CN106533734A
CN106533734A CN201610846218.8A CN201610846218A CN106533734A CN 106533734 A CN106533734 A CN 106533734A CN 201610846218 A CN201610846218 A CN 201610846218A CN 106533734 A CN106533734 A CN 106533734A
Authority
CN
China
Prior art keywords
maintenance
task
post
job
automatization
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610846218.8A
Other languages
Chinese (zh)
Inventor
庞辉富
赵建飞
蒋君伟
徐育毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Guangtong software Limited by Share Ltd XinDa
Original Assignee
Hangzhou Youyun Software Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Youyun Software Co Ltd filed Critical Hangzhou Youyun Software Co Ltd
Priority to CN201610846218.8A priority Critical patent/CN106533734A/en
Publication of CN106533734A publication Critical patent/CN106533734A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/04Network management architectures or arrangements

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to an automation operation method through combination of an actual operation and a post system. The method comprises: operation and maintenance staffs of a data center are divided into different operation and maintenance posts, and the job responsibility and the job content of each post are cleared; according to the managed objects in the data center, the object operation implementation is written in the code and script mode to form an operation library; an operation field is divided, and operation and maintenance tasks in different operation and maintenance fields are combs; and finally, the three factors are associated, operation in the operation library is configured to assemble an SOP work in the flow arrangement mode to associate with the operation and maintenance tasks, and the operation and maintenance tasks are distributed to concrete operation and maintenance posts according to the job responsibility and the job content of operation and maintenance posts. The automation operation method through combination of the actual operation and the post system can effectively solve the problems of the operation and maintenance workload in the current IT operation and maintenance field, insufficient operation and maintenance staffs, high operation and maintenance cost and many artificial faults.

Description

A kind of automatization's O&M method that practical operation is combined with post system
Technical field
The present invention relates to IT O&Ms field, mainly a kind of O&M side of automatization for combining practical operation with post system Method.
Background technology
Enterprise's miscellaneous service is relied on to IT business and is constantly increased in recent years so that the scale of data center's IT infrastructure exists Constantly expand, species being on the increase, numerous enterprises and institutions be faced with IT environment quickly the brought complexity of change, into The severe challenge of the aspects such as sheet, integration, safety, management.These problems are concentrated mainly on, and first, O&M cost occupies height and do not go up, if Standby increasing number, a large amount of loaded down with trivial details, work of repetition in O&M cause a large amount of poorly efficient work of manager, O&M cost constantly to increase Plus;Secondly operation maintenance personnel O&M knowledge dispersion, lacks centralized management, and each system maintenance work is overly dependent upon manager, personnel Job rotation often causes strong influence to work, or even disconnects, and there is human operational error's hidden danger, and is difficult to from basic Upper safeguards system safety;
In view of this, it is special to propose the present invention.
The content of the invention
Present invention aims to the Tough questions faced in the O&M of current data center, and provide a kind of by reality Automatization's O&M method that operation is combined with post system, blames model by O&M hilllock, and the O&M post in maintenance work is managed Reason object, operation model, and the operating platform of automatization is formed, make maintenance work automatization.
The purpose of the present invention is by following technical solution completing.It is this that practical operation combined with post system Automatization's O&M method, is different posies first by data center's maintenance work according to segregation of duties, is such as responsible for service heat The zero line hilllock of line, is responsible for line hilllock for monitoring and configuring maintenance etc.;Go out specific O&M task for different post combings, be Different posies is set out specific task list.Secondly the operation platform of a set of automatization is built, in automatization's operation platform In be directed to data center management object, such as server, the network equipment, memorizer etc., there is provided its corresponding management operation, this Including server start and stop, using deployment etc.;And these abundant operations are assembled into into SOP works by way of flow process layout Industry.Finally, will be the O&M task in post interrelated with the SOP operations in automatization operation platform, form the O&M of automatization Way to manage.So as to reduce manual operations of the operation maintenance personnel in data center.
Further, comprise the following steps that:
(S1) data center's operation maintenance personnel is divided into into different work positions, can be divided according to different dimensions, such as Divide according to organization, or divide according to management object etc.;
(S2), the clearly responsibilities in difference posies and job content, such as zero line hilllock be responsible for the process of service hotline and The process of service request;And form clearly job duty book;
(S3), the scale and demand according to data center, the O&M task in combing O&M field, O&M task are divided into week Phase property and acyclic;
(S4), all of object being managed in statistical data center, hardware device are related to server, network and set Standby, memorizer etc., software service include application system, middleware, in operating system etc.;
(S5) operation of every kind of management object, for all management objects for counting, is enumerated, and is write certainly for every kind of operation Dynamicization realizes code script, forms operation storehouse;
(S6), according to the every kind of O&M task enumerated in step S3, the operation of managed object is passed through into flow process layout A SOP operation is assembled into, SOP operations correspond to O&M task;
(S7) job duty according to defined in step S2, by the O&M task assignment in the O&M field of combing in step S3 To the post of response.
Beneficial effects of the present invention are:The present invention for by the maintenance work of loaded down with trivial details repetition in data center, by code The mode of script by its automatization, by its standardization by way of practical operation is combined with job duty, so as to be formed with Rational automatization's O&M operation model of effect, reduces maintenance work cost and improves O&M safety.The present invention can effectively solving The maintenance work amoun faced in current IT O&Ms field, operation maintenance personnel is not enough, and O&M cost is high and O&M is operated Human error is more, the problems such as system is dangerous.
Description of the drawings
Fig. 1 is block mold graph of a relation;
Fig. 2 implements hilllock duty system instance model schematic diagram for final;
Fig. 3 O&Ms post divides figure;
Fig. 4 O&Ms field and O&M task image.
Specific embodiment
Detailed introduction is done to the present invention below in conjunction with accompanying drawing and embodiment:
As shown in figure 1, automatization's O&M model that operation of the present invention is combined with post system, is related to 6 altogether Object, including O&M post, O&M field, O&M task, management object, operation (storehouse), SOP operations.
The present invention realizes that step is as follows:
S1. O&M post is divided according to enterprise's O&M demand, such as zero line hilllock, a line is divided into according to O&M service procedure The different posies such as hilllock, two wires hilllock, three line hilllocks, as shown in Figure 3;
S2. the clearly responsibilities in difference O&M post and job content, service hotline is responsible on such as zero line hilllock, to user Service request is processed, and the operation task of conventional class is responsible on a line hilllock, and working contents are included opens monitoring, goes into operation It is single, configuring maintenance;O&M support is responsible on two wires hilllock, and working contents change is performed, capacity management, program management, failure pipe Reason etc.;
S3. combing operates the O&M task in field, O&M field can be divided into day clear, High Availabitity guarantee, Performance tuning, Troubleshooting, automatic deployment, change execution etc.;Every kind of O&M field includes many O&M tasks, such as day includes that clearly daily record is clear Reason, dirty data cleaning, cache cleaner etc., as shown in Figure 4.
S4. the management object included by statistical data center, such as server need the model specific to server;Behaviour Make system, CentOS 6.3;Data base MySQL 5.5, Cassandra 2.1.4 etc..
S5. the every kind of management operation that included of object of combing, and is write in every kind of operation realize accordingly scripted code, than Such as 5.5 installation operations of MySQL, the installation script of MySQL 5.5 can be realized by way of Linux Shell, and by script It is stored in operation storehouse.
S6. the O&M task according to the combing of step S3 institute, creates O&M operation, and O&M operation is led to by the operation for managing object Cross flow process layout to form, be such as data-base cluster dilatation task creation entitled " MySQL cluster dilatation operations ", this operation is included MySQL installations, MySQL configurations, MySQL start, and MySQL adds to cluster etc. and operate, and is operated by flow process volume by these Row forms, and is run in the way of flow scheduling;
S7. according to the job duty defined in step S2 and job content, O&M task is assigned to into corresponding O&M post, Such as supported according to the responsible O&M on two wires hilllock, working contents change is performed, capacity management, program management, fault management Deng " data-base cluster dilatation " being distributed to two wires post.
In addition to the implementation, the present invention can also have other embodiment.All employing equivalents or equivalent transformation shape Into technical scheme, all fall within the protection domain of application claims.

Claims (2)

1. a kind of automatization's O&M method for being combined practical operation with post system, is characterized in that:O&M post, O&M are led In domain, O&M task, management Object Operations three associate to form automatization's operation management system, and its step is as follows:
1) O&M post is divided, specifies O&M job duty and job content;
2) statistical data centre management object, manages Object Operations scripting;
3) the O&M task included in combing O&M field;
4) according to O&M task, it is SOP operations by operation layout;
5) according to job duty, corresponding post is given by O&M task assignment.
2. automatization's O&M method that practical operation is combined with post system according to claim 1, it is characterised in that: Comprise the following steps that:
S1, data center's operation maintenance personnel is divided into into different work positions according to different dimensions;
S2, the clearly responsibilities in difference post and job content;
S3, according to the scale and demand of data center, the O&M task in combing O&M field, O&M task be divided into periodically and It is acyclic;
The all of object being managed in S4, statistical data center, hardware device be mainly concerned with server, the network equipment or Memorizer, software service mainly include application system, middleware or operating system;
S5, all management objects for counting, enumerate the operation of every kind of management object, and write automatization for every kind of operation Code script is realized, operation storehouse is formed;
S6, according to the every kind of O&M task enumerated in step S3, the operation of managed object is assembled into by flow process layout One SOP operation, SOP operations correspond to O&M task;
S7, according to defined in step S2 job duty, by the O&M task assignment in the O&M field of combing in step S3 to ring The post answered.
CN201610846218.8A 2016-09-23 2016-09-23 Automation operation method through combination of actual operation and post system Pending CN106533734A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610846218.8A CN106533734A (en) 2016-09-23 2016-09-23 Automation operation method through combination of actual operation and post system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610846218.8A CN106533734A (en) 2016-09-23 2016-09-23 Automation operation method through combination of actual operation and post system

Publications (1)

Publication Number Publication Date
CN106533734A true CN106533734A (en) 2017-03-22

Family

ID=58344135

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610846218.8A Pending CN106533734A (en) 2016-09-23 2016-09-23 Automation operation method through combination of actual operation and post system

Country Status (1)

Country Link
CN (1) CN106533734A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106533766A (en) * 2016-11-11 2017-03-22 郑州云海信息技术有限公司 Operation and maintenance management method and system for cloud data center
CN107169675A (en) * 2017-06-12 2017-09-15 北京光大隆泰科技有限责任公司 Quality task creating method, apparatus and system
CN111476481A (en) * 2020-04-03 2020-07-31 青岛鲨鱼汇信息技术有限公司 Advance work flow combining intelligent labor risk management
CN113162784A (en) * 2020-01-22 2021-07-23 阿里巴巴集团控股有限公司 Operation and maintenance template generation method and device
CN114169848A (en) * 2021-11-19 2022-03-11 深圳市沃科赛尔信息技术有限公司 Digital factory problem solving method
CN114611882A (en) * 2022-02-18 2022-06-10 广州启盟信息科技有限公司 Property service plan distribution method, device and system based on post

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101901399A (en) * 2009-05-27 2010-12-01 北京正辰科技发展有限责任公司 Operation management platform
CN102195813A (en) * 2011-05-04 2011-09-21 成都勤智数码科技有限公司 Method and device for intelligently creating operation and maintenance worksheet
CN103457763A (en) * 2013-08-15 2013-12-18 中电长城网际系统应用有限公司 Multi-channel information distribution method and system based on strategies and automatic operation platform
CN103701641A (en) * 2013-12-19 2014-04-02 迈普通信技术股份有限公司 Method and system of automatic operation and maintenance
CN104009861A (en) * 2013-02-26 2014-08-27 成都勤智数码科技股份有限公司 Operation service management system based on monitoring information
CN104424299A (en) * 2013-09-02 2015-03-18 腾讯科技(深圳)有限公司 Data statistical method and device
CN105653401A (en) * 2015-12-28 2016-06-08 中国民生银行股份有限公司 Method and device for scheduling disaster recovery, operation and maintenance, monitoring and emergency start-stop of application systems

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101901399A (en) * 2009-05-27 2010-12-01 北京正辰科技发展有限责任公司 Operation management platform
CN102195813A (en) * 2011-05-04 2011-09-21 成都勤智数码科技有限公司 Method and device for intelligently creating operation and maintenance worksheet
CN104009861A (en) * 2013-02-26 2014-08-27 成都勤智数码科技股份有限公司 Operation service management system based on monitoring information
CN103457763A (en) * 2013-08-15 2013-12-18 中电长城网际系统应用有限公司 Multi-channel information distribution method and system based on strategies and automatic operation platform
CN104424299A (en) * 2013-09-02 2015-03-18 腾讯科技(深圳)有限公司 Data statistical method and device
CN103701641A (en) * 2013-12-19 2014-04-02 迈普通信技术股份有限公司 Method and system of automatic operation and maintenance
CN105653401A (en) * 2015-12-28 2016-06-08 中国民生银行股份有限公司 Method and device for scheduling disaster recovery, operation and maintenance, monitoring and emergency start-stop of application systems

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
梁浩波,封祐钧,林浩钊: "IT 一体化运维管控技术与管理研究", 《计算机安全》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106533766A (en) * 2016-11-11 2017-03-22 郑州云海信息技术有限公司 Operation and maintenance management method and system for cloud data center
CN107169675A (en) * 2017-06-12 2017-09-15 北京光大隆泰科技有限责任公司 Quality task creating method, apparatus and system
CN113162784A (en) * 2020-01-22 2021-07-23 阿里巴巴集团控股有限公司 Operation and maintenance template generation method and device
CN113162784B (en) * 2020-01-22 2023-08-22 阿里巴巴集团控股有限公司 Method and device for generating operation and maintenance template
CN111476481A (en) * 2020-04-03 2020-07-31 青岛鲨鱼汇信息技术有限公司 Advance work flow combining intelligent labor risk management
CN114169848A (en) * 2021-11-19 2022-03-11 深圳市沃科赛尔信息技术有限公司 Digital factory problem solving method
CN114611882A (en) * 2022-02-18 2022-06-10 广州启盟信息科技有限公司 Property service plan distribution method, device and system based on post

Similar Documents

Publication Publication Date Title
CN106533734A (en) Automation operation method through combination of actual operation and post system
JP5932668B2 (en) Utility grid command filter system
CN105205231B (en) A kind of power distribution network Digital Simulation System based on DCOM
US10116165B2 (en) Powergrid operation and supervision system
CN104281130B (en) Hydroelectric equipment monitoring and fault diagnosis system based on big data technology
CN104463492A (en) Operation management method of electric power system cloud simulation platform
CN102012809B (en) Comprehensive monitoring linkage module design and implementation method
CN104158286B (en) A kind of regulation and control integration main station system
CN105843182A (en) Power dispatching accident handling scheme preparing system and power dispatching accident handling scheme preparing method based on OMS
CN102594919B (en) Information technology (IT) resource supporting system
CN103188088A (en) Equipment information acquisition system and equipment information acquisition method
CN105653401B (en) Application system calamity is standby, O&M, monitoring and emergency start and stop dispatching method and device
CN110689223B (en) Robot batch management system based on RPA control
CN108009258A (en) It is a kind of can Configuration Online data collection and analysis platform
CN103955865A (en) Scheduled and faulted power outage range visualization method based on information interaction
CN105094961A (en) Task scheduling management system based on quartz frame and method thereof
CN108777637A (en) A kind of data center's total management system and method for supporting server isomery
CN105718686A (en) Power distribution network simulation system based on event driving and simulation method thereof
CN104657150A (en) Automatic operation and maintenance method under cluster environment
CN110134053A (en) A kind of monitoring configuration method, device and the equipment of distribution transforming fault outage quick response
CN108052371A (en) Railway TDCS/CTC systems and its application based on virtualization technology
CN109189373A (en) A kind of multi-person synergy development platform and method based on separate traffic application model
CN109447845A (en) A kind of power grid logistics intelligence operation platform based on Internet of Things and mobile Internet
CN106446177A (en) Factory digitalization real-time fine management system
CN110007901A (en) A kind of development system collecting regimental wind-powered electricity generation monitor supervision platform and its operation method and development approach

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20191217

Address after: 311305 no.030, building 3, No.6 heting street, Qingshanhu street, Lin'an District, Hangzhou City, Zhejiang Province

Applicant after: Hangzhou Youyun Software Co., Ltd.

Applicant after: Beijing Guangtong software Limited by Share Ltd XinDa

Address before: 311305, No. three, No. 6, Ting Ting Street, 030 Qingshan Lake Street, Hangzhou, Zhejiang, Ling'an

Applicant before: Hangzhou Youyun Software Co., Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170322