CN106567407B - A kind of Water Environment In Lakes repair base station and its construction method - Google Patents

A kind of Water Environment In Lakes repair base station and its construction method Download PDF

Info

Publication number
CN106567407B
CN106567407B CN201610941995.0A CN201610941995A CN106567407B CN 106567407 B CN106567407 B CN 106567407B CN 201610941995 A CN201610941995 A CN 201610941995A CN 106567407 B CN106567407 B CN 106567407B
Authority
CN
China
Prior art keywords
bed mud
steel jacket
concrete
water
section steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610941995.0A
Other languages
Chinese (zh)
Other versions
CN106567407A (en
Inventor
刘学应
陈晓汀
方华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University of Water Resources and Electric Power
Original Assignee
Zhejiang University of Water Resources and Electric Power
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University of Water Resources and Electric Power filed Critical Zhejiang University of Water Resources and Electric Power
Priority to CN201610941995.0A priority Critical patent/CN106567407B/en
Publication of CN106567407A publication Critical patent/CN106567407A/en
Application granted granted Critical
Publication of CN106567407B publication Critical patent/CN106567407B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/06Constructions, or methods of constructing, in water
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/52Treatment of water, waste water, or sewage by flocculation or precipitation of suspended impurities
    • C02F1/5281Installations for water purification using chemical agents
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/32Biological treatment of water, waste water, or sewage characterised by the animals or plants used, e.g. algae
    • C02F3/327Biological treatment of water, waste water, or sewage characterised by the animals or plants used, e.g. algae characterised by animals and plants
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/88Dredgers; Soil-shifting machines mechanically-driven with arrangements acting by a sucking or forcing effect, e.g. suction dredgers
    • E02F3/8808Stationary installations, e.g. installations using spuds or other stationary supports
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/88Dredgers; Soil-shifting machines mechanically-driven with arrangements acting by a sucking or forcing effect, e.g. suction dredgers
    • E02F3/90Component parts, e.g. arrangement or adaptation of pumps
    • E02F3/92Digging elements, e.g. suction heads
    • E02F3/9243Passive suction heads with no mechanical cutting means
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/28Dredgers or soil-shifting machines for special purposes for cleaning watercourses or other ways
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2103/00Nature of the water, waste water, sewage or sludge to be treated
    • C02F2103/007Contaminated open waterways, rivers, lakes or ponds
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2301/00General aspects of water treatment
    • C02F2301/04Flow arrangements

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Organic Chemistry (AREA)
  • Water Supply & Treatment (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Paleontology (AREA)
  • Biotechnology (AREA)
  • Botany (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Microbiology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Treatment Of Sludge (AREA)

Abstract

The invention discloses a kind of Water Environment In Lakes to repair base station and its construction method, and base station includes substrate, base body and Ji Ding, lower layer, middle layer and upper layer has been poured in base body, lower layer and bed mud storehouse are interconnected;Free-wheeling system is installed in lower layer, telescopic arm is installed on the outside of free-wheeling system, sludge handling mechanism is mounted on telescopic arm, water inlet pipe is installed in middle layer, suction pump is installed in upper layer, suction pump connects water inlet pipe;The upper end of Ji Ding is equipped with Nozzle At The Ingot Mold group, and Nozzle At The Ingot Mold group connects suction pump.Its construction technology is the following steps are included: (1) first section steel jacket box installation;(2) bottom concrete pours;(3) base concrete pours;The installation of (4) second section steel jacket boxes;(5) base body concreting;(6) base top concreting;(7) it installs.Repairing base station has the function of following three kinds: 1, Sediment Dredging;2, water body self-loopa in lake;3, physics renovation agent is launched, the impurity in lake can be agglomerated.

Description

A kind of Water Environment In Lakes repair base station and its construction method
Technical field
The present invention relates to Water Environment In Lakes improvement, repair base station and its construction party more particularly, to a kind of Water Environment In Lakes Method.
Background technique
With the aggravation of global warming and mankind's activity, the unreasonable development of lake and reservoir and its water resource, China lake is set to be faced with severe environmental problem.Such as western lake shrinking, salinization, in addition it is dry;East lake is enclosed tideland for cultivation and net Culture in enclosure is grown seriously, pollution aggravation, and generally existing eutrophication causes water quality deterioration, and aquatic ecosystem is degenerated;Northern China and Western part is limited and the fast development of economy and society by natural environment, water resource critical shortage;And water resource is relatively abundanter South but cause water quality water shortage because of the artificial pollution of water environment, seriously restrict the mankind existence and region economy with Social development, it is necessary to cause the great attention of society and take effective measures, reinforce the protection and improvement of lake environment, maintain Man and nature's and harmonious region sustainable development.
Currently, common manual method repairs Water Environment In Lakes, including build ecological slope protection, abundant aquatic animals and plants, filtering Impurities in water (removal pollutant) etc., the manual method is time-consuming and laborious, needs a large amount of human cost, and repairing efficiency is long.
Summary of the invention
The purpose of the present invention is to provide a kind of Water Environment In Lakes to repair base station and its construction method, in the prior art Defect, design a kind of reparation base station, which has the function of following three kinds: 1, Sediment Dredging;2, in lake water body from Circulation;3, physics renovation agent is launched, the impurity in lake can be agglomerated.The reparation base station can remotely control, compared to more existing Technology is time saving and energy saving;And the reparation base station can come into operation whenever and wherever possible, and it is very convenient, for a long time, efficiently it can remain good Good Water Environment In Lakes.
In order to solve the above-mentioned technical problem, it adopts the following technical scheme that
A kind of Water Environment In Lakes reparation base station, including substrate, base body and Ji Ding, substrate upper end pour base body, hold with base Pour Ji Ding, it is characterised in that: poured bed mud storehouse in substrate, lower layer, middle layer and upper layer, lower layer and bed mud have been poured in base body Storehouse is interconnected;Free-wheeling system is installed in lower layer, telescopic arm is installed on the outside of free-wheeling system, is mounted on bottom on telescopic arm Mud processing mechanism, sludge handling mechanism include that device, the lower end connection of hydraulic cylinder are disturbed in hydraulic cylinder, bed mud absorber and bed mud punching Device is disturbed in bed mud punching, and bed mud punching, which is disturbed, is equipped with bed mud absorber on device, device is disturbed in bed mud punching and bed mud absorber cooperates, and bed mud is inhaled It receives and is connected with bed mud pipe on device, bed mud pipe is connected in lower layer, is equipped with slush pump on bed mud pipe;It is equipped in middle layer into water It manages, suction pump is installed in upper layer, suction pump connects water inlet pipe;The upper end of Ji Ding is equipped with Nozzle At The Ingot Mold group, the connection of Nozzle At The Ingot Mold group Suction pump.
Further, free-wheeling system includes motor, driving assembly and turntable, and driving assembly includes driving wheel, belt, driven Wheel, shaft, area's shoulder, connecting plate, reciprocating gear and reciprocating gear axis, motor connect driving wheel, are connected with belt, skin on driving wheel The other end of band connects driven wheel, and driven wheel connects shaft, shaft bonding pad shoulder, and area's shoulder connects connecting plate, and connecting plate connects past Gear compound, reciprocating gear connect reciprocating gear axis.
Further, telescopic arm includes sleeve, the first telescopic joint, the second telescopic joint and third telescopic joint, and one end of sleeve connects Switch through disk, the other end of sleeve connects the first telescopic joint, and the first telescopic joint connects the second telescopic joint, and the second telescopic joint connects third Telescopic joint, bolt connection piece is connected on third telescopic joint, and bolt connection piece connects hydraulic cylinder.First telescopic joint, second stretch Casing coupling and third telescopic joint are scalable, expand the sphere of action of telescopic arm by Telescopic, promote the effect of Sediment Dredging, Structure is simple, easy to operate.
Further, it includes that head is disturbed in driving motor, retarder and punching that device is disturbed in bed mud punching, and driving motor connects retarder, slows down Head is disturbed in device connection punching.Punching is driven to disturb head rotation after driving motor starting, punching, which is disturbed, to be realized in the present rotary course of head and rush to bed mud Disturb so that bed mud faster, more efficient absorbed by bed mud absorber.Retarder for adjust punching disturbs a revolving speed, avoid because For revolving speed is too fast and shortens its service life.
Further, bed mud absorber includes the first absorption mouth, the second absorption mouth and sucker, and first, which absorbs mouth and second, absorbs Mouth is respectively arranged on the two sides of bed mud absorber, and sucker connects bed mud pipe.First absorption mouth and the second absorption mouth are divided into punching and disturb head Both ends, bed mud rushed disturb primary drying disturb dispersion after is absorbed rapidly mouth absorption, be obviously improved the working efficiency of Sediment Dredging.
Further, Nozzle At The Ingot Mold group includes drinking-water pipe, busbar connector and spray head, and one end of drinking-water pipe connects suction pump, drinking-water pipe The other end connect busbar connector, spray head is uniformly installed on busbar connector, cast feeder is installed above busbar connector, cast feeder and is converged It is connected with solenoid valve between stream row, by solenoid valve control cast feeder.Nozzle At The Ingot Mold group can spray water to lake, to promote lake Interior water body self-loopa, further the improvement water ecological setting.
A kind of Water Environment In Lakes repair the construction method of base station, it is characterised in that include the following steps:
(1) first section steel jacket box installation: a, first section steel jacket box platform for lining are set up;B, first section steel jacket box piecemeal lifting;C, root According to the assembled first section steel jacket box of design requirement;D, head section steel jacket box is hung by platform for lining using fixed gin pole crane barge, and transferred extremely The design position of underwater base station, and be adjusted and fix;
(2) bottom concrete pours: being constructed using underwater concreting method, one-time-concreting molding is hoisted by lower It pours, control bottom concrete pours with a thickness of 1m;
(3) base concrete pours: it is constructed using underwater concreting method, one-time-concreting molding;Assembling reinforcement first, Supporting is established, is then hoisted and is poured by lower, the bed mud storehouse of 1.2-2m high is reserved in casting process, controls the high 3- of substrate 4.2m;First section steel jacket box is removed after curing concrete;
(4) second section steel jacket boxes installation: according to the assembled second section steel jacket box of the installation process of step (1), by the second section steel Casing is transferred to substrate location, it is adjusted and is fixed according to design drawing;
(5) base body concreting: base body is poured using underwater concreting method according to construction requirement, in casting process Middle pre-installation free-wheeling system, telescopic arm, water inlet pipe, suction pump and drinking-water pipe;The second section steel bushing is removed after the completion of concrete curing Case;
(6) according to construction requirement, template support, assembling reinforcement base top concreting: are set up in the construction location of Ji Ding; Then casting concrete reserves drinking-water pipe installation site, and drinking-water pipe is made to pass through Ji Ding, curing concrete after the completion of pouring;
(7) it installs: taking busbar connector to be mounted on the upper end Ji Ding, and connect drinking-water pipe;Cast feeder is taken to be mounted on busbar connector upper end.
After it is preferred that, the assembled process of first section steel jacket box in step (1) c specifically: first by each portion of first section steel jacket box Position is sequentially placed, and after supervision surveying is checked and accepted, forms first section steel jacket box using hanging basket and manual welding assembly on platform for lining.
After it is preferred that, the process of base body concreting in step (5) specifically: underwater coagulation a, is used according to construction requirement Native casting method pours the lower half portion concrete of lower layer, and the steel jacket box of the part is removed after the completion of concrete curing;B, by rotation Mechanism, telescopic arm, bed mud pipe and slush pump are pre-mounted to the lower half portion of lower layer;It is poured according to construction requirement using underwater concrete The method of building pours the top half concrete of lower layer, and the steel jacket box of the part is removed after the completion of concrete curing;C, water inlet pipe is pre- In installation to middle layer, middle layer concrete is then poured using underwater concreting method according to construction requirement, concrete curing is complete At the rear steel jacket box for removing the part;D, suction pump and drinking-water pipe are pre-mounted in upper layer, and suction pump is connected into water inlet pipe And drinking-water pipe, upper layer concrete is then poured using underwater concreting method according to construction requirement, after the completion of concrete curing Remove the steel jacket box of the part.
As a result of the above technical solution, the following beneficial effects are obtained:
The present invention is that a kind of Water Environment In Lakes repair base station and its construction method, for the defects in the prior art, design A kind of reparation base station, the reparation base station have the function of following three kinds: 1, Sediment Dredging;2, water body self-loopa in lake;3, it launches Peripheral doses agent can agglomerate the impurity in lake.The reparation base station can remotely control, the time saving province of the prior art that compares Power;And the reparation base station can come into operation whenever and wherever possible, and it is very convenient, it can for a long time, efficiently maintain good Lake Water Environment.Its specific beneficial effect shows as the following:
1, bed mud storehouse centralized collection bed mud, convenient for processing.
2, free-wheeling system, telescopic arm and sludge handling mechanism cooperate with each other, and free-wheeling system drives turntable by motor Rotation, and then telescopic arm rotation is driven, then the telescopic arm by rotating drives the rotation of sludge handling mechanism, bed mud punching in rotary course It disturbs device and constantly rushes and disturb bed mud, the bed mud after punching is disturbed disperses simultaneously to be absorbed by bed mud absorber, realizes the Sediment Dredging in circumferential direction, indirectly Remove water body in lake in heavy metal, nutrient and hardly degraded organic substance, to greatest extent reduce pollutant concentration, greatly The ecological environment of amplitude improvement slope protection water body.
3, telescopic arm has the characteristics that telescopic, changes the sphere of action of sludge handling mechanism in the horizontal direction, thus It is significantly expanded the process range of Sediment Dredging, promotes the effect of Sediment Dredging.
4, water inlet pipe, suction pump and Nozzle At The Ingot Mold group cooperate with each other, and under the action of suction pump, it is attached that water inlet pipe sucks its Close water body, and each position in lake is sprayed to by Nozzle At The Ingot Mold group, realize the self-loopa of water body in lake.In the work of self-loopa Under, the dissolved oxygen in water body rises, and is more advantageous to the growth of aquatic animals and plants, and then strengthen the self-regeneration energy of water body in lake Power.
5, include aluminium salt, molysite etc. filled with peripheral doses agent in cast feeder, be launched by Nozzle At The Ingot Mold group to lake In;The nutrient that peripheral doses agent can adsorb in water is condensed in water-bed bed mud, removes impurities in water, effect with physical method Fruit is significant.
Detailed description of the invention
The present invention will be further explained below with reference to the attached drawings:
Fig. 1 is the structural schematic diagram that a kind of Water Environment In Lakes of the present invention repair base station;
Fig. 2 is the connection schematic diagram of motor and driving assembly in the present invention;
Fig. 3 is the structural schematic diagram of telescopic arm in the present invention;
Fig. 4 is the structural schematic diagram of substrate in the present invention;
Fig. 5 is the connection schematic diagram of busbar connector and spray head in the present invention;
Fig. 6 is the structural schematic diagram of bed mud absorber in the present invention;
Fig. 7 is the structural schematic diagram that device is disturbed in bed mud punching in the present invention.
Specific embodiment
It include two aspects in the present invention, wherein on the one hand mainly describing a kind of Water Environment In Lakes reparation base station, including substrate 1, base body 2 and base top 3, substrate 1, base body 2 and base top 3 from bottom to top successively pour;Bed mud storehouse 31, bed mud have been poured in substrate 1 Storehouse 31 is 1.2-2m high, and bed mud storehouse 31 can facilitate centralized processing bed mud with centralized collection bed mud, time saving and energy saving.
1 upper end of substrate pours base body 2, and lower layer 4, middle layer 11 and upper layer 13 have been poured in base body 2;Lower layer 4 and bed mud storehouse 31 It is interconnected, free-wheeling system is installed, free-wheeling system is pre-installed in lower layer 4 in casting process in lower layer 4;Free-wheeling system packet Include motor 18, driving assembly and turntable 5, driving assembly include driving wheel 19, belt 20, driven wheel 21, shaft 22, area's shoulder 23, Connecting plate 24, reciprocating gear 25 and reciprocating gear axis 26, motor 18 connect driving wheel 19, are connected with belt 20 on driving wheel 19, The other end of belt 20 connects driven wheel 21, and driven wheel 21 connects shaft 22,22 bonding pad shoulder 23 of shaft, the connection connection of area's shoulder 23 Plate 24, connecting plate 24 connect reciprocating gear 25, and reciprocating gear 25 connects reciprocating gear axis 26.After motor 18 starts, pass through actively Wheel 19, belt 20 and driven wheel 21 drive shaft 22 to rotate, shaft 22 driven after rotating connecting plate 24, area's shoulder 23, connecting plate 24, Reciprocating gear 25 and reciprocating gear axis 26 rotate, and then turntable 5 is driven to rotate.
The outside of turntable 5 is equipped with telescopic arm 6, and every 90 ° of installations, one telescopic arm 6, telescopic arm 6 is by sleeve 40, first Telescopic joint 27, the second telescopic joint 28 and third telescopic joint 29 form, and one end of sleeve 40 connects turntable 5, the other end of sleeve 40 The first telescopic joint 27 is connected, the first telescopic joint 27 connects the second telescopic joint 28, and the second telescopic joint 28 connects third telescopic joint 29, the Bolt connection piece 30 is connected on three telescopic joints 29.First telescopic joint 27, the second telescopic joint 28 and third telescopic joint 29 can be stretched Contracting expands the sphere of action of telescopic arm 6 by Telescopic, and the length range of telescopic arm 6 is 2-9.5m, and contraction is most grown in short-term 2m expands into longest duration 9.5m.
Sludge handling mechanism is installed on the bolt connection piece 30 of telescopic arm 6, sludge handling mechanism include hydraulic cylinder 7, Device 36 is disturbed in bed mud absorber 8 and bed mud punching, and hydraulic cylinder 7 connects bolt connection piece 30;Hydraulic cylinder 7 is connected by its piston rod Device 36 is disturbed in bed mud punching, and bed mud punching, which is disturbed, is equipped with bed mud absorber 8 on device 36, device 36 and 8 phase interworking of bed mud absorber are disturbed in bed mud punching It closes;Hydraulic cylinder 7 is able to drive bed mud punching and disturbs device 36 and the up and down motion of bed mud absorber 8 when working, to cope with different depth Sediment Dredging, be connected with bed mud pipe 9 on bed mud absorber 8, bed mud pipe 9 is connected in lower layer 4;It includes driving that device 36 is disturbed in bed mud punching Dynamic motor 37, retarder 38 and punching disturb first 39, and driving motor 37 connects retarder 38, and the connection punching of retarder 38 disturbs first 39.Driving Punching is driven to disturb first 39 rotation after the starting of motor 37, punching is disturbed realization in first 39 present rotary courses and is disturbed to rushing for bed mud, so that Bed mud faster, more efficient absorbed by bed mud absorber 8.Retarder 38 disturbs first 39 revolving speed for adjusting punching, avoids because of revolving speed It is too fast and shorten its service life.Bed mud absorber 8 includes that the first absorption mouth 33, second absorbs mouth 34 and sucker 35, and first inhales Closing in 33 and the second absorption mouth 34 are respectively arranged on the two sides of bed mud absorber 8, and sucker 35 connects bed mud pipe 9.First absorbs mouth 33 The both ends that punching disturbs first 39 are divided into the second absorption mouth 34, bed mud, which is rushed to disturb after dispersion is disturbed in first 39 punching, is absorbed rapidly mouth absorption, It is discharged into bed mud storehouse 31 under the action of sucker 35 and slush pump 10 by bed mud pipe 9, is obviously improved the work effect of Sediment Dredging Rate.
Free-wheeling system, telescopic arm 6 and sludge handling mechanism cooperate with each other, and free-wheeling system drives turntable by motor 18 5 rotations, and then drive telescopic arm 6 to rotate, then the telescopic arm 6 by rotating drives the rotation of sludge handling mechanism, rotary course indsole Mud punching disturbs the constantly punching of device 36 and disturbs bed mud, and the bed mud after punching is disturbed disperses and absorbed by bed mud absorber 8, realizes that the bed mud in circumferential direction is dredged It dredges, indirectly removes heavy metal, nutrient and the hardly degraded organic substance in water body in lake, reduce pollutant to greatest extent Concentration significantly improves the ecological environment of slope protection water body.Telescopic arm 6 has the characteristics that telescopic, changes bottom in the horizontal direction The sphere of action of mud processing mechanism promotes the effect of Sediment Dredging to be significantly expanded the process range of Sediment Dredging.
Water inlet pipe 12 is installed, the two sides of water inlet pipe 12 are contacted with water body in lake in middle layer 11;It is equipped in upper layer 13 The lower end of suction pump 14, suction pump 14 connects water inlet pipe 12.After suction pump 14 starts, Lake Water is evacuated in water inlet pipe 12;Base The upper end on top 3 is equipped with Nozzle At The Ingot Mold group, and Nozzle At The Ingot Mold group includes drinking-water pipe 15, busbar connector 16 and spray head 32, one end of drinking-water pipe 15 Suction pump 14 is connected, the other end of drinking-water pipe 15 connects busbar connector 16, is uniformly equipped with spray head 32 on busbar connector 16.Water inlet pipe 12, suction pump 14 and 32 mould group of spray head cooperate with each other, and under the action of suction pump 14, water inlet pipe 12 sucks the water near it Body, and each position in lake is sprayed to by 32 mould group of spray head, realize the self-loopa of water body in lake.In the effect of self-loopa Under, the dissolved oxygen in water body rises, and is more advantageous to the growth of aquatic animals and plants, and then strengthen the self-regeneration energy of water body in lake Power.
The top of busbar connector 16 is equipped with cast feeder 17, and solenoid valve 41 is connected between cast feeder 17 and busbar connector 16, is borrowed Solenoid valve 41 is helped to control cast feeder 17.It includes aluminium salt, molysite etc. that peripheral doses agent is filled in cast feeder 17, passes through spray head 32 Mould group is launched into lake;The nutrient that peripheral doses agent can adsorb in water is condensed in water-bed bed mud, with physics side Method removes impurities in water, significant effect.
Another aspect of the present invention describes a kind of construction method of Water Environment In Lakes reparation base station, it is characterised in that including such as Lower step:
(1) first section steel jacket box installation:
A, first section steel jacket box platform for lining is set up;
B, first section steel jacket box piecemeal lifting;
C, according to the assembled first section steel jacket box of design requirement: being first sequentially placed each position of steel jacket box, surveyed through management After amount is checked and accepted, steel jacket box is formed using hanging basket and manual welding assembly on platform for lining.
D, head section steel jacket box is hung by platform for lining using fixed gin pole crane barge, and transferred to the design position of underwater base station It sets, and is adjusted and fixes;
(2) bottom concrete pours:
It is constructed using underwater concreting method, one-time-concreting molding is hoisted by lower and poured, controls bottom concrete It pours with a thickness of 1m, control flatness error is 25mm, concrete strength C20.Arrange 4 conduits, conduit altogether in caisson Position is respectively in totally 11 positions such as four angles of caisson and center.It is wanted to make bottom concrete pouring quality meet design It asks, we especially take following measure:
A, caisson bottom concrete uses C20, and the slump is 18-22cm when concrete is sent to scene.
B, in order to extend the setting time of concrete, add suitable retarder.
C, it is added in concrete and effectively prevent concrete additive soluble in water.
(3) 1 concreting of substrate:
It is constructed using underwater concreting method, one-time-concreting molding;Assembling reinforcement first establishes supporting, then by low Place, which hoists, to be poured, and the bed mud storehouse 31 of 1.2-2m high is reserved in casting process, and control substrate 1 is 3-4.2m high;After curing concrete Remove first section steel jacket box;
The installation of (4) second section steel jacket boxes:
A, the second section steel jacket box platform for lining is set up;
B, the second section steel jacket box piecemeal lifts;
C, according to the assembled second section steel jacket box of design requirement: each position of the second section steel jacket box is sequentially placed first, After supervision surveying is checked and accepted, the second section steel jacket box is formed using hanging basket and manual welding assembly on platform for lining.
D, the second section steel jacket box is hung by platform for lining using fixed gin pole crane barge, and transferred to 1 position of substrate, gone forward side by side Row is adjusted and is fixed;
(5) 2 concreting of base body:
A, the lower half portion concrete of lower layer 4 is poured using underwater concreting method according to construction requirement, concrete is supported The steel jacket box of the part is removed after the completion of shield;
B, free-wheeling system, telescopic arm 6, bed mud pipe 9 and slush pump 10 are pre-mounted to the lower half portion of lower layer 4;According to applying Work requires the top half concrete that lower layer 4 is poured using underwater concreting method, and the portion is removed after the completion of concrete curing The steel jacket box divided;
C, water inlet pipe 12 is pre-mounted in middle layer 11, is then poured according to construction requirement using underwater concreting method 11 concrete of middle layer removes the steel jacket box of the part after the completion of concrete curing;
D, suction pump 14 and drinking-water pipe 15 are pre-mounted in upper layer 13, and suction pump 14 is connected into water inlet pipe 12 and is drawn water Then pipe 15 pours 13 concrete of upper layer using underwater concreting method according to construction requirement, tears open after the completion of concrete curing Except the steel jacket box of the part.
(6) 3 concreting of base top:
According to construction requirement, the construction location on base top 3 sets up template support, assembling reinforcement;Then casting concrete, in advance 15 installation site of drinking-water pipe is stayed, drinking-water pipe 15 is made to pass through base top 3, curing concrete after the completion of pouring;
(7) it installs:
It takes busbar connector 16 to be mounted on 3 upper end of base top, and connects drinking-water pipe 15;Cast feeder 17 is taken to be mounted on busbar connector 16 End.
The above is only specific embodiments of the present invention, but technical characteristic of the invention is not limited thereto.It is any with this hair Based on bright, to solve essentially identical technical problem, essentially identical technical effect is realized, made ground simple change, etc. With replacement or modification etc., all it is covered by among protection scope of the present invention.

Claims (8)

1. a kind of Water Environment In Lakes repair base station, including substrate, base body and Ji Ding, the substrate upper end pour the base body, institute It states to hold with base and pours the Ji Ding, it is characterised in that: poured bed mud storehouse in the substrate, poured down in the base body Layer, middle layer and upper layer, the lower layer and the bed mud storehouse are interconnected;Free-wheeling system, the rotation are installed in the lower layer Mechanism includes motor, driving assembly and turntable, and the driving component includes driving wheel, belt, driven wheel, shaft, area's shoulder, connection Plate, reciprocating gear and reciprocating gear axis, the motor connect the driving wheel, are connected with belt, the skin on the driving wheel The other end of band connects the driven wheel, and the driven wheel connects the shaft, and the shaft connects area's shoulder, area's shoulder The connecting plate is connected, the connecting plate connects the reciprocating gear, and the reciprocating gear connects the reciprocating gear axis, described Telescopic arm is installed on the outside of free-wheeling system, sludge handling mechanism, the sludge handling mechanism are mounted on the telescopic arm Device is disturbed including the punching of hydraulic cylinder, bed mud absorber and bed mud, the lower end of the hydraulic cylinder connects the bed mud punching and disturbs device, described Bed mud punching, which is disturbed, is equipped with the bed mud absorber on device, device is disturbed in the bed mud punching and the bed mud absorber cooperates, described Bed mud pipe is connected on bed mud absorber, the bed mud pipe is connected in the lower layer, is equipped with slush pump on the bed mud pipe; Water inlet pipe is installed in the middle layer, suction pump is installed in the upper layer, the suction pump connects the water inlet pipe;The base The upper end on top is equipped with Nozzle At The Ingot Mold group, and the Nozzle At The Ingot Mold group connects the suction pump.
2. a kind of Water Environment In Lakes repair base station according to claim 1, it is characterised in that: the telescopic arm includes sleeve, first Telescopic joint, the second telescopic joint and third telescopic joint, one end of the sleeve connect the turntable, the other end connection of the sleeve First telescopic joint, first telescopic joint connect second telescopic joint, and second telescopic joint connects the third and stretches Casing coupling, bolt connection piece is connected on the third telescopic joint, and the bolt connection piece connects the hydraulic cylinder.
3. repairing base station according to a kind of Water Environment In Lakes of claim 2, it is characterised in that: it includes driving electricity that device is disturbed in the bed mud punching Head is disturbed in machine, retarder and punching, and the driving motor connects the retarder, and head is disturbed in the retarder connection punching.
4. a kind of Water Environment In Lakes repair base station according to claim 1, it is characterised in that: the bed mud absorber includes the first suction It closes up, the second absorption mouth and sucker, the first absorption mouth and the second absorption mouth are respectively arranged on the bed mud absorber Two sides, the sucker connect the bed mud pipe.
5. a kind of Water Environment In Lakes repair base station according to claim 1, it is characterised in that: the Nozzle At The Ingot Mold group include drinking-water pipe, Busbar connector and spray head, one end of the drinking-water pipe connect the suction pump, and the other end of the drinking-water pipe connects the busbar connector, Spray head is uniformly installed on the busbar connector, cast feeder, the cast feeder and the confluence are installed above the busbar connector Solenoid valve is connected between row, by cast feeder described in solenoid valve control.
6. the construction method that a kind of Water Environment In Lakes as described in claim 1 repair base station, it is characterised in that including walking as follows It is rapid:
(1) first section steel jacket box installation: a, first section steel jacket box platform for lining are set up;B, first section steel jacket box piecemeal lifting;C, basis is set Meter requires assembled first section steel jacket box;D, head section steel jacket box is hung by platform for lining using fixed gin pole crane barge, and transferred to underwater The design position of base station, and be adjusted and fix;
(2) bottom concrete pours: it is constructed using underwater concreting method, one-time-concreting molding is hoisted by lower and is poured, Control bottom concrete pours with a thickness of 1m;
(3) base concrete pours: it is constructed using underwater concreting method, one-time-concreting molding;Assembling reinforcement first, Supporting is established, is then hoisted and is poured by lower, the bed mud storehouse of 1.2-2m high is reserved in casting process, controls the high 3- of the substrate 4.2m;First section steel jacket box is removed after curing concrete;
(4) second section steel jacket boxes installation: according to the assembled second section steel jacket box of the installation process of step (1), by the second section steel jacket box In decentralization to the substrate location, it is adjusted and is fixed according to design drawing;
(5) the base body concreting: the base body is poured using underwater concreting method according to construction requirement, is being poured The free-wheeling system, the telescopic arm, the water inlet pipe, the suction pump and the drinking-water pipe are pre-installed in the process;Concrete The second section steel jacket box is removed after the completion of maintenance;
(6) base top concreting: according to construction requirement, setting up template support in the construction location of the Ji Ding, binding Reinforcing bar;Then casting concrete reserves the drinking-water pipe installation site, so that the drinking-water pipe is passed through the Ji Ding, pours completion Curing concrete afterwards;
(7) it installs: taking busbar connector to be mounted on the upper end Ji Ding, and connect the drinking-water pipe;Cast feeder is taken to be mounted on busbar connector Upper end.
7. a kind of Water Environment In Lakes repair the construction method of base station according to claim 6, it is characterised in that: the step (1) the first assembled process for saving steel jacket box in c specifically: each position of first section steel jacket box is sequentially placed first, is surveyed through management After amount is checked and accepted, first section steel jacket box is formed using hanging basket and manual welding assembly on platform for lining.
8. a kind of Water Environment In Lakes repair the construction method of base station according to claim 6, it is characterised in that: the step (5) process of the concreting of base body described in specifically: institute a, is poured using underwater concreting method according to construction requirement The lower half portion concrete of lower layer is stated, the steel jacket box of the part is removed after the completion of concrete curing;B, by the free-wheeling system, institute State the lower half portion that telescopic arm, the bed mud pipe and the slush pump are pre-mounted to the lower layer;Water is used according to construction requirement Lower concrete casting method pours the top half concrete of the lower layer, and the steel bushing of the part is removed after the completion of concrete curing Case;C, the water inlet pipe is pre-mounted in the middle layer, is then poured according to construction requirement using underwater concreting method The middle layer concrete removes the steel jacket box of the part after the completion of concrete curing;D, by the suction pump and the drinking-water pipe It is pre-mounted in the upper layer, and the suction pump is connected into the water inlet pipe and the drinking-water pipe, then according to construction requirement The upper layer concrete is poured using underwater concreting method, the steel jacket box of the part is removed after the completion of concrete curing.
CN201610941995.0A 2016-11-01 2016-11-01 A kind of Water Environment In Lakes repair base station and its construction method Active CN106567407B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610941995.0A CN106567407B (en) 2016-11-01 2016-11-01 A kind of Water Environment In Lakes repair base station and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610941995.0A CN106567407B (en) 2016-11-01 2016-11-01 A kind of Water Environment In Lakes repair base station and its construction method

Publications (2)

Publication Number Publication Date
CN106567407A CN106567407A (en) 2017-04-19
CN106567407B true CN106567407B (en) 2019-08-06

Family

ID=58536458

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610941995.0A Active CN106567407B (en) 2016-11-01 2016-11-01 A kind of Water Environment In Lakes repair base station and its construction method

Country Status (1)

Country Link
CN (1) CN106567407B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114075836A (en) * 2021-11-19 2022-02-22 江苏逐水环境科技有限公司 Bottom sludge treatment equipment for lake ecological restoration

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06287978A (en) * 1993-04-05 1994-10-11 Hiroaki Yamashiro Function recovering device of sea bottom ground and river bottom ground
CN102219314A (en) * 2011-04-28 2011-10-19 曾永芳 Oxygen adding and circulating water activating machine
CN102926419B (en) * 2011-08-09 2015-09-23 浙江科技学院 A kind of sludge pipeline is inhaled and is sent device
CN204432965U (en) * 2014-12-11 2015-07-01 邵质权 A kind of environmental protection strand inhales the traversing lateral thruster of dredger

Also Published As

Publication number Publication date
CN106567407A (en) 2017-04-19

Similar Documents

Publication Publication Date Title
CN103938644B (en) The reserved precast concrete cushion cap of stake socket bore and the assembling many pile foundations mounting method based on this cushion cap
CN109262823A (en) Repeat assembling PC component production system and production method
CN102182180B (en) Rotary extrusion sleeve anchor rod and construction method thereof
CN205577003U (en) Dredging device for water conservancy project
CN106567407B (en) A kind of Water Environment In Lakes repair base station and its construction method
CN102094422A (en) Full-revolving variable amplitude pile driving frame and using method thereof
CN207176787U (en) A kind of Accrete clearing device for hydraulic engineering
CN108018840A (en) Tower-type irrigating trash
CN202315437U (en) Lifting device for dross well of sewage treatment primary settling tank
CN203684305U (en) Inspection shaft sludge lifting stranding cage with mechanical shovel
CN202881928U (en) Sludge soft foundation solidifying machine
CN202882099U (en) Prefabricated assembly-type round inspection well with integrated base and well room
CN201495548U (en) Manual hole digging filling pile protective wall concrete material receiving platform
CN201704723U (en) Flushing well pumping system
CN205114897U (en) That climbs formula braced system in tower built -in is put has bad luck device certainly
CN108868787B (en) Shield starting construction method for river-crossing tunnel
CN210104812U (en) Automatic installation structure for scour prevention layer of offshore wind power foundation
CN208949951U (en) A kind of riverway sludge cleaning plant
CN207844923U (en) A kind of small-sized device for lifting in civil construction
CN209824762U (en) Novel turning device for dung leaking plate
CN208933913U (en) Whole revetment wall form mobile device
CN209308070U (en) A kind of sleiding form support frame
CN203307713U (en) Curb form removal machine
CN206501131U (en) A kind of vacuum mechanical-arm
CN102071692A (en) Construction method for performing bottom plate support replacement on foundation pit by using annular plate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant