CN207490436U - ±500kV直流输电线路双联双挂V型复合绝缘子串更换方法的模型 - Google Patents
±500kV直流输电线路双联双挂V型复合绝缘子串更换方法的模型 Download PDFInfo
- Publication number
- CN207490436U CN207490436U CN201721478938.XU CN201721478938U CN207490436U CN 207490436 U CN207490436 U CN 207490436U CN 201721478938 U CN201721478938 U CN 201721478938U CN 207490436 U CN207490436 U CN 207490436U
- Authority
- CN
- China
- Prior art keywords
- composite insulator
- insulator string
- power transmission
- transmission lines
- duplex
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000012212 insulator Substances 0.000 title claims abstract description 52
- 239000002131 composite material Substances 0.000 title claims abstract description 45
- 230000005540 biological transmission Effects 0.000 title claims abstract description 21
- 238000009413 insulation Methods 0.000 claims abstract description 14
- 239000000203 mixture Substances 0.000 claims abstract description 10
- 150000001875 compounds Chemical class 0.000 abstract description 2
- 230000005611 electricity Effects 0.000 description 2
- 239000000725 suspension Substances 0.000 description 2
- 239000004020 conductor Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound data:image/svg+xml;base64,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 data:image/svg+xml;base64,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 [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 description 1
- 239000010931 gold Substances 0.000 description 1
- 229910052737 gold Inorganic materials 0.000 description 1
- 239000012211 strain insulator Substances 0.000 description 1
Abstract
本实用新型公开±500kV直流输电线路双联双挂V型复合绝缘子串更换方法的模型,所述组合翻板卡具一端通过螺纹孔和螺栓安装在矩形联板上,组合翻板卡具另一端连接有丝杆,所述丝杆上连接有绝缘拉棒,所述绝缘拉棒顶端安装在横担上,所述横担上设置有复合绝缘子串,所述复合绝缘子串两端连接有导线侧均压环,所述导线侧均压环设置在矩形联板上。优点,本实用新型在更换±500kV直流输电线路双联双挂V型复合绝缘子时有效的避开了绝缘子串两侧的均压环,在保证线路正常运行状况下,通过收紧承力系统丝杆,将双联复合绝缘子串的力进行转移,实现对V型复合绝缘子串的更换。该方法有效解决承力系统受大力,减小作业人员劳动强度,降低作业风险,提高作业效率。
Description
± 500kV直流输电线路双联双挂V型复合绝缘子串更换方法的 模型
技术领域
[0001] 本实用新型属于输电线路检修技术领域,具体为±500kv直流输电线路双联双挂V 型复合绝缘子串更换方法的模型。
背景技术
[0002] 目前,云南电网已投运的±500kV永富直流输电线路,总长度560.966km,导线排列 方式为4XLGJ800/70,导线重量2.787kg/m,途经高山峻岭占比37%,最大垂直档距l597m, 其中耐张塔多采用双联双挂点耐张盘型绝缘子串(2X550kN),直线塔均为复合绝缘子串 (SHV1、SHV3A、SHV4A)。其中大量运用了双联双挂V型悬垂复合绝缘子串结构,传统更换V型 复合绝缘子串的作业方法是在导线侧联板及塔头间通过卡具、丝杆、拉棒构成垂直上拉的 承力系统,通过收紧丝杆,垂直拉起整个V型结构复合绝缘子串,将力转移到承力系统上,实 现任意绝缘子串更换。但无法满足±500kV永富直流输电线路大荷载、大档距、大吨位金具、 绝缘子等承力要求,目前还没有一套系统的作业方法可运用于该结构的绝缘子串上,给直 流线路检修工作带来较大影响,甚至影响直流输电线路安全可靠运行。 实用新型内容
[0003] 针对上述现有技术存在的问题,本实用新型提供结构简单,检修方便的± 500kv 直流输电线路双联双挂V型复合绝缘子串更换方法的模型。
[0004] 其技术方案为:
[0005] ±500kV直流输电线路双联双挂V型复合绝缘子串更换方法的模型,包括组合翻板 卡具、丝杆、横担、绝缘拉棒、螺栓、矩形联板、复合绝缘子串、导线侧均压环;
[0006] 所述组合翻板卡具一端通过螺纹孔和螺栓安装在矩形联板上,组合翻板卡具另一 端连接有丝杆,所述丝杆上连接有绝缘拉棒,所述绝缘拉棒顶端安装在横担上,所述横担上 设置有复合绝缘子串,所述复合绝缘子串两端连接有导线侧均压环,所述导线侧均压环设 置在矩形联板上。
[0007] 进一步,所述复合绝缘子串底端穿出导线侧均压环设置在矩形联板上。
[0008] 进一步,所述复合绝缘子串由双串组成。
[0009] 进一步,所述横担上设置有把手。
[0010] 使用本实用新型±500kV直流输电线路双联双挂V型复合绝缘子串更换方法的模 型时,建立与双联双挂V型复合绝缘子串结构相匹配的承力系统,该系统是沿±500kv直流 输电线路双联双挂V型复合绝缘子串悬挂方向进行布置,其一端是固定在矩形联板卡上的 组合式翻版卡具、与卡具连接的依次是松紧承力系统的丝杆、绝缘拉棒,另一端是固定在塔 头侧横担,各部分连接方式为螺栓式,此系统分别安装在双联双挂V型复合绝缘子串两端。
[0011] 本实用新型在更换±500kV直流输电线路双联双挂V型复合绝缘子串任意串作业 时有效的避开了绝缘子串两侧的均压环,无需拆除均压环,在保证线路正常运行状况下,通 过收紧承力系统丝杆,将双联复合绝缘子串的力进行转移,实现对V型复合绝缘子串的更 换。该方法可有效解决承力系统受大力,减小作业人员劳动强度,降低作业风险,提高作业 效率。
附图说明
[0012] 图1为本实用新型结构示意图;
[0013] 图2为本实用新型工作状态图;
[0014] 其中,1-组合翻板卡具、2-丝杆、3-横担、4-绝缘拉棒、5-螺栓、6-矩形联板、7-复合 绝缘子串、8_导线侧均压环。
具体实施方式
[0015]如图1-2所示,±500kV直流输电线路双联双挂V型复合绝缘子串更换方法的模型, 包括组合翻板卡具1、丝杆2、横担3、绝缘拉棒4、螺栓5、矩形联板6、复合绝缘子串7、导线侧 均压环8;
[0016]所述组合翻板卡具1 一端通过螺纹孔和螺栓5安装在矩形联板6上,组合翻板卡具1 另一端连接有丝杆2,所述丝杆2上连接有绝缘拉棒4,所述绝缘拉棒4顶端安装在横担3上, 所述横担3上设置有复合绝缘子串7,所述复合绝缘子串7两端连接有导线侧均压环8,所述 导线侧均压环8设置在矩形联板6上。
[0017] 进一步,所述复合绝缘子串7底端穿出导线侧均压环8设置在矩形联板6上。
[0018] 进一步,所述复合绝缘子串7由双串组成。
[0019] 进一步,所述横担3上设置有把手。
[0020] 使用本实用新型±5〇〇kV直流输电线路双联双挂V型复合绝缘子串7更换方法的模 型时,建立与双联双挂V型复合绝缘子串7结构相匹配的承力系统,该系统是沿±50〇kV直流 输电线路双联双挂V型复合绝缘子串7悬挂方向进行布置,其一端是固定在矩形联板6上的 组合式翻版卡具1、与卡具连接的依次是松紧承力系统的丝杆2、绝缘拉棒4,另一端是固定 在塔头侧横担,各部分连接方式为螺栓5式,此系统分别安装在双联双挂V型复合绝缘子串 两端。
Claims (4)
1. ± 500kV直流输电线路双联双挂V型复合绝缘子串更换方法的模型,其特征在于,包 括组合翻板卡具(1)、丝杆⑵、横担(3)、绝缘拉棒⑷、螺栓(5)、矩形联板¢)、复合绝缘子 串⑺、导线侧均压环⑻; 所述组合翻板卡具(1) 一端通过螺纹孔和螺栓(5)安装在矩形联板(6)上,组合翻板卡 具(1)另一端连接有丝杆(2),所述丝杆(2)上连接有绝缘拉棒(4),所述绝缘拉棒(4)顶端安 装在横担(3)上,所述横担(3)上设置有复合绝缘子串(7),所述复合绝缘子串(7)两端连接 有导线侧均压环(8),所述导线侧均压环(8)设置在矩形联板(6)上。
2. 根据权利要求1所述的±500kV直流输电线路双联双挂V型复合绝缘子串更换方法的 模型,其特征在于,所述复合绝缘子串(7)底端穿出导线侧均压环(8)设置在矩形联板(6) 上。
3. 根据权利要求1所述的±500kV直流输电线路双联双挂V型复合绝缘子串更换方法的 模型,其特征在于,所述复合绝缘子串⑺由双串组成。
4. 根据权利要求1所述的±5〇〇kV直流输电线路双联双挂V型复合绝缘子串更换方法的 模型,其特征在于,所述横担03)上设置有把手。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721478938.XU CN207490436U (zh) | 2017-11-08 | 2017-11-08 | ±500kV直流输电线路双联双挂V型复合绝缘子串更换方法的模型 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721478938.XU CN207490436U (zh) | 2017-11-08 | 2017-11-08 | ±500kV直流输电线路双联双挂V型复合绝缘子串更换方法的模型 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207490436U true CN207490436U (zh) | 2018-06-12 |
Family
ID=62475814
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721478938.XU Active CN207490436U (zh) | 2017-11-08 | 2017-11-08 | ±500kV直流输电线路双联双挂V型复合绝缘子串更换方法的模型 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207490436U (zh) |
-
2017
- 2017-11-08 CN CN201721478938.XU patent/CN207490436U/zh active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202014054U (zh) | 用于±660kV直流输电线路耐张绝缘子的检修工具 | |
CN102136695B (zh) | 用于±660kV直流输电线路的检修工器具 | |
CN101814707B (zh) | 一种带电更换220kV线路V串绝缘子的工具及方法 | |
CN103594968A (zh) | 一种输电杆塔多分裂导线提升装置 | |
CN203014270U (zh) | 输电线路双分裂导线用三角联板接头 | |
CN103422699A (zh) | 一种复合材料输电线路杆塔 | |
CN207490436U (zh) | ±500kV直流输电线路双联双挂V型复合绝缘子串更换方法的模型 | |
CN202721419U (zh) | 绝缘悬挂线夹 | |
CN203690797U (zh) | 绝缘子串检修用横担侧夹具 | |
CN205565511U (zh) | 同塔双回钢管杆更换绝缘子作业用横担卡具 | |
CN105514877A (zh) | 同塔双回钢管杆更换绝缘子作业用横担卡具 | |
CN202197048U (zh) | 一种塔用双角钢挂点起重连接工具 | |
CN106602465A (zh) | 输电线路直线塔第一片绝缘子更换工具 | |
CN201332246Y (zh) | 大吨位导线提线器 | |
CN105119203A (zh) | 一种配网综合带电检修提线工具 | |
CN2641874Y (zh) | 预制式铝管跳线 | |
CN206432624U (zh) | 输电线路直线塔第一片绝缘子更换工具 | |
CN206205554U (zh) | 一种用于酒杯型塔中相复合横担的连接结构 | |
CN204441800U (zh) | 一种500kV紧凑型线路V型绝缘子串更换卡具 | |
CN201639240U (zh) | 集束四芯耐张线夹 | |
CN204271535U (zh) | 输电线路双挂绝缘子联板扶正装置 | |
CN207490437U (zh) | ±500kV直流输电线路单联单挂V型复合绝缘子串更换翼型卡具 | |
CN204258160U (zh) | 更换线塔绝缘子工具 | |
CN202856238U (zh) | 带电更换线路多回塔中相绝缘子串的工具 | |
CN209029173U (zh) | 一种新型防断裂与变形的直角挂板 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant |