CN106585665A - High speed railway visualization integrated system - Google Patents

High speed railway visualization integrated system Download PDF

Info

Publication number
CN106585665A
CN106585665A CN201611268500.9A CN201611268500A CN106585665A CN 106585665 A CN106585665 A CN 106585665A CN 201611268500 A CN201611268500 A CN 201611268500A CN 106585665 A CN106585665 A CN 106585665A
Authority
CN
China
Prior art keywords
module
speed railway
data
integrated system
dimensional modeling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611268500.9A
Other languages
Chinese (zh)
Inventor
朱治民
李文泰
李新安
孟彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU MEILUN IMAGING SYSTEMS Co Ltd
Original Assignee
JIANGSU MEILUN IMAGING SYSTEMS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU MEILUN IMAGING SYSTEMS Co Ltd filed Critical JIANGSU MEILUN IMAGING SYSTEMS Co Ltd
Priority to CN201611268500.9A priority Critical patent/CN106585665A/en
Publication of CN106585665A publication Critical patent/CN106585665A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61KAUXILIARY EQUIPMENT SPECIALLY ADAPTED FOR RAILWAYS, NOT OTHERWISE PROVIDED FOR
    • B61K9/00Railway vehicle profile gauges; Detecting or indicating overheating of components; Apparatus on locomotives or cars to indicate bad track sections; General design of track recording vehicles
    • B61K9/08Measuring installations for surveying permanent way

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Processing Or Creating Images (AREA)

Abstract

The invention discloses a high speed railway visualization integrated system. According to the high speed railway visualization integrated system, the technical scheme comprises a datum collecting module, a datum processing module, a database module, a three-dimensional modeling module and a three-dimensional displaying module; the datum collecting module is used for collecting the stereoscopic environmental condition data along a high speed railway and sending the data to the datum processing module, after the data from the datum collecting module is received by the datum processing module, parameters capable of enabling the three-dimensional modeling module to identify are generated, and the parameters are sent to the three-dimensional modeling module; and after the parameters capable of being identified are received by the three-dimensional modeling module, a stereoscopic environmental image along the high speed railway is generated, and the database module is used for storing image data of the high speed railway, GIS data and three-dimensional molds and for adjustment and using of the three-dimensional modeling module. According to the scheme provided by the invention, the general view of the operating stereoscopic environment of a high-speed rail route can be accurately reflected, the real-time condition of the high-speed rail route can be monitored in real time, and operational safety of high-speed trains can be effectively guaranteed.

Description

A kind of high-speed railway visualizes integrated system
Technical field
The present invention relates to high-speed railway monitoring technical field, more particularly to a kind of high-speed railway visualization integrated system.
Background technology
As the fast development of China Express Railway, high ferro circuit are increasingly longer, depend merely on traditional manual patrol and can not Meet and require, although have high ferro rail real-time monitoring system, but the overall picture of high ferro circuit three-dimensional environment can not be reacted;Especially exist High and steep mountains, it is with a varied topography where, set up high-speed railway steric environment model and monitor in real time, high ferro operation safety is even more It is most important.
The content of the invention
In view of the shortcomings of the prior art, present invention is primarily targeted at offer one kind can be with the high iron wire of accurate response Steric environment overall picture, and the instant situation of monitor in real time high ferro circuit are run in road, can effectively ensure that high ferro train operation is pacified Full high-speed railway visualization integrated system.
For achieving the above object, the invention provides following technical scheme:A kind of high-speed railway visualizes integrated system, bag Include data acquisition module, data processing module, DBM, three-dimensional modeling module and Three-dimensional Display module, the data Acquisition module is used to gather the steric environment status data of line of high-speed railway and send data to data processing module, described Data processing module receives and the parameter for enabling to the identification of three-dimensional modeling module is generated after the data of data acquisition module, and Parameter is transmitted to three-dimensional modeling module, the three-dimensional modeling module to be received and generate line of high-speed railway after discernible parameter Steric environment image;The DBM is used to store image data, GIS data and the threedimensional model of high-speed railway and supply three Dimension MBM is called.
Preferably, the data acquisition module is lidar measurement device.
Preferably, the lidar measurement device includes GPS, laser range finder and inertial navigation set.
Preferably, the data processing module is connected with real-time monitoring module, and the real-time monitoring module receives rail inspection The signal that measurement equipment sends.
Preferably, the Three-dimensional Display module includes line fault unit, and the line fault unit can be three-dimensional aobvious Show circuit breaks down in module place and situation.
Preferably, the DBM includes image data unit, GIS data unit and model library unit.
Preferably, the Three-dimensional Display module includes multichannel ring curtain stereo projection apparatus.
The present invention has the advantage that the present invention can run three-dimensional ring with accurate response high ferro circuit relative to prior art Border overall picture, and the instant situation of monitor in real time high ferro circuit, can effectively ensure the safety of high ferro train operation.
Description of the drawings
Fig. 1 is the structured flowchart that a kind of high-speed railway of the present invention visualizes integrated system.
In figure:1st, data acquisition module;2nd, data processing module;3rd, three-dimensional modeling module;4th, Three-dimensional Display module;5th, it is real When monitoring modular;6th, line fault unit;7th, DBM;8th, image data unit;9th, GIS data unit;10th, model library Unit.
Specific embodiment
Below in conjunction with the accompanying drawings the invention will be further described.
As shown in figure 1, a kind of high-speed railway visualizes integrated system, including data acquisition module 1, data processing module 2, DBM 7, three-dimensional modeling module 3 and Three-dimensional Display module 4, the data acquisition module 1 is used to gather high-speed railway Steric environment status data along the line simultaneously sends data to data processing module 2, and the data processing module 2 is received from number The parameter of the identification of three-dimensional modeling module 3 is enabled to according to generating after the data of acquisition module 1, and parameter is transmitted to three-dimensional modeling Module 3, the three-dimensional modeling module 3 receives generation line of high-speed railway steric environment image after discernible parameter;It is described DBM 7 is used to store image data, GIS data and the threedimensional model of high-speed railway and call for three-dimensional modeling module 3.
The present invention can run steric environment overall picture, and the instant shape of monitor in real time high ferro circuit with accurate response high ferro circuit Condition, can effectively ensure the safety of high ferro train operation.
Preferably, the data acquisition module 1 is lidar measurement device.
Further, the lidar measurement device includes GPS, laser range finder and inertial navigation set.
Preferably, the data processing module 2 is connected with real-time monitoring module 5, and the real-time monitoring module 5 receives rail The signal that testing equipment sends.
Preferably, the Three-dimensional Display module 4 includes line fault unit 6, and the line fault unit 6 can be in three-dimensional Circuit breaks down in display module 4 place and situation.
Preferably, the DBM 7 includes image data unit 8, GIS data unit 9 and model library unit 10.
Preferably, the Three-dimensional Display module 4 includes multichannel ring curtain stereo projection apparatus.Multichannel ring curtain stereoprojection Device can in real time show that high-speed railway runs steric environment overall picture.
The above is only the preferred embodiment of the present invention, and protection scope of the present invention is not limited merely to above-mentioned enforcement Example, all technical schemes belonged under thinking of the present invention belong to protection scope of the present invention.It should be pointed out that for the art Those of ordinary skill for, some improvements and modifications without departing from the principles of the present invention, these improvements and modifications Should be regarded as protection scope of the present invention.

Claims (7)

1. a kind of high-speed railway visualizes integrated system, it is characterised in that including data acquisition module, data processing module, number According to library module, three-dimensional modeling module and Three-dimensional Display module, the data acquisition module is used to gather line of high-speed railway Steric environment status data simultaneously sends data to data processing module, and the data processing module is received from data acquisition module Generate after the data of block and enable to the parameter of three-dimensional modeling module identification, and parameter is transmitted to three-dimensional modeling module, it is described Three-dimensional modeling module receives generation line of high-speed railway steric environment image after discernible parameter;The DBM is used Call in the image data, GIS data and the threedimensional model that store high-speed railway and for three-dimensional modeling module.
2. a kind of high-speed railway according to claim 1 visualizes integrated system, it is characterised in that:The data acquisition module Block is lidar measurement device.
3. a kind of high-speed railway according to claim 2 visualizes integrated system, it is characterised in that:The laser radar is surveyed Amount device includes GPS, laser range finder and inertial navigation set.
4. a kind of high-speed railway according to any claim in claims 1 to 3 visualizes integrated system, and its feature exists In:The data processing module is connected with real-time monitoring module, and the real-time monitoring module receives what rail testing equipment sent Signal.
5. a kind of high-speed railway according to claim 4 visualizes integrated system, it is characterised in that:The Three-dimensional Display mould Block includes line fault unit, and the line fault unit being capable of circuit breaks down in Three-dimensional Display module place And situation.
6. a kind of high-speed railway according to claim 1 visualizes integrated system, it is characterised in that:The DBM Including image data unit, GIS data unit and model library unit.
7. a kind of high-speed railway according to claim 1 visualizes integrated system, it is characterised in that:The Three-dimensional Display mould Block includes multichannel ring curtain stereo projection apparatus.
CN201611268500.9A 2016-12-31 2016-12-31 High speed railway visualization integrated system Pending CN106585665A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611268500.9A CN106585665A (en) 2016-12-31 2016-12-31 High speed railway visualization integrated system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611268500.9A CN106585665A (en) 2016-12-31 2016-12-31 High speed railway visualization integrated system

Publications (1)

Publication Number Publication Date
CN106585665A true CN106585665A (en) 2017-04-26

Family

ID=58582150

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611268500.9A Pending CN106585665A (en) 2016-12-31 2016-12-31 High speed railway visualization integrated system

Country Status (1)

Country Link
CN (1) CN106585665A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109446286A (en) * 2018-09-28 2019-03-08 山东中创软件商用中间件股份有限公司 A kind of method for visualizing and device of freeway network figure
CN110187361A (en) * 2019-05-23 2019-08-30 中国科学技术大学 Laser radar atmospheric seeing system based on railway network

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012025406A1 (en) * 2010-08-27 2012-03-01 Siemens Aktiengesellschaft Device for graphically visualizing system states
WO2012119879A1 (en) * 2011-03-07 2012-09-13 Siemens Aktiengesellschaft Railway control system
CN103077282A (en) * 2013-01-15 2013-05-01 西南交通大学 Rapid modeling method for high-speed railway scene based on basic-element combination and multilevel semantic constraint
CN103481917A (en) * 2013-09-22 2014-01-01 江苏美伦影像系统有限公司 Visual modeling system of high-speed railway
CN105679169A (en) * 2015-12-31 2016-06-15 中国神华能源股份有限公司 Railway electronic sand table system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012025406A1 (en) * 2010-08-27 2012-03-01 Siemens Aktiengesellschaft Device for graphically visualizing system states
WO2012119879A1 (en) * 2011-03-07 2012-09-13 Siemens Aktiengesellschaft Railway control system
CN103077282A (en) * 2013-01-15 2013-05-01 西南交通大学 Rapid modeling method for high-speed railway scene based on basic-element combination and multilevel semantic constraint
CN103481917A (en) * 2013-09-22 2014-01-01 江苏美伦影像系统有限公司 Visual modeling system of high-speed railway
CN105679169A (en) * 2015-12-31 2016-06-15 中国神华能源股份有限公司 Railway electronic sand table system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109446286A (en) * 2018-09-28 2019-03-08 山东中创软件商用中间件股份有限公司 A kind of method for visualizing and device of freeway network figure
CN109446286B (en) * 2018-09-28 2022-01-04 山东中创软件商用中间件股份有限公司 Visualization method and device for highway road network map
CN110187361A (en) * 2019-05-23 2019-08-30 中国科学技术大学 Laser radar atmospheric seeing system based on railway network

Similar Documents

Publication Publication Date Title
CN110996048B (en) Remote visualization system and method for coal roadway heading machine
CN205445677U (en) Tunnel safety precaution and automatic control system of measurationing
CN106408861B (en) A kind of station monitoring early-warning system
CN104794331B (en) Deep basal pit health monitoring management system and its management method
CN103587555A (en) Train running seamless monitoring system based on satellite differential positioning and UWB positioning
CN102795248A (en) System for dynamically tracking and monitoring train running based on precise satellite positioning
CN111611855A (en) Three-dimensional visual robot intelligence system of patrolling and examining of transformer substation
CN110133669B (en) Three-dimensional laser foreign matter intrusion monitoring method and system
CN202631007U (en) Dynamic monitoring and analyzing system of high-speed railway contact network based on plurality of platforms
CN105115605A (en) Track train infrared detection system and detection method
CN202728266U (en) Train driving dynamic tracking and monitoring system based on satellite accurate positioning
CN105313908A (en) Scanning device for facilities beside railway track
CN108182738A (en) A kind of Urban Underground pipe gallery method for inspecting based on WI-FI positioning
CN106585665A (en) High speed railway visualization integrated system
CN108663669A (en) Airborne laser radar system for being applied in power-line patrolling
CN104484836A (en) Grid fault decision-making assisting visualization system and method
CN202710132U (en) Liquid level detecting device and shield tunneling machine
CN109387218A (en) Mobile unit and road upkeep aided management system
CN205049450U (en) Dust monitored control system suitable for mill workshop
CN104627159A (en) Urban rail vehicle brake monitoring system and method
CN201816610U (en) Real-time track data acquiring and processing device
CN107067751A (en) Road construction area, which slows down, to test the speed integrated safe control and information feedback system
Tagiew et al. Osdar23: Open sensor data for rail 2023
CN103678559A (en) Method and device for displaying monitoring data
CN105387818A (en) Large-scale three-dimensional shape measurement method based on one-dimensional image sequence

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170426

WD01 Invention patent application deemed withdrawn after publication