CN106545117B - A kind of public utility Integral ceiling and its construction method - Google Patents
A kind of public utility Integral ceiling and its construction method Download PDFInfo
- Publication number
- CN106545117B CN106545117B CN201610339026.8A CN201610339026A CN106545117B CN 106545117 B CN106545117 B CN 106545117B CN 201610339026 A CN201610339026 A CN 201610339026A CN 106545117 B CN106545117 B CN 106545117B
- Authority
- CN
- China
- Prior art keywords
- water
- integral ceiling
- air
- conditioning
- horizontal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/006—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation with means for hanging lighting fixtures or other appliances to the framework of the ceiling
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/06—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/18—Means for suspending the supporting construction
- E04B9/20—Means for suspending the supporting construction adjustable
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Duct Arrangements (AREA)
Abstract
A kind of public utility Integral ceiling, including including bearing unit (100), functional unit and interface unit, the main air hose of air-conditioning (6) is mounted horizontally structural member and passes through and be supported on Horizontal mounting arrangements part;The main air hose of air-conditioning (6) includes inverted U-shaped body passageways (6.1), transferring outward on inverted U-shaped body passageways two sides of the bottom side has horizontal lock portion (6.2), in horizontal lock portion, central integration has vertically portion (6.3), the horizontal lock portion is capping sticking department (6.4) in vertically portion right part, the horizontal lock portion is decorative panel sticking department (6.5) in vertically portion left part, bottom cover (8) is fastened in capping sticking department (6.4), clamping Decorative hanging board (7) is connected in the two sides vertically portion of U-shaped body passageways (6.1), the clamping decorative panel (7) is equipped in the lower section of bottom cover buckling parts across slot, horizontal structural component is crossed described across slot.The public utility Integral ceiling ensure that Integral ceiling can accomplish that layer height is minimum by the mutually matched structure of the main air hose of air-conditioning and Horizontal mounting arrangements part, be accomplished by the structure design and the combination of functional column of water, electricity and gas integrated frame convenient to install and maintain.
Description
Technical field
The invention belongs to furred ceiling technical fields, and in particular to a kind of public utility Integral ceiling and its construction method.
Background technique
It is the development trend of furred ceiling industry, referred to as Integral ceiling that furred ceiling is integrated with electric appliance.Integral ceiling is by plate
Formed with electric appliance set, modularization is the most prominent feature of Integral ceiling, Integral ceiling generally by heating module, lighting module,
The ventilation materials such as module and metal aluminum-pinch are arbitrarily assembled with modular form, disassembly convenience, type multiplicity.Computer floor and data
Treatment of laboratory, hospital and government organs commence business the multiple data processing equipments for being increasingly dependent on and being arranged inside.Rationally
Using water, electricity, warm, air, the functional requirement of Integral ceiling is increasingly becomed.Meanwhile the furred ceiling for reducing height is also that client is non-
The form often liked.
Integral ceiling mostly uses greatly being connected and fixed to complete keel frame structure of lightgage steel joist and triangular keel at present, also
Need to install the facilities such as water pipe, cable, air hose on frame, this structure installation procedure is complicated, and stability is inadequate.
A kind of integrated suspended ceiling device is designed, the integrated basic demand of water, electricity, gas, heat has both been met, also meets the high height of layer most
Low requirement, it is the problem of designer really that the simple location and installation of structure is convenient.
Summary of the invention
In view of the above existing problems in the prior art, the present invention provides a kind of public utility Integral ceiling and its construction parties
Method.
The invention is realized in this way a kind of public utility Integral ceiling, including including bearing unit, functional unit and connect
Mouth unit, the bearing unit include Horizontal mounting arrangements part, phase with vertical installation part and several whole weight bearing parts, are horizontally mounted
The crossover node of structural member is connected the phase with vertical installation part, and the whole weight bearing part is adjustably fixedly connected described vertical
Mounting structure, the whole weight bearing part are fastened on house top plate;The functional unit include with wind module, fire alarm module and
Electricity-water-gas module, the functional unit are fixed on the top of bearing unit, Integral ceiling connecting interface are worn under the functional unit
Unit;Described with wind module includes the main air hose of air-conditioning, and the main air hose of air-conditioning is passed through by the Horizontal mounting arrangements part of other direction
And it is supported on Horizontal mounting arrangements part;The main air hose of air-conditioning includes inverted U-shaped body passageways, in inverted U-shaped body passageways bottom
Two sides are transferred outward horizontal lock portion, and in horizontal lock portion, central integration has vertically portion, the horizontal lock
Portion is capping sticking department in vertically portion right part, and the horizontal lock portion is decorative panel in vertically portion left part
Sticking department, bottom cover are fastened on capping sticking department, are connected with clamping decoration in the two sides vertically portion of inverted U-shaped body passageways and are hung
Plate, the clamping Decorative hanging board are equipped in the lower section of bottom cover buckling parts across slot, and horizontal structural component is crossed described across slot.
Further, transferring outward in the top margin two sides of inverted U-shaped body passageways has top fixed part, and top fixed part is fixed
At the top of house, the high height in the main air hose of the air-conditioning of the layer of Integral ceiling.
Further, the cross section of the clamping Decorative hanging board is Z-shaped, including the integrally formed upper clamping that lays flat on one's back
Portion, lower clamping portion and opposite joint portion, the clamping Decorative hanging board in the left side and the clamping Decorative hanging board on right side dock simultaneously in opposite joint portion
It is locked with fixing piece, the size of the inverted U-shaped body passageways of the main air hose of air-conditioning is not by the crossover node of Horizontal mounting arrangements part
The limitation of size, the main air hose of air-conditioning substitute a Horizontal mounting arrangements part, are worn by the Horizontal mounting arrangements part of other direction
It crosses and is supported on Horizontal mounting arrangements part.
Further, the clamping Decorative hanging board includes integrally formed upper clamping portion, lower clamping portion and opposite joint portion, works as a left side
When the clamping Decorative hanging board of side and the clamping Decorative hanging board on right side are connected to the two sides of inverted U-shaped body passageways, the lower clamping portion
The distance between be equal to horizontal structural component intersect when mesh width, between the lower clamping portion in left side and the lower clamping portion on right side
It is connected with decoration panel.
Further, the electricity-water-gas module includes forceful electric power module, light current module, upper water module and gas module.
It further, further include water, electricity and gas integrated frame, water, electricity and gas integrated frame is mountain font main body, is among the font main body of mountain
Isolation board, is equipped with electric bridge portion in the side of isolation board, is equipped with water pipe installation portion and tracheae installation portion, water in the other side of isolation board
Electrical integrated frame is fixed on bearing unit, and the electricity-water-gas module is fixed on the water, electricity and gas integrated frame.
Further, an avris is fixed with the first water, electricity and gas integrated frame on the bearing unit, is fixed in another avris
Second water, electricity and gas integrated frame, the forceful electric power module are mounted on the first water, electricity and gas integrated frame, and high-tension cable is threaded through in spool, high
Voltage cable connects junction box, wears Integral ceiling linkage function column under the junction box outlet wiring, functional column lower accepting water is electrically whole
End;The light current module is mounted on the second water, electricity and gas integrated frame, and type low-voltage cable is threaded through the spool of the second water, electricity and gas integrated frame
In, low-voltage cable connects junction box, and Integral ceiling connection suspension type electric-appliance interface module is worn under the junction box outlet wiring.
Further, the fire alarm module includes high pressure water supervisor, and the high pressure water supervisor is separately positioned on the main wind of air-conditioning
On the bearing unit on the close wall side of the two sides of pipe, high pressure water is responsible for other scion grafting and goes out high pressure water branch pipe, and the high pressure water branch pipe is worn
Cross Integral ceiling connection fire-fighting spraying head and functional column.
Further, described with wind module includes fresh air structure, air discharge structure and air-conditioner wind structure, the fresh air of fresh air structure
Main air hose is directly anchored on bearing unit, and connects fresh air terminal by wearing Integral ceiling under branch pipe;The air draft of air discharge structure
Main air hose one end connects air draft terminal by wearing Integral ceiling under vertical branch pipe, and the other end is discharged to by air exhaust branch pipe across wall
Outside house.
A kind of construction method of the public utility Integral ceiling, includes the following steps:
1) support unit is constructed, and the first positioning supporting part is arranged in the corner first direction fixed intervals in house, second
The second positioning supporting part is arranged in direction fixed intervals, and second positioning supporting part is lower than the height of the first positioning supporting part certain
Distance;
2) first level structural member is installed, and more first level structural members are equidistantly positioned pair in a first direction in parallel
It answers on the first positioning supporting part;
Wherein, the main air hose of air-conditioning is installed therein on first positioning supporting part by the installation of the main air hose of air-conditioning;
3) the second horizontal structural component is installed, and more second horizontal structural components are equidistantly located in parallel and are hung down with first direction
On second positioning supporting part of straight second direction, the second horizontal structural component crosses the air-conditioning main air hose when installation;First
Horizontal structural component and the second horizontal structural component infall install fixed knot;
4) phase with vertical installation part, institute are installed in the installation of vertical structural component along the vertical multiple fixed knots of wall surrounding in house
It states and is fixedly connected with whole weight bearing part at the top of phase with vertical installation part, at least 3 swell fixtures pass through the slotted mount holes and fix
On floor;
5) Dingan County fills ceiling height really, when being fixed to minimum constructive height installation, by the inverted U-shaped body passageways of the main air hose of air-conditioning
Top hold out against at the top of house, be fixed at the top of house with the bolt hole that expansion bolt passes through top fixed part;
Alternatively, when adjustable Integral ceiling height installation, it will not be solid at the top of the top fixed part of the main air hose of air-conditioning and house
It is fixed, the top nut of phase with vertical installation part is rotated, adjustable range label is carried out on the integrally screw rod of weight bearing part, is adjusted all
The screw rod of whole weight bearing part screws the position in nut and marks to sustained height;
6) the hollow space installation function unit between house top plate and horizontal structural component, is connected to function for interface unit
On energy unit;
7) support unit is removed.
The problem of present invention realizes Integral ceiling by following technical spirit: guarantee can accomplish that layer is high minimum while to collect
At.
(1) the structure design of the main air hose of air-conditioning, guarantees to integrate with Horizontal mounting arrangements part, while the height of fire alarm
Pressure pipe point both sides are arranged symmetrically, and ensure that the balance of Horizontal mounting arrangements part;
(2) design of adjustable Horizontal mounting arrangements part, the whole supporting part and vertical structural component of Horizontal mounting arrangements part
Adjustable design.
The main air hose of air-conditioning and Horizontal mounting arrangements part are integrated, Horizontal mounting arrangements part wearing below body passageways
It crosses slot and is supported on the lower section of the main air hose of air-conditioning.
In addition, then the height of Integral ceiling is exactly the height of the main air hose of air-conditioning by roof is clung at the top of the main air hose of air-conditioning
Degree can accomplish that the lowermost layer of Integral ceiling is high.
(3) the structure design and the combination of functional column of water, electricity and gas integrated frame, partition is by electricity and water, edge of drawing last breath, water, electricity and gas one
Body frame be integrated with water, electricity it is gentle, this integrated installation be convenient for and functional column combination, it is convenient to install and maintain;
The public utility Integral ceiling, integrated level is high, passes through the phase interworking of the main air hose of air-conditioning and Horizontal mounting arrangements part
The structure design of conjunction ensure that Integral ceiling can accomplish that layer height is minimum, pass through structure design and the functional column of water, electricity and gas integrated frame
It is convenient to install and maintain in conjunction with accomplishing.
Detailed description of the invention
Fig. 1 is the main sectional view of public utility Integral ceiling of the present invention.
Fig. 2 is the IV1:8 partial enlarged view of public utility Integral ceiling of the present invention.
Fig. 3 a) be the main air hose of air-conditioning first embodiment cross-sectional view;
Fig. 3 b) be the main air hose of air-conditioning second embodiment cross-sectional view.
Specific embodiment
It elaborates, but is not intended to limit the scope of the invention to the embodiment of the present invention below in conjunction with attached drawing.
As shown in Figure 1, a kind of integrated suspended ceiling device, including bearing unit 100, functional unit, interface unit, the load-bearing
Unit 100 includes several whole weight bearing parts 1 and Horizontal mounting arrangements part 2, phase with vertical installation part 3, the Horizontal mounting arrangements
Part includes first level structural member 2.1 and the second horizontal structural component 2.2, and the corner first direction fixed intervals in house first are set
The first positioning supporting part is set, the second positioning supporting part is set in second direction fixed intervals, second positioning supporting part is than the
The low certain distance of the height of one positioning supporting part, in a first direction by the parallel equidistant positioning of more first level structural members 2.1
Correspondence positioning supporting part on, then more second horizontal structural components 2.2 are equidistantly located in parallel vertical with first direction
Second direction correspondence supporting element on, be equipped with and fix in first level structural member 2.1 and 2.2 infall of the second horizontal structural component
Knot 2.3 is equipped with phase with vertical installation part 3 along the vertical multiple fixed knots of wall surrounding, fixes at the top of the phase with vertical installation part 3
The whole weight bearing part 1 of connection, the whole weight bearing part 1 includes threaded shank 1.1 and fixed cover 1.2, and the fixed cover is equipped with extremely
Few 3 slotted mount holes, at least 3 swell fixtures 1.3 pass through the slotted mount holes and are fixed on floor, the flute profile installation
Hole is designed to cross flute profile, can arbitrarily adjust in both horizontally and vertically 30-80 millimeters of ranges to guarantee installation dimension standard
Really.
The functional unit includes using wind module, fire alarm module, electricity-water-gas module, and the electricity-water-gas module includes forceful electric power mould
Block, light current module, upper water module and gas module, described with wind module includes fresh air structure, air discharge structure and air-conditioner wind structure.
The interface unit includes functional column, suspension type electric-appliance interface module, air draft terminal interface.
The main air hose 4 of the fresh air of fresh air structure is directly anchored on bearing unit, and by wearing Integral ceiling connection under branch pipe
Fresh air terminal.Main 5 one end of air hose of the air draft of air discharge structure connects air draft terminal 18 by wearing Integral ceiling under vertical branch pipe, another
End passes through wall by air exhaust branch pipe 5.1 and is discharged to outside house.The air draft terminal 18 include universal draft hood, atomic absorption cover or
Person's vent cabinet.
In order to reduce the height of Integral ceiling as far as possible, the structure with horizontal structural component one of the main air hose of air-conditioning is devised,
Cross section such as Fig. 3 a of the main air hose), Fig. 3 b) shown in, the main air hose 6 of air-conditioning include inverted U-shaped body passageways 6.1, in inverted U-shaped master
Body the bottom of the channel two sides transfer have horizontal lock portion 6.2 outward, and in horizontal lock portion, central integration has vertically portion
6.3, the horizontal lock portion is capping sticking department 6.4 in vertically portion right part, and the horizontal lock portion is vertically being locked
Determining portion's left part is decorative panel sticking department 6.5.
Inverted U-shaped body passageways 6.1 are integrally formed part, lower openings;It is further preferred that inverted U-shaped body passageways 6.1 are
Assembly parts, transverse slat and two risers, two riser two sides are transferred outward, and turning point and transverse slat are fixedly connected to form inverted U-shaped body passageways,
Turning point is equipped with the top fixed part 6.6 being fixedly connected with roof.
Bottom cover 8 is fastened on capping sticking department, so main air hose of air-conditioning has reformed into the closed channel that can be divulged information.It is falling
The two sides decorative panel sticking department of U-shaped body passageways 6.1 is respectively arranged with clamping Decorative hanging board 7, the cross of the clamping Decorative hanging board 7
Section is lay flat on one's back Z-shaped, including integrally formed upper clamping portion 7.1 and lower clamping portion 7.2 and opposite joint portion 7.3, the left side
Clamping Decorative hanging board and right side clamping Decorative hanging board opposite joint portion dock and locked with fixing piece.
As shown in Fig. 3 b), the clamping Decorative hanging board 7 is equipped with passing through for horizontal structural component in the lower section of bottom cover buckling parts
Slot, when main air hose substitutes the installation of horizontal structural component, the horizontal structural component of another vertical direction cross it is described pass through slot, should
The lower surface 5-10mm of the distance from top bottom cover 8 of horizontal structural component.The width of the main air hose is not by the grid of horizontal structural component
Size limitation, size are freely set.
It is further preferred that being another embodiment of main air hose cross section, the clamping Decorative hanging board as Fig. 3 a) is shown
7 include integrally formed upper clamping portion 7.1, lower clamping portion 7.2 and pair being integrally attached between clamping portion and lower clamping portion
Seam portion 7.3, when the clamping Decorative hanging board in left side and the clamping Decorative hanging board on right side are connected to the two sides of inverted U-shaped body passageways 6.1
When, the distance between described lower clamping portion 7.2 is exactly equal to mesh width when horizontal structural component is intersected, and the clamping in left side fills
It adorns between the lower clamping portion of hanging plate and the lower clamping portion of the clamping Decorative hanging board on right side and is connected with decoration panel, the clamping decoration
The opposite joint portion of the adjacent clamping Decorative hanging board in the opposite joint portion of hanging plate and right side is fixed.At this moment the width of main air hose is horizontal structural component
Gridding length when intersection, the height H of main air hose determine the height of Integral ceiling.
The side of the length direction of the inverted U-shaped body passageways of air-conditioning main air duct is equipped at least two branch air duct installing port, installation
After good main air duct, branch air duct can be connected on the branch air duct installing port, and the other end connection of the branch air duct is inlaid in dress
Air diffuser on decoration panel.
It is fixed to the installation of minimum constructive height, during installation, the top of the inverted U-shaped body passageways 6.1 of the main air hose of air-conditioning is pushed up
Tightly at the top of house, the main air hose occupies the position of a horizontal structural component, passes through top fixed part 6.6 with expansion bolt
Bolt hole is fixed at the top of house.
The installation of adjustable Integral ceiling height, during installation, not by the top fixed part 6.6 and house of the main air hose of air-conditioning
Top is fixed, and the top nut of phase with vertical installation part is rotated, and the whole screw rod for bearing a heavy burden part screws the position in nut
Adjust, thus Horizontal mounting arrangements part at the top of house at a distance from the height of i.e. Integral ceiling be also adjusted.
After main air duct installs, the hollow space between house top plate and horizontal structural component is the sky for installing other modules
Between.
The fire alarm module includes high pressure water supervisor 16, and the high pressure water supervisor is separately positioned on the two of the main air hose 6 of air-conditioning
On the bearing unit on the close wall side of side, high pressure water is responsible for 16 side scion graftings and goes out high pressure water branch pipe, and the high pressure water branch pipe passes through collection
Fire-fighting spraying head 9 and functional column 10 are connected at furred ceiling.
As shown in Fig. 2, further include water, electricity and gas integrated frame, water, electricity and gas integrated frame is mountain font main body, among the font main body of mountain
For isolation board 11.1, it is equipped with electric bridge portion 11.2 in the side of isolation board, is equipped with water pipe installation portion 11.3 in the other side of isolation board
With tracheae installation portion 11.4.Water, electricity and gas integrated frame is fixed on bearing unit.The isolation board 11.1 is formed of an electrically insulating material.
Water pipe installation portion 11.3 includes multiple water pipe clips;Tracheae installation portion 11.4 includes multiple tracheae clips.Electric bridge portion is installed with point
Wire box, junction box connect spool 11.6, wear Integral ceiling linkage function column 10 under spool 11.6.
An avris is fixed with the first water, electricity and gas integrated frame 12 on the bearing unit, is fixed with the second water power in another avris
Gas integrated frame 13.
The forceful electric power module is mounted on the first water, electricity and gas integrated frame 12, and high-tension cable is threaded through in the spool, high pressure
Cable connection junction box wears Integral ceiling linkage function column 10 under the junction box outlet wiring.Functional column lower accepting water is electrically whole
End.
The light current module is mounted on the second water, electricity and gas integrated frame 13, and type low-voltage cable is threaded through the second water, electricity and gas integrated frame
Spool in, low-voltage cable connects junction box, and Integral ceiling connection suspension type electric-appliance interface is worn under junction box outlet wiring
Module 14.
Meanwhile upper water branch is fixed in the water pipe installation portion of the first water, electricity and gas integrated frame or the second water, electricity and gas integrated frame
Pipe 15, fuel gas conduit are fixed in the tracheae installation portion of the first water, electricity and gas integrated frame or the second water, electricity and gas integrated frame, water pipe and combustion
It is worn under tracheae and wears Integral ceiling under Integral ceiling linkage function column or water pipe and fuel gas conduit and connect suspension type electric-appliance interface mould
Block.
The public utility Integral ceiling, integrated level is high, passes through the phase interworking of the main air hose of air-conditioning and Horizontal mounting arrangements part
The structure design of conjunction ensure that Integral ceiling can accomplish that layer height is minimum, pass through structure design and the functional column of water, electricity and gas integrated frame
It is convenient to install and maintain in conjunction with accomplishing.
Claims (10)
1. a kind of public utility Integral ceiling, including bearing unit (100), functional unit and interface unit, the bearing unit
It (100) include Horizontal mounting arrangements part (2), phase with vertical installation part (3) and several whole weight bearings part (1), Horizontal mounting arrangements
The crossover node of part is connected the phase with vertical installation part (3), which is characterized in that
Whole weight bearing part (1) is adjustably fixedly connected with the phase with vertical installation part (3), the whole weight bearing part fastening
Onto house top plate;
The functional unit includes using wind module, fire alarm module and electricity-water-gas module, and the functional unit is fixed on bearing unit
(100) Integral ceiling connecting interface unit is worn under the functional unit in top;
Described with wind module includes the main air hose of air-conditioning (6), and the main air hose of air-conditioning (6) is mounted horizontally structural member and passes through and support
On Horizontal mounting arrangements part;
The main air hose of air-conditioning (6) includes inverted U-shaped body passageways (6.1), is transferred outward on inverted U-shaped body passageways two sides of the bottom side
There are horizontal lock portion (6.2), central integration has vertically portion (6.3) in horizontal lock portion, and the horizontal lock portion exists
Vertically portion right part is capping sticking department (6.4), and the horizontal lock portion is decoration in vertically portion left part
Plate sticking department (6.5), bottom cover (8) are fastened in capping sticking department (6.4), vertically lock in the two sides of inverted U-shaped body passageways (6.1)
Determine portion and be connected with clamping Decorative hanging board (7), the clamping Decorative hanging board (7) is equipped in the lower section of bottom cover buckling parts across slot, water
Flat crosses described across slot.
2. a kind of public utility Integral ceiling as described in claim 1, which is characterized in that in the top margin two sides of U-shaped body passageways
Turnover has top fixed part (6.6) outward, and top fixed part (6.6) is fixed at the top of house, and the layer of Integral ceiling is high in institute
State the height (H) of the main air hose of air-conditioning (6).
3. a kind of public utility Integral ceiling as described in claim 1, which is characterized in that the cross of clamping Decorative hanging board (7)
Section is lay flat on one's back Z-shaped, including integrally formed upper clamping portion (7.1), lower clamping portion (7.2) and opposite joint portion (7.3), described
The clamping Decorative hanging board in left side and the clamping Decorative hanging board on right side are docked and are locked with fixing piece, the main wind of air-conditioning in opposite joint portion
The size for managing the inverted U-shaped body passageways (6.1) of (6) is not limited by the crossover node size of Horizontal mounting arrangements part, the sky
It adjusts main air hose to substitute a Horizontal mounting arrangements part, is passed through and be supported on by the Horizontal mounting arrangements part of other direction and be horizontally mounted
On structural member.
4. a kind of public utility Integral ceiling as described in claim 1, which is characterized in that the clamping Decorative hanging board (7) includes
Integrally formed upper clamping portion (7.1), lower clamping portion (7.2) and opposite joint portion (7.3), when the clamping Decorative hanging board in left side and right side
Clamping Decorative hanging board when being connected to the two sides of inverted U-shaped body passageways (6.1), the distance between described lower clamping portion (7.2) etc.
Mesh width when horizontal structural component is intersected, is connected with decorative cover between the lower clamping portion in left side and the lower clamping portion on right side
Plate.
5. a kind of public utility Integral ceiling as described in claim 1, which is characterized in that the electricity-water-gas module includes forceful electric power mould
Block, light current module, upper water module and gas module.
6. a kind of public utility Integral ceiling as claimed in claim 5, which is characterized in that further include water, electricity and gas integrated frame, water power
Gas integrated frame is mountain font main body, is isolation board (11.1) among the font main body of mountain, is equipped with electric bridge portion in the side of isolation board
(11.2), it is equipped with water pipe installation portion (11.3) and tracheae installation portion (11.4) in the other side of isolation board, water, electricity and gas integrated frame is solid
It is scheduled on bearing unit, the electricity-water-gas module is fixed on the water, electricity and gas integrated frame.
7. a kind of public utility Integral ceiling as claimed in claim 6, which is characterized in that an avris is fixed on the bearing unit
There is the first water, electricity and gas integrated frame (12), is fixed with the second water, electricity and gas integrated frame (13), the forceful electric power module installation in another avris
On the first water, electricity and gas integrated frame (12), high-tension cable is threaded through in spool, and high-tension cable connects junction box, and the junction box goes out
Integral ceiling linkage function column (10), functional column lower accepting water electric terminal are worn under mouth wiring;The light current module is mounted on second
On water, electricity and gas integrated frame (13), type low-voltage cable is threaded through in the spool of the second water, electricity and gas integrated frame, and low-voltage cable connects junction box,
Integral ceiling connection suspension type electric-appliance interface module (14) is worn under the junction box outlet wiring.
8. a kind of public utility Integral ceiling as described in claim 1, which is characterized in that the fire alarm module includes high pressure water master
It manages (16), the high pressure water supervisor is separately positioned on the bearing unit on the close wall side of the two sides of the main air hose of air-conditioning (6), high pressure
The other scion grafting of water supervisor (16) goes out high pressure water branch pipe, and the high pressure water branch pipe passes through Integral ceiling connection fire-fighting spraying head (9) and function
It can column (10).
9. a kind of public utility Integral ceiling as claimed in claim 7, which is characterized in that described with wind module includes fresh air knot
Structure, air discharge structure, the main air hose of the fresh air of fresh air structure (4) are directly anchored on bearing unit, and by wearing integrated hang under branch pipe
Top connection fresh air terminal;The main air hose of the air draft of air discharge structure (5) one end connects air draft end by wearing Integral ceiling under vertical branch pipe
It holds (18), the other end passes through wall by air exhaust branch pipe (5.1) and is discharged to outside house.
10. a kind of construction method of the public utility Integral ceiling as described in claim 1-9 is any, which is characterized in that
Include the following steps:
1) support unit is constructed, and the first positioning supporting part is arranged in the corner first direction fixed intervals in house, in second direction
The second positioning supporting part, second positioning supporting part spacing lower than the height of the first positioning supporting part is arranged in fixed intervals
From;
2) first level structural member is installed, in a first direction by the parallel equidistant positioning of more first level structural members (2.1)
On corresponding first positioning supporting part;
Wherein, the main air hose of air-conditioning (6) is installed therein on first positioning supporting part by the installation of the main air hose of air-conditioning;
3) the second horizontal structural component is installed, and more second horizontal structural components (2.2) are equidistantly located in and first direction in parallel
On second positioning supporting part of vertical second direction, the second horizontal structural component (2.2) crosses the air-conditioning main air hose when installation
(6);In first level structural member (2.1) and the second horizontal structural component (2.2) infall installation fixed knot (2.3);
4) installation of vertical structural component installs phase with vertical installation part (3) along the vertical multiple fixed knots of wall surrounding in house, described
Whole weight bearing part (1) is fixedly connected at the top of phase with vertical installation part (3), at least 3 swell fixtures (1.3) are negative across the entirety
Heavy mail (1) is fixed on floor;
5) Dingan County fills ceiling height really, when being fixed to minimum constructive height installation, by the inverted U-shaped body passageways of the main air hose of air-conditioning
(6.1) it is held out against at the top of house at the top of, is fixed on house top with the bolt hole that expansion bolt passes through top fixed part (6.6)
Portion;
Alternatively, when adjustable Integral ceiling height installation, it will not be solid at the top of the top fixed part (6.6) of the main air hose of air-conditioning and house
It is fixed, the top nut of phase with vertical installation part is rotated, adjustable range label is carried out on the integrally screw rod of weight bearing part, is adjusted all
The screw rod of whole weight bearing part screws the position in nut and marks to sustained height;
6) the hollow space installation function unit between house top plate and horizontal structural component, is connected to function list for interface unit
In member;
7) support unit is removed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610339026.8A CN106545117B (en) | 2016-05-19 | 2016-05-19 | A kind of public utility Integral ceiling and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610339026.8A CN106545117B (en) | 2016-05-19 | 2016-05-19 | A kind of public utility Integral ceiling and its construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106545117A CN106545117A (en) | 2017-03-29 |
CN106545117B true CN106545117B (en) | 2019-07-09 |
Family
ID=58364938
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610339026.8A Active CN106545117B (en) | 2016-05-19 | 2016-05-19 | A kind of public utility Integral ceiling and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106545117B (en) |
Families Citing this family (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112313383A (en) * | 2018-05-16 | 2021-02-02 | 增城市碧桂园物业发展有限公司 | Ceiling system provided with water pipe and weak current electric wire |
CN111164267A (en) * | 2018-05-16 | 2020-05-15 | 增城市碧桂园物业发展有限公司 | Ceiling system provided with water pipes and strong-current electric wires |
WO2019218253A1 (en) * | 2018-05-16 | 2019-11-21 | 深圳市君盈建筑科技有限公司 | Suspended ceiling system having separated water pipe and electrical cable |
WO2019218238A1 (en) * | 2018-05-16 | 2019-11-21 | 增城市碧桂园物业发展有限公司 | Suspended ceiling system having water pipe and high-voltage cable installed therein |
CN110499861A (en) * | 2018-05-16 | 2019-11-26 | 深圳市君盈建筑科技有限公司 | A kind of furred ceiling electricity separation system |
WO2019218212A1 (en) * | 2018-05-16 | 2019-11-21 | 深圳市君盈建筑科技有限公司 | Suspended ceiling system having separated water pipe and electrical cable |
WO2019218170A1 (en) * | 2018-05-16 | 2019-11-21 | 增城市碧桂园物业发展有限公司 | Method for construction of suspended ceiling system |
WO2019218228A1 (en) * | 2018-05-16 | 2019-11-21 | 增城市碧桂园物业发展有限公司 | Suspended ceiling system having high-voltage and low-voltage cables installed therein |
WO2019218208A1 (en) * | 2018-05-16 | 2019-11-21 | 增城市碧桂园物业发展有限公司 | Suspended ceiling |
WO2019218233A1 (en) * | 2018-05-16 | 2019-11-21 | 深圳市君盈建筑科技有限公司 | Construction method for house having water pipe separate from main structure |
WO2019218227A1 (en) * | 2018-05-16 | 2019-11-21 | 增城市碧桂园物业发展有限公司 | Suspended ceiling system having water pipe and low-voltage cable installed therein |
CN112218991A (en) * | 2018-05-16 | 2021-01-12 | 增城市碧桂园物业发展有限公司 | Ceiling system provided with strong current and weak current wires |
CN110499860A (en) * | 2018-05-16 | 2019-11-26 | 深圳市君盈建筑科技有限公司 | A kind of furred ceiling electricity separation system |
WO2019218182A1 (en) * | 2018-05-16 | 2019-11-21 | 增城市碧桂园物业发展有限公司 | Suspended ceiling system having high-voltage cable installed therein |
CN108590012A (en) * | 2018-06-01 | 2018-09-28 | 北京亚都新风净化工程技术有限公司 | A kind of furred ceiling overhaul of the equipments panel connector |
CN109750783A (en) * | 2018-12-29 | 2019-05-14 | 天津永利达盛实验室设备有限公司 | A kind of physical and chemical raw laboratory integration Lift-on/Lift-off System |
US20210016119A1 (en) * | 2019-06-12 | 2021-01-21 | Overcast Innovations Llc | Utility connection systems, splines, and associated methods |
CN111576715B (en) * | 2020-05-21 | 2021-06-25 | 玉环墨痕机电科技有限公司 | Triangular keel of electric wire constraint structure |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205777006U (en) * | 2016-05-19 | 2016-12-07 | 武汉科贝科技股份有限公司 | A kind of public utility Integral ceiling |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2691193B1 (en) * | 1992-05-13 | 1994-08-05 | Hosteing Guy | PROFILES TO SUPPORT AND TENSION A FALSE CEILING OR A FALSE WALL. |
US5279632A (en) * | 1992-12-17 | 1994-01-18 | International Business Machines Corporation | Planar clean room ceiling structure |
JP2006299778A (en) * | 2005-04-22 | 2006-11-02 | Matsushita Denko Bath & Life Kk | Joining structure of ceiling panel and wall panel |
CN102261151B (en) * | 2011-05-10 | 2013-01-02 | 北京建工博海建设有限公司 | Bar-type air outlet, silencing plenum box and grille lamp combined suspended ceiling and construction method thereof |
CN203547001U (en) * | 2013-09-26 | 2014-04-16 | 陈正义 | Integration belt |
CN204081193U (en) * | 2014-09-24 | 2015-01-07 | 邹建林 | A kind of Integral ceiling wind outlet unit and installation of ceiling component |
-
2016
- 2016-05-19 CN CN201610339026.8A patent/CN106545117B/en active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205777006U (en) * | 2016-05-19 | 2016-12-07 | 武汉科贝科技股份有限公司 | A kind of public utility Integral ceiling |
Also Published As
Publication number | Publication date |
---|---|
CN106545117A (en) | 2017-03-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106545117B (en) | A kind of public utility Integral ceiling and its construction method | |
CN102041864A (en) | Support keel of integrated ceiling, unit buckle, electrical appliance module and installation method thereof | |
EA013848B1 (en) | Display for public use | |
CN205777006U (en) | A kind of public utility Integral ceiling | |
KR102267744B1 (en) | Ceiling grid system using earthquake-proof installing structure | |
CN111321838B (en) | Heat insulation building suspended ceiling with ventilation effect | |
US20150159824A1 (en) | Assemblies and methods for mounting electrical fixtures to suspended ceilings | |
CN209100786U (en) | A kind of rail traffic non-packed repairs suspension and support integration system of standing | |
CN207405853U (en) | Kitchen and toilet ceiling structure | |
CN103883059B (en) | Hidden dress functional module Integral ceiling | |
CN201546357U (en) | Supporting keel structure of integrated suspended ceiling | |
JP2016118072A (en) | Indoor structure unit and indoor structure | |
CN211923178U (en) | Indoor integrated ceiling of building | |
US10222073B2 (en) | Concealed heating system | |
JP6618715B2 (en) | Air conditioning chamber installation structure | |
CN208332639U (en) | Heating,Ventilating and Air Conditioning mounting structure | |
CN219261486U (en) | House integrated furred ceiling convenient to dismantle | |
CN209277453U (en) | A kind of metal finishing box furred ceiling | |
CN205772680U (en) | Elevator hall's integrated variola structure | |
CN218861889U (en) | Multi-functional integrated furred ceiling convenient to leveling | |
CN216865672U (en) | Suspended ceiling assembling structure | |
JP3203008B2 (en) | Air conditioner installation equipment | |
CN109853814B (en) | Suspended ceiling structure | |
JP2605936B2 (en) | Wall structure | |
CN219386832U (en) | Design structure of stepped wood grain aluminum veneer ceiling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: An integrated suspended ceiling for public facilities and its construction method Effective date of registration: 20230420 Granted publication date: 20190709 Pledgee: Bank of China Limited Ezhou branch Pledgor: WUHAN KEBEI TECHNOLOGY CO.,LTD. Registration number: Y2023420000168 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |