oil cylinder 26 return, so as to prevent hang Hook 22 is opened.The car 32 includes the framework 8 of surrounding, and also including the 3rd axle 23, pouring weight 7, the increase and decrease quantity of pouring weight 7 can be controlled The gross weight of car 32.Car 32 can be moved by leading boots 9 along guide rail 13.The uncoupling rigging 10, top passes through axle 21 It is connected with lifting device 15, bottom is connected by the 3rd axle 23 with car 32.The carrying mechanism of the tested buffer 4 is by pushing Oil cylinder 2, push car body 3, buffer board 5 are constituted, and being stretched by push oil cylinder 2 can be by tested buffer 4 close to or away from car 32 center of gravity.The guider 11 includes uncoupling rigging 10, brake apparatus 12, guiding mechanism 37, hydraulic power unit 29.It is logical Crossing uncoupling rigging 10 can disengage or with reference to car 32.Hydraulic power unit 29 is used to provide power to unhook oil cylinder 26, fills with being oriented to Put 11 to be servo-actuated.Guide rail 13 is fixed or departed to brake apparatus 12 for being directed to device 11.The effect of brake apparatus 12 is to consume weight Storage when thing discharges is the energy in steel rope system.The hydraulic power unit 29 adopts bidirectional hydraulic lock 34, three-position four-way valve 35 controls.When not working, the two-way hydraulic fluid port of unhook oil cylinder 26 is in closed mode, i.e., break off relations machine when driving without external force Structure 10 is located at initial invariant state.
In Fig. 6, Fig. 7, bidirectional hydraulic lock 34, three-position four-way valve 35 are shown.
The effect of bidirectional hydraulic lock 34:Its principle is that the pressure effect guide of other side's oil circuit is taken using two hydraulic control one-way valves Oil, when a square tube road does not have pressure, the opposing party's pipeline is simultaneously closed off, and the effect used in herein is, when hydraulic power loses, The oil-in and oil-out of unhook oil cylinder 26 and safety cylinder 18 in uncoupling rigging 10 is turned off, it is ensured that uncoupling rigging 10 Middle hook 22 keeps original position, prevents misoperation.
The effect of three-position four-way valve 35:When three-position four-way valve 35 does not have control signal, valve element is centrally located, now Closed mode is in by the oil-in and oil-out of three-position four-way valve.Prevent the misoperation of uncoupling rigging 10.
The specific embodiment of the present invention is described above.It is to be appreciated that the invention is not limited in above-mentioned Particular implementation, those skilled in the art can within the scope of the claims make a variety of changes or change, this not shadow Ring the flesh and blood of the present invention.In the case where not conflicting, the feature in embodiments herein and embodiment can any phase Mutually combination.

Claims (8)

1. one kind is fallen test tower, it is characterised in that including pedestal (1), stand (6), guide rail (13), lifting device (15), sedan-chair Railway carriage or compartment (32), uncoupling rigging (10), steel wire rope (14), push car body (3), push oil cylinder (2), buffer board (5);
It is provided with pedestal (1) in stand (6), stand (6) and is provided with guide rail (13), stand (6) top is provided with lifting device (15), Being provided with guide rail (13) inner side can load one or more weights in the car (32) of guide rail (13) motion, car (32) Block (7);
Coupled with uncoupling rigging (10) between lifting device (15) and car (32), lifting device (15) is adopted with uncoupling rigging (10) Coupled with steel wire rope (14);
Stand (6) bottom is provided with the push car body (3) that can be run in the horizontal direction, and pushing car body (3) can be by push oil cylinder (2) drive through the center of gravity lower section of car (32);
Stand (6) bottom is provided with buffer board (5).
2. the test tower that falls according to claim 1, it is characterised in that the uncoupling rigging (10) including side plate (20), First axle (21), unhook oil cylinder (26), contiguous block (25), connecting rod (24), hook (22), load-bearing axle (17);
First axle (21), unhook oil cylinder (26), contiguous block (25), connecting rod (24), hook are provided between two pieces of side plates (20) (22);
First axle (21) connects lifting device (15) by steel wire rope (14);
The piston of unhook oil cylinder (26) is connected with one end of contiguous block (25), and the other end of contiguous block (25) is hinged two connecting rods (24) one end, is designated as respectively connecting rod A, connecting rod B;The other end of connecting rod A is hinged a hook (22), the other end hinge of connecting rod B Connect another hook (22);
Hook (22) is anterior by load-bearing axle (17) hinged side (20), can rotate around load-bearing axle (17);
The front end of hook (22) arranges semicircle, and two hooks (22) can merge the 3rd axle (23) of cladding car (32);
The piston composition quadric chain of hook (22), connecting rod (24), contiguous block (25) and unhook oil cylinder (26), unhook oil cylinder (26) piston can drive hook (22) to open or close;After (22) closure is linked up with, two connecting rods (24) are in horizontal level Or substantially in horizontal level.
3. the test tower that falls according to claim 2, it is characterised in that be provided with safety cylinder on the outside of the side plate (20) (18), piston connection safety pin (19) of safety cylinder (18), side plate (20) is provided with the mistake with safety pin (19) Corresponding matching Hole (31), when uncoupling rigging (10) is closed, safety pin (19) can extend into via (31) gear under the driving of safety cylinder (18) Firmly the piston of unhook oil cylinder (26), prevents the piston of unhook oil cylinder (26) from returning.
4. the test tower that falls according to claim 1, it is characterised in that including guider (11);
Guider (11) is arranged between car (32) and lifting device (15), for the guiding of uncoupling rigging (10);
Brake apparatus (12) is provided with the guider (11);Brake apparatus (12) can be touched with remote controlled manner Send out and reset, or using triggering manually and reset.
5. the test tower that falls according to claim 1, it is characterised in that two hooks of the uncoupling rigging (10) (22) cavity formed when, the two hooks (22) are closed is a cylinder or essentially one cylinder;Hook (22) For clamping the 3rd axle (23) of car (32).
6. the test tower that falls according to claim 2, it is characterised in that the uncoupling rigging (10) is including the second axle (28), the second axle (28) carries out spacing for the open angle and hook (22) of control hook (22) when closing.
7. the test tower that falls according to claim 6, it is characterised in that the second axle (28) is fastenedly connected side plate (20), position Between two hooks (22), and the lower section of the piston positioned at unhook oil cylinder (26) and contiguous block (25);
When (22) closure is linked up with, the piston of unhook oil cylinder (26) promotes contiguous block (25) tight against firmly the second axle (28).
8. the test tower that falls according to claim 1, it is characterised in that including oil cylinder hydraulic control system;Oil cylinder hydraulic Control system is controlled using bidirectional hydraulic lock (34) and three-position four-way valve (35).
CN201611149796.2A 2016-12-13 2016-12-13 It falls and tests tower Expired - Fee Related CN106629286B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611149796.2A CN106629286B (en) 2016-12-13 2016-12-13 It falls and tests tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611149796.2A CN106629286B (en) 2016-12-13 2016-12-13 It falls and tests tower

Publications (2)

Publication Number Publication Date
CN106629286A true CN106629286A (en) 2017-05-10
CN106629286B CN106629286B (en) 2019-11-15

Family

ID=58824692

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611149796.2A Expired - Fee Related CN106629286B (en) 2016-12-13 2016-12-13 It falls and tests tower

Country Status (1)

Country Link
CN (1) CN106629286B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110207968A (en) * 2019-06-21 2019-09-06 安徽九纲机电有限公司 A kind of hydraulic buffer of elevator test tower assembly line
CN110980462A (en) * 2019-12-12 2020-04-10 庄燕婷 Elevator hydraulic buffer test tower assembly line
CN113044689A (en) * 2021-03-09 2021-06-29 河北东方富达机械有限公司 Detacher for elevator safety component test
CN113511569A (en) * 2021-04-15 2021-10-19 中船第九设计研究院工程有限公司 Unhooking reset device and unhooking reset method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2452679Y (en) * 2000-12-06 2001-10-10 赵燕书 Cylinder travel limiting device for plastic window angle cleaning machine
CN201906889U (en) * 2010-12-24 2011-07-27 唐山市丰润区鑫源机械制造有限公司 Track clamping device of metallurgical hot sawing machine
CN201993220U (en) * 2011-03-31 2011-09-28 东莞市恒宇仪器有限公司 Impact testing machine of roller blades
CN102680198A (en) * 2012-05-14 2012-09-19 杭州沪宁电梯配件有限公司 Elevator buffer testing equipment
CN202538209U (en) * 2012-03-28 2012-11-21 徐州重型机械有限公司 Supporting leg vertical oil cylinder limiting protection device and fire-fighting truck provided with same
CN203385550U (en) * 2013-08-19 2014-01-08 天津市特种设备监督检验技术研究院 Instantaneous-type anti-drop safety device inspection testbed
CN105174022A (en) * 2015-09-10 2015-12-23 长沙嘉百精密机械有限公司 Automatic hydraulic unhooking device
CN105540423A (en) * 2016-01-21 2016-05-04 河南理工大学 Quick unhooking device with rocker sliding block mechanism

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2452679Y (en) * 2000-12-06 2001-10-10 赵燕书 Cylinder travel limiting device for plastic window angle cleaning machine
CN201906889U (en) * 2010-12-24 2011-07-27 唐山市丰润区鑫源机械制造有限公司 Track clamping device of metallurgical hot sawing machine
CN201993220U (en) * 2011-03-31 2011-09-28 东莞市恒宇仪器有限公司 Impact testing machine of roller blades
CN202538209U (en) * 2012-03-28 2012-11-21 徐州重型机械有限公司 Supporting leg vertical oil cylinder limiting protection device and fire-fighting truck provided with same
CN102680198A (en) * 2012-05-14 2012-09-19 杭州沪宁电梯配件有限公司 Elevator buffer testing equipment
CN203385550U (en) * 2013-08-19 2014-01-08 天津市特种设备监督检验技术研究院 Instantaneous-type anti-drop safety device inspection testbed
CN105174022A (en) * 2015-09-10 2015-12-23 长沙嘉百精密机械有限公司 Automatic hydraulic unhooking device
CN105540423A (en) * 2016-01-21 2016-05-04 河南理工大学 Quick unhooking device with rocker sliding block mechanism

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110207968A (en) * 2019-06-21 2019-09-06 安徽九纲机电有限公司 A kind of hydraulic buffer of elevator test tower assembly line
CN110980462A (en) * 2019-12-12 2020-04-10 庄燕婷 Elevator hydraulic buffer test tower assembly line
CN113044689A (en) * 2021-03-09 2021-06-29 河北东方富达机械有限公司 Detacher for elevator safety component test
CN113044689B (en) * 2021-03-09 2024-04-09 河北东方富达机械有限公司 Unhooking device for elevator safety component test
CN113511569A (en) * 2021-04-15 2021-10-19 中船第九设计研究院工程有限公司 Unhooking reset device and unhooking reset method
CN113511569B (en) * 2021-04-15 2023-01-24 中船第九设计研究院工程有限公司 Unhooking reset device and unhooking reset method

Also Published As

Publication number Publication date
CN106629286B (en) 2019-11-15

Similar Documents

Publication Publication Date Title
CN106629286A (en) Falling testing tower
CN203247009U (en) Automatic detacher of under water hanging object
CN103938589B (en) For showing the hydraulic rotary lock ingot method of hole arc door
CN204281061U (en) A kind of can the combined sling of automatic releasing hook
CN206705517U (en) Can automatic shutter crane hook
CN107724670A (en) A kind of framework laterally pushed type inside-climbing tower crane based on top module system does not fall beam and climbed method
CN108750930A (en) Gravity self-locking mechanism and the self-locking pipe fitting fixture for using the mechanism
CN202717497U (en) Lifting device of prefabricated composite floor slab
CN202704850U (en) Control device for super-lift system, super-lift system and engineering machinery
CN205906930U (en) From locking -type lifting hook
CN203920769U (en) A kind of rail device of grabbing
CN203558691U (en) Side-opening two-folding landing door device of elevator
CN208218202U (en) A kind of crane grabbing device
CN106013001A (en) Method for operating multi-hole diversion tunnel sealing and blocking gate through trolley
CN214359812U (en) Hoisting tackle
CN110056711A (en) A kind of self-tipping type lowering equipment
CN209127874U (en) A kind of concurrent lifting device
CN104444794A (en) Marine hydraulic remote-control grab bucket
CN108116971A (en) Crane Special running
CN208700413U (en) A kind of anti-dropout crampon
CN201649149U (en) Link type fast connector for excavator
CN203113305U (en) Hydraulic balancing device of ship lift cable wire with mechanical locking function
CN208345607U (en) Automatic yard high-speed track hangs safety work with self-service pusher
CN102674147A (en) Opening and closing mechanism for single-cable grab bucket
CN206278832U (en) The chassis centering of self-closing vertical steel coils clamp and guide frame

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191115