CN106567359A - Island developing technology adopting island shelf light rail and floating boat layer ring type double-peak-body wave power generation - Google Patents

Island developing technology adopting island shelf light rail and floating boat layer ring type double-peak-body wave power generation Download PDF

Info

Publication number
CN106567359A
CN106567359A CN201610828592.5A CN201610828592A CN106567359A CN 106567359 A CN106567359 A CN 106567359A CN 201610828592 A CN201610828592 A CN 201610828592A CN 106567359 A CN106567359 A CN 106567359A
Authority
CN
China
Prior art keywords
sea
ring
water
island
floating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610828592.5A
Other languages
Chinese (zh)
Inventor
管理
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610828592.5A priority Critical patent/CN106567359A/en
Publication of CN106567359A publication Critical patent/CN106567359A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B9/00Water-power plants; Layout, construction or equipment, methods of, or apparatus for, making same
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03BMACHINES OR ENGINES FOR LIQUIDS
    • F03B13/00Adaptations of machines or engines for special use; Combinations of machines or engines with driving or driven apparatus; Power stations or aggregates
    • F03B13/12Adaptations of machines or engines for special use; Combinations of machines or engines with driving or driven apparatus; Power stations or aggregates characterised by using wave or tide energy
    • F03B13/14Adaptations of machines or engines for special use; Combinations of machines or engines with driving or driven apparatus; Power stations or aggregates characterised by using wave or tide energy using wave energy
    • F03B13/22Adaptations of machines or engines for special use; Combinations of machines or engines with driving or driven apparatus; Power stations or aggregates characterised by using wave or tide energy using wave energy using the flow of water resulting from wave movements to drive a motor or turbine
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03BMACHINES OR ENGINES FOR LIQUIDS
    • F03B3/00Machines or engines of reaction type; Parts or details peculiar thereto
    • F03B3/12Blades; Blade-carrying rotors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/30Energy from the sea, e.g. using wave energy or salinity gradient

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)

Abstract

Disclosed is an island developing technology adopting island shelf light rail and floating boat layer ring type double-peak-body wave power generation. Particularly, a plurality of super-large type partial floating bodies annularly form an island shelf (or an island-surrounding floating shelf), light rails and multiple layers of wave power generation platforms on roads and blocks are erected and arranged in sinking and floating bins, every two partial floating bodies with two (three or four or five or six) peaks realize clearance relay and form the island shelf along with adjacent units, multiple anchoring system sea-crossing articulating rings are erected and connected with distributed double-peak walls and corresponding spiral water wheels, a wheel dam retention wall and the like is constructed, a ring-in-ring type water accumulating pool with a high sea outlet surface and a low micro water head is formed, the multiple functions of wave dissipating, revetment protection, harbor protection and power generation are realized, the integrated island shelf and the oval-strip-shaped bin boat units are connected annularly to form first, second, third, fourth, sixth...Xth rings, floating type power generation boats extend outwards to the sea surface, and the double-peak double-wall ellipsoid ring boat wave power generation system is formed.

Description

The Development of Islands technology of " island shelf light rail pontoon layer ring " bimodal body seawave power generation
Technical field
The present invention relates to a kind of Development of Islands technology of " island shelf light rail pontoon layer ring " bimodal body seawave power generation, especially With the inclined buoyancy aid ring-shaped combination of some ultra-large types in the case where the multilayer bridge of ring stand light rail (highway block) in sea is enclosed around island, it is attached separately to each In to sea to the sink-float storehouse at port, often put it is double (three, a team of four horses, 5, land) the two inclined buoyancy aid relays at peak head sea and tie each other with adjacent cells Into island shelf closure stress ring body, continue to be passed with the sea outside island shelf closure stress ring body then and set bimodal wall pontoon ring and connect into Rigid closure stress ring body. so that many ring bodies are passed and set, often to correspond to and be equipped with spiral water wheels wheel dam dash on ring body wheel carrier case wall Wall, the sea wave power generation system that the multi-functional wave that disappears of catch basin of the humble head in composition above tide, shore protection, Hu Gang, generating are integrated.
Background technology
At present, in the whole seawave power generation neck city of China or even the whole world, because of its discontinuity to wave, randomness and unstable Property cannot overcome, repay examination using also only " duck tongue type ", " sea snake formula ", " python formula " etc. as new energy development, and For the considerable damage power of wave, many research direction " avoidance " tendencies are serious, and port, the service mankind are protected to sea as shore protection is taken into account Comprehensive study of existence life that ocean is marched and the tide under producing, sea wave energy " taming " the property ground in terms of exploitation, nearly 20 Except my ZL 94201303.4 in year《Wave generated universal bank-protecting combination power station》、CN941183037.9《Gas Water mutually presents shield port shore protection simple wave power station》、ZL94213154《Extension lock gate for tide power station》、CN95103906 《A kind of small-head high-efficiency pouring water turbine》、ZL92234337《Set the tone double floating two-wing horizontal tide power plants》In achievement slightly Explore and promote outer, still again without big progress ... the mankind must change traditional " passivity " such as " navigation light " formula " in passing " thoughtcast of sea wave energy is taken, it is harmless to huge billow even on the islands and reefs relied on without seashore on one's own initiative Change development, advance in pioneering spirit and there must be institute's conduct and fully develop talents, audaciously find the mankind in ocean in face of huge billow Existence life and the cheap road that produces, otherwise --- our helpless letting alone when certain billow of dashing to the skies several times passes by often " is zeroed " Tragedy recur or content just to the plantation cultivation of littoral zone, the illumination that generates electricity again and again and what is also talked march to ocean!
Region Sansha City is set up on June 21st, 2012, Chinese government's declaration!Sansha City stands erect at the South Sea of China from this, Hold in the arms 2,600,000 square kilometres of China west, in, the marine territory in the husky archipelago in south three.The Sansha City of China should allow the whole world Attract attention, she must collect the intelligence and strength of national people, be that the whole mankind marches work to ocean with unprecedented will and courage and resourcefulness Go out contribution ... since the beginning of history according to my research, the counterweight for allowing Sansha City " ox " to get up, far not only act as South China Marine one to some " not heavy aircraft carrier ", will also be wide with sovereignty and the military deterrent force for showing economic power of taking an oath The South Sea on build more than 200 modern cities, with each island, reef, beach continental rise as the strong point, abampere should be completed The scientific leap of full urban construction, the leap of supporting industry general layout and prefecture-level city's size of population, " territory inferior " high-quality turn The leap of rate and utilization rate, solve South Sea 13km altogether2On continental rise area shrilly " people with bird strive ground " " people strives with woods The leap of the ecological problem on ground ", the leap for starting world ocean industry development speed and scale, make first archipelago of China ground Level city undertakes and completes global human and realizes total leap to the stormy waves developing that heads on that ocean is marched.
There is every year tropical cyclone in the South Sea, it is a kind of very strong warm cardioid cyclone, blast is often accompanied with when passing by sudden and violent Rain and huge billow, whole marine site is tranquil in addition to some except 3~May, and most months are all burbulent in the billow of fresh gale or so Under gushing, the development orientation and productive life safety of Sansha City is severely impacted really.If cannot throughout the year guarantee that the whole people give birth to Life is perfectly safe with public or private property, and that is not just Sansha City!City, people is livable, and visitor is also livable, builds according to prefecture-level city of China Starting scale, 1000 family resident Ke Ju, 20000 family residents also should occupy, and million people more should occupy!Therefore, Sansha City urgency Be essential will and must a kind of unprecedented levels supporting first collect at any time or sea wave dynamic energy of the elimination in any direction and destruction The municipal works of power, it is more guaranteed to ensure that extending the facility beyond the naturally anti-ripple sand bar of such as Yongxing Island is perfectly safe The multi-functional wave for having the productive life environment of the premise that is perfectly safe under " two is a-hundred-year " sea situation such as tsunami, hurricane billow is sent out Electric system!
However, China all too negligible in the innovation carrier marched to ocean and most different ways all cannot reach the same goal again, It is mostly again to fight separately as the owner of patent, it, in the face of above-mentioned needs, is not a kind of existing water conservancy project achievement to lack cooperation ... Some breakthroughs be capable of complete independently, but need every aspect achievement to be polymerized jointly, particularly unified integration crowd family Length reach optimum state and more need the whole people to participate in ... what ifChinese " can not wait again ", and the whole earth is also " can not Again etc. "!According to preresearch estimates, only from 200 islands and reefs at the South Sea such as Yongxing Island, the new forms of energy amount that sea wave energy is developed Level, by each island " urbanization " after just, the rule installed of mid-term touch with annual electricity generating capacity be respectively (1500~5000) MW and (78~260) hundred million kwh/a, with this push away in whole Sansha City 50 to ten years can seawave power generation installation and annual electricity generating capacity be respectively (3 ~10) hundred million KW (equivalent to more than the 30% of the national KW levels of total installed capacity 10.5 hundred million of China 2011) and (1.56~50,000) hundred million Kwh/a (equivalent to more than the 34% of China's 4.6 trillion kwh levels of total generating in 2011).
The content of the invention
The purpose of the present invention is:In my ZL 94201303.4《Wave generated universal bank-protecting combination power station》's On the basis of achievement in research, realize (intending such as, the Yongxing Island or even China in the South Sea at " light rail highway block ring stand multilayer bridge " More than 5000 island circle sea, or more than 66 gulf such as Liaodong Wan, Bohai Sea Gulf, Hangzhou Wan, Laizhou Wan, North Sea domain enclose sea) Sea under bridge disappears on " the island shelf light rail pontoon layer ring " that wave, shore protection, Hu Gang, generating be integrated, and constitutes inclined buoyancy aid and spiral shell The catch basin of double wall dash such as rotation water wheels, disposably completes the replacement of spiral water wheels or part replaces exploitation and profit after the conventional hydraulic turbine With sea wave energy, realize eliminating sea beat power under both tsunami safety standards of 200 years one chances of absolute guarantee, effect is surpassed again and " is collected Wave is all-round+safety let out can ", more to plan as a whole the maximizing the benefits of " unrestrained, floating, pond, lock, the overall allotment of wheel generate electricity ", and in this base Become with existing overpass ocean engineering technology disposition that complete " bridge net is light for anti-of wave resistance --- universal bank-protecting generating --- on plinth Rail --- overhead city street --- inside and outside artificial huge port --- development of real estate in port --- reinforcing bar coagulation buoyancy tank module all trades platform, Network split, dismounting, replacing randomization --- villa, building, real estate, traffic, grade separation, block networking --- ' reclamation of wasteland by an army units ' industry (Lian Cun, Ying Zhen, the administrative division at different levels of county of group) band --- gardens networking industry ecological intervallum --- net cage is planted and grows industry ecological Intervallum --- characteristic work, agriculture, business's zoning band --- coagulation buoyancy tank military camp, weight (light) type airport, derrick village, mountain villa of lying fallow, School, physical culture place band --- coagulation floating box structure is private ' aircraft carrier ' manufacturing industry --- marine site ' pump ' ' lamp ' is put deeply outside ring city The cheap ultra-large type Oil/gas Well petrochemical industry aircraft carrier platform group in a hundred or so times of low temperature goodization fishing ground --- fishing paddy grows plant industry --- " ring Island shelf or a ring chinampa bridge assemble " one, two, three, four, five, six ... X rings " floating generating ship extension with reference to ellipse bar storehouse ship The bimodal pair of wall ellipsoid ring ship sea wave power generation system on sea draws out the mankind and expands sea into municipal polycycle a century project to be continued system Foreign space planning and march route map.
The object of the present invention is achieved like this:Around island such as Sansha City Yongxing Island (or islands and reefs even submerged reef shoal, or all It is that only there is the ocean address of radiation cable wire anchoring condition or artificial caisson reef disk directly to go up on the steel cross board at the rear of an ancient carriage of the water surface) with radius Bridge under overhead (the big loop circle sea overpass of the multilayer such as point light rail, the highway, block) bridge that 2.5~10km rings are set up per bridge opening Reinforced concrete sluice foundation is spread along sea bed between pier, is set between two conjoined axle legs and dash forward before seabed platform, bridge leg current obstruction area 5~7%, Leg is spaced 50m with leg, and often the centre position in sea level to seabed arranges adjustable to sea to port water away from 5~20m of sea liftings Flat progressive double or three horizontal type fans cylindrical cavity rigid body, independent steel of the horizontal dead axle on sea level domatic " peak " of the scapus post heart Partially buoyancy aid, on compounded rubber spring precast segment clearance positioning deck of the body on the inside of pier frame (or per dead axle on string have two with Go up inclined buoyancy aid and unify horizontal being scheduled on the pre-buried bearing holder (housing, cover) of two leg coagulations);Partially buoyancy aid " fan post " horizontal type, is slope to extra large side 50×26m2Or big inclined plane, it is dead axle cylinder edge face that forward position " fan post " circle central axis are horizontally set with elongated transverse axis or end axle, after set half Footpath be the three-dimensional curved panel of 26m or so as " peak " convex surface, the chamber end of left and right two is set with horizontal dead axle as the two of radius 26m or so The both sides sector end plate of the steel plate surface of fan-shaped interior reinforced concrete stay bolt, it is complete in addition to being provided with Water Exit and adjusting floating mouth (door) to go to the bottom Coagulation boxboard bottom surface in the underseal of closed cavity, with this fan cylindrical cavity rigid body is constituted;Rigid body top set into go out vent charge (its with Air compressor is connected), backward level is located in sink-float storehouse on the basis of horizontal dead axle outer sleeve cylinder edge edge face, inclined buoyancy aid in storehouse It is floating in left and right, rear three faces clearance rising-falling tone around horizontal dead axle and more than water surface 16m can be projected, on into before double (three) " peak " dash " wall ", wall sets again unified into " ring " in succession with the type such as every conjoined axle leg and lead leg adjacent dynamic cell one after another and each other The catch basin for constituting dash ring week (sets flood discharge pipeline, pipeline or extends to depths seabed, and choose flow direction in the bottom of catch basin On) to the front portion " single, double (three) peak (ring) wall " in sea;Pond rear portion often corresponds to ring " wall " and then corresponds to inclined buoyancy aid and conjoined axle leg Frame system, if holding case by rubber dam and wheel carrier shaddock holds fixed spiral water wheels (or partly standby tubular turbine) under the arm;Spiral water wheels, For eight to some helical blades, piece is sine surface or the convex-concave punching press such as " herringbone ", " cross ", " lattice, flute profile " by a narrow margin Or the wheel blade spiral of scabbed casting, into diagonal flow type water wheels, water wheel axle output power is simultaneously multistage with the generator of some power that differ in size " the machine dam ringwall " of the unit dash that axis point and clutch generate electricity, with this correspondence " double (single, multiple) peak (ring) walls " a week, ring Tens or even hundreds of wheel wall system unit are set to passing, machine dam ringwall constitutes the general of catch basin with bimodal wall, leakproof dash bottom surface Shore protection and seawave power generation unify huge ring leg formula generation platform (ring) island shelf (the island shelf system, also the four corners of the world four of polywater generating On direction, often selecting a bridge opening to divide into can in front and back remove the huge floating generating ship for backing into and moving, in case navigation is in wind sheltering ship Warship approaches and is used) " ring " system.Followed by outwards expand by ring again and enclose sea, i.e., at " ring ' island shelf ' " (if necessary to " a ring ' island shelf ' " can also be connected into " ring ' island scaffold ' " and emerging on excessively high and steep island or artificial reef disk with huge ellipse bar storehouse ship cell rings Build city) on the basis of system, set up the pile foundation of overpass conjoined axle leg to involve to sea radiation as anchor foundation in ring Cable wire, often radial direction stretches the steel band net that the second ring of big ring sea is added across 1.5~2km or so, net grappling " bicyclic ring island to sea to rope One week " each " pontoon polycyclic system " unit (can certainly add " three ring rotary islands one week " equipment, " Fourth Ring rotary island one week " equipment Until the equipment of " X rings rotary island one week ", or even cloth is all over whole island region or marine site, will it include " ring " in Inner circles sea half Footpath is increased to 3~Xkm):Cable wire connects big ring steel band net, nets " two rings " each ellipse bar storehouse ship list that ring is sequentially connect a week by Jing stay bolts bar One by one the circle of fastening one " circle " is got up for unit, so that " three, four, five, six rings etc. " are all completely anchored across the sea.Wherein, it is front Backward the combining structure of the ellipse bar storehouse ship unit that sea sets bimodal inclined buoyancy aid to port two is:Ring cloth is often corresponded in 12 to some footpaths Solid point system determines and radiates latent leading in 5~10m or so deeply at the pile foundation in seabed under to cable wire from " ring ' island shelf ' " conjoined axle leg support Limit, often big ring steel band net (the net work set up through the country in one " ring " extension magnitude outer ring waters of 1.5~2km is crossed by level system The all of " pontoon polycyclic system " for outer all some " ring " the marine site Inner of island shelf generates the master for being transmitted, being changed by unrestrained impact stress Body, body one is often corresponded to once stay bolt bar and fixes an ellipse bar storehouse ship unit, and anchoring is integrated between unit and both sides adjacent cells, Constitute the unified positioning system that one whole " ring " fit rete cord radial direction lock ring draws anchor);The two neighboring ellipse bar storehouse ship of correspondence per unit, Boat bottom is connected with platform buoyancy tank " elastic plate " (being generator installation room and Working Life area in buoyancy tank), on the casing of bottom to Sink-float storehouse is symmetrically opened in sea to former and later two directions at port, and holohedral symmetry is swum before and after respectively setting between two bimodal inclined buoyancy aids of height in two storehouses The relay of gap type thimble by wave, formed to sea to bimodal inclined buoyancy aid in the both direction of port by wave each other work and restization and be catch basin dash Bimodal wall, on casing face center set spiral water wheels (in wheel nowel space set draw water and under two row's drainage ports, take turns to sea to Port side symmetrically sets flow control door, and Men Weitong bottoms drainage port enters sea) wheel dam dash " wall " that combines with rubber dam and wheel carrier case, case " plate " left side connects hull and the right side connects the laterally adjacent unit catch basin of hull and is provided with mutual outlet pass, or to fill stone etc. in huge case case Each other ring leads to generating integrated to unify polywater to select the deep-sea " the total positioning of anchor of artificial reef case cable wire " for sinking to the bottom arbitrary location to constitute Chi Chi " pontoon ring system " wave that disappears, generating assembly (then formed " pontoon polycyclic system " wave that disappears, generating assembly);" pontoon polycyclic system " will also Often correspond to " a rotary island frame " and be arranged in the whole bridge opening for setting huge floating generating " door ship " on the four corners of the world four or some directions Lower correspondence often sets " the U depressed places " of " two rings ", and the Inner whole floating that sets in depressed place generates electricity " door ship ", in case navigation is approached in leeward side ships and is used; On outermost floating generating ship system " ring " in " island shelf pontoon polycyclic system " technical scheme on " X rings ", if necessary per ellipse Bar storehouse ship can extend each sink-float storehouse, storehouse Inner according to combat a natural disaster to need to increase set inclined buoyancy aid quantity to a three, team of four horses, 5, Lu Fengjie Power disappears wave, so that " Chilean Oc ean Tsunami " that reciprocity " without calamity " defence is such as referred to as meeting May nineteen sixty in thousand one becomes a reality.
Operation principle and operating instruction:Above-mentioned " island shelf light rail pontoon layer ring " technical scheme, by two a-hundred-year peaces Full standard, it is ensured that absolute protection when 16m of about 17 grades or so typhoon generations or so high angry waves of wave pass by, it is general next Say, 60~70m high water columns can be evoked during this billow impact seashore, but seabed or solid barrier are not reached in unrestrained energy active force Hinder and will not produce turbulent waves before thing, that is to say, that wave at this moment is only that inertia kinetic energy is closed latentization in wave, Its huge destructive power could can only passively discharge destructive power when sufficiently stable rigid barrier is met.This It is that the reason for once having " concrete block of 1370 tons of weights moves 10m " wave destructive power to record is located, if the front energy of wave The buoyancy potential energy and the kinetic energy of this stock market wave for having " 1370 tons " magnitude is met in advance with soft state, and that must change sea Unrestrained " 1370 tons " gravity-driven is static pressure water column, never has that act of terrifying waves.Therefore, as long as people are in unrestrained energy " quilt Go to balance out with the buoyancy potential energy of enough magnitudes before dynamic ground " release and just just lose billow naturally after its whole kinetic energy Destructive power and take its produce in large quantities electric energy (part of electric energy can not be converted, its energy is a large amount of to deep-sea in static pressure form Let out can, while also deep-sea cold water and eutrophic water is turned over to upper strata in passing so that top layer water eutrophication is allowed to be formed in the South Sea often Year low temperature benefits the society to the municipal especially big fishing ground of ideal value ... before the high angry waves of 16m attack, bimodal two in front and back Air compressor partially on buoyancy aid inflates the vertical height for making it set up emersion sea level into inclined buoyancy aid and is both greater than 16m+1m, with Super large buoyancy potential energy standingization receives at any time wave impact that is marine and coming, until when wave passes by, due to the horizontal stroke of inclined buoyancy aid Residual stress ratio value of the dead axle bearing element stress at high-torque end can be what is ignored, and sea wave dynamic energy is all concentrated on 10m to 26m puts forth effort to apply impact thrust in the distribution of wave bending moment end in corresponding points, and especially wave is applied to sea level above direction Wave speed lower 104The unit inertia force kinetic energy of ton seawater, meets horizontal dead axle and goes here and there inclined buoyancy aid, and body should have in advance altogether under relative velocity During the buoyancy elastic potential energy of 15000 tons of displacement, wave can only be attacked on slope aspect above inclined buoyancy aid slope, treat tons up to ten thousand The seawater of weight takes advantage of inertia all to rush to during inclined-plane, and simply equity reduces the draining buoyancy of nearly ten thousand tons of inclined buoyancy aid and offsets in full Whole kinetic energy of wave, push through inclined buoyancy aid " peak face " and enter catch basin especially under inertia force leaving velocity by water column seawater.Just It is because that instant wave while the height of inclined buoyancy aid " peak face " has been depressed into about 2/3 or so also break through " bimodal " by moment Enter pond, as the i.e. inclined buoyancy aid that seawater enters pond will lose normal pressure again while storing up the full gesture of foot and rising " peak " and reach most in moment High level, is that the second wave is attacked the sea wave dynamic energy that comes again on slope and offset to being perfectly safe and static wave water is slow closely stagnant by inclined buoyancy aid potential energy State performs all and prepares (if the wave for actually passing by is excessive, to retrodeviate buoyancy aid meeting nature and receive inclined by anteposition into catch basin Buoyancy aid buoyancy potential energy offsets the sea wave energy that " remnants " get off, and peak heights after can aligning at any time are so as to be perfectly safe poly- with peak efficiency Water generates electricity and mutually unifies with letting out to work;If having a surplus if leading peak buoyancy potential energy is ample, then the inclined buoyancy aid of postpeak can be slope Adjust the nearly straight angle above, when waiting the catch basin discrepancy in elevation after stormy waves substantially to reduce, the inclined buoyancy aid peak height of all postpeaks is tuned up one by one with The prolongation of high-power generating dutation of exerting oneself is obtained, moderate seas generated output work is adjusted back again after all postpeaks are all turned up full blast Condition) ... it is not only innoxious by wave but also energy utilization is become the generating of catch basin water column so that going round and beginning again.Due to above-mentioned The water for being converted into the water column of certain head gathers into system catch basin, and water head normal sea after with body constitutes 1~18m potential differences While promoting spiral hydraulic generator, and the unit to the catch basin for entirely not receiving wave flows and goes, and head causes it He do not receive wave attack slope and fail poly- water column corresponding unit all spiral water wheels can normal power generation (this is also this One of bright big innovation advantage);It is flat after eliminating " water wheels modelled after an antique " because of rotating speed raising because spiral water wheels are helical blades Put blade viscosity resistance is excessive and the unstable grade of interruption and cannot improve rotating speed and the drawback such as a large amount of bubbles, noise, poorly efficient, Also simultaneously because pipelined channel resistance is reasonable between the process of the convex-concave stamping surface such as sine surface by a narrow margin of helical blade and blade Increase, being also substantially equal to or maintain the waterpower angle of plate blade improves energy conversion efficiency, especially completes the present invention The mutually unified innovation task of the low cost of the seawave power generation of super-flow, summary, high efficiency, is wave under humble head condition A convenient road is found in generating scale.When system is under normal sea situation, inclined buoyancy aid can at any time be adjusted according to wave wave height Exposing dash " peak " value on 0 height above sea level sea, to be slightly above wave high so as to impact attack the wave on slope break through it is double or unimodal when do not have Substantially backflow is advisable;Because of the big annular 360 ° of structural features of whole system's multiple-unit disjunctor of the present invention, no matter from the big of any direction The energy of little wave all will necessarily innoxious polywater generate electricity, but only half counting unit receives wave with unequal magnitude, its wave Can be fully utilized, this is about as much as " huge ring leg formula generation platform (ring) island shelf " system or " huge floating generates electricity The wave face of passing by of " diameter " span by " island shelf light rail pontoon layer ring " of (ring) ship " system exports gross energy to all collections Get up, in addition to energy flood discharge is let out more than installed capacity part, about can send substantial amounts of electric energy, such as the South Sea forever by system effectiveness During Xing Dao sea areas are general under moderate seas, the seawave power generation power of " frame " system of 4~5km diameters can ensure in 30MW or so, 9~ The seawave power generation power of " ship " system of 10km " two rings " diameter can ensure in 75MW or so.The present invention is developed by South Sea sea wave energy Using the universal bank-protecting in Sansha City rotary island elevated railway block bridge and ecological oceansphere sea be port, for ground, for city, for the sea of industry While foreign municipal works develop on a large scale, also with the grand background of exploitation solar energy indirectly, there is theory to think, certain marine site Inner Dynamic, the order of magnitude of potential energy of generation wave total energy is about as much as the outer sun of the earth and projects and reach the one of corresponding water surface solar energy Half, in fact, when any one on whole South China Sea receives solar energy and to wind effect power, present invention simulation sea area Just it is likely to be subject to what is formed behind the region for leaving wind to surge, surges and be perhaps because that also other sea areas push away surging With joint efforts, especially this sea area stormy waves direction is made a concerted effort, unrestrained to increase close to the refraction dynamics formation accumulation of energy in seabed one by one Degree is higher and affects deeper Inner ripples, and Inner ripples are constituted in movement with waveform and close dynamic, potential-energy balance system, in addition to friction loss Only reaching bank base or meeting rigid barrier just can be released ... but the proal speed ratio waveform of Inner ripple water Mobile slightly slow, moieties water body acceleration in vertical direction is more than acceleration of gravity on corrugated, and its hydrone can front volume If cleave come off corrugated be also it is a kind of it is common cleave consume a part can wave breaker phenomenon ... we Sansha City 210 Ten thousand km2It is considered as a huge efficient and very cheap solar energy and collects device, is just understood that the conjunction that present invention installation is envisioned Rationality and importance, such as obtaining example proves that Sansha City islands and reefs more than 200 can often enclose the city that marine origin is populations up to a million, The direct economic benefit of generating, Zong Touzi $120~15,000,000,000 yuan, to ensure average output 80- are all estimated as at the beginning of the embodiment of the present invention Simultaneously the kwh abilities of year generating 70-120 hundred million emerge 1000000 kw, with the megawatt of China Three Gorges kwan-yin hall power station total installed capacity 10,006 The basic standard of 7687 yuan/kw of specific investment cost compares to improve 50% specific investment cost cost, if submarine cable Transmission Cost is not Calculate and normally exist including elevated railway block multilayer bridge by biomass energy sources for generating electricity online valency income in continent is recoverable within about 4 years in Inner If 200 cities of the fully invested ... of Inner expand three to five times of circle marine origin industry and scale seawave power generation by the present invention, Year wave gross generation is 4.2~7,000,000,000,000 kwh, about the 91 of the annual national generating capacity of China 2011~150%).In south Sea, in addition to four, May some relatively placidities, throughout the year in it is more than wave it is random constantly, the average of the present invention is set by 3~4m heads Meter installed capacity, it is ensured that its 500~1000MW that exerts oneself substantially, and installed capacity should be between 800~1600MW, initial stage Sending electric energy can be most of superfluous, it is proposed that the rubber that matching is powered on the outside of system outside two to ten kilometers or hundred kilometers of the radiation of a week Capsule body automatic control snorkeling erects the high-power submarine diving pump in tough pipe to 1~300m of water meter seas and deep-sea water Inner " sun " optically focused Lamp etc., the wide deep exploitation low temperature eutrophy seawater for completing surrounding sea Inner simultaneously " blends " surface temperature and Fu Burong to epiliminion Oxygen strengthens " artificial fishing ground " planning of photosynthetic loaded termination in profundal zone again.Because the present invention is to collect sea wave energy side From the beginning of face is depths extra large from 10m of close 0 value energy-flux density or so, the wave water of every kinetic energy can all change into catch basin water column (with this will circle marine site Inner the certainly situation without remaining sea beat power in addition to " artificial bay " Inner wind-engagings regenerate wave Under, the wave induction moment of flexure produced to its ocean engineering ensures desired value Inner in minimum to the continent rivers water surface, and makes to float The parameters such as elastic deformation, the bending stress of case facility are only selected in Inner rivers buoyancy tank critical field Inner.Reason is:The present invention is provided with and disappears The measure that multimodal drives sea is provisioned with again in addition to the bimodal inclined buoyancy aid of the high angry waves wave impulsive forces of 16m is ensured;Ripple is regenerated with regard to port Inner, In general, the time that state identical wind acts on sea is longer, marine site scope is bigger, and stormy waves is stronger, and " artificial harbour The time of gulf " Inner wind effects is extremely short, and scope is again minimum, so weight ripple in the water for substantially going deep into seawater, its surface will not be formed Reeb wave far can not reach seabed below buoyancy tank draft, and through the country various standardization are mixed more not to interfere with present invention circle The wave of flotation case induces the expected design of torque.When polywater pool water level significant change, then system can be automatic by pressure sensing Open and close accumulation of energy to drain off floodwaters the door of control, pipe, culvert water channel;Sea is adapted in system generating general power according to sea situation instruction adjustment or after adjusting Unrestrained randomness, discontinuity realize in the stable running mutually unified with efficiency power generation that system can automatically make control matching water wheels The current limliting pressure of generator unit linkage quantity and steady control spiral water wheels and the inclined buoyancy aid sink-float of flow system tune electric gate valve and Inner peaks Number sequence etc..Because being perfectly safe for " ring " is resistant to two a-hundred-year typhoon billow, deeper one week more than ten in the extra large scope of circle Ten thousand mu of spaces are that good harbour supplies naval vessel wind sheltering, military installations, fishing processing industry and commodity industry or harbour affairs logistics, commercial Management System etc. It is used;Account for ten thousand mu of seas of most phytal zones is except " influx " access bridge of four to eight overpass takes up an area outer all exploitation The commodity of " Lou Yu buildings layering connection Jing, layer by layer Bei Cheng areas repeatedly " hug real estate, can meet 50~1,000,000 people in such as " long-range collection ' one night of group is into hugging ' " etc. live and socialization life in characteristic real estate or each personalized building unit;Set up on sea-bridge pier One week light rail, become urban transportation and the infrastructure of scenery of going sightseeing, it is inside and outside on the overpass anchor ring of top layer block The short building of light material is built in the both sides at bridge edge, and for food and drink, Lv Su, retail shop, sightseeing synthesis function, center takes up bulk and moves soil Inland landscape forest, becomes and attracts the greenbelt that seabird is stopped, and the both sides of band are morning exercises, body-building, walking public good street;It is especially unique Global characteristic is:" people gradually moves back, Lin Zengwei, and ten thousand is young winged on the islands and reefs continental rise of center;Cable car frame, ' fowl axle ' returns, excrement fertilizers for potted flowers " ... The scene of the South Sea continental rise " pure environmental protection " of good one Ecology Human Settlements." two rings " structure for being provided with huge floating generating (ring) ship is first First head sea and more effectively ensure that being perfectly safe for productive life facility in " ring " and enclosed marine site, it is equivalent to making " one Ring " to extra large side only undertake " two rings " enclose marine site wind-engaging blow afloat regeneration wave disastrous pressure and degree of safety is further carried It is high;" two rings " is a difference in that with the seawave power generation principal character of " ring ":It is symmetrical in two-by-two before and after spiral water wheels and sets to sea Bimodal inclined buoyancy aid and unique can disappear on port any direction after discharge outlet draining generating under wheel and front sea wave and generating to port Carry out simultaneously, make regeneration wave in enclose marine site in the lump elimination and it is safer;Due to enclosing the big ring steel band net " ring in marine site Anchor " body is tensed at bridge pier base surely with cable wire system, and is formed the ring with the fixed each generator unit of stay bolt bar correspondence system and respectively generated electricity Disappear wave, polywater, the anchoring effect of generating in the inward-outward direction of unit;Because cable wire system is all connection water-bed in below 10m, own Various steel construction buoyancy tank, coagulation buoyancy tanks for absorbing water not super 10m etc. can safe layout or sea of berthing in circle marine site;Due to The safety guarantee absolutization of two a-hundred-year stormy waves sea situations, the present invention and " two, three, four, five, six ... the X in future are taken precautions against Ring " successive projects, can march and opening gate to ocean transfer in force for Chinese population, in such as " two rings " ring or set coagulation Buoyancy tank villa real estate band, in " three rings " or set in coagulation buoyancy tank building real estate band, " Fourth Ring " ring or set and plant on the face of being surrounded by sea agricultural Between make " reclamation of wasteland by an army units " industry without native herbary of buoyancy tank or sea (Lian Cun, Ying Zhen, the administrative division at different levels of county of group) band, coagulation buoyancy tank garden Forest network and park are gone sight-seeing the cage culture industry of the industries such as scape (point, area, band) Planning Net, state-run fish-farming operation traffic and are formatted band and ecology Each coagulation buoyancy tank distinctive industry zoning, characteristic farm zoning, distinctive tourism zoning and each industry set under " traffic " networking of interval Partition ... or nurture simple huge seriation platform surpass again according to the ultralow honest and clean several times of existing ocean engineering imitate it is some The structure technology industry such as coagulation buoyancy tank side again, circle, ring, ellipse:Such as, the " super ' boat of 100,000 coagulation buoyancy tank drilling wells is made It is female ' " production platform and the chemical industry platform of " Oil/gas Well operation mine and refine petrochemical industry city super ' aircraft carrier ' " is risen, and oil tanker logistics Harbour affairs industry, oil pipeline safeguard industry, and coagulation buoyancy tank military camp, the MISSILE LAUNCHING of mobility (move and go to sea and can return port wind sheltering) All kinds of sufficient amount of " aircraft carrier " platforms such as field, weight (light) type airport, leisure mountain villa, school, stadium, fishery processing etc.! According to initial analysis, the no matter big U.S.'s " Niemi as invested 10.6 ten thousand tons of maximum displacements of 6,200,000,000 yuan of $ of coagulation buoyancy tank manufacture Hereby " 3.2 tons " Hainan is precious husky No. 001 " of level aircraft carrier, " the oil aircraft carrier 981 " of hundred million yuan of $60 of investment, hundred million yuan of $15 of investment Fishery aircraft carrier, or according to the cost precedent of China's South Sea oil/gas drilling budget 1.2 hundred million yuan/wells of $, even require to exceed again Ten times hundred times of displacement standard, she but takes less than high-end equipment manufacture, do not use complication dynamic positioning, become more meticulous it is high-end Material, information technology network systematization etc., or even connect general inland navigation craft manufacturing technology and may ensure that safety and send big Use, can be started High Speed Construction Sansha City ... with the whole people.Because impulsive force suffered on the axle edge of inclined buoyancy aid can be ignored, just Illustrate no matter each " ring " meets the sea situation of many high wave levels, its impulsive force all will be offset by inclined buoyancy aid case buoyancy potential energy, Remaining impulsive force must the corresponding stay bolt bar rigidity push-and-pulls of Jing be entirely delivered to big annulus steel by hunchbacked string rope closing structure system Elastic stress and axial stress offset that (especially it is and steel band ring the stress transmitting and converting on the Lang Su directions of front once again To the support stress of " given ", make each section of support stress make a concerted effort be zero power), remaining very little impulsive force is just transmitted by cable wire To at the disjunctor footing of bridge pier grappling of " a rotary island frame ";With regard to flood discharge and draining, because the axle edge nozzle face of the inclined buoyancy aid of its system is It is selected in the water that two a-hundred-year wave Inner ripples can not have influence on intrinsic energy boundary layer, the pressure reduction of any left and right sides all can change There is a seawater inactive state of 10m or big depth the bottom of axle edge position and the through-flow condition of infinite the earth, all waves can momentum push through it is bimodal It is through-flow and dynamic that the water column and the seawater of following surrounding that static pressure potential energy must be converted to forms pressure reduction.With this in the same manner, when maximum stormy waves Arrive, sea beat attacks slope necessarily makes most water body kinetic energy be converted into the water column of static pressure potential energy, and water column determines superelevation in unrestrained high More seawater below axle edge is set to return the through-flow realization fully draining in sea or flood discharge in sea level;As for towards storm tide (including big Tsunami is in Inner), draw its attack slope Jing it is bimodal so that a three, team of four horses, 5, above the multiple tracks slope of the inclined buoyancy aids of Lu Feng, by whole " ring " outward Partially buoyancy aid makes moist to flatten and weighs into " cavity ring " for floating over floating generating ship system in water, and tidal bore is polymerized to exceed around the whole top of cavity ring Jing The static pressure water column of surrounding height above sea level mean sea level hydraulic pressure is port " storehouse " water level, and " storehouse " effect must be sensed gives computer instruction " ring " Under flexible gate opening buoyancy aid " passage " to low pressure 0 height above sea level face flood discharge (two, three, four, five, six " rings " be pontoon, its bottom it Floodwater releasing port is then that more flood discharge is carefree naturally), even 36m high tsunami tide comes, as long as water level in port must be shown Mean sea level water column value of talling even only 36+1m, must from inclined buoyancy aid lower section camera will " continuous come astonished unrestrained frightful billows and waves " water mistake Deep-sea " moisture regain " flood discharge and guarantee that tsunami safe or that tsunami destructive power is eliminated under natural " suitably heightening water level " is tamed and dociled The dynamic characteristic of clothes.The operation principle that specific Oc ean Tsunami is innoxious to take precautions against natural calamities is, due to the inclined buoyancy aid ring group of " ring " shape arrangement The body domain by head tidal bore, around week, attack behind slope by pressure impact, is steadily polymerized to float over " cavity ring " the body mildness extruding in water, Body is surrounded in the water relay of tidal bore, i.e., all also to follow kinetic energy the head attacked and regulate and control huge potential energy with " cavity ring " of inclined buoyancy aid The rule of basic neutralisation, is converted into higher as big such as (36+10~36+X) m high water column by huge buoyancy potential energy Big peak clipping is slowed down and loses basic kinetic energy, and water column is synchronously increased until weight enters slightly larger than " cavity ring " draining buoyancy side with this Port, the water of port " reservoir effect " must become to rising as high as the banks, and " storehouse " rises as high as the banks after appropriateness, and computer must moderately open flexible gate, work as tenesmus Make tidal bore around its body with the flood discharge of port storehouse, Jing profundal zones below return offshore waters, without shaking, damage (more than water level Safe and sound, water-break below water level is still) size building or any floating thing in port will not be carried away, any external floating Thing also all can be blocked in outside " water column ring ' mountain ' ", i.e. " island shelf pontoon is polycyclic " electricity generation system domain export-oriented rigidity stress Outside guardrail (as long as ... have ready conditions that the storm tide of brutality can be allowed to lose kinetic energy and it is remained does not produce impact to engineering safety The well-behaved power along Gui Hai, vertical has been that the highest water level since having record comes this and patronizes, and will not also cross and plunder autumn hair).If, Sansha City There to be the huge " boat of all kinds of floating box type platforms of 100,000 genuine cheap ten times hundred times of each industry around each island It is female " ... such as buoyancy tank platform rigs " aircraft carrier ", or else she will consider " destructive power in sea " in enclosed marine site, it is only necessary to Consider " the buoyancy tank platform standard of land inland water transport " and " how many ton variable loads ", do not consider wave induction bending size Under torque " basic design bending stiffness and homogeneous texture stress ", only meeting " anti-corrosion and maintenance " needs just can be with.
One " epeirogenetic area " 600 × 2000m2, 180 ton fluctuating loads, draft 10m, maximum displacement 960 Ten thousand tons of coagulation buoyancy tank group body, can be used as the sea base oil " aircraft carrier " of drilled 20 mouthfuls of offshore oil gas wells as land --- and per mouthful 600~10,000,000 yuan of the cost of investment of Oil/gas Well about $, and the cost of whole aircraft carrier platform and 20 mouthfuls of Oil/gas Wells and oil-refining chemical Totle drilling cost is about 700,000,000 yuan or so of $, however, but have much be included in this cost can valuate in addition it is total into profit Subsidiary property rights in volume:1st, " ' native 200mm is put, the lower cell of soil is fixedly mounted with the thick soil vegetables high yields of the solid aqueous bottom 180mm ' of pearl powder lattice 1000 mu of the high yield vegetables vegetable garden of field area ";2nd, standardization is devised in buoyancy tank, and " more than 10m ties the m of case storehouse factory building 300,000 on top2; 3rd, the m of storage storehouse 600,000 on 6m or so knots top2;4th, the commodity of metal structure the hug room m of ' 1,000,0002;5th, public body-building recreation building sides 10,000 m of product2”;6th, two 2000m (or local extends for it 200~3500m of floating box) long runway ... only with mesh " shallow sea oil/gas drilling cost is five times of land drilling cost to front oil/gas drilling, and deep sea drilling is well drilling of shallow sea cost Five times " the cost of 1.2 hundred million yuan/wells of existing deep-sea oil gas well $ just save than total amount according to cost etc. of its 20 mouthfuls of oil wells 16.2 hundred million yuan of $, adds sale " 700 yuan/m of factory building $22,100,000,000 yuan " " sell the commercial house by 1000 yuan/m of $2It is calculated as $ 1,000,000,000 " 600 yuan/m of $ are hired out in storage for unit "2A be 3,600,000,000 yuan of $ " etc., be as a result wait than have a net increase of profit be " $ 83.2~Hundred million yuan ", its The most basic of value is not more temptation itself more similar than land in kind, but the South Sea have it is millions of in addition it is several necessarily on Hundred million people settle down, plant, cultivate and start an undertaking, and the subsidiary species of formation are for example coastal, the island city big market for having more development space, Have this chance (superfine " boat of this maximum displacement up to more than 10,000,000 tons of coagulation buoyancy tank for winning back all the money lost more than ten times " realizations " It is female " platform, its cost just correspond to the Nimitz level aircraft carrier cost of 10.6 ten thousand tons of U.S. displacement ten/mono-) --- As long as every island reef beach or the marine site for only having cable wire location condition employ the present invention, the people for enclosing sea area can Breeding and planting and exploitation oil are securely engaged in substantially as land or the productive life information processing such as factory is opened up and are lived Move ... until all of islands and reefs are all developed into around big city and big city without the need for expanding " arable land " again and reaching ecological " empty Between " till rational configuration standard!
It is very economical only to consider that Oil/gas Well is bored, produced, managing, defeated " ring land oil gas --- middle netting is planted " builds:One The inner ring radius 10km and outer shroud radius of individual " artificial reef disk " grappling is r12km about 138km2" the big ring buoyancy tank combination of area Epeirogenetic platform " (even anchor by enclose extra large radius protect for 13km " a belt city island shelf " ring), be about available for the people of resident population 500,000, nearly thousand mouthfuls Oil/gas Well (often bunging down also much lower compared with the drilling cost of land), " epeirogenetic area " (Φ 23.9km)-(Φ 20.2km)km2, more than 20,000 mus of continental rise development platform, more than 70,000 mus of cultivation field, more than 100,000 mus of net cage seawater field, 2000 tons Change total load head, draft 9m, the oil gas and " aircraft carrier " of the agricultural and sideline fish production of comprehensive oil that 1,200,000,000 tons of maximum displacement is put down Platform;600~10,000,000 yuan of the cost of investment of its every mouthful Oil/gas Well about $, and the cost of whole aircraft carrier platform and 840 mouthfuls of Oil/gas Wells Totle drilling cost be about $ 70~11,000,000,000 yuan or so (again plus " a belt city island shelf " and " artificial reef disk " municipal tourist facilities throw 7,000,000,000 yuan of about $ of money), about 2 years durations.Only contrast the cost of 1.2 hundred million yuan/wells of existing deep-sea oil gas drilling well $ and contrast The cost of nearly thousand mouthfuls of Oil/gas Wells is just amounted to has saved $ 800~90,000,000,000 yuan, 12 fan frame shapes of continental rise decile, is per corner “200×200m2" resident hug living area, four sides set a row Oil/gas Well platform every 180~200m, are suitable between each column platform Wide " Huan Shui highways and forest landscape belt " platform, sets some seawater Ecological Fish Culture net cage bands and little on the near water surface of each platform edge Spelling case Tian Zhi bands (" ' 200mm puts soil, the land surface in solid pearl powder water-bearing layer 200mm ' the thickness soil vegetables high-yield field of the lower lattice of soil " High yield vegetables vegetable garden);Lucite is set on case band top or transparent long-pending rain arc is fluffy, in the fresh water side groove that fluffy rolling rainwater takes to field, Groove internal water accumulation is from water pump product in corresponding each " little reservoir " on platform ... formed mu cultivation field about more than 70,000, more than 100,000 The kind cultivation base in mu net cage seawater field etc..
If it is desired to, the present invention can be being enclosed in extra large each " ring " port area, coagulation buoyancy tank is spliced in whole waters and " is made Land " platform (beam orifice that the vertical maritime upper poly- sunlight bottom scattered light of the even cloth of platform body is shone enters water and inflation oxygen-dissolving device, or Using illumination in the water below electric energy supplement platform shade etc.), theoretically:If can have under the premise of additional Oc ean Tsunami early warning with When to floating thing " ease out tune anchor rise pool or adjust ring reply " and reserve the land real estate person property in island and move in high-rise room If two primary conditions of safe escape time, being enclosed marine site and can splicing various types of " ring " shield coagulation buoyancy tank is carried out Marine ecology makes the territory high-quality inferior on ground and opens up boundary planning.
China in addition to Taiwan and Hainan Island more than 200 square kilometres of Sui Ming islands, Zhoushan Island, East Sea Island, Hai Tandao, Changxing Island, and 1 square kilometre of island are added up to more than 5000, coastal area of china have again Liaodong Wan, Bohai Sea Gulf, Hangzhou Wan, Laizhou Wan, More than 66, North Sea etc., the smaller bay of area only Hainan just have 68, Guangdong Province have 510, Fujian Province have 125 ... all There are exploitation island shelf or bimodal wall ellipsoid ring ship ring type circle sea or arc formula to enclose the condition marched to ocean in sea, if widelyd popularize, The gate of China ocean must be quickly opened, 5,000 medium and small marine cities are at least built, every city can averagely live in peace 150,000 People, altogether about 700,000,000 people employment is marched --- and allow the life of China and the means of production continuously to originate from defeated from the South Sea, realize ocean Productivity is liberated comprehensively.
As a result of such scheme, present invention achieves both absolute guarantee's (safety standard met for 200 years) eliminates sea Unrestrained impulsive force, surpass again effect " collect wave it is all-round+safety let out can ", more to plan as a whole " unrestrained, floating, pond, lock, the overall allotment of wheel generate electricity " Maximizing the benefits:It is all with islands and reefs small island beach as rely on, according to the Process of Urbanization Construction needs marched to ocean, existing " light rail highway Block ring stand multilayer bridge " urban construction necessity premise etc., but by military strength projection, " territory inferior " high quality exploitation, seabed Petrol resources exploitation, Ecological Project Construction are mutually unified.As premise, the bimodal inclined buoyancy aid of seawave power generation of the present invention is simply located at Under bridge, the round-the-clock wave that disappears, shore protection, Hu Gang, Hu Qiao, generating take into account and have a surplus, the outmoded conventions idea in the seawave power generation field that both broken traditions Being perfectly safe (realize two a-hundred-year safety standards) for " Sansha City political affairs " construction is fundamentally ensure that again, it is deterministically complete Into (" anti-of wave resistance --- universal bank-protecting generating --- bridge net light rail --- overhead city street --- inside and outside artificial huge port --- port Interior development of real estate --- reinforcing bar coagulation buoyancy tank module all trades platform, network split, dismounting, replacing randomization --- villa, building Space, real estate, traffic, grade separation, block networking --- ' reclamation of wasteland by an army units ' industry (Lian Cun, Ying Zhen, the administrative division at different levels of county of group) band --- Gardens networking industry ecological intervallum --- plant and grow industry ecological intervallum --- characteristic work, agriculture, business's zoning band --- by net cage Coagulation buoyancy tank military camp, weight (light) type airport, derrick village, leisure mountain villa, school, physical culture place band --- the coagulation floating box structure people Battalion ' aircraft carrier ' manufacturing industry --- the low temperature goodization fishing ground --- fishing paddy grows plant industry --- hundred that marine site ' pump ' ' lamp ' is put deeply outside ring city Ten times of cheap ultra-large type Oil/gas Well petrochemical industry aircraft carrier platform groups ") integrated island shelf or a rotary island scaffold and polycyclic bimodal wall pond Ellipse bar storehouse ship modular construction combine many " rings " huge floating generating ship system islands and reefs small island beach or artificial reef disk and " the island shelf light rail in global each continent of bank base grappling, the scientific ecological ring type circle sea of the coastal seashore in island or arc formula project to enclose sea areas The mankind that pontoon layer ring " is built expand ocean space planning and march route map.
Description of the drawings
Below according to Figure of description, the invention will be further described.
Fig. 1, it is first embodiment of the invention " conjoined axle leg --- bimodal inclined buoyancy aid --- catch basin --- spiral water The wave that disappears of wheel ", polywater, universal bank-protecting, the basic cell structure of " ring system of island shelf one " (referred to as " ring ") of seawave power generation are illustrated Figure.
Fig. 2, be spiral water wheels wheel body in the present invention main structure diagram.
Fig. 3, be Fig. 2 A-A cross-sectional side view structural representations.
Fig. 4, be spiral water wheels helical blade sine surface point orthographic projection linkage section schematic diagram.
Fig. 5, it is that " --- bimodal inclined buoyancy aid --- spiral water wheels --- is bimodal for ellipse bar storehouse ship for second embodiment of the invention The wave that disappears of partially buoyancy aid ", polywater, universal bank-protecting, " ' pontoon polycyclic system ' two (three, four, five, six ... X) ring " (letter of seawave power generation Claim two rings) basic cell structure schematic diagram.
Fig. 6, it is Fig. 5 B-B cross-sectional side view structural representations.
Fig. 7, it is that four sides structural representation is cutd open in inclined buoyancy aid side.
Fig. 8, it is that of the invention " island shelf light rail pontoon layer ring " passs the wave that disappears, polywater, universal bank-protecting, the seawave power generation for setting by ring Always schematic diagram is looked down to the extra large engineering of circle by system.
1 in figure, it is provided with helical blade, piece sinusoidal punch forming in curved surface or " herringbone ", " cross ", " lattice, flute profile " It is connected on wheel cylinder etc. the process shaping weldering of convex-concave stamping surface, cylinder axle center is worn " island shelf light rail pontoon layer ring " wall pond of rotating shaft and sent out The water wheels and transmission, check, brake assemblies (abbreviation spiral water wheels) of electricity;2nd, to strain outer arcuate door automatically controlled dynamic for the fishing of water wheels list (double) side Power system (abbreviation electronic controlled power system);3rd, it is water wheels component that the wall pond that the fishing of arc body is strained watt generates electricity (abbreviation fishing is strained);4th, outside automatic flow control It is water wheels component (abbreviation flow control door) that the wall pond of arc shaped tile electric gate valve generates electricity;5th, spiral (sine surface) blade (abbreviation leaf Piece);6th, horizontal rotatory force output (fixed) axle (abbreviation rotating shaft);7th, spiral water wheels wheel cylinder (the abbreviation floating foundation of the floating gesture moulding of predetermined super large Wheel cylinder);8 and Generators under altogether cock wheel dam set a roof beam in place the water wheels component (referred to as wheel dam waterwall) of formula wheel watt one waterwall system; 9th, catch basin;10th, gap shoe plate processed is oozed in control;11 are provided with buoyancy tank (workspace) formula of floodwater releasing port door without leakage bottom of pond plate (abbreviation bottom of pond Plate);12nd, bearing frame (bearing frame under abbreviation pond) under the pond for bearing certain water column pressure level is designed;13rd, load bearing support pylon with Control sea utilizes tidal power with the dash under water at port (two meters of South Sea tidal range, when next time of tide wave can be too small, can be closed) I am " ZL094213154《Extension lock gate for tide power station》" technology generates electricity and the flexible gate system of safe flood discharge is (simple Claim flexible gate);14th, submerged gentle slope basal plane (abbreviation seabed);15th, hydraulic generator Tail water reuse mouth (abbreviation tail water mouth);16th, zero The height above sea level water surface (abbreviation sea);17 set across the machine supporting leg of Inner (outward) side ultra-wide disjunctor (letter inside and outside leg) of municipal overpass; 18th, the travelling sink-float storehouse of the U-shaped huge nest track blocking of inclined buoyancy aid (referred to as sink-float storehouse);19th, the downward flood-discharge tunnel in pond or culvert (letter are led to Culvert);20th, adjust floating press be filled with arrange, inhale enter gas outlet (simple vent charge);21st, the reinforcing bar of non-corrosive metal (NCM) outer wall is mixed Above solidifying rigid body slope (above simple slope);22nd, horizontal fixed (turning) axle;23rd, the sink-float storehouse high performance steel coagulation of wall pond generating system Main body, four to six bottom stakes, the prefabricated special reinforcement bridge leg " island shelf " of two leg disjunctors (simple conjoined axle leg or claim island shelf);24th, prevent Reinforced concrete rigid body three-dimensional arc chamber curved surface (simple cambered surface) of rotten metal outer wall;25th, inclined buoyancy aid potential energy pinnacle body regulation and control limit for height " peak " Face (abbreviation peak claims peak face);26th, billow sine swash (simple swash) of " a-hundred-year safety standard ";27th, correspondence first is determined The sink-float storehouse safety of dash set by axle axle edge and the pre-buried doorframe of guided bone flood discharge door and axle edge radial direction, the thrust of anti-enormous impact Twin shaft bolster side leg (simple lead leg);28th, culvert electric gate valve;29th, the multilayer of light rail highway and block top surface follows extra large overhead bridging The reinforcing bar both legs (simple pier frame leg) of load-bearing on body pier;30th, culvert extends seabed and far goes to choose and the pipeline of seawater stirred on stream (bottom is prolonged in letter Pipe);31st, system outside radiate within one week one to ten kilometer (or hundred kilometers outer) excess power load (snorkeling rubber utricule and certainly Control sink-float vertical tube is to the abdomen of 0.5~3m of water meter seas), the low temperature eutrophy seawater of establishing in a wide range of outer marine site Inner around is completed to epiliminion " blending " sea table water temperature, the rich deep water nutrient source, rolling dissolved oxygen, secondary profundal zone illumination mended be used for the high-power of artificial high yield fishing ground The loaded termination (simple subsea pump system) of submarine diving pump and time deep-sea water daylight lamp system;32 set light rail bridge floor layer (simple light rail Layer);33rd, track;34th, inner and outer ring train;35th, " Jinyun jewelled palace " short building (referred to as short building);36th, shopping mall;37th, intend in the South Sea Yongxing Island so that China more than 5000 island ring type circle sea, or in Liaodong Wan, Bohai Sea Gulf, Hangzhou Wan, Laizhou Wan, the north More than 66 gulf such as gulf domain arc formula encloses the " anti-of " island shelf pontoon polycyclic system " the fixed bridge leg formula generating stand in sea and pontoon polycyclic system Unrestrained anti---- universal bank-protecting generating --- bridge net light rail --- overhead city street --- inside and outside artificial huge port --- real estate in port Exploitation --- reinforcing bar coagulation buoyancy tank module all trades platform, network split, dismounting, replacing randomization --- villa, building, real estate, Traffic, grade separation, block networking --- ' reclamation of wasteland by an army units ' industry (Lian Cun, Ying Zhen, the administrative division at different levels of county of group) band --- gardens networking Industry ecological intervallum --- plant and grow industry ecological intervallum --- characteristic work, agriculture, business's zoning band --- coagulation buoyancy tank by net cage Military camp, weight (light) type airport, derrick village, leisure mountain villa, school, physical culture place band --- coagulation floating box structure is private ' aircraft carrier ' --- a hundred or so times of the low temperature goodization fishing ground --- fishing paddy grows plant industry --- that marine site ' pump ' ' lamp ' is put deeply outside ring city is cheap for manufacturing industry Ultra-large type Oil/gas Well petrochemical industry aircraft carrier platform group " integration island shelf bridge, can also be with huge if necessary to " ring ' island shelf ' " The municipal administration that the ellipse bar storehouse ship cell rings of type are connected into " ring ' island scaffold ' " and city is built on excessively high and steep island or artificial reef disk is century-old A belt city island shelf of the rotary island of " island shelf " continued as polycyclic anchor cable foundation engineering wall pond generating unit groups cyclization city crane span structure (a referred to as belt city island shelf claims island shelf or claims a rotary island scaffold);38th, " inland gardens " transplanting band;39th, fertile soil platform;40th, add Strong joist bridge floor;41st, block highway bridge aspect (simple block);42nd, end plate;43rd, mutual outlet pass;44th, high bending stiffness and it is equal The coagulation floating box type platform generator machine room of even structural stress keel shoe net and electric power pick-up, provide for oneself load workshop, worker Living area, the wall pond generating module (simple platform buoyancy tank plate) of the draining potential energy case boxboard of stable draining;45th, Working Life area; 46th, the wall pond generating module (referred to as ellipse bar storehouse ship) of the ellipse bar ship in inclined buoyancy aid sink-float storehouse;47th, rubber dam between taking turns;48th, wheel carrier case connection Take turns the water wheels component (abbreviation wheel carrier case wall) of the wall pond generating system of the eaves tile waterwall system that sets a roof beam in place;49th, the inclined buoyancy aid of horizontal positioning is allowed to Lower rotation, the water for being attacked slope plays the rotation nozzle face that the dead axle tumbling barrel or bearing holder (housing, cover) of edge are locked (abbreviation axle edge claims face nozzle);50th, it is front Afterwards dash from two with Ba Jiqiang as symmetrical centre to bimodal inclined buoyancy aid on platform buoyancy tank plate and the ellipse bar storehouse ship in left and right one Century-old some the extending out in continuous circle sea of municipal ring floating " pontoon polycyclic system " of elevated bridge that " ring " is changed builds ocean engineering wall pond dash Huge floating generating ship system unit (abbreviation floating generating ship);51st, the center sea of " Yongxing Island " (reef) landform continental rise is simulated Foreign engineering Ju Mao reefs area (abbreviation center islands and reefs area);52nd, " ring " circle sea (referred to as " ring ");53rd, " two rings " circle sea (referred to as " two rings ");54th, " three, four, five, six ... X rings " extension sea cable wire that totally one ring is anchored (referred to as outer strop) is stretched to; 55th, (abbreviation image point connects spot projection point line of the helical blade sine surface pad of imaginary floating drum in wheel cylinder section Line);56th, spot projection point line (referred to as point line) of the helical blade sine surface pad in wheel cylinder section;57th, cylinder is taken turns;58、 Adjust emersion water inlet, door (abbreviation water in-out port);59th, imagination is provided with buoyancy and big stream decrement is simultaneous and carries efficient expanding wheel cylinder (referred to as imaginary floating drum);60th, it is single, double, three, a team of four horses, 5, the inclined buoyancy aid of Lu Feng relays and machine dam close polywater double walls or symmetrical two set Bimodal wall, with reference to universal bank-protecting and the ellipsoid ring ship system of seawave power generation (referred to as double walls or the title pair of bottom leakproof water fender boxboard Peak wall ellipsoid ring ship);61st, the precast reinforced coagulation of steel construction (high performance concrete) into high bending stiffness homogeneous texture stress The inclined buoyancy tank wall pool structure of keel shoe net has above slope, " peak " convex surface, horizontal dead axle edge face, two sides sector end plate, boxboard bottom Six faces in face are simultaneously opened up into the fan cylinder generating module (referred to as buoyancy aid partially) for going out vent charge, the floating mouth of Water Exit tune;62 and even The bimodal inclined buoyancy aid sink-float storehouse of body bridge leg one extension lead leg (or both sides Jing platform buoyancy tanks plate connection ellipse bar storehouse ship is integrated) Frame (referred to as sink-float storehouse frame);63rd, the main cable (abbreviation cable wire) of rotary island radial direction tension;64th, ship and big annulus steel loop ball float string The anchor pole (abbreviation stay bolt bar) of the stay bolt rigidity stress of arm processed;65th, a net is often segmented adjoint point drawknot in big annulus steel loop to decile Composition bends section, bends local elasticity (the reserved minimum back of a bow of apical grafting stay bolt bar, hunchbacked section closure stress or triangle string knot closure stress Elastic margin value in section) steel band section, steel band resists the netting of big ring to be deformed into the overall support of steel band to draw the rigid stress (will domain domain Closing net concentrates the transfers tension on the back of a bow to offset between big annulus steel Inner axial stresses are bent each other, and finally domain domain is closed Net residual stress reaches the island heart) string rope or boom plate string muscle (abbreviation string rope);66th, string rope net node;67th, according to a-hundred-year Anger wave pressure level calculates the hunchbacked top strain elasticity allowance of segmentation, the final big annulus steel (letter for determining segmentation riveting knot size Claim big annulus steel);68th, the hundreds of thousands of back of a bow that elastic allowance has been preset by string hitch net, hunchbacked ring splices 360 ° of (back of a bow Between also string hitch net) centripetal answer component to be converted to rope tension to be offseted between the back of a bow each other by big annulus steel Inner axial stresses Disappear, final transmission is the anchoring for corresponding to 180 ° of compound support tensions for setting radial direction cable wire that are mutually symmetrical of faint domain anchor position Pontoon can bear changing its impact stress and being provided with peace for origin of force at the top of each hunchbacked section bow for the positioning stress of stay bolt under extreme sea condition Anchor tying of the axial direction support tension of each hunchbacked section under full elasticity allowance in combination with the elastic buffer power of closure bowstring structure The big ring steel band net (referred to as big ring steel band net) of structure and operation principle anchor architecture;69th, existed with two bimodal wall (or double walls) dash Some rings of wave power generating ship system unit are put connection and are tied by radial direction steel, Suo Xian ropes net on platform buoyancy tank plate connection ellipse bar storehouse ship Huge floating generating (ring) ship system of big ring steel band anchoring (abbreviation floating generating ship claims huge floating generating ship system); 70th, some main cables (referred to as prolonging rope) for renewing " ring " engineering are extended down to;71st, the floating limit plate washer (profile plate) of reserve load;72nd, it is fan-shaped End plate;73rd, hunchbacked section;74th, the stay bolt load steel structure foot rest (abbreviation foot rest) to sea bed is touched;75th, float gesture and fill the mouth that loses heart in Regulation and control storehouse (the referred to as regulation and control of falling mouth storehouse);76th, the automatically controlled daylighting of anti-air hardening steel grid ellipsoid frame glass, product rain, ventilation, the door and window oxygenation of fowl road is adjusted Pressure system steel canopy (abbreviation fiberglass canopy).
Specific embodiment
In FIG, put that anterior-posterior horizontal is parallel to be positioned at bearing and determine by two horizontal dead axles 22 between two conjoined axle legs 23, lead leg 27 Positioned at having in the seawater of 10m or so away from sea and away from seabed, constitute forebody-afterbody thimble-type and pass the shapes such as two bimodal 25 that set Partially buoyancy aid 61 (radius is 26 meters and circles around axle 22 with the body 61 of lifting of rising and falling, its top be above slope 21 with Bottom is 36 °~45 ° in angle for boxboard bottom surface 18, and rear portion is that the level that cambered surface 24 constitutes Inner idle discharge water with front axle edge 49 is indulged To the floating box with horizontal dead axle 22 as the huge fan column construction in axle center) in sink-float the Inner of storehouse 62, sink-float storehouse 62 (wait higher than axle backward 6) set control with the clearance of body 61 and ooze gap shoe plate 10 processed, the continued access bottom of pond plate 11 of plate 10;Have under plate 11 beam in length and breadth and delay it is parallel be equipped with it is floating The Inner axle center of base wheel cylinder 7 is fixed with horizontal rotating shaft 6,7 peripheral hardware of cylinder, four spirals and makees the spiral water wheels 1 of the blade 5 of sine surface process; Wheel 1 sets fishing and strains 3 and water valve 4 in right side, and set closure of port door system immediately below water wheels tail water mouth 15 constituting with its clearance of bottom of pond plate 11 13rd, under pond bearing frame 12 constitute bimodal 25, wheel dam waterwall 8, two " wall " catch basins 9 of spiral water wheels 1, pond leads to for 9 time and is provided with culvert The culvert 19 for bending towards deep-sea of hole electric gate valve 28.
In fig. 2, horizontal dead axle 6 is axle center through the center of wheel cylinder 57 and two ends end plate 42, and oblique 45 ° of the rotation of its blade 5 is every Intersection point is welded on wheel cylinder 57 or imaginary floating foundation wheel cylinder 7 and rotates outer margin contour as the structure of spiral water wheels 1 of cylinder with blade 5.
In figure 3, it is sequentially outside with this with horizontal dead axle 6 as the symmetrical axle center of the body of spiral water wheels 1 of column shaped rotating profile It is to take turns cylinder 57 or set floating foundation wheel cylinder 7 to assume that circumference and the rotating outer wheel of blade 5 exterior feature and end plate 42 of wheel 1 overlap circumference, contour The upper bisecting point of grade four is often crossed the intersection point of quaterfoil 5 of radial line and is welded on wheel cylinder 57.
In the diagram, blade 5 is spot welded in wheel cylinder 57 per intersection point and assumes each neighbouring orthographic projection that spins on floating foundation wheel cylinder 7 Repeatedly line is respectively sinusoidal point line 56 and image point line 55 to point.
In Figure 5, to be provided with two row's culverts 19, Inner chambers are used as the platform buoyancy tank plate 44 in Working Life area 45 as bottom of pond Plate 11, the center of plate 11 be longitudinally set with the spiral water wheels 1 of wheel carrier case 48 connect and take turns between the machine dam waterwall that constitutes of rubber dam 47 in symmetrically The heart, two sink-float storehouses 62 are set to sea to the symmetrical office in port, and two are positioned to sea to the ennation at port by ellipse bar storehouse ship 46 per storehouse 62 Individual horizontal dead axle 22, the Inner of two storehouse 62 respectively sets respectively the inclined buoyancy aid 61 at the high and low peak 25 of two orders to sea to the side holohedral symmetry of heading sea at port For bimodal;Horizontal dead axle 22, the arc of precursor 61 are put per the inclined buoyancy aid 61 in the front peak 25 in side in the first place of ship 46 to sea or to the axle edge 49 at port Face 24 and the thimble of axle edge 49 of rear body 61 connect the floating gap in the face of track formula three and are co-located in the Inner of storehouse 62 that rises and falls, and the inner lip of storehouse 62 that rises and falls set with it is rear Gap shoe plate 10 processed is oozed in the control that the clearance of inclined buoyancy aid 61 at peak 25 is combined, and it is to constitute catch basin 9 to form bimodal 25 wall with wheel carrier case wall 48, Pond 9 is by two mutual outlet passes 43 and the floating of whole " ring " catch basin 9 of adjacent cells intercommunication each other by the middle part of ellipse bar pontoon 46 Generating ship system 50.
In figure 6, to the high and low bimodal inclined buoyancy aid 61 of extra large side be placed in narrow rectangle by left ellipse bar pontoon 46 and right ellipse bar Pontoon 46 and wheel carrier case 48,44 innings of platform buoyancy tank plate into three faces sink-float storehouse 62 in clearance and move, collectively form front peak 25 inclined Buoyancy aid 61 front, the inclined buoyancy aid 61 of rear ebb 25 it is posterior by the intercommunication of mutual outlet pass 43 every the catch basin 9 of ship 46 floating generating ship system The 50 bimodal walls of the dash of pond 9 for being.
In the figure 7, it is the center of circle to cover fixed horizontal dead axle 22 around the clearance of axle edge 49, with above slope 21 and boxboard bottom surface 18 for partly Footpath, the empty huge chambers of Inner for constituting 40 ° of arc chamber face 24 the huge of floating mouth 58 is adjusted by vent charge 20 and the downward Water Exit in boxboard bottom surface 18 Type fans the inclined buoyancy aid 61 of column construction.
In fig. 8, centered on center islands and reefs area 51, imagination set up the overpass that ring puts sea, and bridge divides into Convenient table " ring " system of formula generation platform frame 37, system ring anchor system radially sets 12 cable wires 64 to extra large, and cable wire 64 draws fixed big ring steel Band 67, the hunchbacked section 73 of 67 points 72 sections of band, per string pulling rope 65, every middle position of string rope 65 bears a Zhi Xian to each section of 73 liang of nodes Rope, six string rope unifications are tied string rope net nodes 66 and strain at each string rope 65 and constitute big ring steel band net 68;Per back of a bow section 73 top position Connecing stay bolt bar 64 and corresponding " two rings " anchor pontoon and generating electricity is that 72 units of floating generating ship system 50 on 69 connect one by one.

Claims (10)

1. a kind of Development of Islands technology of " island shelf light rail pontoon layer ring " bimodal body seawave power generation, be with center islands and reefs area (51) Center, ring is put under the overpass at sea, and ring is provided with inclined buoyancy aid (61), it is characterized in that:The generation platform " ring " of island shelf (37) System, to extra large 12 to some cable wires (64) are radially set, and cable wire (64) draws fixed big ring steel band (67), some sections of bows of band (67) point Dorsal segment (73), per string pulling rope (65), every middle position of string rope (65) ties one to each section of (73) two nodes, six unification knot string rope net knots Point (66) and strain at each string rope (65) and constitute big ring steel band net (68);Per the back of a bow section (73) top position connect stay bolt bar (64) with it is corresponding Several floating generating ship system (50) units that " two rings " anchor pontoon generates electricity in system (69) connect one by one;Each ring element is to extra large side Or be all provided with conjoined axle leg (23) or ellipse bar storehouse ship (46) office to port symmetrical side to sea and close elimination impulsive force sink-float storehouse frame (62) of heading sea Interior sink-float storehouse (18), storehouse (18) Inner is all provided with being positioned at by two horizontal dead axles (22) has the sea of 10m or so away from sea and away from seabed Bimodal (25) or the inclined buoyancy aid (61) of multimodal (25) of shapes such as two in water horizontal level or the shape such as not, sink-float storehouse (18) is backward Gap shoe plate (10) processed, plate (10) continued access bottom of pond plate (11) or platform buoyancy tank plate are oozed Deng control is set higher than axle (6) and body (61) clearance (44);Plate (11,44) have culvert (19) delay it is parallel be equipped with wheel cylinder (57) or floating foundation wheel cylinder (7) axle center fix be installed with horizontal turn Four to some spirals are set on axle (6) and cylinder (57,7) and make the spiral water wheels (1) of the blade (5) of sine surface process;Wheel (1) Fishing is set in right side and strain (3) and water valve (4), and set closure of port immediately below water wheels tail water mouth (15) constituting with its bottom of pond plate (11) clearance Bearing frame (12) constitutes bimodal (25), Generators (8), two " wall " catch basins (9) of spiral water wheels (1) under door system (13), pond, Under pond (9) lead to be provided with culvert electric gate valve (28) the culvert (19) for bending towards deep-sea island shelf (37) or a rotary island scaffold (37) with The one island shelf (37) or a rotary island that " the island shelf light rail pontoon layer ring " that polycyclic bimodal wall ellipsoid ring ship (60) combines generates electricity is floating The wave of " one, two, three, four, five, six ... X rings " floating generating ship that frame (37) and ellipse bar storehouse ship unit (46) ring are connected into is sent out The Development of Islands technology of many " rings " huge floating generating ship system (69) of electricity.
2. the Development of Islands technology of seawave power generation according to claim 1, its specific features is:Municipal administration is surrounded by sea under overpass Correspondence per two conjoined axle legs (23) inside and outside put between leg (17), lead leg (27) two horizontal dead axles (22) be positioned at away from sea with away from seabed In having the seawater horizontal level of certain depth, constitute forebody-afterbody thimble-type and pass the shapes such as two that set or bimodal (25) of shape such as not Inclined buoyancy aid (61);Body (61) radius is the inclined buoyancy aid of the sink-float lifting that tens or some rice make the motion of circumference acute angle around axle (22) (61), its top is that (21) and bottom are 36 °~45 ° in angle for boxboard bottom surface above slope, rear portion for cambered surface (24) with it is front Portion's axle edge (49) constitutes the floating box with horizontal dead axle (22) as the huge horizontal fan column construction in axle center of the level longitudinal direction of Inner idle discharge water; It is higher than that axle (6) and body (61) clearance are provided with control and ooze gap shoe plate (10) processed, plate (10) continued access bottom of pond plate that sink-float storehouse (18) is waited backward (11);There is beam in length and breadth under plate (11) and delay parallel floating foundation wheel cylinder (7) the Inner axle center that is equipped with and be fixed with horizontal rotating shaft 6, cylinder (7) peripheral hardware four Bar spiral and make sine surface process blade (5) spiral water wheels (1);Wheel (1) sets fishing and strains (3) and water valve (4) in right side, and Constitute bearing frame (12) under water wheels tail water mouth (15) underface sets closure of port door system (13), pond is constituted with its bottom of pond plate (11) clearance Bimodal (25), wheel dam waterwall (8), the catch basin (9) of the double walls (60) of spiral water wheels (1), lead under pond (9) and are provided with culvert electric brake The island shelf (37) of " a rotary island frame " of the culvert (19) for bending towards deep-sea of door (28).
3. the Development of Islands technology of seawave power generation according to claim 1, its specific features is:Floating generating ship system (50), to be provided with two row's culverts (19), Inner chambers are used as platform buoyancy tank plate (44) of Working Life area (45) as bottom of pond plate (11), plate (11) center be longitudinally set with wheel carrier case (48) spiral water wheels (1) connect and take turns between rubber dam (47) constitute take turns dam waterwall (8) For symmetrical centre, two sink-floats storehouse (18) are set to the symmetrical office in port to sea, per storehouse (18) by ellipse bar storehouse ship (46) to sea to port Ennation position two horizontal dead axles (22), two storehouses (18) Inner respectively sets two orders to sea to the side holohedral symmetry of heading sea at port respectively The inclined buoyancy aid (61) of high and low peak (25) is bimodal;Per the front peak in side (25) partially buoyancy aid (61) to sea or to port axle edge (49) in Horizontal dead axle (22) is put in ship (46) first place, and the cambered surface (24) of precursor (61) connects the face of track formula three and floats with axle edge (49) thimble of rear body (61) Gap is co-located in storehouse (62) Inner that rises and falls, and storehouse (62) inner lip that rises and falls sets the control combined with inclined buoyancy aid (61) clearance of postpeak (25) and oozes Gap shoe plate (10) processed, forms bimodal (25) wall and wheel carrier case wall (48) system and constitutes catch basin (9), pond (9) by two each other by " ' pontoon polycyclic system ' two of mutual outlet pass (43) and whole " ring " catch basin (9) of adjacent cells intercommunication in the middle part of ellipse bar pontoon (46) The floating generating ship (50) of huge floating generating ship system (69) unit of (three, four, five, six ... X) ring ".
4. the Development of Islands technology of seawave power generation according to claim 1, its specific features is:With horizontal dead axle (6) as circle The symmetrical axle center of spiral water wheels (1) body of cylindricality rotation profile, is outwards sequentially wheel cylinder (57), floating foundation wheel cylinder (7), rotation with this Blade (5), blade (5) is spot welded the forward projection point that each adjoint point spins on wheel cylinder (57) or floating foundation wheel cylinder (7) per intersection point, and point connects Line is respectively sinusoidal point line (56) and image point line (55), and rotating outer wheel is wide and end plate (42) overlaps circumference, on contour Deng four bisecting points often cross the four of radial line as cured leaf piece (5) intersection point be welded on the wall pond gear of the spiral water wheels (1) on wheel cylinder (57) Water generating module.
5. the Development of Islands technology of seawave power generation according to claim 1, around axle edge (49) clearance fixed horizontal dead axle is covered (22) be the center of circle, with above slope (21) and boxboard bottom surface (18) as radius, constitute the empty huge chambers of Inner in 40 ° of arc chamber face (24) by Vent charge (20) adjusts the inclined buoyancy aid (61) of the huge fan column construction of floating mouth (58) with the downward Water Exit in boxboard bottom surface (18), its Specific features are:Be placed in sink-float storehouse (18) Inner clearance with relay set it is double, three, a team of four horses, 5, Lu Feng (25) buoyancy aids (61) partially, body (61) The downward Water Exit in boxboard bottom surface (18) adjusts floating mouth (58) to be provided with system tune automatic open/close and closes door in the series of combination moulding of mouth (58) Inner Double walls (60) generate electricity system.
6. the Development of Islands technology of seawave power generation according to claim 1, its specific features is:Radially cable wire is set to extra large (64), cable wire (64) draws fixed big ring steel band (67), the hunchbacked section (73) of 72 or some sections of band (67) point, each section of (73) two nodes Per string pulling rope (65), string rope (65) often bears one string rope in centre, six string ropes unification knot string rope net node (66) and Strain at each string rope (65) composition and connect big ring steel band net (68) stay bolt bar (64) excessively and each " ring " floating generating of outer strop (54) grappling Ship system (50) changes its impact stress and puts forth effort the big ring that node is provided with safety elastic allowance into each hunchbacked section (73) bow top The axial direction support tension of each hunchbacked section (73) of steel band (67) with the elastic buffer power of closure bowstring structure in combination with or with " manually The total positioning of anchor of reef case cable wire " selectes the anchor architecture and operation principle of the arbitrary location in deep-sea.
7. the Development of Islands technology of seawave power generation according to claim 1, its specific features is:Partially buoyancy aid (61) it is double, Threeth, a team of four horses, 5, wave is changed in the buoyancy potential energy body relay of Lu Feng (25) polylith and tsunami tide kinetic energy is into anti-of water column potential energy and general The operation principle of shore protection seawave power generation.
8. the Development of Islands system of seawave power generation according to claim 1, its specific features is:Towards storm tide, draw it Tidal bore attack slope Jing it is bimodal so that a three, team of four horses, 5, above the multiple tracks slope of Lu Feng (25) partially buoyancy aids (61) (21), whole each " ring " partially Buoyancy aid (61) pressing of making moist is weighed into and floated in dead axle (49) water away from water surface certain depth below simultaneously again away from seabed certain distance Floating generating ship system (50) " cavity ring " body, tidal bore is polymerized to tall the average sea table in Haicheng City around the whole top of hollow ring body Jing The static pressure water column of face hydraulic pressure is port " storehouse " water level, and " storehouse " effect must be opened moderately under the inclined buoyancy aids (61) of flexible gate system (13) Jing " passage " is to the flood discharge of low pressure sea level, even 36m or so high tsunami tide comes, the average sea as long as port Inner water levels tall Face hydraulic pressure value, even only (36+1) m, it is also possible to the depth under the safe flood discharge Jing in inclined buoyancy aid (61) lower section " continuous next astonished unrestrained frightful billows and waves " Extra large " moisture regain " and guarantee to safely eliminate the structure of Tsunami disaster and dynamic characteristic, and due to the inclined buoyancy aid of annular arrangement (61) domain makes moist, and water burst headring around week, attack behind slope by pressure impact, by surely into " cavity ring " body floated in water, water of the body for tidal bore Around its body, i.e., all heads to attack slope also follow kinetic energy to being respectively combined into the overall inclined buoyancy aid (61) on " ring " of rigidity for relay, The huge buoyancy potential energy of body (61) is converted into higher big retarding as big such as (36+1~36+X) m high head and loses Basic kinetic energy, is crossed until weight with this synchronization increasing water column and is entered a port more than body (61) draining buoyancy side, be i.e. port " reservoir effect " water Must rise as high as the banks, " storehouse " the rises as high as the banks gate system (13) that stretch after appropriateness moderately opens, and forces tidal bore around its body (61) with the flood discharge of port storehouse instantly Jing profundal zones below return offshore waters, without shaking, damage size building or will not carry away any in port Floating thing, any external floating thing also all can be blocked in outside " water column ring ' mountain ' ", i.e. " island shelf pontoon is polycyclic " island shelf (37) the innoxious work of taking precautions against natural calamities of tsunami or outside the guardrail of the export-oriented rigidity stress of bimodal wall ellipsoid ring ship (60) the electricity generation system domain Make principle.
9. the Development of Islands system of seawave power generation according to claim 1, its specific features is:Intend the Yongxing in the South Sea More than the 5000 island circle sea of island or even China, or in more than 66 gulf such as Liaodong Wan, Bohai Sea Gulf, Hangzhou Wan, Laizhou Wan, North Sea Enclose " island shelf pontoon polycyclic system " the fixed bridge leg formula generating stand in sea and " anti-of wave resistance --- the general shield of pontoon polycyclic system in domain Bank generating --- bridge net light rail --- overhead city street --- inside and outside artificial huge port --- development of real estate in port --- reinforcing bar coagulation Buoyancy tank module all trades platform, network split, dismounting, replacing randomization --- villa, building, real estate, traffic, grade separation, block net Networking industry ecological in gardens is spaced network --- ' reclamation of wasteland by an army units ' industry (Lian Cun, Ying Zhen, the administrative division at different levels of county of group) band --- Band --- plant and grow industry ecological intervallum --- characteristic work, agriculture, business's zoning band --- coagulation buoyancy tank military camp, weight (light) by net cage Type airport, derrick village, leisure mountain villa, school, physical culture place band --- coagulation floating box structure is private ' aircraft carrier ' manufacturing industry --- The cheap ultra-large type oil gas in a hundred or so times of low temperature goodization fishing ground --- fishing paddy grows plant industry --- that marine site ' pump ' ' lamp ' is put deeply outside ring city Well petrochemical industry aircraft carrier platform group " integration island shelf (37) combines the islands and reefs small island beach of many " rings " huge floating generating ship system (69) Grappling and global each continent, island it is coastwise fixed scientific (expand human living space, seawater oxygenation, add lustre to, rich foster bio-artificial Operationization, improves fecundity of the sea) it is ecological that (" people gradually moves back, Lin Zengwei, ten thousand young fly on islands and reefs continental rise;Cable car frame, ' fowl axle ' return, Excrement fertilizers for potted flowers ") ring type circle sea or arc formula project to enclose sea areas " island shelf light rail pontoon layer ring " build the mankind expand ocean space rule Draw and march route map.
10. Development of Islands system according to claim 1, its specific features is:Tall averagely with water level in port Sea water column value even only 1m, let alone 36m high tsunami tide, will its gush the static water-column for being converted to 36+1m, The water for gushing is set to remove off-lying sea from depth of water sea " moisture regain " flood discharge that inclined buoyancy aid lower section camera " will continue and carry out astonished unrestrained frightful billows and waves " and guarantee safety Or island shelf (37) or ring chinampa frame (37) that tsunami destructive power is thoroughly eliminated under natural " suitably heightening reservoir water level " Or bimodal wall ellipsoid ring ship (60) ring, arc formula enclose the general wave that disappears, the shore protection work under sea taming storm tide, tsunami dynamic characteristic Journey.
CN201610828592.5A 2016-09-19 2016-09-19 Island developing technology adopting island shelf light rail and floating boat layer ring type double-peak-body wave power generation Pending CN106567359A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610828592.5A CN106567359A (en) 2016-09-19 2016-09-19 Island developing technology adopting island shelf light rail and floating boat layer ring type double-peak-body wave power generation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610828592.5A CN106567359A (en) 2016-09-19 2016-09-19 Island developing technology adopting island shelf light rail and floating boat layer ring type double-peak-body wave power generation

Publications (1)

Publication Number Publication Date
CN106567359A true CN106567359A (en) 2017-04-19

Family

ID=58531806

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610828592.5A Pending CN106567359A (en) 2016-09-19 2016-09-19 Island developing technology adopting island shelf light rail and floating boat layer ring type double-peak-body wave power generation

Country Status (1)

Country Link
CN (1) CN106567359A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109080782A (en) * 2018-08-28 2018-12-25 励土峰 A kind of large-scale chinampa at sea
CN110748490A (en) * 2019-11-06 2020-02-04 东阳面世建筑工程有限公司 Steel bridge for small river convenient to discharge flood and water
CN111695180A (en) * 2020-05-20 2020-09-22 中铁二院工程集团有限责任公司 Method for determining railway space line position in karst mountain area
CN112550579A (en) * 2020-12-29 2021-03-26 烟台南山学院 Ship wave dissipation device
NO20201000A1 (en) * 2020-09-11 2022-03-14 Nader Hassavari Float assembly for wave power conversion system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1132824A (en) * 1995-04-05 1996-10-09 管理 Small-head high-efficiency pouring water turbine
CN102913371A (en) * 2012-08-06 2013-02-06 管理 Island shelf floating boat multi-ring power generation system consisting of double-peak-body and helical water wheel wave absorption retaining wall
US20160247628A1 (en) * 2015-02-25 2016-08-25 Onesubsea Ip Uk Limited Subsea transformer with seawater high resistance ground

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1132824A (en) * 1995-04-05 1996-10-09 管理 Small-head high-efficiency pouring water turbine
CN102913371A (en) * 2012-08-06 2013-02-06 管理 Island shelf floating boat multi-ring power generation system consisting of double-peak-body and helical water wheel wave absorption retaining wall
US20160247628A1 (en) * 2015-02-25 2016-08-25 Onesubsea Ip Uk Limited Subsea transformer with seawater high resistance ground

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109080782A (en) * 2018-08-28 2018-12-25 励土峰 A kind of large-scale chinampa at sea
CN110748490A (en) * 2019-11-06 2020-02-04 东阳面世建筑工程有限公司 Steel bridge for small river convenient to discharge flood and water
CN110748490B (en) * 2019-11-06 2020-07-14 惠安县科曼源科技服务有限公司 Steel bridge for small river convenient to discharge flood and water
CN111695180A (en) * 2020-05-20 2020-09-22 中铁二院工程集团有限责任公司 Method for determining railway space line position in karst mountain area
CN111695180B (en) * 2020-05-20 2022-05-10 中铁二院工程集团有限责任公司 Method for determining railway space line position in karst mountain area
NO20201000A1 (en) * 2020-09-11 2022-03-14 Nader Hassavari Float assembly for wave power conversion system
NO346405B1 (en) * 2020-09-11 2022-07-11 Nader Hassavari Float assembly for wave power conversion system
CN112550579A (en) * 2020-12-29 2021-03-26 烟台南山学院 Ship wave dissipation device
CN112550579B (en) * 2020-12-29 2021-12-17 烟台南山学院 Ship wave dissipation device

Similar Documents

Publication Publication Date Title
CN106567359A (en) Island developing technology adopting island shelf light rail and floating boat layer ring type double-peak-body wave power generation
US8102071B2 (en) River and tidal power harvester
CN102602751B (en) Control cable machine, zither, Zheng Qu operating mechanism, zither electrical generator, wind are driven ship and method
CN105766749B (en) A kind of off-lying sea cultivation wind resistance wave type radial type net cage
Lister et al. Sustainable artificial island concept for the Republic of Kiribati
CN104743072A (en) Combined buoyancy marine reclaimed land
CN103437946A (en) Large-rotating-wheel multi-cylinder type automatic rotating power generation method for implementing automatic intake-exhaust by means of gravity to obtain over-compensatory buoyancy-gravity energy
CN102913371A (en) Island shelf floating boat multi-ring power generation system consisting of double-peak-body and helical water wheel wave absorption retaining wall
CN104179624A (en) Current-driven ultralarge impeller power generation method and river dredging method
CN205946906U (en) Articulated formula box with a net of unrestrained type of anti -wind is bred to off -lying sea
CN104165117A (en) Power generation method for realizing superpower automatic circulation and automatic compensation-output by means of buoyancy and gravity
Tong et al. Advanced materials and devices for hydropower and ocean energy
GB2551571A (en) A system and method for extracting power from tides
CN203268295U (en) High-stability floating platform floating with water level
CN102134933B (en) Stereoscopic level building
CN109080782A (en) A kind of large-scale chinampa at sea
EP1991741A2 (en) Buoyant structures
CN106256964A (en) Multipurpose over-water platform
CN101949349A (en) Method for generating power by utilizing sails in flowing water
Bhatt Modular Maritime Metropolis: A Review on Sustainable Floating City
Rehman FLOATING ARCHITECTURE
Skorpa Developing new methods to cross wide and deep Norwegian fjords
Williams The Romance of Modern Engineering: Containing Interesting Descriptions in Non-technical Language of the Nile Dam, the Panama Canal, the Tower Bridge, the Brooklyn Bridge, the Trans-Siberian Railway, the Niagara Falls Power Co., Bermuda Floating Dock, Etc., Etc
CN106638527A (en) Multi-purpose water platform
Bott Power plus proteins from the sea

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170419

WD01 Invention patent application deemed withdrawn after publication