CN106545043A - A kind of efficient excavating gear of mineral mining - Google Patents

A kind of efficient excavating gear of mineral mining Download PDF

Info

Publication number
CN106545043A
CN106545043A CN201611136948.5A CN201611136948A CN106545043A CN 106545043 A CN106545043 A CN 106545043A CN 201611136948 A CN201611136948 A CN 201611136948A CN 106545043 A CN106545043 A CN 106545043A
Authority
CN
China
Prior art keywords
crane
fixed plate
quartering hammer
digging machine
nut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611136948.5A
Other languages
Chinese (zh)
Other versions
CN106545043B (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ankang Xiangze Oilfield Materials Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201611136948.5A priority Critical patent/CN106545043B/en
Publication of CN106545043A publication Critical patent/CN106545043A/en
Application granted granted Critical
Publication of CN106545043B publication Critical patent/CN106545043B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/30Auxiliary apparatus, e.g. for thawing, cracking, blowing-up, or other preparatory treatment of the soil
    • E02F5/305Arrangements for breaking-up hard ground

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The present invention relates to a kind of excavating gear, more particularly to a kind of efficient excavating gear of mineral mining.The technical problem to be solved in the present invention is to provide a kind of efficient excavating gear of time saving and energy saving mineral mining.In order to solve above-mentioned technical problem, the invention provides the efficient excavating gear of such a mineral mining, includes wheel, wheeled digging machine, the first swing seat, crane, head rod, sector gear, cylinder, tooth bar, slide rail, fixed plate, contiguous block, second connecting rod etc.;Wheeled digging machine bottom is symmetrical to be provided with wheel, and crane and the second swing seat are provided with the top of wheeled digging machine, and crane is located on the left of the second swing seat, is hingedly connected with sector gear in the second swing seat.Fast, the simple to operate effect of time saving and energy saving, excavation speed is invention achieves, Telescopic-cylinder drives the continuous breaking ores of quartering hammer, while excavating hoe constantly excavates mineral, two actions are completed simultaneously.

Description

A kind of efficient excavating gear of mineral mining
Technical field
The present invention relates to a kind of excavating gear, more particularly to a kind of efficient excavating gear of mineral mining.
Background technology
Mineral refer to what is produced in various geologic processes and develop, are in phase in certain geology and physical and chemical condition Simple substance and their compound to stable native element.Mineral have relatively-stationary chemical composition, also have in solid-state person There is the internal structure of determination;It is the elementary cell for constituting rock and Ore.Exploitation, refers to excavation;Take, such as exploitation oil shale. Efficiently, refer to that efficiency is high, basic explanation is efficiency high.Finger complete in the identical or shorter time than other people more Business, and quality is as other people or more preferably.
Existing excavating gear haves the shortcomings that to take time and effort, therefore needs a kind of time saving and energy saving mineral mining use of design badly Efficient excavating gear.
The content of the invention
(1)Technical problem to be solved
For the shortcoming for overcoming existing excavating gear to take time and effort, the technical problem to be solved in the present invention is to provide one to the present invention Plant the time saving and energy saving efficient excavating gear of mineral mining.
(2)Technical scheme
In order to solve above-mentioned technical problem, the invention provides the efficient excavating gear of such a mineral mining, includes wheel Son, wheeled digging machine, the first swing seat, crane, head rod, sector gear, cylinder, tooth bar, slide rail, fixed plate, contiguous block, Second connecting rod, slide block, quartering hammer, excavation hoe, bearing block, rotating shaft, swing arm, sliding sleeve and the second swing seat, wheeled digging machine bottom It is symmetrical to be provided with wheel, crane and the second swing seat are provided with the top of wheeled digging machine, and crane is located on the left of the second swing seat, Sector gear is hingedly connected with second swing seat, crane inner left wall is provided with the first swing seat, is hinged in the first swing seat Cylinder is connected with, cylinder right-hand member is connected with head rod, and head rod right-hand member is articulated and connected with sector gear, in crane Top is provided with slide rail and fixed plate, and slide rail is located on the left of fixed plate, and slide rail is provided with slide block, and connection is connected with front side of slide block Block, is connected with tooth bar on the left of contiguous block, tooth bar is engaged with sector gear, and tooth bar lower end is connected with quartering hammer, on front side of fixed plate on End is provided with bearing block, and rotating shaft is provided with front side of bearing block, and rotating shaft is provided with swing arm, and swing arm is provided with sliding sleeve, swing arm lower end Excavation hoe is connected with, middle part is hingedly connected with the second connecting rod on front side of fixed plate, right on front side of the second connecting rod left end and contiguous block End is articulated and connected, and is articulated and connected on front side of the second connecting rod right-hand member and sliding sleeve.
Preferably, screw bolt and nut is also included, hoe is excavated and is provided with bolt, bolt passes through swing arm, bolt left end to set There is a nut, nut is coordinated with bolt, is contacted with swing arm on the right side of nut, nut is shaped as annular, and the overall diameter of nut is 8cm, the material of nuts and bolt are rustless steel.
Preferably, crushing teeth is also included, quartering hammer bottom is provided with crushing teeth, and crushing teeth is vertical at quartering hammer bottom, Crushing teeth is shaped as triangular pyramid, and the bottom surface rib length of crushing teeth is 8cm, a height of 6cm of crushing teeth, the material of crushing teeth is Q235 steel.
Preferably, electric pushrod and brake pad are also included, it is symmetrical on the inside of wheeled digging machine bottom wheel to be provided with electronic pushing away Bar, electric pushrod lower end be connected with brake pad, and brake pad is shaped as cuboid, a length of 8cm of brake pad, the width of brake pad For 20cm, a height of 3cm of brake pad.
Preferably, warning sign is also included, crane top left side is provided with warning sign, and warning sign is perpendicular to crane top Portion, warning sign are shaped as cuboid, a width of 5cm of warning sign, a length of 50cm of warning sign, a height of 30cm of warning sign, The material of warning sign is plastics.
Preferably, also include storage tank, below the outer left wall of wheeled digging machine, be provided with storage tank, on the right side of storage tank with wheeled digging machine outside Left wall contacts, and storage tank is shaped as cuboid, a length of 20 centimetres of storage tank, a width of 30cm of storage tank, storage tank A height of 35cm, the material of storage tank is rustless steel.
Preferably, reinforcement is also included, at the top of wheeled digging machine, is provided with reinforcement, reinforcement left upper end and crane inner left wall Connection, reinforcement are located at the lower section of the first swing seat, are in 45° angle at the top of reinforcement and wheeled digging machine, and the length of reinforcement is 40cm, The material of reinforcement is Q235 steel.
Preferably, fixed plate is shaped as cuboid, and the length of fixed plate is 10cm, a width of 8cm of fixed plate, fixed A height of 1.5m of plate, perpendicular to crane inner top, fixed plate is located at the right of slide rail to fixed plate, and the material of fixed plate is Q235 Steel.
Preferably, quartering hammer is shaped as cuboid, and a length of 20cm of quartering hammer, a width of 15cm of quartering hammer crush A height of 18cm of hammer, quartering hammer are located at the right of wheeled digging machine, and quartering hammer is located at the left for excavating hoe, and the material of quartering hammer is Q235 Steel.
Operation principle:When excavating mineral, wheeled digging machine is travelled at the appropriate speed, starts Telescopic-cylinder, is driven fan-shaped Gear is swung around the second swing seat, so as to band carry-over bar is moved up and down, and then drives quartering hammer to move up and down.Move down on tooth bar It is dynamic, drive contiguous block to move up and down, swing up and down the second connecting rod, so that swing arm swings, and then uproot excavation Ore is excavated constantly.Meanwhile, quartering hammer constantly beats Ore, makes ore reduction, wheeled digging machine movement excavation is uprooted in wider array of model Enclose interior excavation Ore.When Ore excacation is finished, and quartering hammer and excavation are uprooted when setting back, and cylinder quits work.
Because also including screw bolt and nut, excavate hoe and be provided with bolt, bolt passes through swing arm, bolt left end to be provided with spiral shell Mother, nut and bolt coordinate, and contacts with swing arm on the right side of nut, and nut is shaped as annular, and the overall diameter of nut is 8cm, The material of nuts and bolt is rustless steel, so adjusting nut, just can change to excavating hoe, so as to ensure to excavate at hoe In sharp state.
Because also including crushing teeth, quartering hammer bottom is provided with crushing teeth, and crushing teeth is vertical at quartering hammer bottom, crushes Tooth is shaped as triangular pyramid, and the bottom surface rib length of crushing teeth is 8cm, a height of 6cm of crushing teeth, the material of crushing teeth is Q235 Steel, so the crushing effect of quartering hammer is more preferable.
It is because also including electric pushrod and brake pad, symmetrical on the inside of wheeled digging machine bottom wheel to be provided with electric pushrod, Electric pushrod lower end is connected with brake pad, and brake pad is shaped as cuboid, a length of 8cm of brake pad, brake pad it is a width of 20cm, a height of 3cm of brake pad, so when wheeled digging machine is parked, starting electric pushrod elongation, drive brake pad to move down, When brake pad is contacted with ground, electric pushrod stops elongation, and the frictional force between brake pad and ground can prevent wheeled digging machine from moving.
(3)Beneficial effect
Fast, the simple to operate effect of time saving and energy saving, excavation speed is invention achieves, Telescopic-cylinder drives quartering hammer constantly to break Broken ore, while excavating hoe constantly excavates mineral, two actions are completed simultaneously, and save manpower, and it is time saving and energy saving to have reached Purpose, so as to improve the efficiency of mineral mining.
Description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is second main structure diagram of the present invention.
Fig. 3 is the third main structure diagram of the present invention.
Fig. 4 is the 4th kind of main structure diagram of the present invention.
Fig. 5 is the 5th kind of main structure diagram of the present invention.
Labelling in accompanying drawing for:1- ground, 2- wheels, 3- wheeled digging machines, the first swing seats of 4-, 5- cranes, 6- first connect Extension bar, 7- sector gears, 8- cylinders, 9- tooth bars, 10- slide rails, 11- fixed plates, 12- contiguous blocks, the second connecting rods of 13-, 14- are slided Block, 15- quartering hammers, 16- excavate hoe, 17- bearing blocks, 18- rotating shafts, 19- swing arms, 20- sliding sleeves, the second swing seats of 21-, 22- Bolt, 23- nuts, 24- crushing teeths, 25- electric pushrods, 26- brake pads, 27- warning signs, 28- storage tanks, 29- reinforcements.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of efficient excavating gear of mineral mining, as Figure 1-5, includes wheel 2, wheeled digging machine 3, the first swing seat 4, liter Drop frame 5, head rod 6, sector gear 7, cylinder 8, tooth bar 9, slide rail 10, fixed plate 11, contiguous block 12, the second connecting rod 13rd, slide block 14, quartering hammer 15, excavation hoe 16, bearing block 17, rotating shaft 18, swing arm 19, sliding sleeve 20 and the second swing seat 21, dig 3 bottom of pick car is symmetrical to be provided with wheel 2, is provided with crane 5 and the second swing seat 21, and crane 5 is located at the top of wheeled digging machine 3 On the left of second swing seat 21, sector gear 7 in the second swing seat 21, is hingedly connected with, 5 inner left wall of crane is provided with the first pendulum Dynamic seat 4, is hingedly connected with cylinder 8 in the first swing seat 4,8 right-hand member of cylinder is connected with head rod 6,6 right-hand member of head rod It is articulated and connected with sector gear 7,5 inner top of crane is provided with slide rail 10 and fixed plate 11, and slide rail 10 is left positioned at fixed plate 11 Side, slide rail 10 are provided with slide block 14, and contiguous block 12 is connected with front side of slide block 14, and tooth bar 9, tooth bar 9 are connected with the left of contiguous block 12 Engage with sector gear 7,9 lower end of tooth bar is connected with quartering hammer 15,11 front side upper end of fixed plate is provided with bearing block 17, bearing block 17 Front side is provided with rotating shaft 18, and rotating shaft 18 is provided with swing arm 19, and swing arm 19 is provided with sliding sleeve 20, and 19 lower end of swing arm is connected with digging Pick hoe 16, on front side of fixed plate 11, middle part is hingedly connected with the second connecting rod 13, on front side of 13 left end of the second connecting rod and contiguous block 12 Right-hand member is articulated and connected, and is articulated and connected on front side of 13 right-hand member of the second connecting rod and sliding sleeve 20.
Bolt 22 and nut 23 are also included, hoe 16 is excavated and is provided with bolt 22, bolt 22 passes through swing arm 19, bolt 22 Left end is provided with nut 23, nut 23 is coordinated with bolt 22, is contacted with swing arm 19 on the right side of nut 23, and nut 23 is shaped as annulus Shape, the overall diameter of nut 23 are rustless steel for the material of 8cm, nut 23 and bolt 22.
Crushing teeth 24 is included also, 15 bottom of quartering hammer is provided with crushing teeth 24, and crushing teeth 24 is vertical at 15 bottom of quartering hammer Portion, crushing teeth 24 are shaped as triangular pyramid, and the bottom surface rib length of crushing teeth 24 is 8cm, a height of 6cm of crushing teeth 24, crush The material of tooth 24 is Q235 steel.
Electric pushrod 25 and brake pad 26 are included also, it is symmetrical on the inside of 3 bottom wheel 2 of wheeled digging machine to be provided with electric pushrod 25,25 lower end of electric pushrod is connected with brake pad 26, and brake pad 26 is shaped as cuboid, and a length of 8cm of brake pad 26 rubs A width of 20cm of cleaning block 26, a height of 3cm of brake pad 26.
Warning sign 27 is included also, 5 top left side of crane is provided with warning sign 27, and warning sign 27 is pushed up perpendicular to crane 5 Portion, warning sign 27 are shaped as cuboid, a width of 5cm of warning sign 27, a length of 50cm of warning sign 27, the height of warning sign 27 For 30cm, the material of warning sign 27 is plastics.
Storage tank 28 is also included, and storage tank 28 is provided with below 3 outer left wall of wheeled digging machine, with wheeled digging machine 3 on the right side of storage tank 28 The contact of outer left wall, storage tank 28 are shaped as cuboid, a length of 20 centimetres of storage tank 28, a width of 30cm of storage tank 28, A height of 35cm of storage tank 28, the material of storage tank 28 is rustless steel.
Reinforcement 29 is also included, reinforcement 29 at the top of wheeled digging machine 3, is provided with, 29 left upper end of reinforcement is left with crane 5 Wall connects, and reinforcement 29 is located at the lower section of the first swing seat 4, is in 45° angle at the top of reinforcement 29 and wheeled digging machine 3, reinforcement 29 Length is 40cm, and the material of reinforcement 29 is Q235 steel.
Fixed plate 11 is shaped as cuboid, and the length of fixed plate 11 is 10cm, a width of 8cm of fixed plate 11, fixed A height of 1.5m of plate 11, fixed plate 11 are located at the right of slide rail 10, fixed plate 11 perpendicular to 5 inner top of crane, fixed plate 11 Material be Q235 steel.
Quartering hammer 15 is shaped as cuboid, a length of 20cm of quartering hammer 15, a width of 15cm of quartering hammer 15, quartering hammer 15 a height of 18cm, quartering hammer 15 are located at the right of wheeled digging machine 3, and quartering hammer 15 is located at the left for excavating hoe 16, quartering hammer 15 Material is Q235 steel.
Operation principle:When excavating mineral, wheeled digging machine 3 is travelled at the appropriate speed, is started cylinder 8 and is stretched, drives fan Shape gear 7 is swung around the second swing seat 21, so as to band carry-over bar 9 is moved up and down, and then drives quartering hammer 15 to move up and down.Tooth Bar 9 is moved up and down, and is driven contiguous block 12 to move up and down, is swung up and down the second connecting rod 13, so that swing arm 19 or so is put It is dynamic, and then make excavation hoe 16 constantly excavate Ore.Meanwhile, quartering hammer 15 constantly beats Ore, moves ore reduction, wheeled digging machine 3 It is dynamic, make excavation hoe 16 excavate Ore in wide range.When Ore excacation is finished, and quartering hammer 15 and excavation hoe 16 When setting back, cylinder 8 quits work.
Because also including bolt 22 and nut 23, excavate hoe 16 and be provided with bolt 22, bolt 22 passes through swing arm 19, spiral shell 22 left end of bolt is provided with nut 23, nut 23 is coordinated with bolt 22, is contacted with swing arm 19 on the right side of nut 23, and nut 23 is shaped as Annular, the overall diameter of nut 23 are rustless steel for the material of 8cm, nut 23 and bolt 22, so adjusting nut 23, just may be used Change to excavating hoe 16, so as to ensure to excavate hoe 16 in sharp state.
Because also including crushing teeth 24,15 bottom of quartering hammer is provided with crushing teeth 24, and crushing teeth 24 is vertical at quartering hammer 15 bottoms, crushing teeth 24 are shaped as triangular pyramid, and the bottom surface rib length of crushing teeth 24 is 8cm, a height of 6cm of crushing teeth 24, The material of crushing teeth 24 is Q235 steel, so the crushing effect of quartering hammer 15 is more preferable.
It is because also including electric pushrod 25 and brake pad 26, symmetrical on the inside of 3 bottom wheel 2 of wheeled digging machine to be provided with electronic Push rod 25,25 lower end of electric pushrod are connected with brake pad 26, and brake pad 26 is shaped as cuboid, brake pad 26 it is a length of 8cm, a width of 20cm of brake pad 26, a height of 3cm of brake pad 26, so when wheeled digging machine 3 is parked, starting electric pushrod 25 and stretching It is long, drive brake pad 26 to move down, when brake pad 26 contact with ground 1, electric pushrod 25 stops extending, brake pad 26 and Frictional force between ground 1 can prevent wheeled digging machine 3 from moving.
Embodiment described above only expresses the preferred embodiment of the present invention, and its description is more concrete and detailed, but and Therefore the restriction to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art For, without departing from the inventive concept of the premise, some deformations, improvement can also be made and substituted, these belong to this Bright protection domain.Therefore, the protection domain of patent of the present invention should be defined by claims.

Claims (9)

1. the efficient excavating gear of a kind of mineral mining, it is characterised in that include wheel(2), wheeled digging machine(3), first swing Seat(4), crane(5), head rod(6), sector gear(7), cylinder(8), tooth bar(9), slide rail(10), fixed plate (11), contiguous block(12), the second connecting rod(13), slide block(14), quartering hammer(15), excavate hoe(16), bearing block(17), rotating shaft (18), swing arm(19), sliding sleeve(20)With the second swing seat(21), wheeled digging machine(3)Bottom is symmetrical to be provided with wheel(2), dig Pick car(3)Top is provided with crane(5)With the second swing seat(21), and crane(5)Positioned at the second swing seat(21)Left side, the Two swing seats(21)On be hingedly connected with sector gear(7), crane(5)Inner left wall is provided with the first swing seat(4), the first pendulum Dynamic seat(4)On be hingedly connected with cylinder(8), cylinder(8)Right-hand member is connected with head rod(6), head rod(6)Right-hand member with Sector gear(7)It is articulated and connected, crane(5)Inner top is provided with slide rail(10)And fixed plate(11), and slide rail(10)Positioned at solid Fixed board(11)Left side, slide rail(10)It is provided with slide block(14), slide block(14)Front side is connected with contiguous block(12), contiguous block(12)It is left Side is connected with tooth bar(9), tooth bar(9)With sector gear(7)Engagement, tooth bar(9)Lower end is connected with quartering hammer(15), fixed plate (11)Front side upper end is provided with bearing block(17), bearing block(17)Front side is provided with rotating shaft(18), rotating shaft(18)It is provided with swing arm (19), swing arm(19)It is provided with sliding sleeve(20), swing arm(19)Lower end is connected with excavation hoe(16), fixed plate(11)In front side Portion is hingedly connected with the second connecting rod(13), the second connecting rod(13)Left end and contiguous block(12)Front side right-hand member is articulated and connected, the Two connecting rods(13)Right-hand member and sliding sleeve(20)Front side is articulated and connected.
2. the efficient excavating gear of a kind of mineral mining according to claim 1, it is characterised in that also include bolt (22)And nut(23), excavate hoe(16)It is provided with bolt(22), bolt(22)Through swing arm(19), bolt(22)Left end sets There is nut(23), nut(23)With bolt(22)Coordinate, nut(23)Right side and swing arm(19)Contact, nut(23)Shape For annular, nut(23)Overall diameter be 8cm, nut(23)And bolt(22)Material be rustless steel.
3. the efficient excavating gear of a kind of mineral mining according to claim 1, it is characterised in that also include crushing teeth (24), quartering hammer(15)Bottom is provided with crushing teeth(24), crushing teeth(24)It is vertical at quartering hammer(15)Bottom, crushing teeth(24) Be shaped as triangular pyramid, crushing teeth(24)Bottom surface rib length be 8cm, crushing teeth(24)A height of 6cm, crushing teeth(24)'s Material is Q235 steel.
4. the efficient excavating gear of a kind of mineral mining according to claim 1, it is characterised in that also include electronic pushing away Bar(25)And brake pad(26), wheeled digging machine(3)Bottom wheel(2)Inner side is symmetrical to be provided with electric pushrod(25), electric pushrod (25)Lower end is connected with brake pad(26), brake pad(26)Be shaped as cuboid, brake pad(26)A length of 8cm, friction Block(26)A width of 20cm, brake pad(26)A height of 3cm.
5. the efficient excavating gear of a kind of mineral mining according to claim 1, it is characterised in that also include warning sign (27), crane(5)Top left side is provided with warning sign(27), warning sign(27)Perpendicular to crane(5)Top, warning sign(27) Be shaped as cuboid, warning sign(27)A width of 5cm, warning sign(27)A length of 50cm, warning sign(27)It is a height of 30cm, warning sign(27)Material be plastics.
6. the efficient excavating gear of a kind of mineral mining according to claim 1, it is characterised in that also include storage tank (28), wheeled digging machine(3)Storage tank is provided with below outer left wall(28), storage tank(28)Right side and wheeled digging machine(3)Outer left wall contact, storage Thing case(28)Be shaped as cuboid, storage tank(28)A length of 20 centimetres, storage tank(28)A width of 30cm, storage tank (28)A height of 35cm, storage tank(28)Material be rustless steel.
7. the efficient excavating gear of a kind of mineral mining according to claim 1, it is characterised in that also include reinforcement (29), wheeled digging machine(3)Top is provided with reinforcement(29), reinforcement(29)Left upper end and crane(5)Inner left wall connects, reinforcement (29)Positioned at the first swing seat(4)Lower section, reinforcement(29)With wheeled digging machine(3)Top be in 45° angle, reinforcement(29)Length For 40cm, reinforcement(29)Material be Q235 steel.
8. a kind of efficient excavating gear of mineral mining according to claim 1, it is characterised in that fixed plate(11)Shape Shape is cuboid, fixed plate(11)Length be 10cm, fixed plate(11)A width of 8cm, fixed plate(11)A height of 1.5m, Fixed plate(11)Perpendicular to crane(5)Inner top, fixed plate(11)Positioned at slide rail(10)Right, fixed plate(11)Material For Q235 steel.
9. a kind of efficient excavating gear of mineral mining according to claim 1, it is characterised in that quartering hammer(15)Shape Shape is cuboid, quartering hammer(15)A length of 20cm, quartering hammer(15)A width of 15cm, quartering hammer(15)A height of 18cm, Quartering hammer(15)Positioned at wheeled digging machine(3)Right, quartering hammer(15)Uproot positioned at excavating(16)Left, quartering hammer(15)Material For Q235 steel.
CN201611136948.5A 2016-12-12 2016-12-12 A kind of efficient excavating gear of mineral mining Active CN106545043B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611136948.5A CN106545043B (en) 2016-12-12 2016-12-12 A kind of efficient excavating gear of mineral mining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611136948.5A CN106545043B (en) 2016-12-12 2016-12-12 A kind of efficient excavating gear of mineral mining

Publications (2)

Publication Number Publication Date
CN106545043A true CN106545043A (en) 2017-03-29
CN106545043B CN106545043B (en) 2018-09-14

Family

ID=58397359

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611136948.5A Active CN106545043B (en) 2016-12-12 2016-12-12 A kind of efficient excavating gear of mineral mining

Country Status (1)

Country Link
CN (1) CN106545043B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106963037A (en) * 2017-05-11 2017-07-21 湖州练市宇颖鞋业有限公司 A kind of footwear part circulates drying glue equipment
CN107142983A (en) * 2017-06-22 2017-09-08 汪建文 A kind of irrigation canals and ditches automatic mining equipment
CN107447799A (en) * 2017-09-26 2017-12-08 司晨骁 A kind of pipe trench dredger of the natural gas line laying for street
CN108020979A (en) * 2018-03-15 2018-05-11 成都合能智发科技有限公司 Night traffic scene of the accident harvester
CN108729481A (en) * 2018-05-03 2018-11-02 钟丹红 A kind of construction paves equipment with ground soil
CN113494036A (en) * 2021-07-30 2021-10-12 安徽三远建设有限公司 Multi-position hitting and smashing device for municipal road construction stones

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130052889A (en) * 2011-11-14 2013-05-23 (주)신명건설기술공사 Complex dredger and dredging method using the same
CN205630909U (en) * 2016-05-14 2016-10-12 东亚装饰股份有限公司 Hogging device for fitment
CN106105440A (en) * 2016-08-31 2016-11-16 李运雄 A kind of quick loosening device of roadside greening
CN205731406U (en) * 2016-05-13 2016-11-30 高银山 A kind of highway is built with stone efficiency crushing device
CN205732905U (en) * 2016-05-16 2016-11-30 赣州天文磁业有限公司 A kind of accurate rapid molding device of magnet strip
CN205761505U (en) * 2016-05-14 2016-12-07 泉州品创知识产权服务有限公司 A kind of finishing plastic garbage quick crashing device
CN205761326U (en) * 2016-05-13 2016-12-07 林福安 A kind of Ore collects breaker
CN106192904A (en) * 2016-08-26 2016-12-07 杨建锋 A kind of artificial Channel broadening device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130052889A (en) * 2011-11-14 2013-05-23 (주)신명건설기술공사 Complex dredger and dredging method using the same
CN205731406U (en) * 2016-05-13 2016-11-30 高银山 A kind of highway is built with stone efficiency crushing device
CN205761326U (en) * 2016-05-13 2016-12-07 林福安 A kind of Ore collects breaker
CN205630909U (en) * 2016-05-14 2016-10-12 东亚装饰股份有限公司 Hogging device for fitment
CN205761505U (en) * 2016-05-14 2016-12-07 泉州品创知识产权服务有限公司 A kind of finishing plastic garbage quick crashing device
CN205732905U (en) * 2016-05-16 2016-11-30 赣州天文磁业有限公司 A kind of accurate rapid molding device of magnet strip
CN106192904A (en) * 2016-08-26 2016-12-07 杨建锋 A kind of artificial Channel broadening device
CN106105440A (en) * 2016-08-31 2016-11-16 李运雄 A kind of quick loosening device of roadside greening

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106963037A (en) * 2017-05-11 2017-07-21 湖州练市宇颖鞋业有限公司 A kind of footwear part circulates drying glue equipment
CN107142983A (en) * 2017-06-22 2017-09-08 汪建文 A kind of irrigation canals and ditches automatic mining equipment
CN107447799A (en) * 2017-09-26 2017-12-08 司晨骁 A kind of pipe trench dredger of the natural gas line laying for street
CN108020979A (en) * 2018-03-15 2018-05-11 成都合能智发科技有限公司 Night traffic scene of the accident harvester
CN108729481A (en) * 2018-05-03 2018-11-02 钟丹红 A kind of construction paves equipment with ground soil
CN113494036A (en) * 2021-07-30 2021-10-12 安徽三远建设有限公司 Multi-position hitting and smashing device for municipal road construction stones

Also Published As

Publication number Publication date
CN106545043B (en) 2018-09-14

Similar Documents

Publication Publication Date Title
CN106545043A (en) A kind of efficient excavating gear of mineral mining
CN106894456B (en) A kind of drilling is bulldozed compacting equipment with soil block
CN102747704B (en) Sand beach cleaning vehicle and cleaning operation method thereof
CN108952748B (en) Open TBM bottom comprehensive slag removal system
CN205822294U (en) A kind of geology detecting is with removing soil device
CN111946362A (en) Auxiliary device for rapid tunneling of coal mine tunnel
WO2019109535A1 (en) Clean and efficient coal mining method
CN106644541B (en) Excavation device for three-way loading three-dimensional analog simulation test excavation system
CN205822164U (en) A kind of geology detecting shoveling Handling device
CN104373122A (en) Digging and anchoring device for coal collection by using star wheel
CN206368383U (en) Loading shovel
CN208702420U (en) A kind of bottom open type TBM integrates cleaning dregs system
CN205712236U (en) A kind of civil engineering efficient excavator tool
CN103433111B (en) Automatic moving type disintegrating machine
CN102808431B (en) Double-arm excavator
CN201896617U (en) Coal charging machinery used on blasting driving face of coal mine
CN201883464U (en) Rescue vehicle
CN103407504B (en) A kind of crawler belt vehicle frame and clear native device thereof
CN204078817U (en) Open type rock ripper bucket wheel formula slag cleaning device
CN202030331U (en) Loader
CN102383449A (en) Digging loader
CN212690024U (en) Tunneling device for coal mining
CN210766573U (en) Underground roadway excavation cleaning machine
CN104358568A (en) Digging and anchoring device for collecting coal by spiral drum
CN204001028U (en) A kind of multipurpose bucket structure with vibrations drill steel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180807

Address after: 314031 Xiuzhou City, Jiaxing, Zhejiang Province Dongsheng West Road, Beijing Science and technology 1 building 811 rooms

Applicant after: Jiaxing Heng Yuan Safe Technology Co.,Ltd.

Address before: 341000 No. 3, Shang Shu street, Zhanggong District, Ganzhou, Jiangxi

Applicant before: Qiu Yan

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221201

Address after: 725000 group 6, Gaojing village, Gaojing community, Xincheng sub district office, Hanbin District, Ankang City, Shaanxi Province

Patentee after: Ankang Xiangze Oilfield Materials Co.,Ltd.

Address before: 314031 Xiuzhou City, Jiaxing, Zhejiang Province Dongsheng West Road, Beijing Science and technology 1 building 811 rooms

Patentee before: Jiaxing Heng Yuan Safe Technology Co.,Ltd.