CN106592573A - Freezer-free liquid nitrogen artificial ground freezing method - Google Patents

Freezer-free liquid nitrogen artificial ground freezing method Download PDF

Info

Publication number
CN106592573A
CN106592573A CN201611205956.0A CN201611205956A CN106592573A CN 106592573 A CN106592573 A CN 106592573A CN 201611205956 A CN201611205956 A CN 201611205956A CN 106592573 A CN106592573 A CN 106592573A
Authority
CN
China
Prior art keywords
liquid nitrogen
drilling
freezing
stratum
ascending pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611205956.0A
Other languages
Chinese (zh)
Other versions
CN106592573B (en
Inventor
王涛
纪洪广
由爽
高宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Science and Technology Beijing USTB
Original Assignee
University of Science and Technology Beijing USTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Science and Technology Beijing USTB filed Critical University of Science and Technology Beijing USTB
Priority to CN201611205956.0A priority Critical patent/CN106592573B/en
Publication of CN106592573A publication Critical patent/CN106592573A/en
Application granted granted Critical
Publication of CN106592573B publication Critical patent/CN106592573B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/11Improving or preserving soil or rock, e.g. preserving permafrost soil by thermal, electrical or electro-chemical means
    • E02D3/115Improving or preserving soil or rock, e.g. preserving permafrost soil by thermal, electrical or electro-chemical means by freezing

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention provides a freezer-free liquid nitrogen artificial ground freezing method and belongs to the technical field of artificial ground freezing. According to the method, construction drilling, namely primary drilling is carried out at first, and then freezing of a drilled hole and the ground surrounding the drilled hole is carried out by inserting a liquid nitrogen injection pipe into the drilled hole; after muddy water in the drilled hole formed through primary drilling and the surrounding ground are frozen, secondary drilling construction is carried out, a stable channel is formed, and liquid nitrogen is injected continuously to achieve ground freezing; and after the range, temperature and strength of frozen soil meet design requirements, liquid nitrogen injection is stopped, and freezing is completed. According to the method, the characteristics of low temperature and quick freezing of the liquid nitrogen are fully used, the ground is frozen in a forced mode, conditions are provided for secondary drilling dry operation, a natural liquid nitrogen heat exchange space is formed in the ground after secondary drilling, the liquid nitrogen makes direct contact with the soil, and higher heat exchange efficiency and higher freezing speed can be obtained. The links of machining, producing and installing traditional freezers are omitted, material is saved, cost is reduced, and the construction progress is improved.

Description

One kind is without the artificial stratum freezing method of frigo liquid nitrogen
Technical field
The present invention relates to artificial ground freezing technique field, particularly relates to one kind without the artificial Freezing stratum as rapid side of frigo liquid nitrogen Method.
Background technology
Artificial stratum freezing process is, using artificial cooling technology, the heat displacement in stratum to be walked, so as to reduce stratum temperature Degree makes stratum become frozen state up to the water freezing in stratum, and the soil body after freezing has certain intensity, can keep out outer Boundary's Water And Earth Pressures, reach the purpose of water proof and stratum consolidation.According to the difference of refrigerant, artificial stratum freezing process can be divided into biography The hypothermic saline of system freezes the method such as to freeze with new liquid nitrogen freezing, dry ice.Standard atmosphere depress, liquid nitrogen vaporization temperature for- 196℃.Amount of heat is absorbed during liquid nitrogen vaporization, can be with the quick freezing soil body, compared with Conventional cryogenic brine freezing, freezing speed Faster, frozen soil temperature is lower, intensity is bigger.With the development of steel and iron industry, as liquid oxygen the liquid nitrogen production of side-product is produced Increase therewith, price is gradually reduced, the case that liquid nitrogen is applied in artificial Freezing stratum as rapid gradually increases.
Current liquid nitrogen freezer seals also with reference to the frigo method for designing in traditional saline freezing system in bottom Feed pipe is passed through in the steel pipe for closing, cryogenic liquid flows in steel pipe, so as to take away Formation heat.Such as:Liquid nitrogen freezer (application Number:200720069041.1), significant difference is had no with traditional hypothermic saline frigo, is remained by freezing pipe, base cone, confession Liquid pipe and escape pipe are constituted.Similar liquid nitrogen freezer patent is concentrated mainly on the liquid nitrogen feed liquid way improvement side to this frigo Face, such as " even freezer of shock tube of liquid nitrogen (application number:200720035238.3) ", " stratigraphic liquid nitrogen freezer (application number: 201010000963.3) ", " there is the liquid nitrogen freezer (application number of many feed pipes:201110264991.0) " etc..Its general character Construction method is:In the earth formation construction drill, lays in the borehole liquid nitrogen freezer, and liquid nitrogen is passed through in frigo, and liquid nitrogen is freezing Vaporization heat absorption in knot device, and it is changed into nitrogen, discharge from escape pipe.Work progress be related to freezing borehole construction, processing and freezing device, Frigo is installed, extracting for frigo is may also relate to after the completion of freezing;The processing of frigo further relate to feed pipe, escape pipe, The processing and connection of base cone, dividing plate etc..
The water shutoff that the artificial Freezing stratum as rapid of liquid nitrogen is usually used in emergency dealing is freezed and soil stabilization, using traditional liquid nitrogen freezing The drawbacks of device carries out the method for Freezing stratum as rapid and has that operation is more, workpiece is more, wastes time and energy, extremely easy delay is speedily carried out rescue work opportunity.
The present invention provides a kind of without the artificial stratum freezing method of frigo liquid nitrogen, exempts the artificial Freezing stratum as rapid of traditional liquid nitrogen and applies Frigo processing in work, frigo such as extract at the operation, accelerating construction progress, reduce construction cost.
The content of the invention
The present invention has that operation is more, workpiece is more, time-consuming expense for the method that traditional liquid nitrogen freezer carries out Freezing stratum as rapid The drawbacks of power, there is provided one kind is without the artificial stratum freezing method of frigo liquid nitrogen.
The method is comprised the following steps that:
(1) construction drill, i.e., once drill:According to stratigraphic type and drilling depth, bore diameter, bore mode is selected, The drilling in the range of the depth of freezing is formed, and carries out borehole cleaning process, it is ensured that foot of hole scum silica frost thickness is less than 300mm;
(2) drilling and peripheral extent Freezing stratum as rapid:Liquid nitrogen ascending pipe is inserted in drilling, is injected by air relief valve control The supply pressure of liquid nitrogen and the air-liquid state of supply liquid nitrogen, liquid nitrogen ascending pipe is made up of two parts, and front end is rigid straight pipe, after Hold as rustless steel flexible hose, using the rig and supporting drilling rod of construction drill, the rigid straight pipe end of liquid nitrogen ascending pipe is inserted Foot of hole;The depth of liquid nitrogen ascending pipe insertion drilling is measured by run of steel, rigid straight pipe threshold value bottom hole pitch is controlled From for 300-500mm;Pressure is injected by the valve regulated liquid nitrogen adjusted on liquid nitrogen storage, when initially injecting, low pressure is taken Power injects gaseous nitrogen, dredging pipeline and pre-cooling pipeline, and injection pressure has continuous air bubbles to emerge to be defined by the top that drills;Incrementally increase Injection pressure is slowly injected into liquid nitrogen to 0.4-0.6Mpa, and progressively above carries drilling rod using rig, lifts speed controlling in 0.2- 0.4m/min, liquid nitrogen ascending pipe is progressively extracted;When liquid nitrogen ascending pipe will extract drilling, reduce injection pressure, make injection Liquid nitrogen switchs to gaseous nitrogen;Using drilling rod the insertion of liquid nitrogen ascending pipe is drilled again, the above-mentioned injection process of repetition, when drilling and periphery 100mm scope freezing soils, and when the pore space of formation does not cave in former drilling after liquid nitrogen ascending pipe is extracted, stop liquid nitrogen note Enter, extract liquid nitrogen ascending pipe;
(3) secondary drilling construction:Muddy water and surrounding formations are dry using auger into frozen state in drilling hole Operation secondary drilling, forms stable duct;
(4) liquid nitrogen freezing stratum is persistently injected:The duct that secondary drilling is formed by the use of in step (three) is used as liquid nitrogen and ground The space of layer heat exchange, reinserts in the borehole liquid nitrogen ascending pipe, injects liquid nitrogen, makes stratum cooling until freezing;
(5) complete to freeze:Frozen soil body scope, temperature, intensity are reached after design requirement, stop liquid nitrogen injection, extract liquid nitrogen Ascending pipe, completes Freezing stratum as rapid.
Wherein, the rigid straight pipe of liquid nitrogen ascending pipe and rustless steel flexible hose are connected by screw thread or flange, and rustless steel is compiled The flexible pipe other end is knitted by screwed connection liquid nitrogen storage (liquid nitrogen bottle or liquid nitrogen tank car).
Liquid nitrogen ascending pipe threshold value bottom hole 200-300mm in step (four), liquid nitrogen injection pressure 0.4-0.8Mpa, liquid nitrogen Ensure drilling upper end liquid nitrogen not overflow in injection process, do not splash.
The method is adapted to the liquid nitrogen freezing construction vertical or diagonally downward that drills, and is not suitable for liquid vertically upward or obliquely Nitrogen frozen construction.
Porous is carried out while when freezing, by liquid nitrogen allotter by liquid nitrogen storage and the flexible rustless steel of liquid nitrogen ascending pipe Flexible hose is connected, and concrete steps are consistent with above-mentioned steps.
The above-mentioned technical proposal of the present invention has the beneficial effect that:
Product is nitrogen after liquid nitrogen endothermic gasification, and gasification product has no adverse effects to stratum, environmentally safe, liquid nitrogen people The coolant closed circulation system in Conventional cryogenic brine freezing is not necessarily formed during work Freezing stratum as rapid.Therefore, liquid nitrogen is made full use of Low temperature, quick freezing property, force frozen ground, and for the dry operation of secondary drilling condition is provided, can be on ground after secondary drilling Natural liquid nitrogen heat exchange space is formed in layer, liquid nitrogen is directly contacted with the soil body, be obtained in that higher heat exchange efficiency, improve and freeze Knot speed.Traditional frigo processing, production, fixing link are reduced, material is saved, reduces cost improves construction speed.
Description of the drawings
Fig. 1 is the present invention without the artificial stratum freezing method steps flow chart schematic diagram of frigo liquid nitrogen;
Fig. 2 is the drilling construction schematic diagram of the present invention;
Fig. 3 is that schematic diagram is freezed in the drilling of the present invention;
Fig. 4 is the secondary drilling schematic diagram of the present invention;
Fig. 5 is the liquid nitrogen freezing schematic diagram of the present invention.
Wherein:1- drills;2- drilling rods;3- liquid nitrogen ascending pipes.
Specific embodiment
To make the technical problem to be solved in the present invention, technical scheme and advantage clearer, below in conjunction with accompanying drawing and tool Body embodiment is described in detail.
The present invention has that operation is more, workpiece is more, time-consuming for the method that existing liquid nitrogen freezer carries out Freezing stratum as rapid Laborious the drawbacks of, there is provided one kind is without the artificial stratum freezing method of frigo liquid nitrogen.
As shown in figure 1, the method includes construction drill, i.e., once drill;Drilling and peripheral extent Freezing stratum as rapid;Secondary brill Construct in hole;Persistently inject liquid nitrogen freezing stratum;The step such as complete to freeze.Specific implementation process is as follows:
Certain shield starting freezing consolidation engineering, takes the liquid nitrogen Freezing stratum as rapid method of surface vertical borehole.
(1) stratum is related to plain fill, silty clay, freeze design drilling depth 25m, bore diameter 89mm, using mud Retaining wall bore mode, is once drilled, and forms the drilling in the range of the depth of freezing, carries out borehole cleaning process, it is ensured that foot of hole Scum silica frost thickness is less than 300mm.As shown in Figure 2.
(2) drilling and peripheral extent Freezing stratum as rapid:Liquid nitrogen ascending pipe 3 is inserted in drilling 1, is noted by air relief valve control Enter the supply pressure of liquid nitrogen and the air-liquid state of supply liquid nitrogen.Liquid nitrogen ascending pipe is made up of two parts, and front end is rigid straight pipe, Length 25.5m, rear end is rustless steel flexible hose, and both are connected by flange, and the rustless steel flexible hose other end passes through liquid nitrogen Allotter connect liquid nitrogen tank car, between connected with flange.Using the rig and supporting drilling rod 2 of construction drill, by liquid nitrogen ascending pipe 3 Rigid straight pipe end insertion drilling 1 bottom.The depth of the insertion of liquid nitrogen ascending pipe 3 drilling 1 is measured by the length of drilling rod 2, control is firm Property straight tube threshold value hole bottom distance be 300mm.Pressure is injected by the valve regulated liquid nitrogen adjusted on liquid nitrogen allotter, initially During injection, low-pressure is taken to inject gaseous nitrogen, dredging pipeline and pre-cooling pipeline, pressure when drilling top there are continuous air bubbles to emerge For control pressure, 15min is stably supplied.Injection pressure is incrementally increased to 0.4Mpa, liquid nitrogen is slowly injected into, and using rig by Drilling rod 2 is carried in step, speed controlling is lifted in 0.2m/min, liquid nitrogen ascending pipe 3 is progressively extracted.Treat liquid nitrogen ascending pipe 3 apart from brill During the 0.2m of hole top, reduce injection pressure, make injection liquid nitrogen switch to gaseous nitrogen.Using drilling rod 2 liquid nitrogen ascending pipe 3 is inserted again After drilling 1, the injection process that is previously mentioned of repetition 5 times, drilling and the periphery 100mm scopes soil body are presented frozen state, and liquid nitrogen The pore space that ascending pipe 3 is formed after extracting in former drilling 1 does not cave in.Stop liquid nitrogen injection, extract liquid nitrogen ascending pipe 3.Such as Fig. 3 It is shown.
(3) secondary drilling construction:Using the dry operation secondary drilling of auger, stable duct is formed.As shown in Figure 4.
(4) liquid nitrogen freezing stratum is persistently injected:By the use of the duct of secondary drilling formation as liquid nitrogen and stratum heat exchange Space, reinserts in the borehole liquid nitrogen ascending pipe 3, progressively injects liquid nitrogen, and liquid nitrogen vaporizes heat absorption in hole, progressively by cold to External diffusion, makes stratum cooling until freezing.Liquid nitrogen ascending pipe threshold value bottom hole 200mm.Liquid nitrogen injects pressure 0.4Mpa, drilling Upper end liquid nitrogen not overflow, do not splash.
(5) complete to freeze:According to monitoring is freezed, frozen soil body scope, temperature, intensity are reached after design requirement, stop liquid nitrogen Injection, extracts liquid nitrogen ascending pipe, completes Freezing stratum as rapid.As shown in Figure 5.
The above is the preferred embodiment of the present invention, it is noted that for those skilled in the art For, on the premise of without departing from principle of the present invention, some improvements and modifications can also be made, these improvements and modifications Should be regarded as protection scope of the present invention.

Claims (4)

1. one kind is without the artificial stratum freezing method of frigo liquid nitrogen, it is characterised in that:Comprise the following steps that:
(1) construction drill, i.e., once drill:According to stratigraphic type and drilling depth, bore diameter, bore mode is selected, formed Drilling in the range of the depth of freezing, and carry out borehole cleaning process, it is ensured that foot of hole scum silica frost thickness is less than 300mm;
(2) drilling and peripheral extent Freezing stratum as rapid:Liquid nitrogen ascending pipe is inserted in drilling, by air relief valve control injection liquid nitrogen Supply pressure and supply liquid nitrogen air-liquid state, liquid nitrogen ascending pipe is made up of two parts, and front end is rigid straight pipe, and rear end is Rustless steel flexible hose, using the rig and supporting drilling rod of construction drill, by the rigid straight pipe end insertion drilling of liquid nitrogen ascending pipe Bottom;The depth of liquid nitrogen ascending pipe insertion drilling is measured by run of steel, controlling rigid straight pipe threshold value hole bottom distance is 300-500mm;Pressure is injected by the valve regulated liquid nitrogen adjusted on liquid nitrogen storage, when initially injecting, takes low-pressure to note Enter gaseous nitrogen, dredging pipeline and pre-cooling pipeline, injection pressure there are continuous air bubbles to emerge to be defined by the top that drills;Incrementally increase injection Pressure is slowly injected into liquid nitrogen to 0.4-0.6Mpa, and progressively above carries drilling rod using rig, lifts speed controlling in 0.2- 0.4m/min, liquid nitrogen ascending pipe is progressively extracted;When liquid nitrogen ascending pipe will extract drilling, reduce injection pressure, make injection Liquid nitrogen switchs to gaseous nitrogen;Using drilling rod the insertion of liquid nitrogen ascending pipe is drilled again, the above-mentioned injection process of repetition, when drilling and periphery 100mm scope freezing soils, and when the pore space of formation does not cave in former drilling after liquid nitrogen ascending pipe is extracted, stop liquid nitrogen note Enter, extract liquid nitrogen ascending pipe;
(3) secondary drilling construction:Muddy water and surrounding formations are into frozen state in drilling hole, using auger stem operation Secondary drilling, forms stable duct;
(4) liquid nitrogen freezing stratum is persistently injected:The duct that secondary drilling is formed by the use of in step (three) is used as liquid nitrogen and stratum heat The space of exchange, reinserts in the borehole liquid nitrogen ascending pipe, injects liquid nitrogen, makes stratum cooling until freezing;
(5) complete to freeze:Frozen soil body scope, temperature, intensity are reached after design requirement, stop liquid nitrogen injection, extract liquid nitrogen injection Pipe, completes Freezing stratum as rapid.
2. according to claim 1 without the artificial stratum freezing method of frigo liquid nitrogen, it is characterised in that:The liquid nitrogen injection The rigid straight pipe and rustless steel flexible hose of pipe is connected by screw thread or flange, and the rustless steel flexible hose other end is connected by screw thread Connect liquid nitrogen storage.
3. according to claim 1 without the artificial stratum freezing method of frigo liquid nitrogen, it is characterised in that:The step (four) Middle liquid nitrogen ascending pipe threshold value bottom hole 200-300mm, liquid nitrogen injection pressure 0.4-0.8Mpa ensures to bore in liquid nitrogen injection process The liquid nitrogen not overflow of hole upper end, do not splash.
4. according to claim 1 without the artificial stratum freezing method of frigo liquid nitrogen, it is characterised in that:The method is adapted to bore Hole liquid nitrogen freezing construction vertically or diagonally downward.
CN201611205956.0A 2016-12-23 2016-12-23 A kind of artificial stratum freezing method of no frigo liquid nitrogen Active CN106592573B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611205956.0A CN106592573B (en) 2016-12-23 2016-12-23 A kind of artificial stratum freezing method of no frigo liquid nitrogen

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611205956.0A CN106592573B (en) 2016-12-23 2016-12-23 A kind of artificial stratum freezing method of no frigo liquid nitrogen

Publications (2)

Publication Number Publication Date
CN106592573A true CN106592573A (en) 2017-04-26
CN106592573B CN106592573B (en) 2018-07-06

Family

ID=58603476

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611205956.0A Active CN106592573B (en) 2016-12-23 2016-12-23 A kind of artificial stratum freezing method of no frigo liquid nitrogen

Country Status (1)

Country Link
CN (1) CN106592573B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108179740A (en) * 2017-12-29 2018-06-19 湖北工业大学 A kind of construction method across solution cavity bored concrete pile
CN109339075A (en) * 2018-11-16 2019-02-15 中国地质科学院探矿工艺研究所 Landslide emergency control technology management method
CN110094207A (en) * 2019-05-23 2019-08-06 王海霖 A kind of artificial stratum freezing system and method for low temperature nitrogen circularly cooling
CN110939453A (en) * 2019-12-20 2020-03-31 中铁隧道局集团有限公司 Cutter real-time monitoring system and normal-pressure cutter changing method
CN111472685A (en) * 2020-04-16 2020-07-31 四川省科建煤炭产业技术研究院有限公司 Intermittent dynamic condensation deep hole drilling method
CN114718047A (en) * 2022-05-19 2022-07-08 南京林业大学 Utilize on-spot carbonization processing system of dry ice reinforcement foundation soil
CN114718039A (en) * 2022-04-12 2022-07-08 宋恩泽 Drilling and liquid nitrogen freezing integrated dam reinforcing device and reinforcing method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0771183A (en) * 1993-09-03 1995-03-14 Minami Kogyo:Kk Frozen construction method
CN102720506A (en) * 2012-05-31 2012-10-10 中铁隧道股份有限公司 Method for replacing tail brush in shield tunnel through liquid nitrogen freezing
CN102912788A (en) * 2012-11-15 2013-02-06 陈绍文 Method for constructing emergency passages rapidly on soft soil foundations
CN104762955A (en) * 2015-03-24 2015-07-08 河南理工大学 Manually excavated pedestal pile construction method based on freezing process
WO2016098367A1 (en) * 2014-12-19 2016-06-23 ケミカルグラウト株式会社 Ground freezing construction method and ground freezing system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0771183A (en) * 1993-09-03 1995-03-14 Minami Kogyo:Kk Frozen construction method
CN102720506A (en) * 2012-05-31 2012-10-10 中铁隧道股份有限公司 Method for replacing tail brush in shield tunnel through liquid nitrogen freezing
CN102912788A (en) * 2012-11-15 2013-02-06 陈绍文 Method for constructing emergency passages rapidly on soft soil foundations
WO2016098367A1 (en) * 2014-12-19 2016-06-23 ケミカルグラウト株式会社 Ground freezing construction method and ground freezing system
CN104762955A (en) * 2015-03-24 2015-07-08 河南理工大学 Manually excavated pedestal pile construction method based on freezing process

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《北京工业大学学报》 *
《建井技术》 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108179740A (en) * 2017-12-29 2018-06-19 湖北工业大学 A kind of construction method across solution cavity bored concrete pile
CN109339075A (en) * 2018-11-16 2019-02-15 中国地质科学院探矿工艺研究所 Landslide emergency control technology management method
CN109339075B (en) * 2018-11-16 2021-06-11 中国地质科学院探矿工艺研究所 Landslide emergency control technology management method
CN110094207A (en) * 2019-05-23 2019-08-06 王海霖 A kind of artificial stratum freezing system and method for low temperature nitrogen circularly cooling
CN110094207B (en) * 2019-05-23 2020-07-17 王海霖 Artificial stratum freezing system and method for low-temperature nitrogen circulating refrigeration
CN110939453B (en) * 2019-12-20 2021-01-29 中铁隧道局集团有限公司 Cutter real-time monitoring system and normal-pressure cutter changing method
CN110939453A (en) * 2019-12-20 2020-03-31 中铁隧道局集团有限公司 Cutter real-time monitoring system and normal-pressure cutter changing method
CN111472685A (en) * 2020-04-16 2020-07-31 四川省科建煤炭产业技术研究院有限公司 Intermittent dynamic condensation deep hole drilling method
CN111472685B (en) * 2020-04-16 2021-10-01 四川省科建煤炭产业技术研究院有限公司 Intermittent dynamic condensation deep hole drilling method
CN114718039A (en) * 2022-04-12 2022-07-08 宋恩泽 Drilling and liquid nitrogen freezing integrated dam reinforcing device and reinforcing method
CN114718039B (en) * 2022-04-12 2023-09-26 宋恩泽 Drilling and liquid nitrogen freezing integrated dam reinforcement device and reinforcement method
CN114718047A (en) * 2022-05-19 2022-07-08 南京林业大学 Utilize on-spot carbonization processing system of dry ice reinforcement foundation soil
CN114718047B (en) * 2022-05-19 2023-03-31 南京林业大学 Utilize on-spot carbonization processing system of dry ice reinforcement foundation soil

Also Published As

Publication number Publication date
CN106592573B (en) 2018-07-06

Similar Documents

Publication Publication Date Title
CN106592573B (en) A kind of artificial stratum freezing method of no frigo liquid nitrogen
CN104061013B (en) One utilizes freezing process to improve the infiltrative method of low-permeability coal seam and device
US3759329A (en) Cryo-thermal process for fracturing rock formations
CN104653185B (en) One freezes the adjustable frigo of segment length and freezing method thereof
WO2021120701A1 (en) Coal seam permeability increasing method utilizing cyclic damage of liquid nitrogen cold impact and phase change gas
US12000626B2 (en) Geothermal development system and the construction method thereof
CN103225497B (en) Exploitation method for microwave in-situ vaporization of formation water and displacement of thick oil
CN109853518B (en) Solar jet type refrigerating device suitable for frozen soil area and frozen soil protection method
US11549222B2 (en) Vertical ground heat exchanger for reducing temperature in carbonaceous shale rock mass and preventing roadbed frost heave
US5370182A (en) Thermal extraction system and method
CN102587878B (en) Multi-element thermal fluid auxiliary gravitational displacement process
CN104847322A (en) Method for improving recovery efficiency for deep common thickened oil water drive-converting into-steam flooding
CN103898895A (en) Freezing device with coaxial liquid supply pipe and liquid return pipe
CN110847151A (en) Method for repairing tunnel underpass cavity by freezing method
CN111980649B (en) Horizontal well low-temperature fluid enhanced heat exchange fracturing method
CN104533326B (en) A kind of Cryogenic air foam drilling method
JP2003239270A (en) Freezing method and pipe material used for the same
CN207143915U (en) A kind of two-tube annular slip casting freezing pipe
CN101696572B (en) Freezer with gas guide structure
CN108086958A (en) Gas hydrates frost well cementation hydrogen-oxygen displacement harmonic extraction method
CN201574390U (en) Stratum liquid nitrogen freezer
CN205561323U (en) Draw device that utilizes geothermal energy
CN103343531B (en) Local difficult frozen ground intensified freezing construction method
CN110344801B (en) Fracturing operation method for combustible ice exploitation, exploitation method and exploitation system
CN114427428B (en) Method for improving recovery ratio of bottom water heavy oil reservoir by stabilizing water pressure and controlling water

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant