CN106555216A CN201611084967.8A CN201611084967A CN106555216A CN 106555216 A CN106555216 A CN 106555216A CN 201611084967 A CN201611084967 A CN 201611084967A CN 106555216 A CN106555216 A CN 106555216A
Authority
CN
China
Prior art keywords
crane
travel switch
trolley track
track
waste liquid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611084967.8A
Other languages
Chinese (zh)
Inventor
汪根生
任小体
游锦山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Hundred Million Good Fortune Automation Science And Technology Ltd
Original Assignee
Hefei Hundred Million Good Fortune Automation Science And Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Hundred Million Good Fortune Automation Science And Technology Ltd filed Critical Hefei Hundred Million Good Fortune Automation Science And Technology Ltd
Priority to CN201611084967.8A priority Critical patent/CN106555216A/en
Publication of CN106555216A publication Critical patent/CN106555216A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C25ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
    • C25DPROCESSES FOR THE ELECTROLYTIC OR ELECTROPHORETIC PRODUCTION OF COATINGS; ELECTROFORMING; APPARATUS THEREFOR
    • C25D11/00Electrolytic coating by surface reaction, i.e. forming conversion layers
    • C25D11/005Apparatus specially adapted for electrolytic conversion coating
    • CCHEMISTRY; METALLURGY
    • C25ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
    • C25DPROCESSES FOR THE ELECTROLYTIC OR ELECTROPHORETIC PRODUCTION OF COATINGS; ELECTROFORMING; APPARATUS THEREFOR
    • C25D11/00Electrolytic coating by surface reaction, i.e. forming conversion layers
    • C25D11/02Anodisation
    • C25D11/04Anodisation of aluminium or alloys based thereon

Abstract

The invention discloses a kind of Stability of Bath Solution control system, it is related to aluminium section bar production equipment technical field, including the superficial treatment system being made up of the multiple technology grooves being arranged in order in line, the trolley track being set in parallel in above the superficial treatment system, and the crane that can be walked on the trolley track driven by actuating unit, also include PLC, waste liquid tank is additionally provided with described in each two between technology groove, it is additionally provided with to determine the first travel switch of the crane stop position on the trolley track, first travel switch is located above the waste liquid tank, first travel switch is connected with crane braking device and the PLC respectively.The present invention can effectively reduce medicine addition and ton material water consumption.

Description

A kind of Stability of Bath Solution control system
Technical field
The present invention relates to aluminium section bar production equipment technical field, and in particular to a kind of Stability of Bath Solution control system.
Background technology
Aluminium section bar is the main structural material of current door and window and curtain wall, is worldwide extensively applied.It is aluminium alloy extruded Outward appearance is single for section bar (non-surface treated), and easily corrodes in moist atmosphere, thus is difficult to meet the high dress of construction material The requirement of decorations property and strong weathering.In order to improve decorative effect, enhancing corrosion resistance and increase the service life, aluminium section bar typically will It is surface-treated.Therefore, surface treatment is the operation essential and particularly important together of aluminium section bar production.Conventional aluminum The method of Surface of profile process is anodizing, can form dense oxidation film in aluminium shape surface by anodizing, should The presence of oxide-film can significantly improve corrosion resistance, wearability and the decoration performance of aluminium alloy extrusions.It is applied in prior art The anode oxidative treatment method of aluminium section bar is referred to:In certain electrolyte, with aluminium section bar part as anode, with rustless steel or aluminum Metal is negative electrode, the process in highly acid electrolytic solution being surface-treated aluminium section bar.
The technical processs such as oil removing, washing, acid etching, alkaline etching can be also carried out before existing oxidation aluminium handling process, Original mode of operation behaviour industry control tank liquor, this mode have very big randomness, and especially when altofrequency is produced, Jing often goes out Now control the situation of water deficiency of time, upper track tank liquor into branch by band down road tank liquor, the composition of road tank liquor by under the influence of, also therefore Increase medicine addition and ton material water consumption.
The content of the invention
To solve above-mentioned technical problem, the present invention provides a kind of reduction medicine addition and the tank liquor of ton material water consumption is stable Property control system.
The present invention is adopted the following technical scheme that:
A kind of Stability of Bath Solution control system, at the surface being made up of the multiple technology grooves being arranged in order in line Reason system, the trolley track being set in parallel in above the superficial treatment system, and by actuating unit drive can be in institute The crane walked on trolley track is stated, the crane braking device that the crane stops on the trolley track can be allowed, is also wrapped PLC and the time relay are included, waste liquid tank is additionally provided with described in each two between technology groove, is also set on the trolley track It is equipped with to determine the first travel switch of the crane stop position, first travel switch is located above the waste liquid tank, The PLC is connected with the crane braking device, first travel switch and the time relay respectively, and first Crane is not affected to walk on trolley track when travel switch does not work;During the first travel switch energization work, crane was walked The first travel switch is touched in journey, signal is sent to PLC, and PLC sends and stops travel commands to crane braking Device, the braking of crane braking device stop crane, now will be unable to control crane walking, can farthest by aluminium section bar The extraction raffinate of residual is removed, thus it is ensured that the ingredient stability of lower road tank liquor, reduces the addition of tank liquor medicine, and PLC sends To the time relay, after the time relay reaches Preset Time, the first travel switch and crane braking device stop clocked command Work, crane can walk on, by time relay timing, accurately can control aluminium section bar the control water time make it is residual on aluminium section bar The extraction raffinate stayed flows to waste liquid tank.
Preferably, the crane includes flexure member and coiler device, the flexure member hoisting object product, the winding dress Winding flexure member is put, the photoswitch that the flexure member can be touched in winding process on the crane, is additionally provided with, The photoswitch is connected with the PLC, crane do not sling article when, the flexure member on coiler device cannot be touched Photoswitch;The aluminium section bar of general surface treatment is all longer, and when crane hangs takes aluminium section bar, needs are sling to higher position ability Mobile, flexure member multilayer-wound on coiler device can be sling aluminium section bar to precalculated position, be now placed in coiler device On flexure member will touch photoswitch, signal is sent to PLC, and PLC sends work order to the first row Cheng Kaiguan, the first travel switch are powered and preparation, realize the above-mentioned course of work, when crane does not hang what is taken aluminium section bar or sling Highly it is not enough to crane will not be affected to walk on trolley track when touching photoswitch, does not affect crane on other stations Work, does not affect the work efficiency of crane.
Preferably, the system also includes two parallel cart tracks, and the two ends of the trolley track are slided respectively and set It is placed on two cart tracks, and the trolley track is walked by actuating unit driving energy on the cart track, institute State trolley track by trolley track brake unit control can stop on the cart track, the system include it is multiple parallel to The superficial treatment system of trolley track arrangement, is provided with waste liquid tank, the big track between superficial treatment system described in each two It is additionally provided with road to determine the second travel switch of the trolley track stop position, second travel switch is located at parallel On the cart track above the waste liquid tank, second travel switch, the trolley track brake unit connect institute respectively State PLC.
Preferably, the waste liquid tank waste liquid tank connection respectively with two adjacent superficial treatment systems, will The waste collection flowed down from aluminium section bar, can focus on to waste liquid, reduce the pollution of waste liquid.
Preferably, first travel switch and second travel switch are normally closed switch, and the photoswitch is Normal open switch.
Beneficial effects of the present invention:
(1) present invention is provided with photoswitch on coiler device, when crane hangs takes the aluminium section bar being surface-treated, will Touching photoswitch, makes the first travel switch be powered and preparation, when crane does not hang the height deficiency for taking aluminium section bar or slinging Crane will not be affected to walk on trolley track during touching photoswitch, not affect work of the crane on other stations, no Affect the work efficiency of crane;
(2) present invention is equipped with travel switch on trolley track and cart track, runs to aluminium section bar at travel switch To stop above waste liquid tank, and make the extraction raffinate that the carrying out on aluminium section bar is surface-treated flow to waste liquid tank, and the receipts by waste liquid tank Collection, facilitates the liquid waste processing in later stage, reduces the pollution of waste liquid;
(3) present invention is additionally provided with the time relay, by time relay timing, when can accurately control the control water of aluminium section bar Between.
Description of the drawings
Accompanying drawing is used for providing a further understanding of the present invention, and constitutes a part for description, the reality with the present invention Applying example is used for explaining the present invention together, is not construed as limiting the invention.In the accompanying drawings:
Structural representations of the Fig. 1 for first embodiment of the invention;
Structural representations of the Fig. 2 for first embodiment of the invention crane;
Control system module frame charts of the Fig. 3 for first embodiment of the invention;
Structural representations of the Fig. 4 for second embodiment of the invention;
Structural representations of the Fig. 5 for second embodiment of the invention crane;
Structural representations of the Fig. 6 for third embodiment of the invention;
Control system module frame charts of the Fig. 7 for third embodiment of the invention.
It is labeled as in figure:1st, superficial treatment system;11st, technology groove;12nd, waste liquid tank;13rd, waste liquid tank;2nd, trolley track; 21st, trolley track brake unit;3rd, crane;31st, flexure member;32nd, coiler device;33rd, crane braking device;4th, PLC controls Device;51st, the first travel switch;52nd, the second travel switch;6th, photoswitch;7th, the time relay;8th, cart track.
Specific embodiment
The specific embodiment of the present invention is described below in conjunction with the accompanying drawings.
Embodiment 1:
As shown in Figures 1 to 3, a kind of Stability of Bath Solution control system of the invention, including by being arranged in order in line The superficial treatment system 1 of the composition of multiple technology grooves 11, the trolley track 2, Yi Jiyou being set in parallel in above superficial treatment system 1 The crane 3 that can be walked on trolley track 2 that actuating unit drives, can allow the crane 3 to stop on the trolley track 2 Crane braking device 33 only, also including PLC 4, is additionally provided with waste liquid tank 12, little track between each two technology groove 11 It is additionally provided with road 2 to determine the first travel switch 51 of 3 stop position of crane, the first travel switch 51 is located on waste liquid tank 12 Side, PLC 4 are connected with crane braking device 33, the first travel switch 51 and the time relay 7 respectively, and trolley track 2 is Single-beam bridge, crane 3 are arranged at below trolley track 2, and the first travel switch 51 is normally closed switch and is arranged under trolley track 2 At crane 3, the first travel switch 51 does not hinder crane 3 to walk along trolley track 2 when not working at end.
Crane 3 includes flexure member 31 and coiler device 32, and 31 hoisting object product of flexure member, coiler device 32 wind flexibility Component 31, is additionally provided with the photoswitch 6 that flexure member 31 can be touched in winding process on crane 3, photoswitch 6 connects PLC 4, the aluminium section bar of general surface treatment are all longer, and needs are sling to higher position and could be moved, and flexure member 31 exists On coiler device 32, multilayer-wound can be sling aluminium section bar to precalculated position, the flexure member being now placed on coiler device 32 31 will touching photoswitch 6.
The working method of the embodiment of the present invention 1:
Control crane 3 is walked on the trolley track 2, to above technology groove 11 after stop, flexure member 31 is fixed into aluminium profiles Material, winds flexure member 31 by coiler device 32 and slings aluminium section bar to precalculated position;
When the aluminium section bar sling reaches precalculated position, the touching photoswitch 6 of flexure member 31 on coiler device 32, signal PLC 4 is sent to, PLC 4 sends work order to the first travel switch 51 and the time relay 7, the first row Cheng Kaiguan 51 and the time relay 7 are powered and preparation;
Control crane 3 runs to next technology groove 11 on trolley track 2, and in walking process, the touching of crane 3 is positioned at waste liquid The first travel switch 51 on trolley track 2 above groove 12, signal are sent to PLC 4, and PLC 4 sends and stops Travel commands are to crane braking device 33 and send clocked command to the time relay 7, and crane 3 stops walking being made on aluminium section bar The extraction raffinate of residual flows to waste liquid tank 12, while 7 timing of the time relay;
After the time relay 7 reaches Preset Time, signal is sent to PLC 4, and PLC 4 sends and quits work Instructing to travel switch and crane travel commands being sent to crane braking device 33, control crane 3 walks on to the next one Technology groove 11.
Embodiment 2:
As shown in Fig. 3 to 5, the present invention a kind of Stability of Bath Solution control system, trolley track 2 be two-beam bridge, crane 3 Two ends are slideably positioned in above twin beams track respectively, and crane 3 is walked on two-beam bridge track by actuating unit driving energy, crane 3 are sling in the middle part of twin beams track aluminium section bar by flexure member 31, and the first travel switch 51 is normally closed switch and is arranged at dolly On the outside of 2 upper end of track at crane 3, the first travel switch 51 does not hinder crane 3 to walk along trolley track 2 when not working.
The other structures of the present embodiment 2 are same as Example 1, and working method is also identical, repeat no more.
Embodiment 3:
As shown in Figure 6,7, on the basis of embodiment 1, a kind of Stability of Bath Solution control system of the present invention also includes two The parallel cart track 8 of bar, the two ends of trolley track 2 are slideably positioned on two cart tracks 8 respectively, and trolley track 2 by Actuating unit driving energy is walked on cart track 8, and trolley track 2 can be in big track by the control of trolley track brake unit 21 Stop on road 8, system includes multiple superficial treatment systems 1 parallel to the arrangement of trolley track 2, each two superficial treatment system 1 Between be provided with waste liquid tank 13, be additionally provided with to determine the second travel switch of 2 stop position of trolley track on cart track 8 52, the second travel switch 52 is located parallel on the cart track 8 above waste liquid tank 13, the second travel switch 52, trolley track Brake unit 21 connects PLC 4, the waste liquid tank 12 respectively with two adjacent superficial treatment systems 1 of waste liquid tank 13 respectively Connection.
On the basis of 1 working method of embodiment, the working method of the embodiment of the present invention 3 also includes:
Control trolley track 2 is walked on cart track 8, and the aluminium section bar sling is moved to next superficial treatment system 1, the touching of trolley track 2 in walking process is located parallel to the second travel switch 52 on the cart track 8 above waste liquid tank 13, Signal is sent to PLC 4, and PLC 4 sends and stops travel commands to trolley track brake unit 21 and send meter When order to the time relay 7, trolley track 2 stops walking making the extraction raffinate remained on aluminium section bar flow to waste liquid tank 13, with constantly Between 7 timing of relay;
After the time relay 7 reaches Preset Time, signal is sent to PLC 4, and PLC 4 sends and quits work Instruct to the second travel switch 52 and trolley track travel commands are sent to trolley track brake unit 21, control trolley track 2 walk on, and the aluminium section bar sling on crane 3 is delivered to next technology groove 11.
The preferred embodiments of the present invention are the foregoing is only, the present invention is not limited to, although with reference to aforementioned reality Apply example to be described in detail the present invention, for a person skilled in the art, which still can be to aforementioned each enforcement Technical scheme described in example is modified, or carries out equivalent to which part technical characteristic.All essences in the present invention Within god and principle, any modification, equivalent substitution and improvements made etc. should be included within the scope of the present invention.

Claims (5)

1. a kind of Stability of Bath Solution control system, including the surface treatment being made up of the multiple technology grooves being arranged in order in line System, the trolley track being set in parallel in above the superficial treatment system, and by actuating unit drive can be described The crane walked on trolley track, can allow the crane braking device that the crane stops on the trolley track, its feature It is, also including PLC and the time relay, described in each two, between technology groove, to be additionally provided with waste liquid tank, the dolly It is additionally provided with track to determine the first travel switch of the crane stop position, first travel switch is located at described useless Above liquid bath, the PLC respectively with the crane braking device, first travel switch and the time relay Connection.
2. a kind of Stability of Bath Solution control system according to claim 1, it is characterised in that the crane includes flexible structure Part and coiler device, the flexure member hoisting object product, the coiler device wind flexure member, are additionally provided with the crane The photoswitch that the flexure member can be touched in winding process, the photoswitch are connected with the PLC.
3. a kind of Stability of Bath Solution control system according to claim 1 and 2, it is characterised in that the system also includes Two parallel cart tracks, the two ends of the trolley track are slideably positioned on two cart tracks respectively, and described Trolley track is walked on the cart track by actuating unit driving energy, and the trolley track is by trolley track brake unit control System can stop on the cart track, and the system includes multiple superficial treatment systems parallel to trolley track arrangement, often Waste liquid tank is provided between two superficial treatment systems, is additionally provided with to determine the trolley track on the cart track Second travel switch of stop position, second travel switch are located parallel on the cart track above the waste liquid tank, Second travel switch, the trolley track brake unit connect the PLC respectively.
4. a kind of Stability of Bath Solution control system according to claim 3, it is characterised in that the waste liquid tank respectively with phase The waste liquid tank connection of two adjacent superficial treatment systems.
5. a kind of Stability of Bath Solution control system according to claim 3, it is characterised in that first travel switch and Second travel switch is normally closed switch, and the photoswitch is normal open switch.
CN201611084967.8A 2016-11-30 2016-11-30 A kind of Stability of Bath Solution control system Pending CN106555216A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611084967.8A CN106555216A (en) 2016-11-30 2016-11-30 A kind of Stability of Bath Solution control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611084967.8A CN106555216A (en) 2016-11-30 2016-11-30 A kind of Stability of Bath Solution control system

Publications (1)

Publication Number Publication Date
CN106555216A true CN106555216A (en) 2017-04-05

Family

ID=58445807

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611084967.8A Pending CN106555216A (en) 2016-11-30 2016-11-30 A kind of Stability of Bath Solution control system

Country Status (1)

Country Link
CN (1) CN106555216A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201678758U (en) * 2010-04-01 2010-12-22 沈阳铝镁设计研究院 Control system of lifting unit
US20110146732A1 (en) * 2007-06-06 2011-06-23 C. Uyemura & Co., Ltd. Workpiece Surface Treatment System
CN204058622U (en) * 2014-08-15 2014-12-31 深圳市鑫承诺科技有限公司 A kind of surface by micro-arc oxidation treatment unit of aluminum magnesium alloy
CN106319595A (en) * 2016-10-21 2017-01-11 南京鸿发有色金属制造股份有限公司 Aluminum profile surface treatment bath solution stability control system and control method thereof
CN206467308U (en) * 2016-10-21 2017-09-05 南京鸿发有色金属制造股份有限公司 Aluminium shape surface handles tank liquor stabilitrak

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110146732A1 (en) * 2007-06-06 2011-06-23 C. Uyemura & Co., Ltd. Workpiece Surface Treatment System
CN201678758U (en) * 2010-04-01 2010-12-22 沈阳铝镁设计研究院 Control system of lifting unit
CN204058622U (en) * 2014-08-15 2014-12-31 深圳市鑫承诺科技有限公司 A kind of surface by micro-arc oxidation treatment unit of aluminum magnesium alloy
CN106319595A (en) * 2016-10-21 2017-01-11 南京鸿发有色金属制造股份有限公司 Aluminum profile surface treatment bath solution stability control system and control method thereof
CN206467308U (en) * 2016-10-21 2017-09-05 南京鸿发有色金属制造股份有限公司 Aluminium shape surface handles tank liquor stabilitrak

Similar Documents

Publication Publication Date Title
CN106319595B (en) Aluminium shape surface handles tank liquor stabilitrak and its control method
CN201236103Y (en) Winding mechanism of trestle crane hoisting mechanism steel wire rope
CN206467308U (en) Aluminium shape surface handles tank liquor stabilitrak
CN204778459U (en) Double small car container bank bridge
CN203333185U (en) Trussed gantry crane
CN202429920U (en) Multi-trolley and double-girder gantry crane
CN204342298U (en) A kind of double track transfer crane
CN201809053U (en) Single-beam bridge-type crane with electric hoist
CN106555216A (en) A kind of Stability of Bath Solution control system
CN103395699B (en) A kind of double-deck bank bridge with vertical lift device
CN202465099U (en) Single-girder partial hanging gantry crane
CN202527343U (en) Coating traveling crane lifting hanging frame structure
CN209353734U (en) For installing the double-track device of curtain wall
CN206599343U (en) Elevator device for moving back desk-top building
CN207658895U (en) Working at height glass hanging equipment
CN208379031U (en) A kind of Novel profile oxidation treatment device
CN207188779U (en) A kind of LF refining steel ladle covering/uncovering device
CN202609884U (en) Mobile sit-on-the-fence frame hanging basket suspension mechanism
CN219058395U (en) Suspension European style electric hoist
CN201338908Y (en) Long distance hoisting device
CN202415007U (en) General crane for feeding basket and trough of electric furnace
CN218371141U (en) Special lifting device for steel structure well of additionally installed elevator
CN204727495U (en) A kind of large-tonnage cable carries hoisting crane
CN204643565U (en) A kind of compound type replacing suspender changed for fan-shaped sections of slab continuous
CN207293904U (en) A kind of portable architectural engineering boom hoisting

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170405