CN106601116A - Process control practical training device and control method thereof - Google Patents

Process control practical training device and control method thereof Download PDF

Info

Publication number
CN106601116A
CN106601116A CN201710065428.8A CN201710065428A CN106601116A CN 106601116 A CN106601116 A CN 106601116A CN 201710065428 A CN201710065428 A CN 201710065428A CN 106601116 A CN106601116 A CN 106601116A
Authority
CN
China
Prior art keywords
water tank
water
storage tank
upper water
tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710065428.8A
Other languages
Chinese (zh)
Inventor
王新
马涛
丁猛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING KANGNI TECHNOLOGY INDUSTRY Co Ltd
Original Assignee
NANJING KANGNI TECHNOLOGY INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING KANGNI TECHNOLOGY INDUSTRY Co Ltd filed Critical NANJING KANGNI TECHNOLOGY INDUSTRY Co Ltd
Priority to CN201710065428.8A priority Critical patent/CN106601116A/en
Publication of CN106601116A publication Critical patent/CN106601116A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B25/00Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes
    • G09B25/02Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes of industrial processes; of machinery

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Apparatus For Making Beverages (AREA)

Abstract

The present invention discloses a process control practical training device and a control method thereof. The device comprises a workbench, the upper surface of the workbench is provided with a bottom water storage tank, the upper surface of the workbench around the bottom water storage tank is provided with a water tank support, the upper portion of the water tank support is provided with an upper water tank, and the upper water tank is located at the upper portion of the bottom water storage tank. The quantity of the water tanks is reduced to two, and the water tanks comprises an upper water tank and a bottom water storage tank; the size of each water tank is reduced, the pipeline is simplified, each pipeline employs a transparent organic glass tube convenient to observe, the pipeline interface employs a fast-plug mode , the assembling is convenient, the workbench is movable, a drainage port is arranged at the lower surface of the workbench to facilitate water containing of bucket, and an electrical cabinet is waterproof to save the space and facilitate the ligature with other devices so as to realize the four practical training modes such as the constant voltage, the constant temperature, the constant current and the constant liquid and have a good application prospect.

Description

A kind of process control actual training device and its control method
Technical field
The present invention relates to Industry Control teaching technique field, and in particular to a kind of process control actual training device and its controlling party Method.
Background technology
At present, process control actual training device realizes process control using 3-5 water tank substantially, and, water tank outlet Lower position is generally placed, causes water tank many, volume is big, overall process control actual training device height is very high, it has not been convenient to student Operation and observation, and, pipeline is complicated, it is not easy to safeguard, draining is inconvenient, and influence process controls the teaching matter of actual training device Amount.
The content of the invention
Technical problem solved by the invention is existing process control actual training device, and water tank is more, and volume is big, and height is very high, no Facilitate student to operate and observe, road is complicated, it is not easy to safeguard, draining is inconvenient, affect the problem of quality of instruction.The mistake of the present invention Process control actual training device and its control method,
In order to achieve the above object, the technical solution adopted in the present invention is:
A kind of process control actual training device, it is characterised in that:Including workbench, the worktable upper surface is provided with the next water storage Case, the worktable upper surface of the next storage tank border is provided with tank bracket, is provided with above the tank bracket Position water tank, the upper water tank is located at the top of the next storage tank,
The side wall lower section of the next storage tank is connected by drinking-water pipe with the side wall lower section of upper water tank, on the drinking-water pipe Water pump is connected with, the water pump is provided with filter with the junction of drinking-water pipe, and the drinking-water pipe is near the position of upper water tank Place is provided with hand control valve,
The side wall top of the next storage tank is connected by overflow pipe with the side wall top of upper water tank, the upper water tank Also passing ratio valve drain pipe is connected with the next storage tank, and on the proportioning valve drain pipe proportioning valve is provided with,
The lower surface of the workbench is provided with the next storage tank drain valve, the next storage tank drain valve and the next storage tank Bottom be connected, the bottom of the upper water tank is provided with its upper water tank drain valve being connected.
A kind of aforesaid process control actual training device, it is characterised in that:Water pump top below the hand control valve is also Pressure transducer is installed, above the hand control valve effusion meter is also equipped with.
A kind of aforesaid process control actual training device, it is characterised in that:The top of the upper water tank is provided with liquidometer, Temperature sensor, float switch, heating rod are provided with the upper water tank.
A kind of aforesaid process control actual training device, it is characterised in that:The side of the workbench is provided with electric box, institute State electric box to be connected with water pump, proportioning valve, pressure transducer, temperature sensor, float switch, heating rod respectively.
A kind of aforesaid process control actual training device, it is characterised in that:The bottom of the workbench is provided with support frame, The corner of the support frame bottom is mounted on universal wheel, and on each universal wheel service brake is provided with.
Control method based on above-mentioned process control actual training device, it is characterised in that:Comprise the following steps,
Step (A), enables process control actual training device, closes the next storage tank drain valve, after adding water into the next storage tank, lid The case lid of upper the next storage tank, can respectively carry out constant pressure, constant temperature, constant current, four kinds of practicing models of permanent liquid;
Step(B)If selection carries out constant voltage mode, hand control valve certain angle is opened, by the PLC being connected with electric box The PID of controller is calculated, and controls pump rotary speed, realizes control hydraulic pressure size, and can manually control the open angle increasing of valve Plus disturbance;
Step(C)If selection carries out constant temperature mode, the water surface of upper water tank is improved to float switch upper position using water pump Afterwards, hand control valve is closed, now, PLC controls heating rod work by the voltage regulator controllers in electric box, and leads to The PID for crossing PLC is calculated, and the coolant-temperature gage in upper water tank design temperature will be added to by heating rod, and waiting temperature is passed Sensor is detected, when reaching design temperature, stops heating, and temperature sensor will carry out real-time detection, and realize the water in upper water tank Temperature is constant;
Step(D)If selection carries out constant current mode, hand control valve is fully opened, by the touch screen being connected with electric box Setting firm discharge value, allows water pump to be supplied water according to setting firm discharge value, when changing present flow rate, is obtained by effusion meter Real-time flow data feeds back to PLC, is calculated by the PID of PLC, controls the increase or reduction of pump rotary speed, Change the size of present flow rate, be capable of achieving bottom storage tank and supply water to upper water tank constant current;
Step(E)If selection carries out permanent liquid pattern, hand control valve is fully opened, by the touch screen being connected with electric box After setting the target level of upper water tank, PLC is calculated by PID, controls pump motor rotating speed to control the next water storage Case to upper water tank constant current is supplied water, and makes the constant liquid level in upper water tank, reaches target level;If the rotating speed of fixed water pump, PLC is calculated by PID, adjusts proportioning valve(2)To make upper water tank reach the constant liquid level after target level;
Step(F), complete any one above-mentioned, two kinds, after three kinds or four kinds of practicing models, upper water tank drain valve is beaten Open, the water in upper water tank is emitted into into lower water tank, terminate practice-training teaching.
The control method of aforesaid process control actual training device, it is characterised in that:Step (A), the height for adding water is 260cm。
The control method of aforesaid process control actual training device, it is characterised in that:Step(B), the model of the certain angle It is trapped among between 30 ° -90 °.
The control method of aforesaid process control actual training device, it is characterised in that:Step(F), terminate practice-training teaching, for a long time When not using, lower water tank drain valve need to be opened, empty the water in upper water tank, two water tanks of lower water tank.
The invention has the beneficial effects as follows:The process control actual training device and its control method of the present invention, reduces water tank quantity It is respectively upper water tank and lower water tank to two, reduces the volume of water tank, pipeline simplifies, and each pipeline is using transparent organic Glass tubing is easy to observation, and using slotting mode soon at pipe interface, easy to assembly, workbench may move, and discharge outlet is in workbench Lower surface, facilitates bucket water receiving, electric box(Water proof type)Installation site, save space is convenient to carry out line, energy with other equipment Constant pressure, constant temperature, constant current, four kinds of practicing models of permanent liquid are enough realized, is had a good application prospect.
Description of the drawings
Fig. 1 is the structural representation of the process control actual training device of the present invention.
The implication of labelling is as follows in accompanying drawing:
1:Upper water tank;2:Proportioning valve;3:Proportioning valve drain pipe;4:Tank bracket;5:The next storage tank;6:Workbench;7:Electricity Gas tank;8:The next storage tank drain valve;9:Drinking-water pipe;10:Upper water tank drain valve;11:Filter;12:Water pump;13:Pressure Sensor;14:Hand control valve;15:Effusion meter;16:Overflow pipe;17:Temperature sensing;18:Liquidometer;19:Float switch; 20:Heating rod;21:Support frame;22:Universal wheel.
Specific embodiment
Below in conjunction with Figure of description, the present invention is further illustrated.
As shown in figure 1, the process control actual training device of the present invention, including workbench 6, the setting of the upper surface of the workbench 6 The upper surface of workbench 6 for having the next storage tank 5, the border of the next storage tank 5 is provided with tank bracket 4, the tank bracket 4 Top upper water tank 1 is installed, the upper water tank 1 is located at the top of the next storage tank 5,
The side wall lower section of the next storage tank 5 is connected by drinking-water pipe 9 with the side wall lower section of upper water tank 1, described to draw water Water pump 12 is connected with pipe 9, the water pump 12 is provided with filter 11, prevents impurity from entering water pump with the junction of drinking-water pipe 9 12, affect its normal operation, the drinking-water pipe 9 that hand control valve 14 is installed at the position of upper water tank 1,
The side wall top of the next storage tank 5 is connected by overflow pipe 16 with the side wall top of upper water tank 1, described upper Water tank 1 is gone back passing ratio valve drain pipe 3 and is connected with the next storage tank 5, and on the proportioning valve drain pipe 3 proportioning valve 2 is provided with,
The lower surface of the workbench 6 is provided with the next storage tank drain valve 8, the next storage tank drain valve 8 and the next storage The bottom of water tank 5 is connected, and the bottom of the upper water tank 1 is provided with its upper water tank drain valve 10 being connected.
The lower section of the hand control valve 14 is provided with pressure transducer 13, and the top of the hand control valve 14 is also installed There is effusion meter 15.
The top of the upper water tank 1 is provided with liquidometer 18, be provided with the upper water tank 1 temperature sensor 17, Float switch 19, heating rod 20.
The side of the workbench 6 is provided with electric box 7, the electric box 7 can waterproof, respectively with water pump 12, ratio Valve 2, pressure transducer 13, temperature sensor 17, float switch 19, heating rod 20 are connected.
The bottom of the workbench 6 is provided with support frame 21, and the corner of the bottom of the support frame 21 is mounted on ten thousand To wheel 22, service brake is provided with each universal wheel 22, is easy to movement, the convenient needs according to teaching to be placed.
Each pipeline of the present invention adopts transparent organic glass pipe, is easy to observation, using slotting mode soon, group at pipe interface Dress is convenient.
Based on the control method of above-mentioned process control actual training device, comprise the following steps,
Step(A), process control actual training device is enabled, the next storage tank drain valve is closed, after adding water into the next storage tank 5, The case lid of the next storage tank 5 is covered, the height for adding water is 260cm, can respectively carry out constant pressure, constant temperature, constant current, four kinds of real trainings of permanent liquid Pattern;
Step(B)If selection carries out constant voltage mode, the certain angle of hand control valve 14 is opened, here the scope of certain angle Between 30 ° -90 °, calculated by the PID of the PLC being connected with electric box 7, control the rotating speed of water pump 12, realize control water Pressure size, and can manually control the open angle increase disturbance of valve 14;
Step(C)If selection carries out constant temperature mode, the water surface of upper water tank 1 is improved to float switch 19 using water pump 12 Behind the position of face, hand control valve 14 is closed, now, PLC controls heating rod by the voltage regulator controllers in electric box 7 20 work, and calculated by the PID of PLC, setting temperature will be added to the coolant-temperature gage in upper water tank 1 by heating rod 20 Degree, waiting temperature sensor 17 is detected, when reaching design temperature, stops heating, and temperature sensor 17 will carry out real-time detection, real Water temperature in existing upper water tank 1 is constant;
Step(D)If selection carries out constant current mode, hand control valve 14 is fully opened, by the touch being connected with electric box 7 Screen setting firm discharge value, allows water pump 12 to be supplied water according to setting firm discharge value, when changing present flow rate, by effusion meter 15 acquisition real-time flow datas feed back to PLC, and the PID of PLC is calculated, control the rotating speed of water pump 12 increase or Reduce, change the size of present flow rate, be capable of achieving bottom storage tank 5 and supply water to the constant current of upper water tank 1;
Step(E)If selection carries out permanent liquid pattern, hand control valve 14 is fully opened, by the touch being connected with electric box 7 After the target level of the upper water tank 1 of screen setting, PLC is calculated by PID, controls the motor speed of water pump 12 to control bottom Storage tank 5 to the constant current of upper water tank 1 is supplied water, and makes the constant liquid level in upper water tank 1, reaches target level;If fixed water pump 12 Rotating speed, then PLC calculated by PID, it is permanent to make upper water tank 1 reach the liquid level after target level to adjust proportioning valve 2 It is fixed;
Step(F), complete any one above-mentioned, two kinds, after three kinds or four kinds of practicing models, by upper water tank drain valve 10 Open, the water in upper water tank 1 is emitted into into lower water tank 5, terminate practice-training teaching, when not using for a long time, need to be by lower water tank Drain valve 8 is opened, and empties the water in upper water tank 1,5 two water tanks of lower water tank.
The process control actual training device and its control method of the present invention, reduces water tank quantity to two, is respectively upper water Case and lower water tank, reduce the volume of water tank, and pipeline simplifies, and volume ratio like product reduces 1-2 times, and needed raw material is also big Big to reduce, low manufacture cost, each pipeline is easy to observation using transparent organic glass pipe, using slotting mode soon at pipe interface, Easy to assembly, workbench may move, and discharge outlet facilitates bucket water receiving, electric box in the lower surface of workbench(Water proof type)Install Position, save space is convenient to carry out line with other equipment, can realize constant pressure, constant temperature, constant current, four kinds of practicing models of permanent liquid, Have a good application prospect, cross control actual training device and adopt modular design method, simple structure is easy to assembly quick, convenient Curstomer's site assembling is used, and saves occupation of land space, also possesses the process control real training function of a complete set;Using standard interface not only Can be overlapped with other control system, moreover it is possible to have a style of one's own through expansion.The present invention's crosses control actual training device as a work( Can module, can be connected with the PLC in other industrial control systems, converter, input/output module etc. Connect, constitute an infant industry control system that can be flexible and changeable, only client does not save purchase cost, moreover it is possible to expansion equipment work( Service efficiency and can be improved.
The ultimate principle and principal character and advantages of the present invention of the present invention has been shown and described above.The technology of the industry Personnel it should be appreciated that the present invention is not restricted to the described embodiments, the simply explanation described in above-described embodiment and description this The principle of invention, without departing from the spirit and scope of the present invention, the present invention also has various changes and modifications, these changes Change and improvement is both fallen within scope of the claimed invention.The claimed scope of the invention by appending claims and its Equivalent thereof.

Claims (9)

1. a kind of process control actual training device, it is characterised in that:Including workbench(6), the workbench(6)Upper surface is provided with The next storage tank(5), the next storage tank(5)The workbench of border(6)Upper surface is provided with tank bracket(4), the water Box bracket(4)Top upper water tank is installed(1), the upper water tank(1)Positioned at the next storage tank(5)Top,
The next storage tank(5)Side wall lower section pass through drinking-water pipe(9)With upper water tank(1)Side wall lower section be connected, institute State drinking-water pipe(9)On be connected with water pump(12), the water pump(12)With drinking-water pipe(9)Junction be provided with filter(11), The drinking-water pipe(9)Near upper water tank(1)Position at hand control valve is installed(14),
The next storage tank(5)Side wall top pass through overflow pipe(16)With upper water tank(1)Side wall top be connected, institute State upper water tank(1)Also passing ratio valve drain pipe(3)With the next storage tank(5)It is connected, the proportioning valve drain pipe(3)On It is provided with proportioning valve(2),
The workbench(6)Lower surface be provided with the next storage tank drain valve(8), the next storage tank drain valve(8)With The next storage tank(5)Bottom be connected, the upper water tank(1)Bottom be provided with its upper water tank drain valve being connected (10).
2. a kind of process control actual training device according to claim 1, it is characterised in that:The hand control valve(14)Under The water pump of side(12)Top is also equipped with pressure transducer(13), the hand control valve(14)Top be also equipped with effusion meter (15).
3. a kind of process control actual training device according to claim 1, it is characterised in that:The upper water tank(1)It is upper Portion is provided with liquidometer(18), the upper water tank(1)Inside it is provided with temperature sensor(17), float switch(19), heating rod (20).
4. a kind of process control actual training device according to claim 1-3, it is characterised in that:The workbench(6)One Side is provided with electric box(7), the electric box(7)Respectively with water pump(12), proportioning valve(2), pressure transducer(13), temperature pass Sensor(17), float switch(19), heating rod(20)It is connected.
5. a kind of process control actual training device according to claim 4, it is characterised in that:The workbench(6)Bottom It is provided with support frame(21), the support frame(21)The corner of bottom is mounted on universal wheel(22), each universal wheel(22) On be provided with service brake.
6. the control method of the process control actual training device according to any one of claim 1-5, it is characterised in that:Including with Lower step,
Step(A), process control actual training device is enabled, the next storage tank drain valve is closed, to the next storage tank(5)Inside add water Afterwards, the next storage tank is covered(5)Case lid, can respectively carry out constant pressure, constant temperature, constant current, permanent four kinds of practicing models of liquid;
Step(B)If selection carries out constant voltage mode, opens hand control valve(14)Certain angle, by with electric box(7)Phase The PID of PLC even is calculated, and controls water pump(12)Rotating speed, realizes control hydraulic pressure size, and can manually control valve (14)Open angle increase disturbance;
Step(C)If selection carries out constant temperature mode, using water pump(12)By upper water tank(1)The water surface improve to float switch (19)After upper position, hand control valve is closed(14), now, PLC passes through electric box(7)In voltage regulator controllers come Control heating rod(20)Work, and calculated by the PID of PLC, by heating rod(20)Will be upper water tank(1)Interior Coolant-temperature gage adds to design temperature, waiting temperature sensor(17)Detection, when reaching design temperature, stops heating, temperature sensor (17)Real-time detection will be carried out, upper water tank will be realized(1)Interior water temperature is constant;
Step(D)If selection carries out constant current mode, by hand control valve(14)Fully open, by with electric box(7)Connected Touch screen sets firm discharge value, allows water pump(12)Supplied water according to setting firm discharge value, when present flow rate need to be changed, passed through Effusion meter(15)Real-time flow data feedback PLC is obtained, is calculated by the PID of PLC, control water pump(12)Rotating speed Increase or reduction, change present flow rate size, be capable of achieving bottom storage tank(5)To upper water tank(1)Constant current is supplied water;
Step(E)If selection carries out permanent liquid pattern, by hand control valve(14)Fully open, by with electric box(7)Connected Touch screen sets upper water tank(1)Target level after, PLC by PID calculate, control water pump(12)Motor speed comes The next storage tank of control(5)To upper water tank(1)Constant current is supplied water, and makes upper water tank(1)Interior constant liquid level, reaches target liquid Position;If fixed water pump(12)Rotating speed, then PLC by PID calculate, adjust proportioning valve(2)To make upper water tank(1)Reach Constant liquid level to after target level;
Step(F), complete any one above-mentioned, two kinds, after three kinds or four kinds of practicing models, by upper water tank drain valve (10)Open, by upper water tank(1)Interior water is emitted into lower water tank(5), terminate practice-training teaching.
7. the control method of process control actual training device according to claim 6, it is characterised in that:Step(A), add water Highly it is 260cm.
8. the control method of process control actual training device according to claim 6, it is characterised in that:Step(B), described one Determine the scope of angle between 30 ° -90 °.
9. the control method of process control actual training device according to claim 6, it is characterised in that:Step(F), terminate real Training teaching, when not using for a long time, need to be by lower water tank drain valve(8)Open, empty upper water tank(1), lower water tank(5)Two Water in water tank.
CN201710065428.8A 2017-02-06 2017-02-06 Process control practical training device and control method thereof Pending CN106601116A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710065428.8A CN106601116A (en) 2017-02-06 2017-02-06 Process control practical training device and control method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710065428.8A CN106601116A (en) 2017-02-06 2017-02-06 Process control practical training device and control method thereof

Publications (1)

Publication Number Publication Date
CN106601116A true CN106601116A (en) 2017-04-26

Family

ID=58585603

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710065428.8A Pending CN106601116A (en) 2017-02-06 2017-02-06 Process control practical training device and control method thereof

Country Status (1)

Country Link
CN (1) CN106601116A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110610646A (en) * 2019-10-14 2019-12-24 佛山科学技术学院 Waterwheel model for teaching
CN112328818A (en) * 2020-10-15 2021-02-05 费斯托教学股份有限公司 Wastewater simulation treatment device and installation error and correction recognition system thereof
CN112396938A (en) * 2020-10-15 2021-02-23 费斯托教学股份有限公司 Waste water transportation simulation device and working condition simulation display system thereof
CN112435557A (en) * 2020-10-15 2021-03-02 费斯托教学股份有限公司 Membrane filtration simulation device and control system thereof

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2821744Y (en) * 2005-07-19 2006-09-27 浙江天煌科技实业有限公司 Process control object system test device
CN201166939Y (en) * 2008-03-18 2008-12-17 温州职业技术学院 Constant pressure water-supply teaching real-training apparatus
CN201392601Y (en) * 2009-04-09 2010-01-27 天津市龙洲科技仪器有限公司 Training platform of process control sensor
CN102129809A (en) * 2011-03-11 2011-07-20 无锡职业技术学院 Liquid level measurement and control training system and operation method thereof
CN201927222U (en) * 2010-12-30 2011-08-10 山东莱茵科技设备有限公司 Process control unit of practical training examination and appraisal device for designer of programmable control system
CN203773846U (en) * 2014-02-22 2014-08-13 山东栋梁科技设备有限公司 Process control practical training device
CN203773861U (en) * 2014-04-09 2014-08-13 河南工业职业技术学院 Process control monitoring training device
CN204390524U (en) * 2015-01-29 2015-06-10 辽宁石化职业技术学院 A kind of automatic control of liquid actual training device
CN205016139U (en) * 2015-09-17 2016-02-03 南京康尼科技实业有限公司 Device is instructed to reality of parallelly connected EDU robot of 3DOF motion delta type
CN205140358U (en) * 2015-08-13 2016-04-06 北京华晟云联科技有限公司 Real device of instructing of senior process control
CN206524105U (en) * 2017-02-06 2017-09-26 南京康尼科技实业有限公司 A kind of process control actual training device

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2821744Y (en) * 2005-07-19 2006-09-27 浙江天煌科技实业有限公司 Process control object system test device
CN201166939Y (en) * 2008-03-18 2008-12-17 温州职业技术学院 Constant pressure water-supply teaching real-training apparatus
CN201392601Y (en) * 2009-04-09 2010-01-27 天津市龙洲科技仪器有限公司 Training platform of process control sensor
CN201927222U (en) * 2010-12-30 2011-08-10 山东莱茵科技设备有限公司 Process control unit of practical training examination and appraisal device for designer of programmable control system
CN102129809A (en) * 2011-03-11 2011-07-20 无锡职业技术学院 Liquid level measurement and control training system and operation method thereof
CN203773846U (en) * 2014-02-22 2014-08-13 山东栋梁科技设备有限公司 Process control practical training device
CN203773861U (en) * 2014-04-09 2014-08-13 河南工业职业技术学院 Process control monitoring training device
CN204390524U (en) * 2015-01-29 2015-06-10 辽宁石化职业技术学院 A kind of automatic control of liquid actual training device
CN205140358U (en) * 2015-08-13 2016-04-06 北京华晟云联科技有限公司 Real device of instructing of senior process control
CN205016139U (en) * 2015-09-17 2016-02-03 南京康尼科技实业有限公司 Device is instructed to reality of parallelly connected EDU robot of 3DOF motion delta type
CN206524105U (en) * 2017-02-06 2017-09-26 南京康尼科技实业有限公司 A kind of process control actual training device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
麦艳红等: "基于GE Rx3i PLC生产过程控制技术实训装置设计与实现", 《河池学院学报》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110610646A (en) * 2019-10-14 2019-12-24 佛山科学技术学院 Waterwheel model for teaching
CN112328818A (en) * 2020-10-15 2021-02-05 费斯托教学股份有限公司 Wastewater simulation treatment device and installation error and correction recognition system thereof
CN112396938A (en) * 2020-10-15 2021-02-23 费斯托教学股份有限公司 Waste water transportation simulation device and working condition simulation display system thereof
CN112435557A (en) * 2020-10-15 2021-03-02 费斯托教学股份有限公司 Membrane filtration simulation device and control system thereof

Similar Documents

Publication Publication Date Title
CN106601116A (en) Process control practical training device and control method thereof
CN102854122B (en) Multifunctional annular oil-gas-water multiphase flow corrosion simulation test device
CN101705935B (en) Water pump parallel machine set operation mechanism and control strategy simulation test device
CN209447413U (en) A kind of water pump simulation teaching device
CN205140357U (en) Real device of instructing of small -size process control
CN206524105U (en) A kind of process control actual training device
CN104459071A (en) Simulation system for algal bloom emergency regulation and control under changing environment and operation method of simulation system
CN204650835U (en) One can operated from a distance flow/level sensing experiment device for teaching
CN106932215B (en) Experimental device for simulating closed conveying of long-distance liquid conveying pipeline
CN100999246A (en) Sea thermocline imitation system for test of underwater delivery means
CN102808609A (en) U-shaped tubular single well producing rate metering device
CN209034271U (en) A kind of material-stirring device
CN206778364U (en) A kind of water supply mechanism of vacuum emulsification pot
CN208320505U (en) A kind of dissolving tank agitating device
CN204405663U (en) A kind of multifunctional modification emulsified asphalt pilot plant
CN106718357A (en) A kind of full-automatic plant fast propagation educates environment conditioning system soon
CN203773284U (en) Automatic weighing and water-adding system
CN202926310U (en) U-shaped tubular single well yield metering device
CN2727880Y (en) Procedure control experimental apparatus
CN207178832U (en) A kind of intelligent water cut-off device
CN208030227U (en) A kind of automatic grease adding set
CN210728747U (en) Intelligent double-control multifunctional automatic separation device
RU128935U1 (en) EXPERIMENTAL-EDUCATIONAL INSTALLATION OF AUTOMATION OF TECHNOLOGICAL PROCESSES OF PULP AND PAPER PRODUCTION
CN210050366U (en) Pump station is with valve according to flow automatic control
CN109857156A (en) A kind of parallel automatic liquid adding device and its implementation method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170426