CN106592648A - Ground anti-cracking treatment method - Google Patents
Ground anti-cracking treatment method Download PDFInfo
- Publication number
- CN106592648A CN106592648A CN201710074078.1A CN201710074078A CN106592648A CN 106592648 A CN106592648 A CN 106592648A CN 201710074078 A CN201710074078 A CN 201710074078A CN 106592648 A CN106592648 A CN 106592648A
- Authority
- CN
- China
- Prior art keywords
- cushion cap
- backfill
- cystosepiment
- precast slab
- ground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
Abstract
The invention discloses a ground anti-cracking treatment method. The ground anti-cracking treatment method comprises the following steps: (A) treatment of a column lower bearing platform: (A-1) a difference between the field long-time settlement and the pile foundation settlement is determined through an estimation mode, that is, a settlement difference is determined; (A-2) the top elevation of the bearing platform is determined according to the settlement difference determined in the step (A-1); and a column is positioned on the bearing platform; (A-3) brick molds are built at the outer periphery of the bearing platform by one lap; and a foam plate 2 is arranged between the brick molds and the bearing platform; (A-4) a cushion layer between the brick molds and the foam plate 2 is cut off by a cutter for separation; (A-5) soil out of the brick molds is filled for compaction; and the upper part of the bearing platform in the brick molds is not filled; (A-6) precast concrete planks and precast concrete plank reinforcements are placed; and (A-7) a building ground layer is totally cast to form a stacked floor; and a foam plate 1 is arranged between the building ground layer and the column. The method uses materials of foam plates, concrete, reinforcements, bricks and mortar, which are general materials in engineering, so that the purchase is convenient.
Description
Technical field
The present invention relates to technical field of construction, specifically a kind of ground crack resistence processing method.
Background technology
In recent years, with the continuous development and the mushroom development of urban construction of China's economy, especially some coastal cities
Land Demand constantly expands, existing land resources can not meet city continue develop demand, sea reclamation into
For the land development form that China's coastal region is main.At present, the construction technology for adopting in Scale Sea Reclamation Project is with waterpower hydraulic reclamation
Based on method.Waterpower hydraulic reclamation method refers to using machineries such as dredger and slush pumps, the mud in river course or surrounding waters is passed through
Special construction pipeline has the land of use value to desired target location through natural sediment.Medium coarse sand is one
Goodr water conservancy hydraulic reclamation material is planted, has had corresponding result of study to show to carry out epeirogenetic using medium coarse sand, can be obtained
Preferable achievement.Because the market price of sand is higher, and thing source is rare, and the use of medium coarse sand is gradually decreased in engineering.Will
Mud is not only able to river training, port and pier as the material of water conservancy hydraulic reclamation in river course or surrounding waters, can also protect
Environment, reduction cost of transportation, shortening foundation stabilization duration, are a kind of good methods achieved many things at one stroke.Therefore, in Practical Project generally
From the mud from coastal waters seabed or river course as waterpower hydraulic reclamation material.Because hydraulic reclamation soil's water content is very high, hole
It is also very higher than very big, decrement, intensity and permeability it is very low, and the hydraulic reclamation time is shorter, not yet consolidates under Gravitative Loads, also
Be say natural surface subsidence be earth's surface is loose or half loose barged-in fill under gravity, by loosely to it is fine and closely woven into
Rock process, therefore barged-in fill area building settlement is larger and the sedimentation deadline is very long, shows so as to form large-area land subsidence
As, when local settle uneven when can with ground cracking affect using with it is attractive in appearance.
For sea-filling region major structure of construction, typically using pile foundation, by the load of agent structure by stake it is incoming under
The supporting course of the preferable soil property in portion, it is ensured that the sedimentation of agent structure meets the requirement of specification.It is usually cost-effective at present, one layer of ground
Face typically directly adopts after building coats way, i.e. rammed earth and directly does 100mm concrete toppings.The method because of surface layer below
The soil body is not also consolidated, and after house use for many years, ground floor understands Continuous Settlement and settling amount is very big, and in post periphery cushion cap position
Put place's sedimentation less, cause to be ftractureed along cushion cap side on post periphery cushion cap junction ground, land subsidence beyond post periphery cushion cap, because
This normal treatment process has had a strong impact on the use of building and attractive in appearance.At present the method for solution ground floor cracking is mainly changed and filled out
Sand-gravel-cushion Technioue, deal pile, cement mixing pile, drain bar add the method for processing foundation such as piling prepressing, or directly do one layer it is overhead existing
Pour reinforced concrete floor.
Although above-mentioned processing method can effectively solve the problem that problem, but relatively costly.How low cost solves barged-in fill area one
The problem of layer ground cracking, is building field problem demanding prompt solution.
The content of the invention
It is an object of the invention to provide a kind of ground crack resistence processing method, to solve above-mentioned background technology in propose
Problem.
For achieving the above object, the present invention provides following technical scheme:
A kind of ground crack resistence processing method, comprises the following steps:
A:The process of post lower cushion cap:
A-1:The determination of the difference of place long-term settlement amount and pile foundation settling amount is carried out by way of estimating, that is, determines sedimentation
Difference;
A-2:Differential settlement according to determining in A-1 determines that cushion cap top mark is high, and post is located on cushion cap;
A-3:Make a circle outside cushion cap and build brick loose tool by laying bricks or stones, No. two cystosepiments are set between brick loose tool and cushion cap;
A-4:The bed course between brick loose tool and No. two cystosepiments is cut off with cutting machine, both are disengaged;
A-5:The outer earthen backfill compacting of brick loose tool is carried out, cushion cap top does not backfill in brick loose tool;
A-6:Carry out the placement of precast slab;
A-7:One-piece casting flooring surface layer, forms laminated floor slab, surface thickness and precast concrete plate thickness, precast concrete
Slab muscle and concrete strength are determined that flooring surface layer arranges a cystosepiment with intercolumniation by calculating is designed;
B:The process of grade beam under filling wall:
B-1:Earthen backfill is carried out, No. two cystosepiments are arranged between backfill and grade beam;
B-2:The bed course between grade beam and No. two cystosepiments is cut off with cutting machine, both are disengaged;
B-3:A number cystosepiment is set between construction flooring surface layer and wall.
As further scheme of the invention:The precast slab two ends are placed in brick loose tool and backfill, across
Cushion cap is crossed, and precast slab reinforcing bar is reserved in backfill
As further scheme of the invention:Described precast slab one end is placed in brick loose tool and backfill, and is being returned
Precast slab reinforcing bar is reserved on banketing, the precast slab other end is stretched into inside cushion cap to post side, precast slab
A number cystosepiment, and the template of laminated floor slab that precast slab is poured as after are set with intercolumniation.
As further scheme of the invention:No. two cystosepiments are the cystosepiment of 100 millimeters thicks.
As further scheme of the invention:A number cystosepiment is the cystosepiment of 30 millimeters thicks.
Compared with prior art, the invention has the beneficial effects as follows:
(1)The present invention is cystosepiment, concrete, reinforcing bar, brick, mortar using material, is in engineering generally using material, buying
It is convenient;
(2)The present invention does not need large-scale professed machine equipment, and construction method is simple, is easy to operation;
(3)Construction cost of the present invention is relatively low, cheap, compared with traditional method for processing foundation, the maximum advantage of this method
It is exactly with low cost;
(4)High treating effect, the present invention can effectively solve ground problem of Cracking caused by one layer of Earth cave, pass through
After this method process, one layer of ground is not ftractureed during Long-Time Service, Equalsettlement;
(5)If sedimentation is larger, only one layer of ground need to be again done on existing ground, it is simple and convenient;
(6)Construction and operational phase are easy to maintenance simple;
(7)Applied range.
Description of the drawings
Fig. 1 is the processing method floor map of crack resistence at the crack resistence processing method center pillar lower cushion cap of ground;
Fig. 2 is the processing profiles schematic diagram in Fig. 1 at 1-1;
Fig. 3 is the processing profiles schematic diagram in Fig. 1 at 2-2;
Fig. 4 is the generalized section one of crack resistence processing method at indoor wall in the crack resistence processing method of ground;
Fig. 5 is the generalized section two of crack resistence processing method at indoor wall in the crack resistence processing method of ground.
