Prior art keywords
insulator
leading screw
transmission line
line tangent
screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710036202.5A
Other languages
English (en)
Inventor
周飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hezhou Power Supply Bureau of Guangxi Power Grid Co Ltd
Original Assignee
Hezhou Power Supply Bureau of Guangxi Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hezhou Power Supply Bureau of Guangxi Power Grid Co Ltd filed Critical Hezhou Power Supply Bureau of Guangxi Power Grid Co Ltd
Priority to CN201710036202.5A priority Critical patent/CN106602465A/zh
Publication of CN106602465A publication Critical patent/CN106602465A/zh
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Electric Cable Installation (AREA)
  • Insulators (AREA)

Abstract

本发明公开了一种输电线路直线塔第一片绝缘子更换工具,它主要由两个卡具本体、两个丝杠、两个绝缘子钩和两个绝缘拉板构成,两个卡具本体相对称排布并通过限位螺杆和限位螺母相互连接并安装在固定物上,每个卡具本体上均设有丝杠槽,两个丝杠的上部设有螺纹连接的丝杠卡托,丝杠卡托安装卡具本体的丝杠槽上,两个丝杠的下部分别连接一个绝缘子钩和一个绝缘拉板,两个绝缘拉板的底部分别设有导线钩。本发明工具能方便更换输电线路直线塔第一片绝缘子,节省人力,操作简便。

Description

输电线路直线塔第一片绝缘子更换工具
技术领域
本发明涉及一种工具制造技术领域,具体是一种应用于输电线路直线塔用于更换第一片绝缘子的工具。
背景技术
目前输电线路(220kV为例)的直线塔绝缘子串第一片更换时通常是高空作业人员用链条葫芦或双钩等工具先将导线收起,再将绳索绑在第三片绝缘子处,地勤人员用绳索拉起整串绝缘子以便高空作业人员更换第一片绝缘子,费时耗力。
发明内容
本发明所要解决的技术问题是提供一种能方便更换输电线路直线塔第一片绝缘子的工具,节省人力,操作简便。
本发明以如下技术方案解决上述技术问题:
本发明输电线路直线塔第一片绝缘子更换工具,它主要由两个卡具本体、两个丝杠、两个绝缘子钩和两个绝缘拉板构成,两个卡具本体相对称排布并通过限位螺杆和限位螺母相互连接并安装在固定物上,每个卡具本体上均设有丝杠槽,两个丝杠的上部设有螺纹连接的丝杠卡托,丝杠卡托安装卡具本体的丝杠槽上,两个丝杠的下部分别连接一个绝缘子钩和一个绝缘拉板,两个绝缘拉板的底部分别设有导线钩。
所述两个卡具本体分别由相互垂直排布的横杆和纵杆构成,横杆和纵杆相互固定连接,丝杠槽设置在横杆上,纵杆上设有限位槽,限位螺杆穿过限位槽并通过限位螺母将两个卡具本体锁紧固定在固定物上,通过限位槽调节不同的安装位置。
本发明工具具有如下优点:
1、采用本发明工具更换输电线路直线塔第一片绝缘子,可以省去50%以上的人力,高空操作人员由2人变为1人,地面人员由3人变为1-2人;
2、本发明工具可以在停电或带电下作业;
3、本发明工具由于采用的卡具装配可调节,可以适用于各种直线杆、塔的横担以及耐张杆塔跳线串挂点,不受塔型限制;
4、本发明工具采用的绝缘子钩可适用于各种玻璃和瓷质绝缘子,不受其型号限制;
5、本发明工具结构简单、操作方便,只需调整螺栓和拉板即可使用。
附图说明
图1是本发明工具采用的卡具在组装后的示意图;
图2是图1中单个卡具的侧视图;
图3是图1的俯视示意图;
图4是本发明工具组装后的侧视图。
图5是本发明工具在使用时的状态示意图。
图中:卡具本体1,横杆1-1,纵杆1-2,丝杠槽2,限位螺母3,限位螺杆4,丝杠5,丝杠卡托6,丝杠把手7,绝缘子钩8,绝缘拉板9,导线钩10,限位槽11,横担12,绝缘子串13。
具体实施方式
下面结合附图对本发明作进一步的描述:
本发明输电线路直线塔第一片绝缘子更换工具包括两个卡具本体1、两个丝杠5、两个绝缘子钩8和两个绝缘拉板9构成,两个卡具本体1相对称排布并通过限位螺杆4和限位螺母3相互连接安装于输电线路的横担12或其它固定物体上,两个卡具本体1分别由相互垂直排布的横杆1-1和纵杆1-2构成,横杆1-1可设置2根,横杆1-1和纵杆1-2相互固定连接,横杆1-1上设置2—4个丝杠槽2,纵杆1-2上设有限位槽11,将限位螺杆4穿过限位槽11并通过限位螺母3将两个卡具本体1锁紧固定于横担12上,通过限位槽11可调节不同安装位置。
两个丝杠5的上部设有螺纹连接的丝杠卡托6,并安装有丝杠把手7,两个丝杠5的下部分别连接一个绝缘子钩8和一个绝缘拉板9,组装时,将丝杠卡托6安装在两个卡具本体1的丝杠槽2上,两个绝缘拉板9的底部分别设有用于托起导线14的导线钩10,绝缘子钩8用于托起绝缘子串13的第三片绝缘子。
本发明采用的卡具本体1由一体式高硬度合金材料制成,可以承受5-10吨的力;丝杠槽2与丝杠卡托6连接,可以承受丝杠传导导线的重量;限位螺母3和限位螺杆4可采用镀锌钢材制作,可以通过调节限位螺母3和限位螺杆4与限位槽11的安装位置来改变卡具组装的距离,以实现安装在不同的导线横担上;采用的丝杠5可适用于10吨及以下重力,满足不同电压等级和档距时可以收起导线;丝杠卡托6为钢材制作,可以承受丝杠5的承力,与丝杠5配合吊起导线;绝缘子钩8为绝缘材料制作,在导线被提升后承受绝缘子串的重量,同时满足带电作业需求;绝缘拉板9为通用的带电作业工具,与丝杠5连接满足承力和绝缘的需求;导线钩10为高硬度合金材,与绝缘拉板9连接勾起导线14。
使用时,查找出绝缘子串13的总长和横担的形式,通过调节将本发明工具安装在横担12上,调节绝缘拉板9的长度使得其组合与绝缘子串13总长吻合,将丝杠卡托6固定在卡具本体1上的丝杠槽2可以使导线钩10勾住导线14,调节绝缘子钩8勾住第三片绝缘子,然后操作丝杠把手7将导线14和绝缘子提升后,取出需更换的第一片绝缘子,安装新的绝缘子之后操作丝杠把手7将导线14和绝缘子释放即可。

Claims (2)

1.输电线路直线塔第一片绝缘子更换工具,其特征在于,它主要由两个卡具本体、两个丝杠、两个绝缘子钩和两个绝缘拉板构成,两个卡具本体相对称排布并通过限位螺杆和限位螺母相互连接并安装在固定物上,每个卡具本体上均设有丝杠槽,两个丝杠的上部设有螺纹连接的丝杠卡托,丝杠卡托安装卡具本体的丝杠槽上,两个丝杠的下部分别连接一个绝缘子钩和一个绝缘拉板,两个绝缘拉板的底部分别设有导线钩。
2.根据权利要求1所述输电线路直线塔第一片绝缘子更换工具,其特征在于,所述两个卡具本体分别由相互垂直排布的横杆和纵杆构成,横杆和纵杆相互固定连接,丝杠槽设置在横杆上,纵杆上设有限位槽,限位螺杆穿过限位槽并通过限位螺母将两个卡具本体锁紧固定在固定物上,通过限位槽调节不同的安装位置。
CN201710036202.5A 2017-01-17 2017-01-17 输电线路直线塔第一片绝缘子更换工具 Pending CN106602465A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710036202.5A CN106602465A (zh) 2017-01-17 2017-01-17 输电线路直线塔第一片绝缘子更换工具

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710036202.5A CN106602465A (zh) 2017-01-17 2017-01-17 输电线路直线塔第一片绝缘子更换工具

Publications (1)

Publication Number Publication Date
CN106602465A true CN106602465A (zh) 2017-04-26

Family

ID=58586023

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710036202.5A Pending CN106602465A (zh) 2017-01-17 2017-01-17 输电线路直线塔第一片绝缘子更换工具

Country Status (1)

Country Link
CN (1) CN106602465A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107069562A (zh) * 2017-06-28 2017-08-18 云南电网有限责任公司曲靖供电局 带电更换绝缘子方法及载荷转移装置
CN107086495A (zh) * 2017-06-28 2017-08-22 云南电网有限责任公司曲靖供电局 载荷转移工具及电力维护设备

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5377402A (en) * 1993-10-27 1995-01-03 Semple, Jr.; Alan R. Electrical insulator change-out tool
RU2417494C1 (ru) * 2010-05-25 2011-04-27 ООО НПП "Средства механизации электрических сетей" Устройство для замены изоляторов на воздушных линиях электропередачи
CN202111437U (zh) * 2011-07-11 2012-01-11 重庆市电力公司检修分公司 分离式螺栓对接双翼卡具
KR20120021556A (ko) * 2010-08-09 2012-03-09 한전케이피에스 주식회사 송전선로용 접속애자 교체장비
CN202797769U (zh) * 2012-09-14 2013-03-13 国家电网公司 110kV线路门型杆边相带电更换绝缘子工具
CN203135312U (zh) * 2013-03-26 2013-08-14 重庆市电力公司检修分公司 500kV线路横担侧端部卡具
CN204290154U (zh) * 2014-11-07 2015-04-22 国网河南省电力公司驻马店供电公司 一种带电更换绝缘子专用工具
CN204517271U (zh) * 2015-03-31 2015-07-29 国网辽宁省电力有限公司辽阳供电公司 一种供输电线路钢管杆带电更换绝缘子专用承力工具
CN204947456U (zh) * 2015-08-14 2016-01-06 国家电网公司 带电更换220kV直线塔中相单串绝缘子的装置
CN206432624U (zh) * 2017-01-17 2017-08-22 广西电网有限责任公司贺州供电局 输电线路直线塔第一片绝缘子更换工具

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5377402A (en) * 1993-10-27 1995-01-03 Semple, Jr.; Alan R. Electrical insulator change-out tool
RU2417494C1 (ru) * 2010-05-25 2011-04-27 ООО НПП "Средства механизации электрических сетей" Устройство для замены изоляторов на воздушных линиях электропередачи
KR20120021556A (ko) * 2010-08-09 2012-03-09 한전케이피에스 주식회사 송전선로용 접속애자 교체장비
CN202111437U (zh) * 2011-07-11 2012-01-11 重庆市电力公司检修分公司 分离式螺栓对接双翼卡具
CN202797769U (zh) * 2012-09-14 2013-03-13 国家电网公司 110kV线路门型杆边相带电更换绝缘子工具
CN203135312U (zh) * 2013-03-26 2013-08-14 重庆市电力公司检修分公司 500kV线路横担侧端部卡具
CN204290154U (zh) * 2014-11-07 2015-04-22 国网河南省电力公司驻马店供电公司 一种带电更换绝缘子专用工具
CN204517271U (zh) * 2015-03-31 2015-07-29 国网辽宁省电力有限公司辽阳供电公司 一种供输电线路钢管杆带电更换绝缘子专用承力工具
CN204947456U (zh) * 2015-08-14 2016-01-06 国家电网公司 带电更换220kV直线塔中相单串绝缘子的装置
CN206432624U (zh) * 2017-01-17 2017-08-22 广西电网有限责任公司贺州供电局 输电线路直线塔第一片绝缘子更换工具

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107069562A (zh) * 2017-06-28 2017-08-18 云南电网有限责任公司曲靖供电局 带电更换绝缘子方法及载荷转移装置
CN107086495A (zh) * 2017-06-28 2017-08-22 云南电网有限责任公司曲靖供电局 载荷转移工具及电力维护设备
CN107086495B (zh) * 2017-06-28 2019-05-31 云南电网有限责任公司曲靖供电局 载荷转移工具及电力维护设备

Similar Documents

Publication Publication Date Title
CN201846021U (zh) 更换750kV耐张绝缘子绝缘吊架
US20130269180A1 (en) Maintenance tool for insulator of direct current transmission line
CN101820144B (zh) 带电更换大截面双分裂导线直线整串绝缘子的专用工具
CN203242960U (zh) 一种悬挂伸缩式硬梯
CN203367865U (zh) 输电线路检修用辅助支架
CN106602465A (zh) 输电线路直线塔第一片绝缘子更换工具
CN201044342Y (zh) 一种塔头导线提升装置
CN203406438U (zh) 一种新型接地线绝缘杆
CN203119387U (zh) 四分裂导线间隔棒快速拆装工具
CN102761077B (zh) 1000kV特高压交流线路耐张绝缘子串绝缘起吊支架
CN206379675U (zh) 带电更换直线塔v串绝缘子导线的联板卡
CN103887735A (zh) 一种输电线路直线带电提线装置
CN203787855U (zh) 一种输电线路直线带电提线装置
CN206432624U (zh) 输电线路直线塔第一片绝缘子更换工具
CN202260254U (zh) 一种带电更换四分裂导线直线整串绝缘子可调式卡具
CN201438617U (zh) Zm塔直线绝缘子串带电提升工具
CN204258160U (zh) 更换线塔绝缘子工具
CN204103354U (zh) 带电更换110kV-2200kV耐张绝缘子串专用工器具
CN201742027U (zh) 110kV同塔双回线路带电更换绝缘子专用工具
CN105449585B (zh) 碳纤维特高压六线提线钩
CN201266807Y (zh) 更换绝缘子装置
CN205377164U (zh) 大吨位ii型悬垂绝缘子导线端专用卡具
CN104022461B (zh) 更换500kv直线单联双串水平绝缘子工具
CN207490436U (zh) ±500kV直流输电线路双联双挂V型复合绝缘子串更换方法的模型
CN106025918A (zh) 一种可调节卡线器

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170426

WD01 Invention patent application deemed withdrawn after publication