CN106532931B - A kind of electric power system dispatching boss station intelligent batch is to point methods - Google Patents
A kind of electric power system dispatching boss station intelligent batch is to point methods Download PDFInfo
- Publication number
- CN106532931B CN106532931B CN201610880879.2A CN201610880879A CN106532931B CN 106532931 B CN106532931 B CN 106532931B CN 201610880879 A CN201610880879 A CN 201610880879A CN 106532931 B CN106532931 B CN 106532931B
- Authority
- CN
- China
- Prior art keywords
- boss
- substation
- main website
- point
- stands
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 20
- 230000011664 signaling Effects 0.000 claims abstract description 24
- 238000012360 testing method Methods 0.000 claims abstract description 24
- 230000004044 response Effects 0.000 claims abstract description 5
- 230000008569 process Effects 0.000 claims abstract description 4
- 238000006073 displacement reaction Methods 0.000 claims description 3
- 238000001514 detection method Methods 0.000 claims description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000003993 interaction Effects 0.000 description 2
- 230000001915 proofreading effect Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Classifications
-
- H02J13/0006—
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/16—Electric power substations
Abstract
The present invention discloses a kind of electric power system dispatching boss and stands intelligent batch to point methods, includes the following steps: step 1, and when boss, which stands, to need to carry out to test, substation is switched to from normal operating condition to a test wait state;Step 2, main website issues special command to start boss station to a testing process, and response fix information in substation makes the information of main website become specific information;Step 3, substation is by remote signalling and telemetry intelligence (TELINT) according to certain regular period Shang Song main website;Step 4, main website verifies the remote signalling received and telemetry intelligence (TELINT), and generates to a test report;Step 5, boss, which stands, terminates to a test, and normal operating condition is restored in substation.Such method can reduce the burden of staff, improve working efficiency, while improve electric power system dispatching boss station to the degree of automation and reliability of point.
Description
Technical field
The present invention relates to the plant stand equipment debugging maintenance technology of field of power system more particularly to electric power system dispatching bosses
It stands to a technology.
Background technique
Continuous with unattended operation transformer station is popularized, and it is power grid that can control centre, which correctly be monitored substation,
The premise of safe and stable operation, this requires the substation informations of control centre's storage and configuration to have height correctness.At present
The network architecture of electric power system dispatching boss station communication is that substation passes through dispatch data net and scheduling station progress substation information
Interaction, before live substation puts into operation or transformation after the completion of usually require the information of scheduling station and substation is verified, protect
Both cards are with uniformity, so that it is guaranteed that control centre can correctly be monitored substation.However, dispatching boss at present
It is generallyd use between standing and realizes Information Proofreading to manually, which is by scheduling station staff's phone contact substation, manually
Information Proofreading.Great work load, and inefficiency are brought to power system staff to point manually, it is easy to produce
Raw mistake, buries major hidden danger to power grid security.Therefore it needs to study a kind of more convenient, more efficient and safer to a side
Method, reduces the burden of staff, and improves the working efficiency of staff, while ensuring the correctness to point, and this case is thus
It generates.
Summary of the invention
The purpose of the present invention is to provide a kind of electric power system dispatching boss station intelligent batch to point methods, can reduce
The burden of staff improves working efficiency, while improving electric power system dispatching boss station to the degree of automation of point and reliable
Property.
In order to achieve the above objectives, solution of the invention is:
A kind of electric power system dispatching boss station intelligent batch includes the following steps: point methods
Step 1, when boss stand need carry out to test when, substation from normal operating condition be switched to test wait
State;
Step 2, main website issues special command to start boss station to a testing process, and response fix information in substation makes to lead
The information stood becomes specific information;
Step 3, substation is by remote signalling and telemetry intelligence (TELINT) according to certain regular period Shang Song main website;
Step 4, main website verifies the remote signalling received and telemetry intelligence (TELINT), and generates to a test report;
Step 5, boss, which stands, terminates to a test, and normal operating condition is restored in substation.
In above-mentioned steps 1, substation is moved back or is received empty remote control operation mode by outer pressing plate throwing and cuts from normal operating condition
It changes to a test wait state.
In above-mentioned steps 2, special command refers to that total calling order or boss stand and arrange order.
In above-mentioned steps 2, fix information includes the telemetry intelligence (TELINT) of the remote signalling information divided entirely and complete zero.
When sending remote signalling information in above-mentioned steps 3, on substation, displacement is generated point by point according to remote signalling information table, using each point
It first closes and divides afterwards, be spaced fixed cycle Shang Song main website.
When sending telemetry intelligence (TELINT) in above-mentioned steps 3, on substation, telemetering variation, measuring point value are generated point by point according to telemetry intelligence (TELINT) table
Definite value, Shang Song main website are reinforced by telemetering measuring point serial number.
In above-mentioned steps 4, main website according to sent on substation the rule of remote signalling and telemetering by the remote signalling received and telemetry intelligence (TELINT)
It is verified.
In above-mentioned steps 4, also the remote signalling received and telemetry intelligence (TELINT) are compared with standard scheduling information table for main website, inspection
The correctness of measurement information.
After adopting the above scheme, the present invention can not change existing scheduling, the network structure of plant stand, do not increase it is additional soft
Hardware device and in the case where not having a power failure, intelligently batch completes the verification of the information such as telemetering, the remote signalling at scheduling boss station, thus
The burden of staff is reduced, electric power system dispatching boss station is improved to the degree of automation and reliability of point, greatlys improve
Working efficiency.
Detailed description of the invention
Fig. 1 is flow chart of the invention.
Specific embodiment
Below with reference to attached drawing, technical solution of the present invention is described in detail.
As shown in Figure 1, the present invention, which provides a kind of electric power system dispatching boss, stands intelligent batch to point methods, in electric power
System call boss stands after the completion of the construction of channel, carries out between boss station to point, to efficiently complete to a checking and accepting;
It is described that point methods are included the following steps:
Step 1, main website and substation are in normal operating condition, when boss stand need carry out to test when, son
It stands and moves back or receives empty remote control operation mode by outer pressing plate throwing and be switched to from normal operating condition to testing a wait state, this
When boss station between no longer carry out the interaction of normal data;
Step 2, into after to test wait state, main website issues total calling order or the agreement order of boss station for substation,
To start boss station to a testing process, fix information is replied by total calling response or boss station agreement command response in substation
(such as remote signalling state is all point, telemetry value is all zero) to main website so that the information of main website becomes specific information;
Step 3, after boss stands starting to test function, substation generates displacement according to remote signalling information table point by point, using every
A point first closes afterwards minute, is spaced fixed cycle Shang Song main website;Then telemetering variation is generated point by point according to telemetry intelligence (TELINT) table, above send master
It stands, wherein measuring point value is fixed by a rule, if measuring point value is by the rule of telemetering measuring point serial number reinforcing definite value, can be set to telemetering
Measuring point serial number adds to be sent on 0.99, since the 1st point, such as 1.99,2.99 ..., 1000.99.
Step 4, main website verifies the remote signalling and telemetry intelligence (TELINT) that receive, specifically can be according to sending remote signalling and distant on substation
Whether the information that the rule judgement of survey receives is correct, while main website believes the remote signalling received and the scheduling of telemetry intelligence (TELINT) and standard
Breath table is compared, the correctness of detection information, and generates to a test report, is explicitly shown error message.
Step 5, boss, which stands, terminates to a test, and normal operating condition is restored in substation;
The above examples only illustrate the technical idea of the present invention, and this does not limit the scope of protection of the present invention, all
According to the technical idea provided by the invention, any changes made on the basis of the technical scheme each falls within the scope of the present invention
Within.
Claims (6)
1. a kind of electric power system dispatching boss stands, intelligent batch is to point methods, it is characterised in that includes the following steps:
Step 1, when boss stand need carry out to test when, substation from normal operating condition be switched to test wait a shape
State;
Step 2, main website issues special command to start boss station to a testing process, and response fix information in substation makes main website
Information becomes specific information;
Step 3, substation is by remote signalling and telemetry intelligence (TELINT) according to certain regular period Shang Song main website;
Wherein, when sending remote signalling information on substation, displacement is generated point by point according to remote signalling information table, is first closed afterwards minute using each point,
Every fixed cycle Shang Song main website;
When sending telemetry intelligence (TELINT) on substation, telemetering variation is generated point by point according to telemetry intelligence (TELINT) table, measuring point value is added by telemetering measuring point serial number
Fixed value, Shang Song main website;
Step 4, main website verifies the remote signalling received and telemetry intelligence (TELINT), and generates to a test report;
Step 5, boss, which stands, terminates to a test, and normal operating condition is restored in substation.
2. a kind of electric power system dispatching boss as described in claim 1 stands intelligent batch to point methods, it is characterised in that: described
In step 1, substation is moved back or is received empty remote control operation mode by outer pressing plate throwing and is switched to from normal operating condition to a test
Wait state.
3. a kind of electric power system dispatching boss as described in claim 1 stands intelligent batch to point methods, it is characterised in that: described
In step 2, special command refers to that total calling order or boss stand and arrange order.
4. a kind of electric power system dispatching boss as described in claim 1 stands intelligent batch to point methods, it is characterised in that: described
In step 2, fix information includes the telemetry intelligence (TELINT) of the remote signalling information divided entirely and complete zero.
5. a kind of electric power system dispatching boss as described in claim 1 stands intelligent batch to point methods, it is characterised in that: described
In step 4, main website is verified the remote signalling received and telemetry intelligence (TELINT) according to sending the rule of remote signalling and telemetering on substation.
6. a kind of electric power system dispatching boss as described in claim 1 stands intelligent batch to point methods, it is characterised in that: described
In step 4, also the remote signalling received and telemetry intelligence (TELINT) are compared with standard scheduling information table for main website, detection information it is correct
Property.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610880879.2A CN106532931B (en) | 2016-10-09 | 2016-10-09 | A kind of electric power system dispatching boss station intelligent batch is to point methods |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610880879.2A CN106532931B (en) | 2016-10-09 | 2016-10-09 | A kind of electric power system dispatching boss station intelligent batch is to point methods |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106532931A CN106532931A (en) | 2017-03-22 |
CN106532931B true CN106532931B (en) | 2019-04-19 |
Family
ID=58333135
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610880879.2A Active CN106532931B (en) | 2016-10-09 | 2016-10-09 | A kind of electric power system dispatching boss station intelligent batch is to point methods |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106532931B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108322374A (en) * | 2018-02-28 | 2018-07-24 | 国电南瑞科技股份有限公司 | A kind of boss station monitoring information check method based on wide-area services bus |
CN109508945A (en) * | 2018-06-22 | 2019-03-22 | 广东电网有限责任公司 | A kind of method of dispatching automation information point automatic checking |
CN109712386A (en) * | 2018-12-06 | 2019-05-03 | 中国南方电网有限责任公司 | A kind of Distributed Modeling System metric data method of calibration based on E format |
CN110212532B (en) * | 2019-07-09 | 2020-08-18 | 国家电网有限公司 | Portable power grid dispatching automation simulation verification system |
CN114123509A (en) * | 2021-11-25 | 2022-03-01 | 广东电网有限责任公司 | Micro-grid distributed resource parallel automatic point-to-point system, method and medium |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101951031A (en) * | 2010-07-02 | 2011-01-19 | 北京航空航天大学 | Distribution network automatic system based on broadband wireless communication and realization method thereof |
CN102209108A (en) * | 2011-05-16 | 2011-10-05 | 广东电网公司深圳供电局 | Method and system for realizing seamless communication between master scheduling station and substation of power grid |
CN103326465A (en) * | 2013-05-17 | 2013-09-25 | 国家电网公司 | Power distribution network terminal access method based on IEC61850 standard |
CN104483842A (en) * | 2014-10-24 | 2015-04-01 | 国网北京市电力公司 | Regulation and control integrated automatic master station comparison method |
CN105046344A (en) * | 2015-05-15 | 2015-11-11 | 北京科东电力控制系统有限责任公司 | Primary station data quality optimizing method for intelligent power grid dispatching technical support system |
CN105576831A (en) * | 2015-12-30 | 2016-05-11 | 北京四方继保自动化股份有限公司 | Automatic verification method for security control of master station and sub station |
-
2016
- 2016-10-09 CN CN201610880879.2A patent/CN106532931B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101951031A (en) * | 2010-07-02 | 2011-01-19 | 北京航空航天大学 | Distribution network automatic system based on broadband wireless communication and realization method thereof |
CN102209108A (en) * | 2011-05-16 | 2011-10-05 | 广东电网公司深圳供电局 | Method and system for realizing seamless communication between master scheduling station and substation of power grid |
CN103326465A (en) * | 2013-05-17 | 2013-09-25 | 国家电网公司 | Power distribution network terminal access method based on IEC61850 standard |
CN104483842A (en) * | 2014-10-24 | 2015-04-01 | 国网北京市电力公司 | Regulation and control integrated automatic master station comparison method |
CN105046344A (en) * | 2015-05-15 | 2015-11-11 | 北京科东电力控制系统有限责任公司 | Primary station data quality optimizing method for intelligent power grid dispatching technical support system |
CN105576831A (en) * | 2015-12-30 | 2016-05-11 | 北京四方继保自动化股份有限公司 | Automatic verification method for security control of master station and sub station |
Also Published As
Publication number | Publication date |
---|---|
CN106532931A (en) | 2017-03-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106532931B (en) | A kind of electric power system dispatching boss station intelligent batch is to point methods | |
CN109193945B (en) | Automatic closed-loop checking method for telecontrol data configuration of intelligent substation | |
CN105790801B (en) | The pairing test method and test device of a kind of electronic equipment and bluetooth equipment | |
CN204291050U (en) | A kind of dispatching and monitoring information check system | |
CN105680441B (en) | Simulation based on stimulated replacement technology is to a device | |
CN101598605A (en) | Cable head temperature online monitoring system | |
CN109599942A (en) | One-touch test device and method towards intelligent substation scene O&M | |
CN104809663A (en) | Power professional technique service assurance surveillance system and method | |
CN208953619U (en) | A kind of distribution terminal intelligent checking system | |
CN105931443A (en) | Method for collecting data of water meter, ammeter, gas meter and heat meter together | |
CN107065773A (en) | A kind of fault of numerical control machine tool method for maintaining | |
CN202917949U (en) | Intelligent recognition control system for malignant loads | |
CN102821010A (en) | Simulator for protector | |
CN110611312A (en) | On-line simulation system and method for panoramic data of substation bay level | |
CN103699760A (en) | Multilayer closed-loop main station detection data source simulation method | |
CN106909615B (en) | Method and device for verifying data information consistency between master station and substation | |
CN104182818B (en) | A kind of method and system of substation information intelligence automatic data collection | |
CN112134351B (en) | Remote telemetry acceptance system and method based on transformer substation distribution network | |
CN103928986B (en) | Dispatching of power netwoks wiring diagram error checking and correction system and method for calibration thereof | |
CN102291442A (en) | Voice inquiry system and method for electricity data | |
CN106291159B (en) | Intelligent acceptance device and acceptance method for main station side power distribution automatic signals | |
CN104835001A (en) | Equipment cabinet U digit detecting system and method | |
CN104574900B (en) | A kind of remote meter reading method and long-distance meter-reading system | |
CN104112183A (en) | Plug-and-play intelligent scheduling model management system and management method of intelligent substation | |
CN204405784U (en) | Based on the Distribution Network Failure detection and location device of wide area measurement information |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |