CN106545024A - Height bleeds back the method for blocking of precipitation deep-well - Google Patents

Height bleeds back the method for blocking of precipitation deep-well Download PDF

Info

Publication number
CN106545024A
CN106545024A CN201510610246.5A CN201510610246A CN106545024A CN 106545024 A CN106545024 A CN 106545024A CN 201510610246 A CN201510610246 A CN 201510610246A CN 106545024 A CN106545024 A CN 106545024A
Authority
CN
China
Prior art keywords
concrete
well
hour
blocking
precipitation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510610246.5A
Other languages
Chinese (zh)
Other versions
CN106545024B (en
Inventor
施群凯
范作锋
杨前
雍正海
康朝辉
任超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201510610246.5A priority Critical patent/CN106545024B/en
Publication of CN106545024A publication Critical patent/CN106545024A/en
Application granted granted Critical
Publication of CN106545024B publication Critical patent/CN106545024B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to the drying meanss field of underground foundation location or other areas, specially a kind of high method for blocking for bleeding back precipitation deep-well are kept by lowering of watertable.A kind of high method for blocking for bleeding back precipitation deep-well, is characterized in that:Implement successively as follows:A. precipitation;B. sealing;C. pour;D. conserve.Present invention closure stagnant water effect is good, and easy to operate, expense is low, high working efficiency.

Description

Height bleeds back the method for blocking of precipitation deep-well
Technical field
The present invention relates to the drying meanss field of underground foundation location or other areas, specially a kind of high method for blocking for bleeding back precipitation deep-well are kept by lowering of watertable.
Background technology
In architectural engineering, many engineerings are all riverine, coastal and build, or multiaspect is near river course, cause that the construction area water yield is abundant, water level is higher.For this engineering in general is excavated using side, the method for side precipitation is constructed, and well depth is typically in 30m~50m.After main body construction is finished, precipitation must be blocked with well using plugging technology, typically adopt concreting technique, but now construction area water level is often far below periphery water level, once precipitation stops, then periphery subsoil water is bled back in well in a large number, bleeds back speed in 1.2m3/ s~2.1m3/ s or so.Cause concrete normally cannot pour, the problems such as not enough, the shut-in well concrete surface that pours rear presetting period produces a large amount of cracks, cause to cause whole base plate drift sand, piping or float etc. significant problem, or even form total destruction.
The content of the invention
In order to overcome the defect of prior art, there is provided one kind is easy to operate, block thoroughly drying meanss, the invention discloses a kind of high method for blocking for bleeding back precipitation deep-well.
The present invention reaches goal of the invention by following technical solution:
A kind of high method for blocking for bleeding back precipitation deep-well, is characterized in that:Implement successively as follows:A. immersible pump or sewage pump are used persistently to precipitation deep-well pumping as dewatering measure, by water lev el control stable away from below well head 1.5m;
B. in the well casing of precipitation deep-well filling level with good sand material as measures of preventing water, 0.6m/hour below is reduced to away from below well head 1.5m, making subsoil water bleed back speed by water lev el control stable;
C. with rapid hardening, the concreting of impervious, microdilatancy to pipe top;
D. conserve.
Described height bleeds back the method for blocking of precipitation deep-well, it is characterized in that:
During step a, the diving pump power of selection is 10kw~15kw, flow 15m3/ hour~20m3/ hour, lift are not less than 100m;From sewage pump discharge 50m3/ hour~80m3/ hour, lift are not less than 20m;
During step b, with good sand material, cobble-stone diameter is 50mm~66mm for the level of selection, and sand particle diameter is 2.3mm~3.1mm, mixing time 20min~40min;The proportioning of sand material is:If the quality of quick hardening cement is a, then stone quality is 1.5a~2a, and sand quality is 2a~3a;
During step c, from rapid hardening, impervious, microdilatancy concrete, the solidification control indexes of concrete are final set in initial set and 60min in 30min, and the impervious index of concrete is that the hydraulic pressure for bearing is not less than 0.8MPa, and the microdilatancy index of concrete is cubical expansivity 0.03%~0.05%;Placement layer by layer is adopted when pouring, per thickness degree in 200mm~300mm, while coordinate vibrating spear to vibrate, with pouring with vibrating, it is ensured that concrete it is closely knit, make concrete surface honeycomb play sand coarse aggregate ratio and control within 6 ‰;
During step d, maintenance method is watered natural curing or the maintenance of artificial heating and moistening from covering, and the moistening of concrete during natural curing, in concrete surface cover film and gunnysack, is kept by the way of watering;During nourishment, external heat source is utilized on concrete surface(Such as iodine-tungsten lamp, coal dust ball stove etc.)And the concrete sprinkled water to newly pouring carries out heating and moistening maintenance.
The invention has the beneficial effects as follows:1. it is good that stagnant water effect is blocked;2. easy to operate, generalization is strong;3. low compared with traditional method expense, and improve;4. speed is blocked, the duration is saved and is improved construction safety degree.
Description of the drawings
Fig. 1 is the flow chart of the present invention.
Specific embodiment
The present invention is further illustrated below by way of specific embodiment.
Embodiment 1
A kind of high method for blocking for bleeding back precipitation deep-well, as shown in Figure 1:Implement successively as follows:
A. immersible pump or sewage pump are used persistently to precipitation deep-well pumping as dewatering measure, by water lev el control stable away from below well head 1.5m:
From immersible pump be 150QJ20-156 types, power of motor 15kw, efficiency 64%, flow 20m3/ hour, lift 156m, rotating speed 2850r/min, connection form adopt shaft coupling direct connection, rated voltage 380V, frequency 50hz, rated current 35.62A, 21 grades of impeller progression, 2 cun of outlet diameter;
From sewage pump be 80PW types, impeller suction be single-suction, flow 80m3/ hour, lift 26m;
B. in the well casing of precipitation deep-well filling level with good sand material as measures of preventing water, 0.6m/hour below is reduced to away from below well head 1.5m, making subsoil water bleed back speed by water lev el control stable:
From level with good sand material, cobble-stone diameter is 50mm~66mm, and sand particle diameter is 2.3mm~3.1mm, mixing time 30min;The proportioning of sand material is:Quick hardening cement quality 400kg, stone quality 725kg, sand quality 1043kg;
C. with rapid hardening, the concreting of impervious, microdilatancy to pipe top:
From rapid hardening, impervious, microdilatancy concrete, the solidification control indexes of concrete are final set in initial set and 60min in 30min, and the seepage-resistant grade of concrete is《50164 Standard for quality control of concrete of GB》The P8 levels of defined, that is, the hydraulic pressure for bearing are not less than 0.8MPa, and the microdilatancy index of concrete is cubical expansivity 0.03%~0.05%;Placement layer by layer is adopted when pouring, per thickness degree in 250mm, while coordinate vibrating spear to vibrate, with pouring with vibrating, it is ensured that concrete it is closely knit, make concrete surface honeycomb play sand coarse aggregate ratio and control within 6 ‰;
D. conserve:
Maintenance method is watered natural curing or the maintenance of artificial heating and moistening from covering, and the moistening of concrete during natural curing, in concrete surface cover film and gunnysack, is kept by the way of watering;During nourishment, external heat source is utilized on concrete surface(Iodine-tungsten lamp, coal dust ball stove etc.)And the concrete sprinkled water to newly pouring carries out heating and moistening maintenance.

Claims (2)

1. a kind of high method for blocking for bleeding back precipitation deep-well, is characterized in that:Implement successively as follows:A. immersible pump or sewage pump are used persistently to precipitation deep-well pumping as dewatering measure, by water lev el control stable away from below well head 1.5m;
B. in the well casing of precipitation deep-well filling level with good sand material as measures of preventing water, 0.6m/hour below is reduced to away from below well head 1.5m, making subsoil water bleed back speed by water lev el control stable;
C. with rapid hardening, the concreting of impervious, microdilatancy to pipe top;
D. conserve.
2. height as claimed in claim 1 bleeds back the method for blocking of precipitation deep-well, it is characterized in that:
During step a, the diving pump power of selection is 10kw~15kw, flow 15m3/ hour~20m3/ hour, lift are not less than 100m;From sewage pump discharge 50m3/ hour~80m3/ hour, lift are not less than 20m;
During step b, with good sand material, cobble-stone diameter is 50mm~66mm for the level of selection, and sand particle diameter is 2.3mm~3.1mm, mixing time 20min~40min;The proportioning of sand material is:If the quality of quick hardening cement is a, then stone quality is 1.5a~2a, and sand quality is 2a~3a;
During step c, from rapid hardening, impervious, microdilatancy concrete, the solidification control indexes of concrete are final set in initial set and 60min in 30min, and the impervious index of concrete is that the hydraulic pressure for bearing is not less than 0.8MPa, and the microdilatancy index of concrete is cubical expansivity 0.03%~0.05%;Placement layer by layer is adopted when pouring, per thickness degree in 200mm~300mm, while coordinate vibrating spear to vibrate, with pouring with vibrating, it is ensured that concrete it is closely knit, make concrete surface honeycomb play sand coarse aggregate ratio and control within 6 ‰;
During step d, maintenance method is watered natural curing or the maintenance of artificial heating and moistening from covering, and the moistening of concrete during natural curing, in concrete surface cover film and gunnysack, is kept by the way of watering;During nourishment, on concrete surface using external heat source and to sprinkle water and heating and moistening maintenance is carried out to the concrete that newly pours.
CN201510610246.5A 2015-09-23 2015-09-23 Plugging method for high-rewet precipitation deep well Active CN106545024B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510610246.5A CN106545024B (en) 2015-09-23 2015-09-23 Plugging method for high-rewet precipitation deep well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510610246.5A CN106545024B (en) 2015-09-23 2015-09-23 Plugging method for high-rewet precipitation deep well

Publications (2)

Publication Number Publication Date
CN106545024A true CN106545024A (en) 2017-03-29
CN106545024B CN106545024B (en) 2020-11-03

Family

ID=58365059

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510610246.5A Active CN106545024B (en) 2015-09-23 2015-09-23 Plugging method for high-rewet precipitation deep well

Country Status (1)

Country Link
CN (1) CN106545024B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202450536U (en) * 2011-12-29 2012-09-26 青岛新华友建工集团股份有限公司 Shallow dewatering and plugging construction device in foundation pit
RU2011110670A (en) * 2011-03-21 2012-09-27 Федеральное государственное автономное образовательное учреждение высшего профессионального образования "Северный (Арктический) фед WAY OF EXTINGUISHING A WELL OF A Fountain OF A FUEL FROM A WELL
CN102776897A (en) * 2012-08-21 2012-11-14 庆阳华晨建筑安装工程有限公司 Wash apron anti-settling anti-cracking construction method and structure
CN103993615A (en) * 2014-05-20 2014-08-20 中国建筑第二工程局有限公司 Plugging structure for large-drawdown pipe well and construction method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2011110670A (en) * 2011-03-21 2012-09-27 Федеральное государственное автономное образовательное учреждение высшего профессионального образования "Северный (Арктический) фед WAY OF EXTINGUISHING A WELL OF A Fountain OF A FUEL FROM A WELL
CN202450536U (en) * 2011-12-29 2012-09-26 青岛新华友建工集团股份有限公司 Shallow dewatering and plugging construction device in foundation pit
CN102776897A (en) * 2012-08-21 2012-11-14 庆阳华晨建筑安装工程有限公司 Wash apron anti-settling anti-cracking construction method and structure
CN103993615A (en) * 2014-05-20 2014-08-20 中国建筑第二工程局有限公司 Plugging structure for large-drawdown pipe well and construction method thereof

Also Published As

Publication number Publication date
CN106545024B (en) 2020-11-03

Similar Documents

Publication Publication Date Title
CN101713197A (en) Method for sealing foundation pit pressure reduction well
CN203213095U (en) Underground water supply and drainage building anti-floating structure
CN205329748U (en) Sediment removal device is used in hydraulic engineering construction
CN101845830B (en) Open caisson deviation rectification construction method
CN103723968A (en) Concrete for volute casing pump structure of nuclear power plant PX pump room and pouring forming method of concrete
CN113668928B (en) Method for controlling construction cracks of ultra-large-volume concrete water pool
CN104047266A (en) Seepage-proofing and leaking-stoppage method of leakage passage
CN203741792U (en) Concrete tooth groove stilling basin
CN106545024A (en) Height bleeds back the method for blocking of precipitation deep-well
CN204238178U (en) Novel water conservancy Ecological Wall
CN107747317B (en) Soft rock foundation impervious wall groove bottom sediment treatment method and soft rock foundation impervious wall groove bottom structure
CN207017544U (en) A kind of water-saving roof garden
CN103174154A (en) Underground building bottom plate water burst well pit solid seal method and auxiliary water lowering device
CN203514332U (en) Casing for blocking dewatering tube well of post-cast strip
CN110777829A (en) Method for treating fixed-point water burst on substrate
CN204875418U (en) Water permeability road surface structure
CN105201009A (en) Tower foundation negative-pressure construction method for river channel
CN108071097A (en) A kind of turbine chamber integral replacing method
CN205444124U (en) Waterproof dam of cement piece formula
CN202073107U (en) Enclosed construction of dewatering well
CN208831025U (en) A kind of hydrous fluids underground chamber concrete construction anti-seepage device
CN102926394B (en) Method for using lime piles to rectify deviation of open caisson
CN207538058U (en) A kind of soft rock base cut-pff wall cell bottom structure
CN206267299U (en) Radiator structure in Basement Mass Concrete process of setting
CN204212170U (en) A kind of vertical shaft type underdrainage tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant