CN106534354A - Electric meter data recording method and apparatus - Google Patents
Electric meter data recording method and apparatus Download PDFInfo
- Publication number
- CN106534354A CN106534354A CN201611132769.4A CN201611132769A CN106534354A CN 106534354 A CN106534354 A CN 106534354A CN 201611132769 A CN201611132769 A CN 201611132769A CN 106534354 A CN106534354 A CN 106534354A
- Authority
- CN
- China
- Prior art keywords
- zero point
- ammeter
- data
- copy reading
- freezing data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/12—Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R19/00—Arrangements for measuring currents or voltages or for indicating presence or sign thereof
- G01R19/175—Indicating the instants of passage of current or voltage through a given value, e.g. passage through zero
Abstract
The invention discloses an electric meter data recording method and apparatus. The method comprises the following steps: determining whether zero point freezing data of all pre-read electric meters are received; if the zero point freezing data of all pre-read electric meters are not received, determining the electric meters having no read zero point freezing data in all pre-read electric meters; and reading the zero point freezing data of the electric meters having no read zero point freezing data in a data base of a concentrator. By adoption of the electric meter data recording method and apparatus disclosed by the invention, the technical problems that manpower is wasted by manual meter reading and that inaccuracy may be caused by meter reading by using the concentrator in the prior art are solved.
Description
Technical field
The present invention relates to computer internet field, in particular to a kind of ammeter data recording method and device.
Background technology
With the progress and the development of society of science and technology, that what is lighted increases the residence position for constantly proving electric energy rapidly, with
The system reform of State Grid's system, in electrity market, the demand of user also constantly improving, electric energy metrical as sending out, supply,
With the trade settlement foundation of tripartite, whether truly with accurately, direct relation the fair and just property of clearing, therefore electricity to its result
Accurately metering is more and more urgent for amount.
, if only checked meter using concentrator, there is event in concentrator in the manual metering waste of manpower used in prior art
When barrier, the electricity made a copy for can be caused inaccurate.
For only checking meter and may cause using manual metering waste of manpower and only using concentrator in above-mentioned prior art
Inaccurate problem, not yet propose effective solution at present.
The content of the invention
A kind of ammeter data recording method and device is embodiments provided, at least to solve only to make in prior art
Only being checked meter with manual metering waste of manpower and using concentrator may caused inaccurate technical problem.
A kind of one side according to embodiments of the present invention, there is provided ammeter data recording method, including:Determine whether to connect
Receive the zero point freezing data of all pre- copy reading ammeters;In the feelings for being not received by all zero point freezing datas of pre- copy reading ammeter
Under condition, it is determined that ammeter of the non-copy reading to zero point freezing data in whole pre- copy reading ammeters;Concentrator data call together survey in copy reading
Zero point freezing data of the non-copy reading to the ammeter of zero point freezing data.
Another aspect according to embodiments of the present invention, additionally provides a kind of ammeter data recording equipment, including:First determines
Module, is used to determine whether to receive the zero point freezing data of all pre- copy reading ammeters;Second determining module, for not connecing
In the case of receiving all zero point freezing datas of pre- copy reading ammeter, it is determined that non-copy reading is freezed to zero point in whole pre- copy reading ammeters
The ammeter of data;Copy reading module, for the non-copy reading of copy reading in calling together and survey in the data of concentrator to the ammeter of zero point freezing data
Zero point freezing data.
In embodiments of the present invention, by the way of concentrator is checked meter, by determining whether to receive all pre- copy reading electricity
The zero point freezing data of table;In the case where all zero point freezing datas of pre- copy reading ammeter are not received by, it is determined that all pre-
Ammeter of the non-copy reading to zero point freezing data in copy reading ammeter;The non-copy reading of copy reading in the data of concentrator call survey together is freezed to zero point
The zero point freezing data of the ammeter of data, has reached the purpose of all ammeter zero point freezing datas of complete documentation, it is achieved thereby that
Accurate recording is guaranteed to the technique effect of all ammeter zero point freezing datas, and then solve in prior art only using manually copying
Table waste of manpower and only using concentrator check meter may caused by inaccurate technical problem.
Description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, this
Bright schematic description and description does not constitute inappropriate limitation of the present invention for explaining the present invention.In the accompanying drawings:
Fig. 1 is a kind of flow chart of according to embodiments of the present invention 1 ammeter data recording method;
Fig. 2 is the flow chart of according to embodiments of the present invention 1 a kind of optional ammeter data recording method;And
Fig. 3 is the structure chart of according to embodiments of the present invention 2 a kind of optional ammeter data recording equipment.
Specific embodiment
In order that those skilled in the art more fully understand the present invention program, below in conjunction with the embodiment of the present invention
Accompanying drawing, is clearly and completely described to the technical scheme in the embodiment of the present invention, it is clear that described embodiment is only
The embodiment of a part of the invention, rather than the embodiment of whole.Based on the embodiment in the present invention, ordinary skill people
The every other embodiment obtained under the premise of creative work is not made by member, should all belong to the model of present invention protection
Enclose.
It should be noted that description and claims of this specification and the term " first " in above-mentioned accompanying drawing, "
Two " it is etc. for distinguishing similar object, without for describing specific order or precedence.It should be appreciated that so using
Data can exchange in the appropriate case, so as to embodiments of the invention described herein can with except here diagram or
Order beyond those of description is implemented.Additionally, term " comprising " and " having " and their any deformation, it is intended that cover
Lid is non-exclusive to be included, and for example, process, method, system, product or the equipment for containing series of steps or unit is not necessarily limited to
Those steps clearly listed or unit, but may include clearly not list or for these processes, method, product
Or intrinsic other steps of equipment or unit.
Embodiment 1
According to embodiments of the present invention, there is provided a kind of embodiment of the method for ammeter data recording method, it should be noted that
Can perform in the such as computer system of one group of computer executable instructions the step of the flow process of accompanying drawing is illustrated, and
And, although logical order is shown in flow charts, but in some cases, institute can be performed with the order being different from herein
The step of illustrating or describe.
Fig. 1 is ammeter data recording method according to embodiments of the present invention, as shown in figure 1, the method comprises the steps:
Step S102, it is determined whether receive the zero point freezing data of all pre- copy reading ammeters.
Specifically, ammeter possesses electricity freezing function, and ammeter can pre-set a freeze-off time, and ammeter is when freezing
Between automatic stay ammeter electricity, for example, daily zero point can be set for freeze-off time, then ammeter will be automatically daily
Zero point the various data-frozens on ammeter, wherein, zero data can be day zero point freezing data, or moon zero point
Freezing data, such as 12 months monthly zero point freezing datas on the 1st.
Step S104, in the case where all zero point freezing datas of pre- copy reading ammeter are not received by, it is determined that all pre-
Ammeter of the non-copy reading to zero point freezing data in copy reading ammeter.
Specifically, in the case where all zero point freezing datas of pre- copy reading ammeter are not received by, also just explanation has portion
Divide ammeter not copy logical, that is, there is no zero point freezing data of the copy reading to part ammeter.
Step S106, the non-copy reading of copy reading in the data of concentrator call survey together are freezed to the zero point of the ammeter of zero point freezing data
Data.
Specifically, concentrator is mainly with realizing remote meter reading, that is, goes to copy the data of ammeter, is then preserved, is collected
The faulty reporting functions of middle device.By setting or can be each item data for gathering and storing ammeter surely, concentrator can pass through
GPRS is connected to main website, and concentrator can carry out calling survey together to each harvester or ammeter, receive the ammeter data of harvester collection
Or direct access ammeter data cached, wherein harvester can be acquired to ammeter data, received in concentrator
To main website when calling survey together, buffered ammeter data is packaged upload, wherein, concentrator collection ammeter data mode have with
Under it is several:Real-time Collection, concentrator directly gather the corresponding data items for specifying ammeter;Timing automatic collection, concentrator is according to master
Stand arrange check meter scheme automatic data collection harvester or ammeter data;Automatically mend and copy, concentrator is not to copying at the appointed time
The ammeter for reading data should have benefit automatically to copy function, when benefit is copied unsuccessfully, generate logout, and can be according to setting to main website report
Accuse.
In embodiments of the present invention, by the way of concentrator is checked meter, by determining whether to receive all pre- copy reading electricity
The zero point freezing data of table;In the case where all zero point freezing datas of pre- copy reading ammeter are not received by, it is determined that all pre-
Ammeter of the non-copy reading to zero point freezing data in copy reading ammeter;The non-copy reading of copy reading in the data of concentrator call survey together is freezed to zero point
The zero point freezing data of the ammeter of data, has reached the purpose of all ammeter zero point freezing datas of complete documentation, it is achieved thereby that
Accurate recording is guaranteed to the technique effect of all ammeter zero point freezing datas, and then solve in prior art only using manually copying
Table waste of manpower and only using concentrator check meter may caused by inaccurate technical problem.
In a kind of optional embodiment, before step S102, including:
Step S202, it is determined whether receive the zero point freezing data of any ammeter.
Step S204, in the case where the zero point freezing data of any ammeter is not received by, determines that whether concentrator exists
Line.
Specifically, in the case where the zero point freezing data of any ammeter is not received by, that is to say, that bright all ammeters
It is and copies logical, that is, does not have zero point freezing data of the copy reading to all pre- copy reading ammeters.In that case it is possible to be collection
Middle device is not online, wherein, concentrator not online may the reason for include but are not limited to phonecard arrearage or spacing, signal not
Good or messaging parameter arranges mistake etc..
Step S206, in the case where the zero point freezing data of any ammeter is received, execution step S102 determines whether
Receive the zero point freezing data of all pre- copy reading ammeters.
In a kind of optional embodiment, after step S204, including:
Step S302, in the case where concentrator is online, does not copy in determining all pre- copy reading ammeters in execution step S104
The step of reading the ammeter of zero point freezing data.
Specifically, in the case where the zero point freezing data and concentrator for being not received by any ammeter is online, now not
Ammeter namely all pre- copy reading list of the copy reading to zero point freezing data.
Step S304, in the case where concentrator is not online, sends the instruction checked to concentrator.
Specifically, in the case where concentrator is not online, it may be possible to which concentrator breaks down, and checks instruction sending
Afterwards, field force just can be checked to the ammeter of zero point freezing data to concentrator and/or non-copy reading according to instruction is checked,
In the event of failure, then can be keeped in repair, after maintenance, copy reading can be carried out to ammeter data by related personnel.
In a kind of optional embodiment, step S106, including:
Step S402, in the data of concentrator call survey together copies non-copy reading in advance and freezes to the zero point of the ammeter of zero point freezing data
Data.
Step S404, it is determined whether be copied into work(in advance.
Step S406, copy in advance it is unsuccessful in the case of, concentrator data call together survey in directly copy non-copy reading to zero point jelly
The zero point freezing data of the ammeter of knot data.
Step S408, it is determined whether be directly copied into work(.
Step S410, directly copy it is unsuccessful in the case of, send to concentrator and/or non-copy reading to zero point freezing data
The instruction checked by ammeter.
Specifically, when the data in concentrator are called survey together and carry out copy reading, first can carry out it is pre- copy, copy unsuccessful in advance,
Exactly cannot copy in advance non-copy reading to the ammeter of zero point freezing data zero point freezing data in the case of, then in concentrator
Data call survey together and directly copied, directly copy unsuccessful, that is, cannot directly copy non-copy reading to the ammeter of zero point freezing data
In the case of zero point freezing data, it may be possible to which concentrator breaks down or non-copy reading occurs to the ammeter of zero point freezing data
Failure, therefore can now send the instruction checked to the ammeter of zero point freezing data to concentrator and/or non-copy reading
In a kind of optional embodiment, after step S102, also include:Step S502, is receiving all pre- copy readings
In the case of the zero point freezing data of ammeter, the zero point freezing data of all pre- copy reading ammeters is recorded;Step S404 it
Afterwards, also include:Step S602, in the case where work(is copied in advance, records to the zero point freezing data of all pre- copy reading ammeters;
After step S408, also include:Step S702, in the case where directly work(is copied into, freezes number to the zero point of all pre- copy reading ammeters
According to being recorded.
Specifically, after all zero point freezing datas of pre- copy reading ammeter are finally got, all of data are remembered
Record, in addition to this it is possible to record the produced problem in whole flow process, the zero point for such as failing to get any ammeter is freezed
Data, fail to get the problems such as all the zero point freezing data of pre- copy reading ammeters, concentrator be not online, it is also possible to record problem
Solution, same final entry also include concentrator daily record.
In a kind of optional embodiment, as shown in Figure 2, it is necessary first to determine whether that the zero point for receiving any ammeter is frozen
Knot data, in the case where the zero point freezing data of any ammeter is received, continue to determine whether to receive all pre- copy reading electricity
The zero point freezing data of table, in the case where the zero point freezing data of any ammeter is not received by, it is thus necessary to determine that concentrator is
It is no online;In the case where all zero point freezing datas of pre- copy reading ammeter are received, can directly to all pre- copy reading ammeters
Zero point freezing data recorded, in the case where all zero point freezing datas of pre- copy reading ammeters are not received by, need
It is determined that whole ammeter of the non-copy reading to zero point freezing data in pre- copy reading ammeters, then the data in concentrator are copied not in calling together and surveying in advance
Zero point freezing data of the copy reading to the ammeter of zero point freezing data, carries out whether pre- copying successfully judges afterwards;It is same to concentrate
In the case that device is online, it is also desirable to it is determined that non-copy reading is not now copied to the ammeter of zero point freezing data in whole pre- copy reading ammeters
Read the ammeter of zero point freezing data namely whole pre- copy reading ammeters;In the case where concentrator is not online, needs send inspection
The instruction of concentrator is looked into, after notifying that field force's live assistance checks that concentrator, site problems are solved, back office force can be notified
Non- copy reading is copied in advance to the zero point freezing data of the ammeter of zero point freezing data, equally carries out whether pre- copying successfully judges afterwards;
In the case where judging to be copied into work(in advance, the zero point freezing data of all pre- copy reading ammeters can be recorded, can not copied in advance
In the case of work(, non-copy reading is directly copied to the zero point freezing data of the ammeter of zero point freezing data in the data of concentrator call survey together,
In the case where judging directly to be copied into work(, the zero point freezing data of all non-copy reading ammeters can be recorded, directly be copied not pre-
In the case of successfully, needs send the instruction for checking concentrator and/or non-copy reading to the ammeter of zero point freezing data, notify field personnel
Personnel on site assists to check concentrator/or non-copy reading to the ammeter of zero point freezing data, after site problems are solved, can notify interior
Diligent personnel copy non-copy reading in advance to the zero point freezing data of the ammeter of zero point freezing data, equally carry out afterwards pre- whether successful copying
Judge.
Embodiment 2
According to embodiments of the present invention, there is provided a kind of product embodiments of ammeter data recording equipment, Fig. 3 is according to this
The ammeter data recording equipment of bright embodiment, as shown in figure 3, the device includes the first determining module, the second determining module and copies
Read through model.
Wherein, the first determining module, is used to determine whether to receive the zero point freezing data of all pre- copy reading ammeters;Second
Determining module, in the case where all zero point freezing datas of pre- copy reading ammeter are not received by, it is determined that all pre- copy readings
Ammeter of the non-copy reading to zero point freezing data in ammeter;Copy reading module, for calling the non-copy reading of copy reading in survey together in the data of concentrator
To the zero point freezing data of the ammeter of zero point freezing data.
In embodiments of the present invention, by the way of concentrator is checked meter, determine whether to receive by the first determining module
The zero point freezing data of whole pre- copy reading ammeters;In the situation for being not received by all zero point freezing datas of pre- copy reading ammeter
Under, ammeter of the non-copy reading to zero point freezing data in the whole pre- copy reading ammeters of the second determining module determination;Then by copy reading module
In the data of concentrator call survey together, the non-copy reading of copy reading has reached complete note to the zero point freezing data of the ammeter of zero point freezing data
The purpose of all ammeter zero point freezing datas is recorded, it is achieved thereby that guaranteeing accurate recording to the skill of all ammeter zero point freezing datas
Art effect, and then only check meter and may cause using manual metering waste of manpower and only using concentrator in solving prior art
Inaccurate technical problem.
In a kind of optional embodiment, device also includes:3rd determining module, the 4th determining module and first call mould
Block.
Wherein, the 3rd determining module, for determining whether to receive the zero of all pre- copy reading ammeters in the first determining module
Before point freezing data, it is determined whether receive the zero point freezing data of any ammeter;4th determining module, for not connecing
In the case of receiving the zero point freezing data of any ammeter, determine whether concentrator is online;First calling module, for receiving
To any ammeter zero point freezing data in the case of, call the first determining module to determine whether to receive all pre- copy reading ammeters
Zero point freezing data.
In a kind of optional embodiment, device also includes:Second calling module and the first instruction send module.
Wherein, the second calling module, in the case of determining that concentrator is online in the 4th determining module, calls second true
Ammeter of the non-copy reading to zero point freezing data in the whole pre- copy reading ammeters of cover half block determination.First instruction send module, for
In the case that 4th determining module determines that concentrator is not online, the instruction checked to concentrator is sent.
In a kind of optional embodiment, copy reading module includes:Copy in advance module, the 5th determining module, directly copy module, the 6th
Determining module and the second instruction send module.
Wherein, module is copied in advance, copies non-copy reading in advance to the ammeter of zero point freezing data for calling together in survey in the data of concentrator
Zero point freezing data;5th determining module, is used to determine whether pre- to be copied into work(;Module is copied directly, in the 5th determining module
It is determined that copy in advance it is unsuccessful in the case of, concentrator data call together survey in directly copy non-copy reading to the zero of the ammeter of zero point freezing data
Point freezing data;6th determining module, is used to determine whether directly to be copied into work(;Second instruction sends module, for determining the 6th
Module determine directly copy it is unsuccessful in the case of, send and concentrator and/or non-copy reading examined to the ammeter of zero point freezing data
The instruction looked into.
In a kind of optional embodiment, device also includes:First logging modle, the second logging modle and the 3rd record mould
Block.
Wherein, in the first determining module, the first logging modle, for determining that the zero point for receiving all pre- copy reading ammeters is frozen
In the case of knot data, the zero point freezing data of all pre- copy reading ammeters is recorded;Second logging modle, for the 5th
In the case that determining module determination is copied into work(in advance, the zero point freezing data of all pre- copy reading ammeters is recorded;3rd record
Module, in the case of determining and being directly copied into work(in the 6th determining module, enters to the zero point freezing data of all pre- copy reading ammeters
Row record.
The embodiments of the present invention are for illustration only, do not represent the quality of embodiment.
In the above embodiment of the present invention, the description to each embodiment all emphasizes particularly on different fields, and does not have in certain embodiment
The part of detailed description, may refer to the associated description of other embodiment.
In several embodiments provided herein, it should be understood that disclosed technology contents, can pass through other
Mode is realized.Wherein, device embodiment described above is only schematic, such as the division of described unit, Ke Yiwei
A kind of division of logic function, can have when actually realizing other dividing mode, such as multiple units or component can with reference to or
Person is desirably integrated into another system, or some features can be ignored, or does not perform.Another, shown or discussed is mutual
Between coupling or direct-coupling or communication connection can be INDIRECT COUPLING or communication link by some interfaces, unit or module
Connect, can be electrical or other forms.
The unit as separating component explanation can be or may not be it is physically separate, it is aobvious as unit
The part for showing can be or may not be physical location, you can local to be located at one, or can also be distributed to multiple
On unit.Some or all of unit therein can be selected according to the actual needs to realize the purpose of this embodiment scheme.
In addition, each functional unit in each embodiment of the invention can be integrated in a processing unit, it is also possible to
It is that unit is individually physically present, it is also possible to which two or more units are integrated in a unit.Above-mentioned integrated list
Unit both can be realized in the form of hardware, it would however also be possible to employ the form of SFU software functional unit is realized.
If the integrated unit is realized and as independent production marketing or use using in the form of SFU software functional unit
When, can be stored in a computer read/write memory medium.Based on such understanding, technical scheme is substantially
The part for contributing to prior art in other words or all or part of the technical scheme can be in the form of software products
Embody, the computer software product is stored in a storage medium, use so that a computer including some instructions
Equipment (can for personal computer, server or network equipment etc.) perform the whole of each embodiment methods described of the invention or
Part steps.And aforesaid storage medium includes:USB flash disk, read only memory (ROM, Read-Only Memory), random access memory are deposited
Reservoir (RAM, Random Access Memory), portable hard drive, magnetic disc or CD etc. are various can be with store program codes
Medium.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should
It is considered as protection scope of the present invention.
Claims (10)
1. a kind of ammeter data recording method, it is characterised in that include:
Determine whether to receive the zero point freezing data of all pre- copy reading ammeters;
In the case where the zero point freezing data of the pre- copy reading ammeter of the whole is not received by, the pre- copy reading electricity of the whole is determined
Ammeter of the non-copy reading to zero point freezing data in table;
Concentrator data call together survey in zero point freezing data of the non-copy reading to the ammeter of zero point freezing data described in copy reading.
2. method according to claim 1, it is characterised in that determine whether that the zero point for receiving all pre- copy reading ammeters is frozen
Before knot data, including:
Determine whether to receive the zero point freezing data of any ammeter;
In the case where the zero point freezing data of any ammeter is not received by, determine whether the concentrator is online;
In the case where the zero point freezing data of any ammeter is received, it is determined whether receive the pre- copy reading electricity of the whole
The zero point freezing data of table.
3. method according to claim 2, it is characterised in that after determining whether the concentrator is online, including:
In the case where the concentrator is online, electricity of the non-copy reading to zero point freezing data in the pre- copy reading ammeter of the whole is determined
Table;
In the case where the concentrator is not online, the instruction checked to the concentrator is sent.
4. the method according to any one of claim 1-3, it is characterised in that call together in survey described in copy reading in the data of concentrator
Zero point freezing data of the non-copy reading to the ammeter of zero point freezing data, including:
The non-copy reading is copied in the data of the concentrator call survey together in advance to the zero point freezing data of the ammeter of zero point freezing data;
Determine whether pre- to be copied into work(;
Copy in advance it is unsuccessful in the case of, directly copy the non-copy reading in the data of the concentrator call survey together to zero point freezing data
Ammeter zero point freezing data;
Determine whether directly to be copied into work(;
Directly copy it is unsuccessful in the case of, send the ammeter to the concentrator and/or the non-copy reading to zero point freezing data
The instruction for being checked.
5. method according to claim 4, it is characterised in that determine whether that the zero point for receiving all pre- copy reading ammeters is frozen
After knot data, also include:
In the case where the zero point freezing data of the pre- copy reading ammeter of the whole is received, zero to the pre- copy reading ammeter of the whole
Point freezing data is recorded;
Determine whether it is pre- be copied into work(after, also include:
In the case where work(is copied in advance, the zero point freezing data of the pre- copy reading ammeter of the whole is recorded;
After determining whether directly to be copied into work(, also include:
In the case where directly work(is copied into, the zero point freezing data of the pre- copy reading ammeter of the whole is recorded.
6. a kind of ammeter data recording equipment, it is characterised in that include:
First determining module, is used to determine whether to receive the zero point freezing data of all pre- copy reading ammeters;
Second determining module, in the case where the zero point freezing data of the pre- copy reading ammeter of the whole is not received by, really
Ammeter of the non-copy reading to zero point freezing data in the pre- copy reading ammeter of the fixed whole;
Copy reading module, for calling zero point of the non-copy reading to the ammeter of zero point freezing data described in copy reading in survey together in the data of concentrator
Freezing data.
7. device according to claim 6, it is characterised in that described device also includes:
3rd determining module, for determining whether to receive the zero point of the pre- copy reading ammeter of the whole in first determining module
Before freezing data, it is determined whether receive the zero point freezing data of any ammeter;
4th determining module, in the case where the zero point freezing data of any ammeter is not received by, it is determined that described
Whether concentrator is online;
First calling module, in the case where the zero point freezing data of any ammeter is received, calling described first
Determining module determines whether to receive the zero point freezing data of all pre- copy reading ammeters.
8. device according to claim 7, it is characterised in that described device also includes:
Second calling module, in the case of determining that the concentrator is online in the 4th determining module, calls described
Two determining modules determine ammeter of the non-copy reading to zero point freezing data in the pre- copy reading ammeter of the whole;
First instruction sends module, in the case of determining that the concentrator is not online in the 4th determining module, sends
The instruction checked by the concentrator.
9. the device according to any one of claim 6-8, it is characterised in that the copy reading module includes:
Module is copied in advance, copies the non-copy reading in advance to the ammeter of zero point freezing data for calling together in the data of the concentrator in survey
Zero point freezing data;
5th determining module, is used to determine whether pre- to be copied into work(;
Directly copy module, for the 5th determining module determine copy in advance it is unsuccessful in the case of, in the data of the concentrator
Call the zero point freezing data for the non-copy reading directly being copied in surveying to the ammeter of zero point freezing data together;
6th determining module, is used to determine whether directly to be copied into work(;
Second instruction send module, for the 6th determining module determine directly copy it is unsuccessful in the case of, send to described
The instruction checked to the ammeter of zero point freezing data by concentrator and/or the non-copy reading.
10. device according to claim 9, it is characterised in that described device also includes:
In first determining module, first logging modle, for determining that the zero point for receiving the pre- copy reading ammeter of the whole is freezed
In the case of data, the zero point freezing data of the pre- copy reading ammeter of the whole is recorded;
Second logging modle, in the case of determining and being copied into work(in advance in the 5th determining module, to the pre- copy reading of the whole
The zero point freezing data of ammeter is recorded;
3rd logging modle, in the case of determining and being directly copied into work(in the 6th determining module, to the pre- copy reading of the whole
The zero point freezing data of ammeter is recorded.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611132769.4A CN106534354A (en) | 2016-12-09 | 2016-12-09 | Electric meter data recording method and apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611132769.4A CN106534354A (en) | 2016-12-09 | 2016-12-09 | Electric meter data recording method and apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106534354A true CN106534354A (en) | 2017-03-22 |
Family
ID=58342986
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611132769.4A Pending CN106534354A (en) | 2016-12-09 | 2016-12-09 | Electric meter data recording method and apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106534354A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108303669A (en) * | 2018-03-09 | 2018-07-20 | 宁波三星医疗电气股份有限公司 | A method of promoting intelligent electric meter calibration efficiency |
CN108416698A (en) * | 2018-03-28 | 2018-08-17 | 宁波三星医疗电气股份有限公司 | A method of promoting smart machine data collection rate |
CN109375146A (en) * | 2018-09-27 | 2019-02-22 | 国网河北省电力有限公司电力科学研究院 | A kind of filling mining method, system and the terminal device of electricity consumption data |
CN110648525A (en) * | 2019-09-25 | 2020-01-03 | 宁波三星医疗电气股份有限公司 | Data complementary reading method and device and power acquisition terminal |
CN110969827A (en) * | 2019-12-18 | 2020-04-07 | 科大智能电气技术有限公司 | Low-voltage power line carrier meter reading system and method |
CN112418622A (en) * | 2020-11-12 | 2021-02-26 | 贵州电网有限责任公司 | Method for relatively positioning equipment for unknown electric meters in transformer area |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201859537U (en) * | 2009-09-27 | 2011-06-08 | 上海可鲁系统软件有限公司 | Multifunctional bandwidth power carrier concentrator |
CN202275498U (en) * | 2011-05-31 | 2012-06-13 | 广东电网公司中山供电局 | Prepaid meter reading system |
CN103001321A (en) * | 2011-09-13 | 2013-03-27 | 南京能瑞自动化设备股份有限公司 | Data concentrator with class-D voltage quality monitoring function |
CN103136914A (en) * | 2011-11-24 | 2013-06-05 | 新疆电力公司电力科学研究院 | TD-LTE wireless network-based automatic meter reading system |
-
2016
- 2016-12-09 CN CN201611132769.4A patent/CN106534354A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201859537U (en) * | 2009-09-27 | 2011-06-08 | 上海可鲁系统软件有限公司 | Multifunctional bandwidth power carrier concentrator |
CN202275498U (en) * | 2011-05-31 | 2012-06-13 | 广东电网公司中山供电局 | Prepaid meter reading system |
CN103001321A (en) * | 2011-09-13 | 2013-03-27 | 南京能瑞自动化设备股份有限公司 | Data concentrator with class-D voltage quality monitoring function |
CN103136914A (en) * | 2011-11-24 | 2013-06-05 | 新疆电力公司电力科学研究院 | TD-LTE wireless network-based automatic meter reading system |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108303669A (en) * | 2018-03-09 | 2018-07-20 | 宁波三星医疗电气股份有限公司 | A method of promoting intelligent electric meter calibration efficiency |
CN108303669B (en) * | 2018-03-09 | 2020-08-14 | 宁波三星医疗电气股份有限公司 | Method for improving meter calibration efficiency of intelligent electric meter |
CN108416698A (en) * | 2018-03-28 | 2018-08-17 | 宁波三星医疗电气股份有限公司 | A method of promoting smart machine data collection rate |
CN109375146A (en) * | 2018-09-27 | 2019-02-22 | 国网河北省电力有限公司电力科学研究院 | A kind of filling mining method, system and the terminal device of electricity consumption data |
CN109375146B (en) * | 2018-09-27 | 2021-03-16 | 国网河北省电力有限公司电力科学研究院 | Supplementary collection method and system for electricity consumption data and terminal equipment |
CN110648525A (en) * | 2019-09-25 | 2020-01-03 | 宁波三星医疗电气股份有限公司 | Data complementary reading method and device and power acquisition terminal |
CN110969827A (en) * | 2019-12-18 | 2020-04-07 | 科大智能电气技术有限公司 | Low-voltage power line carrier meter reading system and method |
CN112418622A (en) * | 2020-11-12 | 2021-02-26 | 贵州电网有限责任公司 | Method for relatively positioning equipment for unknown electric meters in transformer area |
CN112418622B (en) * | 2020-11-12 | 2022-12-09 | 贵州电网有限责任公司 | Method for relatively positioning equipment for unknown electric meters in transformer area |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106534354A (en) | Electric meter data recording method and apparatus | |
CN106056695B (en) | A kind of intelligent mobile inspection terminal based on Internet of Things | |
CN101615687B (en) | Method for intelligently reading data from battery formation device | |
CN107577545A (en) | A kind of failed disk detection and restorative procedure and device | |
CN106951369A (en) | The management method and device of a kind of joint debugging test | |
US8745007B2 (en) | Method of handling large volumes of synchrophasor measurments for real time event replay | |
CN102831541A (en) | Automatic assessment method and device of house value | |
CN105575155B (en) | Method and apparatus for determining vehicle traveling information | |
CN107146041A (en) | A kind of road network based on 3DGIS+BIM runs long-range disease screening interactive system and method | |
CN107038372A (en) | Leaking data interface detection method and device | |
CN105301450A (en) | Distribution network fault automatic diagnosis method and system | |
CN107479540A (en) | Method for diagnosing faults and system | |
CN108269059B (en) | Data management system | |
CN109377282A (en) | Real estate Land Appraisal production management method and system, computer equipment and storage medium | |
CN105912439A (en) | Method, device and system for computer monitoring | |
CN107563671A (en) | A kind of enterprise's test and appraisal planning service system based on internet | |
CN109272674A (en) | A kind of self-service device malfunction elimination system for supporting to use under offline and on-line environment | |
CN113540526B (en) | Fuel cell fault diagnosis method and system based on historical data analysis | |
CN205643673U (en) | Metering device scraps alarm device based on measurement instrument follow -up of quality evaluation system | |
CN108173711A (en) | Enterprises system data exchange monitoring method | |
CN108036767A (en) | A kind of settlement monitoring data treating method and apparatus | |
CN114545069A (en) | Electricity information acquisition, checking and simulation testing device and method thereof | |
CN112579352A (en) | Quality monitoring result generation method, storage medium and quality monitoring system of service data processing link | |
CN109688019A (en) | A kind of fault detection system and its method of web station system | |
CN102521519B (en) | Method and system for predicting storage life of liquid oil product |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170322 |
|
RJ01 | Rejection of invention patent application after publication |