In figure:1- cushion caps, 2- posts, number cystosepiment of 3-, 4- brick loose tools, No. bis- cystosepiments of 5-, 6- surface thicknesses, 7- buildings ground
Face surface layer, 8- precast slab reinforcing bars, 9- bed courses, 10- backfills, 11- precast slabs, 12- walls, 13- grade beams.
Specific embodiment
The technical scheme of this patent is described in more detail with reference to specific embodiment.
Fig. 1-5 are referred to, a kind of ground crack resistence processing method is comprised the following steps:
A:The process of the lower cushion cap 1 of post 2:
A-1:The determination of the difference of place long-term settlement amount and pile foundation settling amount is carried out by way of estimating, that is, determines sedimentation
Difference;
A-2:Differential settlement according to determining in A-1 determines that cushion cap top mark is high, and post 2 is located on cushion cap 1;
A-3:Make a circle outside cushion cap 1 and build brick loose tool 4 by laying bricks or stones, No. two cystosepiments 5 are set between brick loose tool 4 and cushion cap 1;
A-4:The bed course 9 between brick loose tool 4 and No. two cystosepiments 5 is cut off with cutting machine, both are disengaged;
A-5:The outer earthen backfill of brick loose tool 4 compacting is carried out, cushion cap top does not backfill in brick loose tool;
A-6:Carry out precast slab 11 to lay;
A-7:One-piece casting flooring surface layer 7, forms laminated floor slab, surface thickness 6 and the thickness of precast slab 11, prefabricated mixed
Concrete board reinforcing bar 8 and concrete strength arrange a cystosepiment 3 by calculating determination is designed between flooring surface layer 7 and post 2;
B:The process of grade beam under filling wall:
B-1:Earthen backfill is carried out, No. two cystosepiments 5 are arranged between backfill 10 and grade beam 13;
B-2:The bed course 9 between grade beam 13 and No. two cystosepiments 5 is cut off with cutting machine, both are disengaged;
B-3:A cystosepiment 3 is set between construction flooring surface layer 7 and wall 12.
The two ends of the precast slab 11 are placed on brick loose tool 4 and backfill 10, across cushion cap 1, and in backfill
Precast slab reinforcing bar 8 is reserved on 10.
The one end of the precast slab 11 is placed on brick loose tool 4 and backfill 10, and is reserved in backfill 10 pre-
Concrete slab reinforcing bar 8 processed, the other end of precast slab 11 is stretched into inside cushion cap 1 to the side of post 2, precast slab 11 and post 2
Between a cystosepiment 3, and the template of laminated floor slab that precast slab 11 is poured as after are set.
No. two cystosepiments 5 are the cystosepiment of 100 millimeters thicks.
A number cystosepiment 3 is the cystosepiment of 30 millimeters thicks.
The present invention is cystosepiment, concrete, reinforcing bar, brick, mortar using material, is in engineering generally using material, is adopted
Purchaser is just;The present invention does not need large-scale professed machine equipment, and construction method is simple, is easy to operation;Construction cost of the present invention
Relatively low, cheap, compared with traditional method for processing foundation, the maximum advantage of this method is exactly with low cost;Treatment effect
Good, the present invention can effectively solve ground problem of Cracking caused by one layer of Earth cave, after this method process, one
Layer ground is not ftractureed during Long-Time Service, Equalsettlement;If sedimentation is larger, only one need to be again done on existing ground
Layer ground, it is simple and convenient;Construction and operational phase are easy to maintenance simple;Applied range.
Embodiment:
Taizhou Wan circular economy industrial Nesting Zone is located at Taizhou plain east, pass through Linhai City in the range of the administrative region of a city of Taizhou, Jiaojiang District,
Taizhou economic development zone, Luqiao District and Wenling city, about 562 square kilometres of the gross area.Domestic landforms are to impact Plain, beach
Main, east side littoral carries long coastline.Gather and divide into north, east, south three and form a team greatly, medium-sized and small enterprises undertaking area engineering position
In east is formed a team.About 200 mu of land area, along Peng Bei great Dao and Ju Hai main roads arrangement, the land used block image is good, and adjoins
Public lawn and business auxiliary facility, life & amusement is convenient and swift.
Engineering name:Taizhou Wan circular economy industrial Nesting Zone medium-sized and small enterprises undertaking area engineering:
Construction scale:Total land area:160126m2;
Overall floorage:171142 m2;
Total investment of engineering:44576.82 ten thousand yuan.
This engineering design service life is 50 years.
One layer of ground of all factory buildings of this engineering adopts above-mentioned crack resistence processing method, achieves good effect, it is ensured that
Normally the using of floor.
The better embodiment of this patent is explained in detail above, but this patent is not limited to above-mentioned embodiment party
Formula, in the ken that one skilled in the relevant art possesses, can be with the premise of without departing from this patent objective
Make a variety of changes.
Claims (5)
1. a kind of ground crack resistence processing method, it is characterised in that comprise the following steps:
A:The process of post lower cushion cap:
A-1:The determination of the difference of place long-term settlement amount and pile foundation settling amount is carried out by way of estimating, that is, determines sedimentation
Difference;
A-2:Differential settlement according to determining in A-1 determines that cushion cap top mark is high, and post is located on cushion cap;
A-3:Make a circle outside cushion cap and build brick loose tool by laying bricks or stones, No. two cystosepiments are set between brick loose tool and cushion cap;
A-4:The bed course between brick loose tool and No. two cystosepiments is cut off with cutting machine, both are disengaged;
A-5:The outer earthen backfill compacting of brick loose tool is carried out, cushion cap top does not backfill in brick loose tool;
A-6:Carry out the placement of precast slab;
A-7:One-piece casting flooring surface layer, forms laminated floor slab, surface thickness and precast concrete plate thickness, precast concrete
Slab muscle and concrete strength are determined that flooring surface layer arranges a cystosepiment with intercolumniation by calculating is designed;
B:The process of grade beam under filling wall:
B-1:Earthen backfill is carried out, No. two cystosepiments are arranged between backfill and grade beam;
B-2:The bed course between grade beam and No. two cystosepiments is cut off with cutting machine, both are disengaged;
B-3:A number cystosepiment is set between construction flooring surface layer and wall.
2. crack resistence processing method in ground according to claim 1, it is characterised in that put at the precast slab two ends
Put on brick loose tool and backfill, across cushion cap, and precast slab reinforcing bar is reserved in backfill.
3. crack resistence processing method in ground according to claim 1, it is characterised in that put described precast slab one end
Put on brick loose tool and backfill, and precast slab reinforcing bar is reserved in backfill, the precast slab other end is stretched into
To post side inside cushion cap, precast slab arranges a cystosepiment, and the overlapping that precast slab is poured as after with intercolumniation
The template of floor.
4. the ground crack resistence processing method according to Claims 2 or 3, it is characterised in that No. two cystosepiments are 100
The cystosepiment of millimeters thick.
5. the ground crack resistence processing method according to Claims 2 or 3 a, it is characterised in that cystosepiment is 30
The cystosepiment of millimeters thick.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710074078.1A CN106592648B (en) | 2017-02-10 | 2017-02-10 | A kind of ground crack resistence processing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710074078.1A CN106592648B (en) | 2017-02-10 | 2017-02-10 | A kind of ground crack resistence processing method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106592648A true CN106592648A (en) | 2017-04-26 |
CN106592648B CN106592648B (en) | 2019-05-21 |
Family
ID=58585909
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710074078.1A Active CN106592648B (en) | 2017-02-10 | 2017-02-10 | A kind of ground crack resistence processing method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106592648B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110924404A (en) * | 2019-12-21 | 2020-03-27 | 山东天齐置业集团股份有限公司 | Construction method for deep backfill filling wall foundation |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103470044A (en) * | 2013-07-03 | 2013-12-25 | 天津二十冶建设有限公司 | Construction method capable of controlling cracks in concrete floor |
CN103953118A (en) * | 2014-04-18 | 2014-07-30 | 中国水电顾问集团华东勘测设计研究院有限公司 | Connecting structure for preventing ground inside room of factory building from transmitting sedimentation to plinth and wall body |
CN205012596U (en) * | 2015-09-06 | 2016-02-03 | 方远建设集团股份有限公司 | Defense sector face is uniform settlement structure not |
-
2017
- 2017-02-10 CN CN201710074078.1A patent/CN106592648B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103470044A (en) * | 2013-07-03 | 2013-12-25 | 天津二十冶建设有限公司 | Construction method capable of controlling cracks in concrete floor |
CN103953118A (en) * | 2014-04-18 | 2014-07-30 | 中国水电顾问集团华东勘测设计研究院有限公司 | Connecting structure for preventing ground inside room of factory building from transmitting sedimentation to plinth and wall body |
US20150299978A1 (en) * | 2014-04-18 | 2015-10-22 | Hydrochina Huadong Engineering Corporation Limited | Connection Structure for Blocking Settlement of Ground |
CN205012596U (en) * | 2015-09-06 | 2016-02-03 | 方远建设集团股份有限公司 | Defense sector face is uniform settlement structure not |
Non-Patent Citations (1)
Title |
---|
刘世明等: ""软土地基上厂房基础的设计"", 《浙江建筑》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110924404A (en) * | 2019-12-21 | 2020-03-27 | 山东天齐置业集团股份有限公司 | Construction method for deep backfill filling wall foundation |
Also Published As
Publication number | Publication date |
---|---|
CN106592648B (en) | 2019-05-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103774514B (en) | A kind of prefabricated tubular pile embankment structure and construction method thereof | |
CN107419630A (en) | A kind of the soft soil foundation high-filled embankment and construction method of effectively control settlement after construction | |
CN206902488U (en) | A kind of soft soil foundation high-filled embankment of effectively control settlement after construction | |
CN106958256A (en) | A kind of placement layer by layer, the open caisson construction technique repeatedly sunk | |
CN106088127A (en) | Open caisson construction method | |
CN102677661A (en) | Reinforcement method for foundation of silt soft-based cast-in-place box girder support | |
CN108560542B (en) | Waste tire coated building slag bidirectional reinforcement and construction method thereof | |
CN111305027B (en) | Rapid repairing construction method and repairing structure for subsidence of karst area pavement | |
CN102926398A (en) | Construction method of inclined column type corrosion resistant foundation for power line in salt lake area | |
CN101597888B (en) | Construction method of municipal drainage culvert sinking trough | |
CN101858082A (en) | Soft soil foundation new construction post pile pressing technology and construction method thereof | |
CN109750571A (en) | A kind of road landslide emergency and permanent supporting and retaining system integral structure and construction method | |
CN110004991A (en) | Underground structure anti-floating system and construction method based on raised type tangs plate | |
CN109706952A (en) | Large-scale well-sinking construction method | |
CN105155383A (en) | Construction process of bubble light soil | |
CN208219694U (en) | A kind of prefabricated barricade | |
CN113431065A (en) | Rapid construction method and structure of occlusive pile and steel sleeve combined cofferdam | |
CN206902734U (en) | A kind of earth construction of soft foundation zone | |
CN108457289A (en) | A kind of open caisson construction method of complex condition | |
CN105332382B (en) | Adjacent river foundation ditch builds island cofferdam clay water stop construction method | |
CN206457856U (en) | A kind of ground crack resistence structure | |
CN106592648B (en) | A kind of ground crack resistence processing method | |
CN208023600U (en) | A kind of caisson structure suitable for complex environment | |
CN112813757A (en) | Foam light soil composite roadbed construction method for bridge head transition treatment | |
CN110185048A (en) | Deep narrow river valley ultra-deep foundation pit Muddy Bottoms excavate road construction protective slope structure and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |