CN106592648A - Ground anti-cracking treatment method - Google Patents

Ground anti-cracking treatment method Download PDF

Info

Publication number
CN106592648A
CN106592648A CN201710074078.1A CN201710074078A CN106592648A CN 106592648 A CN106592648 A CN 106592648A CN 201710074078 A CN201710074078 A CN 201710074078A CN 106592648 A CN106592648 A CN 106592648A
Authority
CN
China
Prior art keywords
cushion cap
backfill
cystosepiment
precast slab
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710074078.1A
Other languages
Chinese (zh)
Other versions
CN106592648B (en
Inventor
陆文哲
张惠峰
匡昕昕
许国祥
朱黎炜
刘艳
江萍
胡理列
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Urban & Rural Planning Design Institute
Original Assignee
Zhejiang Urban & Rural Planning Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Urban & Rural Planning Design Institute filed Critical Zhejiang Urban & Rural Planning Design Institute
Priority to CN201710074078.1A priority Critical patent/CN106592648B/en
Publication of CN106592648A publication Critical patent/CN106592648A/en
Application granted granted Critical
Publication of CN106592648B publication Critical patent/CN106592648B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution

Abstract

The invention discloses a ground anti-cracking treatment method. The ground anti-cracking treatment method comprises the following steps: (A) treatment of a column lower bearing platform: (A-1) a difference between the field long-time settlement and the pile foundation settlement is determined through an estimation mode, that is, a settlement difference is determined; (A-2) the top elevation of the bearing platform is determined according to the settlement difference determined in the step (A-1); and a column is positioned on the bearing platform; (A-3) brick molds are built at the outer periphery of the bearing platform by one lap; and a foam plate 2 is arranged between the brick molds and the bearing platform; (A-4) a cushion layer between the brick molds and the foam plate 2 is cut off by a cutter for separation; (A-5) soil out of the brick molds is filled for compaction; and the upper part of the bearing platform in the brick molds is not filled; (A-6) precast concrete planks and precast concrete plank reinforcements are placed; and (A-7) a building ground layer is totally cast to form a stacked floor; and a foam plate 1 is arranged between the building ground layer and the column. The method uses materials of foam plates, concrete, reinforcements, bricks and mortar, which are general materials in engineering, so that the purchase is convenient.

Description

A kind of ground crack resistence processing method
Technical field
The present invention relates to technical field of construction, specifically a kind of ground crack resistence processing method.
Background technology
In recent years, with the continuous development and the mushroom development of urban construction of China's economy, especially some coastal cities Land Demand constantly expands, existing land resources can not meet city continue develop demand, sea reclamation into For the land development form that China's coastal region is main.At present, the construction technology for adopting in Scale Sea Reclamation Project is with waterpower hydraulic reclamation Based on method.Waterpower hydraulic reclamation method refers to using machineries such as dredger and slush pumps, the mud in river course or surrounding waters is passed through Special construction pipeline has the land of use value to desired target location through natural sediment.Medium coarse sand is one Goodr water conservancy hydraulic reclamation material is planted, has had corresponding result of study to show to carry out epeirogenetic using medium coarse sand, can be obtained Preferable achievement.Because the market price of sand is higher, and thing source is rare, and the use of medium coarse sand is gradually decreased in engineering.Will Mud is not only able to river training, port and pier as the material of water conservancy hydraulic reclamation in river course or surrounding waters, can also protect Environment, reduction cost of transportation, shortening foundation stabilization duration, are a kind of good methods achieved many things at one stroke.Therefore, in Practical Project generally From the mud from coastal waters seabed or river course as waterpower hydraulic reclamation material.Because hydraulic reclamation soil's water content is very high, hole It is also very higher than very big, decrement, intensity and permeability it is very low, and the hydraulic reclamation time is shorter, not yet consolidates under Gravitative Loads, also Be say natural surface subsidence be earth's surface is loose or half loose barged-in fill under gravity, by loosely to it is fine and closely woven into Rock process, therefore barged-in fill area building settlement is larger and the sedimentation deadline is very long, shows so as to form large-area land subsidence As, when local settle uneven when can with ground cracking affect using with it is attractive in appearance.
For sea-filling region major structure of construction, typically using pile foundation, by the load of agent structure by stake it is incoming under The supporting course of the preferable soil property in portion, it is ensured that the sedimentation of agent structure meets the requirement of specification.It is usually cost-effective at present, one layer of ground Face typically directly adopts after building coats way, i.e. rammed earth and directly does 100mm concrete toppings.The method because of surface layer below The soil body is not also consolidated, and after house use for many years, ground floor understands Continuous Settlement and settling amount is very big, and in post periphery cushion cap position Put place's sedimentation less, cause to be ftractureed along cushion cap side on post periphery cushion cap junction ground, land subsidence beyond post periphery cushion cap, because This normal treatment process has had a strong impact on the use of building and attractive in appearance.At present the method for solution ground floor cracking is mainly changed and filled out Sand-gravel-cushion Technioue, deal pile, cement mixing pile, drain bar add the method for processing foundation such as piling prepressing, or directly do one layer it is overhead existing Pour reinforced concrete floor.
Although above-mentioned processing method can effectively solve the problem that problem, but relatively costly.How low cost solves barged-in fill area one The problem of layer ground cracking, is building field problem demanding prompt solution.
The content of the invention
It is an object of the invention to provide a kind of ground crack resistence processing method, to solve above-mentioned background technology in propose Problem.
For achieving the above object, the present invention provides following technical scheme:
A kind of ground crack resistence processing method, comprises the following steps:
A:The process of post lower cushion cap:
A-1:The determination of the difference of place long-term settlement amount and pile foundation settling amount is carried out by way of estimating, that is, determines sedimentation Difference;
A-2:Differential settlement according to determining in A-1 determines that cushion cap top mark is high, and post is located on cushion cap;
A-3:Make a circle outside cushion cap and build brick loose tool by laying bricks or stones, No. two cystosepiments are set between brick loose tool and cushion cap;
A-4:The bed course between brick loose tool and No. two cystosepiments is cut off with cutting machine, both are disengaged;
A-5:The outer earthen backfill compacting of brick loose tool is carried out, cushion cap top does not backfill in brick loose tool;
A-6:Carry out the placement of precast slab;
A-7:One-piece casting flooring surface layer, forms laminated floor slab, surface thickness and precast concrete plate thickness, precast concrete Slab muscle and concrete strength are determined that flooring surface layer arranges a cystosepiment with intercolumniation by calculating is designed;
B:The process of grade beam under filling wall:
B-1:Earthen backfill is carried out, No. two cystosepiments are arranged between backfill and grade beam;
B-2:The bed course between grade beam and No. two cystosepiments is cut off with cutting machine, both are disengaged;
B-3:A number cystosepiment is set between construction flooring surface layer and wall.
As further scheme of the invention:The precast slab two ends are placed in brick loose tool and backfill, across Cushion cap is crossed, and precast slab reinforcing bar is reserved in backfill
As further scheme of the invention:Described precast slab one end is placed in brick loose tool and backfill, and is being returned Precast slab reinforcing bar is reserved on banketing, the precast slab other end is stretched into inside cushion cap to post side, precast slab A number cystosepiment, and the template of laminated floor slab that precast slab is poured as after are set with intercolumniation.
As further scheme of the invention:No. two cystosepiments are the cystosepiment of 100 millimeters thicks.
As further scheme of the invention:A number cystosepiment is the cystosepiment of 30 millimeters thicks.
Compared with prior art, the invention has the beneficial effects as follows:
(1)The present invention is cystosepiment, concrete, reinforcing bar, brick, mortar using material, is in engineering generally using material, buying It is convenient;
(2)The present invention does not need large-scale professed machine equipment, and construction method is simple, is easy to operation;
(3)Construction cost of the present invention is relatively low, cheap, compared with traditional method for processing foundation, the maximum advantage of this method It is exactly with low cost;
(4)High treating effect, the present invention can effectively solve ground problem of Cracking caused by one layer of Earth cave, pass through After this method process, one layer of ground is not ftractureed during Long-Time Service, Equalsettlement;
(5)If sedimentation is larger, only one layer of ground need to be again done on existing ground, it is simple and convenient;
(6)Construction and operational phase are easy to maintenance simple;
(7)Applied range.
Description of the drawings
Fig. 1 is the processing method floor map of crack resistence at the crack resistence processing method center pillar lower cushion cap of ground;
Fig. 2 is the processing profiles schematic diagram in Fig. 1 at 1-1;
Fig. 3 is the processing profiles schematic diagram in Fig. 1 at 2-2;
Fig. 4 is the generalized section one of crack resistence processing method at indoor wall in the crack resistence processing method of ground;
Fig. 5 is the generalized section two of crack resistence processing method at indoor wall in the crack resistence processing method of ground.
In figure:1- cushion caps, 2- posts, number cystosepiment of 3-, 4- brick loose tools, No. bis- cystosepiments of 5-, 6- surface thicknesses, 7- buildings ground Face surface layer, 8- precast slab reinforcing bars, 9- bed courses, 10- backfills, 11- precast slabs, 12- walls, 13- grade beams.
Specific embodiment
The technical scheme of this patent is described in more detail with reference to specific embodiment.
Fig. 1-5 are referred to, a kind of ground crack resistence processing method is comprised the following steps:
A:The process of the lower cushion cap 1 of post 2:
A-1:The determination of the difference of place long-term settlement amount and pile foundation settling amount is carried out by way of estimating, that is, determines sedimentation Difference;
A-2:Differential settlement according to determining in A-1 determines that cushion cap top mark is high, and post 2 is located on cushion cap 1;
A-3:Make a circle outside cushion cap 1 and build brick loose tool 4 by laying bricks or stones, No. two cystosepiments 5 are set between brick loose tool 4 and cushion cap 1;
A-4:The bed course 9 between brick loose tool 4 and No. two cystosepiments 5 is cut off with cutting machine, both are disengaged;
A-5:The outer earthen backfill of brick loose tool 4 compacting is carried out, cushion cap top does not backfill in brick loose tool;
A-6:Carry out precast slab 11 to lay;
A-7:One-piece casting flooring surface layer 7, forms laminated floor slab, surface thickness 6 and the thickness of precast slab 11, prefabricated mixed Concrete board reinforcing bar 8 and concrete strength arrange a cystosepiment 3 by calculating determination is designed between flooring surface layer 7 and post 2;
B:The process of grade beam under filling wall:
B-1:Earthen backfill is carried out, No. two cystosepiments 5 are arranged between backfill 10 and grade beam 13;
B-2:The bed course 9 between grade beam 13 and No. two cystosepiments 5 is cut off with cutting machine, both are disengaged;
B-3:A cystosepiment 3 is set between construction flooring surface layer 7 and wall 12.
The two ends of the precast slab 11 are placed on brick loose tool 4 and backfill 10, across cushion cap 1, and in backfill Precast slab reinforcing bar 8 is reserved on 10.
The one end of the precast slab 11 is placed on brick loose tool 4 and backfill 10, and is reserved in backfill 10 pre- Concrete slab reinforcing bar 8 processed, the other end of precast slab 11 is stretched into inside cushion cap 1 to the side of post 2, precast slab 11 and post 2 Between a cystosepiment 3, and the template of laminated floor slab that precast slab 11 is poured as after are set.
No. two cystosepiments 5 are the cystosepiment of 100 millimeters thicks.
A number cystosepiment 3 is the cystosepiment of 30 millimeters thicks.
The present invention is cystosepiment, concrete, reinforcing bar, brick, mortar using material, is in engineering generally using material, is adopted Purchaser is just;The present invention does not need large-scale professed machine equipment, and construction method is simple, is easy to operation;Construction cost of the present invention Relatively low, cheap, compared with traditional method for processing foundation, the maximum advantage of this method is exactly with low cost;Treatment effect Good, the present invention can effectively solve ground problem of Cracking caused by one layer of Earth cave, after this method process, one Layer ground is not ftractureed during Long-Time Service, Equalsettlement;If sedimentation is larger, only one need to be again done on existing ground Layer ground, it is simple and convenient;Construction and operational phase are easy to maintenance simple;Applied range.
Embodiment:
Taizhou Wan circular economy industrial Nesting Zone is located at Taizhou plain east, pass through Linhai City in the range of the administrative region of a city of Taizhou, Jiaojiang District, Taizhou economic development zone, Luqiao District and Wenling city, about 562 square kilometres of the gross area.Domestic landforms are to impact Plain, beach Main, east side littoral carries long coastline.Gather and divide into north, east, south three and form a team greatly, medium-sized and small enterprises undertaking area engineering position In east is formed a team.About 200 mu of land area, along Peng Bei great Dao and Ju Hai main roads arrangement, the land used block image is good, and adjoins Public lawn and business auxiliary facility, life & amusement is convenient and swift.
Engineering name:Taizhou Wan circular economy industrial Nesting Zone medium-sized and small enterprises undertaking area engineering:
Construction scale:Total land area:160126m2;
Overall floorage:171142 m2;
Total investment of engineering:44576.82 ten thousand yuan.
This engineering design service life is 50 years.
One layer of ground of all factory buildings of this engineering adopts above-mentioned crack resistence processing method, achieves good effect, it is ensured that Normally the using of floor.
The better embodiment of this patent is explained in detail above, but this patent is not limited to above-mentioned embodiment party Formula, in the ken that one skilled in the relevant art possesses, can be with the premise of without departing from this patent objective Make a variety of changes.

Claims (5)

1. a kind of ground crack resistence processing method, it is characterised in that comprise the following steps:
A:The process of post lower cushion cap:
A-1:The determination of the difference of place long-term settlement amount and pile foundation settling amount is carried out by way of estimating, that is, determines sedimentation Difference;
A-2:Differential settlement according to determining in A-1 determines that cushion cap top mark is high, and post is located on cushion cap;
A-3:Make a circle outside cushion cap and build brick loose tool by laying bricks or stones, No. two cystosepiments are set between brick loose tool and cushion cap;
A-4:The bed course between brick loose tool and No. two cystosepiments is cut off with cutting machine, both are disengaged;
A-5:The outer earthen backfill compacting of brick loose tool is carried out, cushion cap top does not backfill in brick loose tool;
A-6:Carry out the placement of precast slab;
A-7:One-piece casting flooring surface layer, forms laminated floor slab, surface thickness and precast concrete plate thickness, precast concrete Slab muscle and concrete strength are determined that flooring surface layer arranges a cystosepiment with intercolumniation by calculating is designed;
B:The process of grade beam under filling wall:
B-1:Earthen backfill is carried out, No. two cystosepiments are arranged between backfill and grade beam;
B-2:The bed course between grade beam and No. two cystosepiments is cut off with cutting machine, both are disengaged;
B-3:A number cystosepiment is set between construction flooring surface layer and wall.
2. crack resistence processing method in ground according to claim 1, it is characterised in that put at the precast slab two ends Put on brick loose tool and backfill, across cushion cap, and precast slab reinforcing bar is reserved in backfill.
3. crack resistence processing method in ground according to claim 1, it is characterised in that put described precast slab one end Put on brick loose tool and backfill, and precast slab reinforcing bar is reserved in backfill, the precast slab other end is stretched into To post side inside cushion cap, precast slab arranges a cystosepiment, and the overlapping that precast slab is poured as after with intercolumniation The template of floor.
4. the ground crack resistence processing method according to Claims 2 or 3, it is characterised in that No. two cystosepiments are 100 The cystosepiment of millimeters thick.
5. the ground crack resistence processing method according to Claims 2 or 3 a, it is characterised in that cystosepiment is 30 The cystosepiment of millimeters thick.
CN201710074078.1A 2017-02-10 2017-02-10 A kind of ground crack resistence processing method Active CN106592648B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710074078.1A CN106592648B (en) 2017-02-10 2017-02-10 A kind of ground crack resistence processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710074078.1A CN106592648B (en) 2017-02-10 2017-02-10 A kind of ground crack resistence processing method

Publications (2)

Publication Number Publication Date
CN106592648A true CN106592648A (en) 2017-04-26
CN106592648B CN106592648B (en) 2019-05-21

Family

ID=58585909

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710074078.1A Active CN106592648B (en) 2017-02-10 2017-02-10 A kind of ground crack resistence processing method

Country Status (1)

Country Link
CN (1) CN106592648B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110924404A (en) * 2019-12-21 2020-03-27 山东天齐置业集团股份有限公司 Construction method for deep backfill filling wall foundation

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103470044A (en) * 2013-07-03 2013-12-25 天津二十冶建设有限公司 Construction method capable of controlling cracks in concrete floor
CN103953118A (en) * 2014-04-18 2014-07-30 中国水电顾问集团华东勘测设计研究院有限公司 Connecting structure for preventing ground inside room of factory building from transmitting sedimentation to plinth and wall body
CN205012596U (en) * 2015-09-06 2016-02-03 方远建设集团股份有限公司 Defense sector face is uniform settlement structure not

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103470044A (en) * 2013-07-03 2013-12-25 天津二十冶建设有限公司 Construction method capable of controlling cracks in concrete floor
CN103953118A (en) * 2014-04-18 2014-07-30 中国水电顾问集团华东勘测设计研究院有限公司 Connecting structure for preventing ground inside room of factory building from transmitting sedimentation to plinth and wall body
US20150299978A1 (en) * 2014-04-18 2015-10-22 Hydrochina Huadong Engineering Corporation Limited Connection Structure for Blocking Settlement of Ground
CN205012596U (en) * 2015-09-06 2016-02-03 方远建设集团股份有限公司 Defense sector face is uniform settlement structure not

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘世明等: ""软土地基上厂房基础的设计"", 《浙江建筑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110924404A (en) * 2019-12-21 2020-03-27 山东天齐置业集团股份有限公司 Construction method for deep backfill filling wall foundation

Also Published As

Publication number Publication date
CN106592648B (en) 2019-05-21

Similar Documents

Publication Publication Date Title
CN103774514B (en) A kind of prefabricated tubular pile embankment structure and construction method thereof
CN107419630A (en) A kind of the soft soil foundation high-filled embankment and construction method of effectively control settlement after construction
CN206902488U (en) A kind of soft soil foundation high-filled embankment of effectively control settlement after construction
CN106958256A (en) A kind of placement layer by layer, the open caisson construction technique repeatedly sunk
CN106088127A (en) Open caisson construction method
CN102677661A (en) Reinforcement method for foundation of silt soft-based cast-in-place box girder support
CN108560542B (en) Waste tire coated building slag bidirectional reinforcement and construction method thereof
CN111305027B (en) Rapid repairing construction method and repairing structure for subsidence of karst area pavement
CN102926398A (en) Construction method of inclined column type corrosion resistant foundation for power line in salt lake area
CN101597888B (en) Construction method of municipal drainage culvert sinking trough
CN101858082A (en) Soft soil foundation new construction post pile pressing technology and construction method thereof
CN109750571A (en) A kind of road landslide emergency and permanent supporting and retaining system integral structure and construction method
CN110004991A (en) Underground structure anti-floating system and construction method based on raised type tangs plate
CN109706952A (en) Large-scale well-sinking construction method
CN105155383A (en) Construction process of bubble light soil
CN208219694U (en) A kind of prefabricated barricade
CN113431065A (en) Rapid construction method and structure of occlusive pile and steel sleeve combined cofferdam
CN206902734U (en) A kind of earth construction of soft foundation zone
CN108457289A (en) A kind of open caisson construction method of complex condition
CN105332382B (en) Adjacent river foundation ditch builds island cofferdam clay water stop construction method
CN206457856U (en) A kind of ground crack resistence structure
CN106592648B (en) A kind of ground crack resistence processing method
CN208023600U (en) A kind of caisson structure suitable for complex environment
CN112813757A (en) Foam light soil composite roadbed construction method for bridge head transition treatment
CN110185048A (en) Deep narrow river valley ultra-deep foundation pit Muddy Bottoms excavate road construction protective slope structure and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant