CN106546135A - 一种隧道断面开挖控制模具 - Google Patents

一种隧道断面开挖控制模具 Download PDF

Info

Publication number
CN106546135A
CN106546135A CN201610974140.8A CN201610974140A CN106546135A CN 106546135 A CN106546135 A CN 106546135A CN 201610974140 A CN201610974140 A CN 201610974140A CN 106546135 A CN106546135 A CN 106546135A
Authority
CN
China
Prior art keywords
arch
arch ring
ring
positioning pipe
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610974140.8A
Other languages
English (en)
Inventor
周硕
杭宝国
席小龙
李祯
王圣进
周泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 4 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
No 4 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 4 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical No 4 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority to CN201610974140.8A priority Critical patent/CN106546135A/zh
Publication of CN106546135A publication Critical patent/CN106546135A/zh
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明是一种隧道断面开挖控制模具,包括拱圈、定位管、连接板、斜撑和底板,所述拱圈为由无缝钢管焊接而成的拱形钢圈,所述定位管为均布于拱圈外廓上的无缝钢管,所述连接板为竖直设于拱圈中间部位的钢板,所述底板为横向设于拱圈两端拱脚的钢板,所述斜撑一端与连接板连接,另一端与底板连接;本发明拼装完成后,测量员用测量仪器精确确定模具的位置时,仅需确定模具顶点的位置与两侧拱脚位置即确定了整个开挖轮廓面,相比传统测量作业,能够节约20分钟的时间;提高了钻爆的精确度,周边眼沿着定位管打设,保证了炮眼的角度和间距,能够控制好超欠挖,确保良好的爆破效果。

Description

一种隧道断面开挖控制模具
技术领域
本发明涉及隧道施工技术领域,尤其涉及一种隧道断面开挖控制模具。
背景技术
目前隧道施工,国内主要采用“钻爆法”的施工技术,利用炸药爆破岩石,形成隧道的净空断面。施工中,测量员用测量仪器放出隧道开挖轮廓线,用油漆做好标记,开挖工人按照开挖轮廓线钻孔并装药爆破,测量耗费时间长,因为地质或施工技术的原因,超欠挖难以控制,轮廓不圆顺,爆破效果往往达不到理想的要求。
发明内容
本发明旨在解决现有技术的不足,而提供一种隧道断面开挖控制模具,该模具用于隧道断面开挖的轮廓线性控制、超欠挖的控制,可保证良好的爆破效果。
本发明为实现上述目的,采用以下技术方案:一种隧道断面开挖控制模具,包括拱圈、定位管、连接板、斜撑和底板,所述拱圈为由无缝钢管焊接而成的拱形钢圈,所述定位管为均布于拱圈外廓上的无缝钢管,所述定位管与拱圈的外圆相切且平行于拱圈的轴线,所述连接板为竖直设于拱圈中间部位的钢板,所述底板为横向设于拱圈两端拱脚的钢板,所述斜撑一端与连接板连接,另一端与底板连接。
所述拱圈所用钢管直径不大于定位管直径。
所述拱圈为优弧形。
所述拱圈所用钢管直径为42mm。
所述定位管长50mm。
本发明的有益效果是:本发明拼装完成后,测量员用测量仪器精确确定模具的位置时,仅需确定模具顶点的位置与两侧拱脚位置即确定了整个开挖轮廓面,相比传统测量作业,能够节约20分钟的时间;提高了钻爆的精确度,周边眼沿着定位管打设,保证了炮眼的角度和间距,能够控制好超欠挖,确保良好的爆破效果。
附图说明
图1为本发明的结构示意图;
图中:1-拱圈;2-定位管;3-连接板;4-斜撑;5-底板;
以下将结合本发明的实施例参照附图进行详细叙述。
具体实施方式
下面结合附图和实施例对本发明作进一步说明:
如图1所示,一种隧道断面开挖控制模具,包括拱圈1、定位管2、连接板3、斜撑4和底板5,所述拱圈1为由无缝钢管焊接而成的拱形钢圈,所述定位管2为均布于拱圈1外廓上的无缝钢管,所述定位管2与拱圈1的外圆相切且平行于拱圈1的轴线,所述连接板3为竖直设于拱圈1中间部位的钢板,所述底板5为横向设于拱圈1两端拱脚的钢板,所述斜撑4一端与连接板3连接,另一端与底板5连接。
所述拱圈1所用钢管直径不大于定位管2直径。
所述拱圈1为优弧形。
所述拱圈1所用钢管直径为42mm。
所述定位管2长50mm。
本发明在应用时,先按照隧道标准开挖轮廓线作出模具,之后测量员用测量仪器精确确定模具的位置,工人将模具与开挖台车连接,进行模具的固定加固,最后沿着定位管2打设周边炮眼后即可取走模具,定位精准、轮廓圆顺,能有效控制超欠挖。
上面结合附图对本发明进行了示例性描述,显然本发明具体实现并不受上述方式的限制,只要采用了本发明的方法构思和技术方案进行的各种改进,或未经改进直接应用于其它场合的,均在本发明的保护范围之内。

Claims (5)

1.一种隧道断面开挖控制模具,其特征在于,包括拱圈(1)、定位管(2)、连接板(3)、斜撑(4)和底板(5),所述拱圈(1)为由无缝钢管焊接而成的拱形钢圈,所述定位管(2)为均布于拱圈(1)外廓上的无缝钢管,所述定位管(2)与拱圈(1)的外圆相切且平行于拱圈(1)的轴线,所述连接板(3)为竖直设于拱圈(1)中间部位的钢板,所述底板(5)为横向设于拱圈(1)两端拱脚的钢板,所述斜撑(4)一端与连接板(3)连接,另一端与底板(5)连接。
2.根据权利要求1所述的隧道断面开挖控制模具,其特征在于,所述拱圈(1)所用钢管直径不大于定位管(2)直径。
3.根据权利要求1所述的隧道断面开挖控制模具,其特征在于,所述拱圈(1)为优弧形。
4.根据权利要求1所述的隧道断面开挖控制模具,其特征在于,所述拱圈(1)所用钢管直径为42mm。
5.根据权利要求1所述的隧道断面开挖控制模具,其特征在于,所述定位管(2)长50mm。
CN201610974140.8A 2016-11-05 2016-11-05 一种隧道断面开挖控制模具 Pending CN106546135A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610974140.8A CN106546135A (zh) 2016-11-05 2016-11-05 一种隧道断面开挖控制模具

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610974140.8A CN106546135A (zh) 2016-11-05 2016-11-05 一种隧道断面开挖控制模具

Publications (1)

Publication Number Publication Date
CN106546135A true CN106546135A (zh) 2017-03-29

Family

ID=58395522

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610974140.8A Pending CN106546135A (zh) 2016-11-05 2016-11-05 一种隧道断面开挖控制模具

Country Status (1)

Country Link
CN (1) CN106546135A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107504872A (zh) * 2017-09-13 2017-12-22 大连理工大学 一种防止隧道拱脚欠挖的爆破方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2942101C2 (de) * 1979-10-18 1985-05-09 Ruhrkohle Ag, 4300 Essen Vorrichtung zum Durchbauen von Strecken, insbesondere im Bergbau
JPH0835391A (ja) * 1994-07-22 1996-02-06 Ohbayashi Corp 導坑による先行脚部補強型フォアパイリング工法
CN202090923U (zh) * 2011-06-21 2011-12-28 中铁十二局集团第一工程有限公司 可调式隧道开挖台架
CN204002794U (zh) * 2014-07-17 2014-12-10 粤水电轨道交通建设有限公司 一种轨式隧道断面可调综合台车
CN104453930A (zh) * 2014-11-21 2015-03-25 北京首尔工程技术有限公司 一种隧道预衬砌施工设备及施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2942101C2 (de) * 1979-10-18 1985-05-09 Ruhrkohle Ag, 4300 Essen Vorrichtung zum Durchbauen von Strecken, insbesondere im Bergbau
JPH0835391A (ja) * 1994-07-22 1996-02-06 Ohbayashi Corp 導坑による先行脚部補強型フォアパイリング工法
CN202090923U (zh) * 2011-06-21 2011-12-28 中铁十二局集团第一工程有限公司 可调式隧道开挖台架
CN204002794U (zh) * 2014-07-17 2014-12-10 粤水电轨道交通建设有限公司 一种轨式隧道断面可调综合台车
CN104453930A (zh) * 2014-11-21 2015-03-25 北京首尔工程技术有限公司 一种隧道预衬砌施工设备及施工方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107504872A (zh) * 2017-09-13 2017-12-22 大连理工大学 一种防止隧道拱脚欠挖的爆破方法

Similar Documents

Publication Publication Date Title
CN103195453B (zh) 一种基于巷道承载结构的锚杆支护参数确定方法
CN105673046A (zh) 双连拱隧道中导洞拱顶回填施工方法
CN205840894U (zh) 一种隧道约束混凝土拱架机械化施工快速定位纵向连接装置
CN105275481A (zh) 新型高效围岩注浆加固方法
CN210598997U (zh) 用于盾构机超前注浆的注浆管及超前注浆系统
CN105971641B (zh) 一种隧道约束混凝土拱架机械化施工快速定位纵向连接装置
CN106968686A (zh) 一种管棚施工方法
CN106546135A (zh) 一种隧道断面开挖控制模具
CN206529770U (zh) 一种异形钢护筒
CN103410529B (zh) 一种用于软弱围岩的隧道支撑拱脚加固结构及施工方法
CN205858326U (zh) 一种矿井围岩气测压抽采装置
CN110159308B (zh) 一种隧道长管棚定位方法
CN210242790U (zh) 一种管片安装测量托架及盾构设备
CN111810162A (zh) 一种煤矿地面钻孔精准透巷的施工方法
CN207583398U (zh) 一种软弱围岩组合支护装置
CN103161447B (zh) 一种利用定向钻孔进行顺层测压的方法
CN113338979A (zh) 一种水工隧洞钻孔台车开挖施工方法及装置
CN204663390U (zh) 一种带有纠偏功能的钻杆
CN203531919U (zh) 钢管混凝土支架的注浆口与排气孔的补强结构
CN208106342U (zh) 一种多功能双套筒回转钻机钻杆
CN208330410U (zh) 一种隧道穿越破碎带棚护结构
CN207064868U (zh) 超长距离的水平定向钻进穿越复杂障碍的供水管道结构
CN104612156B (zh) 一种静钻根植桩桩平面位移控制工具的控制方法
CN204959585U (zh) 硬基面悬崖壁的通道装置
CN210152557U (zh) 一种扩孔装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170329