CN106525483A - Original sandy soil sampling method and sampling device - Google Patents

Original sandy soil sampling method and sampling device Download PDF

Info

Publication number
CN106525483A
CN106525483A CN201610763899.1A CN201610763899A CN106525483A CN 106525483 A CN106525483 A CN 106525483A CN 201610763899 A CN201610763899 A CN 201610763899A CN 106525483 A CN106525483 A CN 106525483A
Authority
CN
China
Prior art keywords
soil
sampling
sandy soil
cutting edge
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610763899.1A
Other languages
Chinese (zh)
Inventor
芦边
钱志宇
刘卫东
商海英
张旭东
许四法
胡奇超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Middle Forest Survey Research Co Ltd
Original Assignee
Zhejiang Middle Forest Survey Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Middle Forest Survey Research Co Ltd filed Critical Zhejiang Middle Forest Survey Research Co Ltd
Priority to CN201610763899.1A priority Critical patent/CN106525483A/en
Publication of CN106525483A publication Critical patent/CN106525483A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N1/00Sampling; Preparing specimens for investigation
    • G01N1/02Devices for withdrawing samples
    • G01N1/04Devices for withdrawing samples in the solid state, e.g. by cutting
    • G01N1/08Devices for withdrawing samples in the solid state, e.g. by cutting involving an extracting tool, e.g. core bit

Landscapes

  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

An original sandy soil sampling method comprises the following steps: an applicator, a sampling sleeve and a soil sampling cutting edge are assembled together; sandy soil to be sampled firstly has a soil layer covering the sandy soil cleaned, paraffin is heated and melted to form wax oil, and the wax oil is poured in a to-be-sampled area; after the wax oil is completely solidified, a sandy soil sampling device is pressed into the soil layer until the whole sampling device is full of soil; a soil body around the sandy soil sampling device is cleaned, and an annular hollow groove is formed around the sandy soil sampling device; the sandy soil sampling device is gently shaken, the sandy soil at the bottom end of the sandy soil sampling device is divorced from the soil sampling device, and the sampling device is taken out from the soil body; the applicator is dismantled, the excess soil body at the top end of the sampling sleeve is removed, and an upper sealing port cover is mounted; and the soil sampling cutting edge is dismantled, the excess soil body at the bottom end of the sampling sleeve is removed, and a lower sealing port cover is mounted. The original sandy soil sampling method has the advantages that the disturbance on the sampled sandy soil is small, the sampling sandy soil is not easily caused to be loose, and the original sandy soil is convenient to simple, package, transport and transfer.

Description

Original state sandy soil sampling method and its sampler
Technical field
The invention belongs to ground exploration engineering field, and in particular to a kind of sandy soil sampling method and its sampler.
Background technology
With the continuous development of the industry large-scale construction projects such as building, municipal administration, traffic, survey and design level has obtained very big Improve, the requirement to taking soil body sample is also improved therewith.At present for the sampling soil body, often require which maintains the original state.But The three-phase system that the soil body is made up of solid matter, water and gas, soil structures are comparatively loose, particularly with sandy soil, As cohesive strength is very little, in sampling operation, specimen enclosure, storage, transportation, easily disturbance destroys its original structure body System, causes soil body original state sampling difficult, or even sampling failure.
The Chinese patent of Publication No. CN105547743A discloses a kind of original state soil body sampler and sampling method. But for sandy soil, as its cohesive strength is very little, being sampled using the apparatus and method can be very big to soil sample generation Disturbance, acquired soil sample can not represent the primary characteristic of sample section soil.Therefore, it is necessary to be optimized on this basis Improve, propose a kind of original state sandy soil sampling method and its sampler for being suitable for sandy soil sampling.
Also, when sampler is taken out from the soil body, generally require to rock sampler, make the soil of sampler bottom Body is destroyed so as to depart from sandy soil sampler, as the soil structures of bottom are destroyed, it is impossible to represent sandy soil Structure, it is therefore necessary to rejected.In the Chinese patent of Publication No. CN105547743A, which samples cylinder and the cutting edge that fetches earth It is structure as a whole, it is impossible to reject the soil body that bottom is subject to destroy, the soil body that this is damaged can affect the accuracy tested, so having Necessity is improved to which.
The content of the invention
For overcoming the above-mentioned deficiency of prior art, the present invention is provided and a kind of is taken to sampling that sandy soil disturbance is little, not easily causing Sample sandy soil is loose, be easy to the sampling of original state sandy soil, encapsulation, transport, transfer, can reject be damaged the soil body, sample it is more accurate True original state sandy soil sampling method and its sampler.
In order to solve above-mentioned technical problem, the present invention adopts following technical scheme:
A kind of original state sandy soil sampling method, comprises the following steps:
(1)By applicator, sample sleeve, the cutting edge that fetches earth and fit together;
(2)For sandy soil to be sampled, the soil layer covered above which is first cleaned out, cleaning area is not less than
Area to be sampled, the soil layer covered above sandy soil are different according to geology difference;
(3)Heating paraffin is melted to form wax oil, the wax oil of heat is poured in region to be sampled, it is hot
After wax oil is gradually solidified in sandy soil to the cold, the sandy soil in the region is freezing together;So in subsequent samples During sandy soil can be avoided to be disturbed and deformed, the original state of soil sample can be kept well;
(4)After wax oil solidifies completely, the cutting edge that fetches earth of the sandy soil sampler for assembling is placed in into region to be sampled, Operator are exerted a force by applicator, and lentamente sandy soil sampler is pressed in soil layer, until soil sample fills up whole sampling Device, i.e. soil sample top surface reach the height same with sandy soil sampler top surface;
(5)The soil body around sandy soil sampler is removed, depth is removed total more than or equal to sampler
Depth so that form the dead slot of annular around sandy soil sampler;
(6)Lightly rock sandy soil sampler, make the sandy soil of sandy soil sampler bottom be easier to it is destroyed so as to Depart from sandy soil sampler, now, just sandy soil sampler can be taken out from the soil body;
(7)Applicator is pulled down, then removes the unnecessary soil body in sampling sleeve top, the unnecessary soil body was located in applicator originally, Then seal closure is installed on the top of sampling sleeve;
(8)The cutting edge that fetches earth is pulled down, then removes the unnecessary soil body of sampling sleeve bottom end, the unnecessary soil body was located at the cutting edge that fetches earth originally It is interior, lower sealing lid is installed in the bottom of sampling sleeve then, whole sampling process is completed.
Further, in step(3)In, pour wax oil this process and keep uniformly continuous as far as possible, poured from center to surrounding, so that Wax oil can be penetrated in deeper soil layer.
Further, step(3)And step(4)Between, also comprise the steps:Pour after wax oil poured, note protecting institute The surrounding soil in region to be sampled, produces interference with the sandy soil for reducing its region to being sampled as far as possible.
Further, in step(7)In, the unnecessary soil body in sampling sleeve top is rooted out using perching knife;In step(8)In, make The unnecessary soil body of sampling sleeve bottom end is rooted out with perching knife.
Implement the original state sandy soil sampler of above-mentioned sampling method, including applicator, sample sleeve, the cutting edge that fetches earth, on Seal closure, lower sealing lid, the sampling sleeve are both ends open structure, and the lower end of the applicator can with the upper end of sampling sleeve Dismountable is affixed, it is described sampling sleeve lower end it is detachable with the upper end of the cutting edge that fetches earth affixed, the cutting edge that fetches earth include to It is in down the annular blade of sharpening shape, the cutting edge that fetches earth is communicated with sampling sleeve;
The upper seal closure and remove after applicator sampling sleeve upper end coordinate, the lower sealing lid with remove the cutting edge that fetches earth The lower end of sampling sleeve afterwards coordinates;
Original state sandy soil sampler also includes rooting out the soil body of the bottom face for exceeding sampling sleeve and rooting out to exceed taking The instrument of the soil body of the top end face of sample sleeve.
As a kind of preferred, the detachable clamping in upper end of the lower end of the applicator and sampling sleeve, the sampling set Lower end detachable clamping with the upper end of the cutting edge that fetches earth of cylinder;
Specifically, it is circumferentially spaced on the inwall of the upper and lower end of the sampling sleeve to be disposed with bayonet socket, under the applicator Be respectively equipped with fixture block with the bayonet fittings on the outer wall of the upper end of end and the cutting edge that fetches earth, the upper end of the sampling sleeve and On the inwall of lower end in the inner end of bayonet socket respectively have ledge structure, the thickness and applicator of ledge structure, the cutting edge that fetches earth insert The thickness for entering part is identical so that applicator, sample sleeve, the cutting edge three that fetches earth inner chamber internal diameter it is identical, and then reduce into soil Extruding and the disturbance to the soil body.
As another preferably, the lower end of the applicator is connected with the threaded upper ends of sampling sleeve, the sampling sleeve Lower end be connected with the threaded upper ends of the cutting edge that fetches earth;
Specifically, female thread is equipped with the inwall of the upper and lower end of the sampling sleeve, the lower end of the applicator and fetch earth The external screw thread with the screw-internal thread fit is respectively equipped with the outer wall of the upper end of cutting edge, the top and bottom of the sampling sleeve There is ledge structure, the thickness and applicator of ledge structure, the insertion section of the cutting edge that fetches earth respectively in the inner end of female thread on inwall Point thickness it is identical so that applicator, sample sleeve, the cutting edge three that fetches earth inner chamber internal diameter it is identical, and then reduce into native extruding With the disturbance to the soil body.
As it is another kind of preferably, the upper surface of the sampling sleeve and lower surface is equally spaced is provided with bayonet socket, applicator The lower surface of the collar is provided with the fixture block with the bayonet fittings of the upper surface of sampling sleeve, and the upper surface of the cutting edge that fetches earth is provided with and sampling The fixture block of the bayonet fittings of the lower surface of sleeve.
Further, the cutting edge that fetches earth include superposed annulus and from annulus downwards in sharpening shape annular sword The inner chamber internal diameter of portion, annulus and annular blade is identical with the inner chamber internal diameter of the sampling sleeve.
The present invention increased the step for pouring wax oil to the soil body to be sampled before sampling, due to paraffin melting rear with stronger Mobility, and between grittiness soil particle, have larger space, permeability is very strong, therefore wax oil may penetrate into sandy soil it In;The wax oil of heat gradually will be solidified in process of osmosis to the cold, so as to sandy soil is solidified to together.So, in sampling During sandy soil do not easily cause disturbance, the original state of sandy soil can be kept well.Simultaneously because the intensity of paraffin(Resistance to compression, Anti-shear ability)It is very little, it is negligible to the performance impact to be measured of sandy soil.
The beneficial effects of the present invention is:
1st, offer is a kind of little to sampling sandy soil disturbance, does not easily cause sampling sandy soil loosely, is easy to the sampling of original state sandy soil, envelope Dress, transport, the original state sandy soil sampling method of transfer and its sampler;
2nd, sample cylinder and the cutting edge that fetches earth is detachable affixed, after unloading the cutting edge that fetches earth, can reject and exceed sampling sleeve The soil body of bottom face, the soil body were located at originally and fetched earth in cutting edge, due to being destroyed the soil body of bottom when taking out sampler, Therefore rejected;
2nd, the soil body of the top end face for exceeding sampling sleeve after unloading applicator, can be rejected, the soil body is originally positioned at applicator In sleeve, destroyed due to the compressing for top end face by sleeve, therefore rejected.
Description of the drawings
Fig. 1 is the structure chart of the applicator of the original state sandy soil sampler embodiment one of the present invention.
Fig. 2 is the structure chart of the sampling sleeve of the original state sandy soil sampler embodiment one of the present invention.
Fig. 3 is the upper surface schematic diagram of sampling sleeve shown in Fig. 2.
Fig. 4 is the sectional view of the cutting edge that fetches earth of the original state sandy soil sampler embodiment one of the present invention.
Fig. 5 is the axonometric chart of the cutting edge that fetches earth of the original state sandy soil sampler embodiment one of the present invention.
Fig. 6 is the use state figure of the original state sandy soil sampler embodiment one of the present invention.
Fig. 7 is the cooperation figure of the lower surface with the upper surface of the cutting edge that fetches earth of the sampling sleeve of embodiment two.
Fig. 8 is the cut-away view after the sampling sleeve vertical profile of embodiment two.
Structure charts of the Fig. 9 for the cutting edge that fetches earth of embodiment two.
Specific embodiment
It is for making the objects, technical solutions and advantages of the present invention become more apparent, below in conjunction with drawings and the embodiments, right The present invention is described in further detail, it will be appreciated that embodiment described herein is only used for being specifically described the present invention, not structure Into limitation of the present invention.
Embodiment one
A kind of original state sandy soil sampling method, comprises the following steps:
(1)Applicator 1, sampling sleeve 2, the cutting edge 3 that fetches earth are fitted together, in the present embodiment, applicator 1, sampling sleeve 2, Fetch earth and connect and fix between cutting edge 3;
(2)For sandy soil to be sampled, the soil layer covered above which is first cleaned out using spade, cleaning area is not less than wanted The area of sampling, the soil layer covered above sandy soil are different according to geology difference;
(3)Heating paraffin is melted to form wax oil, the wax oil of heat is poured in region to be sampled, pour wax oil this process to the greatest extent Amount keeps uniformly continuous, is poured from center to surrounding, so that wax oil can be penetrated in deeper soil layer;
After the wax oil of heat is gradually solidified in sandy soil to the cold, the sandy soil in the region is freezing together, so follow-up Sandy soil can be avoided in sampling process to be disturbed and deformed, the original state of soil sample can be kept well;
(4)After wax oil has been poured, the surrounding soil in the region for noting protecting to be sampled, to reduce which to the area that sampled as far as possible The sandy soil in domain produces interference;
(5)After wax oil solidifies completely, the cutting edge 3 that fetches earth of the sandy soil sampler for assembling is placed in into area to be sampled Domain, operator are exerted a force by applicator 1, and lentamente sandy soil sampler is pressed in soil layer, until soil sample is filled up entirely Sampler, i.e. soil sample top surface reach the height same with sandy soil sampler top surface;Use state figure shown in Fig. 6 is not yet It is fully inserted in the soil body, the part of label 4 is the sandy soil top layer for cutting out overlying soil;
(6)The soil body around sandy soil sampler is removed using perching knife, aggregate depth of the depth more than or equal to sampler is removed Degree so that form the dead slot of annular around sandy soil sampler;
(7)Lightly double swerve sandy soil sampler, the sandy soil of sandy soil sampler bottom be easier to it is destroyed from And depart from sandy soil sampler, now just sandy soil sampler can be taken out from the soil body;
(8)Applicator 1 being pulled down, the unnecessary soil body in 2 top of sampling sleeve being rooted out using perching knife, the unnecessary soil body was located at originally and applies In power device 1, then seal closure is installed on the top of sampling sleeve 2;
(9)The cutting edge 3 that fetches earth being pulled down, the unnecessary soil body in 2 bottom of sampling sleeve being rooted out using perching knife, the unnecessary soil body was located at originally Fetch earth in cutting edge 3, lower sealing lid is installed in the bottom of sampling sleeve 2 then, whole sampling process is completed;
(10)The outer surface of sampling sleeve 2 is cleaned out.
Afterwards, acquired soil sample can be carried out transporting, be shifted, among soil test.
The present embodiment increased the step for pouring wax oil to the soil body to be sampled before sampling, due to after paraffin melting with compared with Strong mobility, and have larger space between grittiness soil particle, permeability is very strong, therefore wax oil may penetrate into sandy soil it In;The wax oil of heat gradually will be solidified in process of osmosis to the cold, so as to sandy soil is solidified to together.So, in sampling During sandy soil do not easily cause disturbance, the original state of sandy soil can be kept well.Simultaneously because the intensity of paraffin(Resistance to compression, Anti-shear ability)Very little, to sandy soil performance to be measured(Such as resistance to compression, anti-shearing, internal friction angle, dilative angle etc.)Affect to neglect Slightly disregard.
In the present embodiment, the structure for implementing a kind of original state sandy soil sampler of above-mentioned sampling method is as described below, but The sampling method is not limited only to the sampler using following structure.
As shown in figures 1 to 6, original state sandy soil sampler, including applicator 1, sampling sleeve 2, the cutting edge 3 that fetches earth, upper sealing Lid, lower sealing lid, in figure, upper and lower seal closure is not shown, and the sampling sleeve 2 is both ends open structure, under the applicator 1 End and the detachable clamping in upper end for sampling sleeve 2, the lower end of the sampling sleeve 2 are detachable with the upper end of the cutting edge 3 that fetches earth Clamping, the cutting edge 3 that fetches earth include superposed annulus 31 and from the 31 downward annular blade 32 in sharpening shape of annulus, take Native cutting edge 3 is communicated with sampling sleeve 2;
The upper seal closure and remove after applicator 1 sampling sleeve 2 upper end coordinate, the lower sealing lid with remove the sword that fetches earth The lower end of the sampling sleeve 2 after mouth 3 coordinates;
The original state sandy soil sampler also includes rooting out the soil body of the bottom face for exceeding sampling sleeve 2 and rooting out exceeding In the perching knife of the soil body of the top end face of sampling sleeve 2.
The applicator 1 includes power transmission handle 11 and the collar 12, and power transmission handle is distributed in the both sides of the collar 12 in symmetry shape, Left side power transmission handle 11 in "" shape, its horizon bar 111 fixed as force section, lower end and the collar 12 of its vertical bar 112 Connection, the upper end closed of the collar 12, when fetching earth, soil sample top surface reaches the height of the top surface of the collar 12, the lower end of the collar 12 and sampling The upper end of sleeve 2 forms interface arrangment.
In the present embodiment, as shown in Figure 2 and Figure 3, sample the upper surface of sleeve 2 and lower surface be equally spaced is provided with bayonet socket 21, The lower surface of the collar 12 of applicator 1 is provided with the fixture block with the cooperation of bayonet socket 21 of the upper surface of sampling sleeve 2, and fetch earth cutting edge 3 Upper surface is provided with the fixture block with the cooperation of bayonet socket 21 of the lower surface of sampling sleeve 2, to form detachable clamping relation.Bayonet socket 21 Can also transposition with fixture block.
It is described force handle 1 the collar 12, sampling sleeve 2,3 three of cutting edge that fetches earth internal diameter it is identical, the circle of the cutting edge 3 that fetches earth Ring 31 is identical with the inner chamber internal diameter of annular blade 32, to reduce the disturbance into soil extruding and to the soil body.
In the present embodiment, concrete size is as follows:
The internal diameter 60mm, external diameter 72mm, thickness 6mm, high 30mm of the collar 12 of force handle 1.
The internal diameter 60mm, external diameter 72mm, high 120mm of sampling sleeve 2.
Fetch earth internal diameter 60mm, external diameter 72mm, the high 50mm of cutting edge 3, and 31 high 20mm of its annulus starts to cut from 31 lower end of annulus If annular blade 32.
Embodiment two
As Figure 7-9, the present embodiment with the difference of embodiment one is:The lower end of the applicator 1 and sampling sleeve 2 The detachable clamping in upper end, the detachable clamping in upper end of the lower end of the sampling sleeve 2 and the cutting edge 3 that fetches earth;
Specifically, it is circumferentially spaced on the inwall of the upper and lower end of the sampling sleeve 2 to be disposed with bayonet socket 21, the applicator 1 Lower end and the cutting edge 3 that fetches earth upper end outer wall on be respectively equipped with the bayonet socket 21 coordinate fixture block 5, the sampling sleeve There is ledge structure 6, the thickness and applicator of ledge structure 6 respectively in the inner end of bayonet socket 21 on the inwall of 2 top and bottom 1st, fetch earth cutting edge 3 insertion portion thickness it is identical so that applicator 1, sampling sleeve 2, the inner chamber internal diameter of 3 three of cutting edge that fetches earth It is identical, and then reduce the disturbance into soil extruding and to the soil body.
Ledge structure 6 can also form block face to the fixture block 5 that applicator 1 and the cutting edge 3 that fetches earth are stretched into.
Embodiment three
The present embodiment with the difference of embodiment two is:The lower end of the applicator 1 is connected with the threaded upper ends of sampling sleeve 2 Connect, the lower end of the sampling sleeve 2 is connected with the threaded upper ends of the cutting edge 3 that fetches earth;
Specifically, female thread is equipped with the inwall of the upper and lower end of the sampling sleeve 2, the lower end of the applicator 1 and take The external screw thread with the screw-internal thread fit is respectively equipped with the outer wall of the upper end of native cutting edge 3, and the upper end of the sampling sleeve 2 is with There is ledge structure respectively in the inner end of female thread on the inwall at end, the thickness of ledge structure and applicator 1, fetch earth cutting edge 2 The thickness of insertion portion is identical so that applicator 1, sampling sleeve 2,3 three of cutting edge that fetches earth inner chamber internal diameter it is identical, and then reduce Enter soil extruding and the disturbance to the soil body.
In a word, presently preferred embodiments of the present invention is the foregoing is only, not to limit the present invention, all essences in the present invention Modification, equivalent and improvement made within god and principle etc., should be included within the scope of the present invention.

Claims (10)

1. original state sandy soil sampling method, it is characterised in that comprise the following steps:
(1)By applicator, sample sleeve, the cutting edge that fetches earth and fit together;
(2)For sandy soil to be sampled, the soil layer covered above which is first cleaned out, cleaning area is not less than
Area to be sampled, the soil layer covered above sandy soil are different according to geology difference;
(3)Heating paraffin is melted to form wax oil, the wax oil of heat is poured in region to be sampled, it is hot
After wax oil is gradually solidified in sandy soil to the cold, the sandy soil in the region is freezing together;So in subsequent samples During sandy soil can be avoided to be disturbed and deformed, the original state of soil sample can be kept well;
(4)After wax oil solidifies completely, the cutting edge that fetches earth of the sandy soil sampler for assembling is placed in into region to be sampled, Operator are exerted a force by applicator, and lentamente sandy soil sampler is pressed in soil layer, until soil sample fills up whole sampling Device, i.e. soil sample top surface reach the height same with sandy soil sampler top surface;
(5)The soil body around sandy soil sampler is removed, depth is removed total more than or equal to sampler
Depth so that form the dead slot of annular around sandy soil sampler;
(6)Lightly rock sandy soil sampler, make the sandy soil of sandy soil sampler bottom be easier to it is destroyed so as to Depart from sandy soil sampler, now, just sandy soil sampler can be taken out from the soil body;
(7)Applicator is pulled down, then removes the unnecessary soil body in sampling sleeve top, the unnecessary soil body was located in applicator originally, Then seal closure is installed on the top of sampling sleeve;
(8)The cutting edge that fetches earth is pulled down, then removes the unnecessary soil body of sampling sleeve bottom end, the unnecessary soil body was located at the cutting edge that fetches earth originally It is interior, lower sealing lid is installed in the bottom of sampling sleeve then, whole sampling process is completed.
2. original state sandy soil sampling method as claimed in claim 1, it is characterised in that in step(3)In, pour wax oil this mistake Cheng Jinliang keeps uniformly continuous, is poured from center to surrounding, so that wax oil can be penetrated in deeper soil layer.
3. original state sandy soil sampling method as claimed in claim 1, it is characterised in that step(3)And step(4)Between, also Comprise the steps:Pour after wax oil poured, the surrounding soil in the region for noting protecting to be sampled, to reduce which to institute as far as possible The sandy soil in the region of sampling produces interference.
4. original state sandy soil sampling method as claimed in claim 1, it is characterised in that in step(7)In, rooted out using perching knife The unnecessary soil body in sampling sleeve top;In step(8)In, the unnecessary soil body of sampling sleeve bottom end is rooted out using perching knife.
5. the original state sandy soil sampler of the sampling method such as one of claim 1-4 is implemented, it is characterised in that including force Device, sleeve, the cutting edge that fetches earth, upper seal closure, lower sealing lid is sampled, the sampling sleeve is both ends open structure, the applicator Lower end with sampling sleeve upper end it is detachable affixed, it is described sampling sleeve lower end it is detachable with the upper end of the cutting edge that fetches earth It is affixed, the cutting edge that fetches earth include superposed annulus and from annulus downwards in sharpening shape annular blade, fetch earth cutting edge Communicate with sampling sleeve;
The upper seal closure and remove after applicator sampling sleeve upper end coordinate, the lower sealing lid with remove the cutting edge that fetches earth The lower end of sampling sleeve afterwards coordinates;
Original state sandy soil sampler is also exceeded and is taken including the soil body and rejecting for rejecting the bottom face for exceeding sampling sleeve The instrument of the soil body of the top end face of sample sleeve.
6. original state sandy soil sampler as claimed in claim 5, it is characterised in that the lower end of the applicator and sampling set The detachable clamping in upper end of cylinder, lower end detachable clamping with the upper end of the cutting edge that fetches earth of the sampling sleeve;
Specifically, it is circumferentially spaced on the inwall of the upper and lower end of the sampling sleeve to be disposed with bayonet socket, under the applicator Be respectively equipped with fixture block with the bayonet fittings on the outer wall of the upper end of end and the cutting edge that fetches earth, the upper end of the sampling sleeve and On the inwall of lower end in the inner end of bayonet socket respectively have ledge structure, the thickness and applicator of ledge structure, the cutting edge that fetches earth insert The thickness for entering part is identical so that applicator, sample sleeve, the cutting edge three that fetches earth inner chamber internal diameter it is identical, and then reduce into soil Extruding and the disturbance to the soil body.
7. original state sandy soil sampler as claimed in claim 5, it is characterised in that the lower end of the applicator and sampling set The threaded upper ends connection of cylinder, the lower end of the sampling sleeve are connected with the threaded upper ends of the cutting edge that fetches earth;
Specifically, female thread is equipped with the inwall of the upper and lower end of the sampling sleeve, the lower end of the applicator and fetch earth The external screw thread with the screw-internal thread fit is respectively equipped with the outer wall of the upper end of cutting edge, the top and bottom of the sampling sleeve There is ledge structure, the thickness and applicator of ledge structure, the insertion section of the cutting edge that fetches earth respectively in the inner end of female thread on inwall Point thickness it is identical so that applicator, sample sleeve, the cutting edge three that fetches earth inner chamber internal diameter it is identical, and then reduce into native extruding With the disturbance to the soil body.
8. original state sandy soil sampler as claimed in claim 5, it is characterised in that the upper surface of the sampling sleeve and under End face is equally spaced to be provided with bayonet socket, and the lower surface of the collar of applicator is provided with the card with the bayonet fittings of the upper surface of sampling sleeve Block, the upper surface of the cutting edge that fetches earth are provided with the fixture block with the bayonet fittings of the lower surface of sampling sleeve.
9. original state sandy soil sampler as claimed in claim 5, it is characterised in that the cutting edge that fetches earth is included positioned at top Annulus and from annulus downwards in sharpening shape annular blade, annulus and annular blade inner chamber internal diameter with the sampling The inner chamber internal diameter of sleeve is identical.
10. original state sandy soil sampler as claimed in claim 5, it is characterised in that the instrument is exceeded for rooting out Sample the soil body of the bottom face of sleeve and the perching knife of the soil body of the top end face for exceeding sampling sleeve can be rooted out.
CN201610763899.1A 2016-08-30 2016-08-30 Original sandy soil sampling method and sampling device Pending CN106525483A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610763899.1A CN106525483A (en) 2016-08-30 2016-08-30 Original sandy soil sampling method and sampling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610763899.1A CN106525483A (en) 2016-08-30 2016-08-30 Original sandy soil sampling method and sampling device

Publications (1)

Publication Number Publication Date
CN106525483A true CN106525483A (en) 2017-03-22

Family

ID=58343665

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610763899.1A Pending CN106525483A (en) 2016-08-30 2016-08-30 Original sandy soil sampling method and sampling device

Country Status (1)

Country Link
CN (1) CN106525483A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108195615A (en) * 2018-02-02 2018-06-22 浙江中林勘察研究股份有限公司 Original state three-phase soil sample sampler and sampling method
CN109141957A (en) * 2018-08-13 2019-01-04 中国科学院南京土壤研究所 A kind of acquisition and production method of 1 m original state monolith of sand
CN109459460A (en) * 2018-12-25 2019-03-12 长安大学 A kind of scanning electron microscope observation device and method of intact loess humidification sample
CN111366406A (en) * 2020-04-28 2020-07-03 吉林大学 Sampling device and sampling method for undisturbed sample of residual granite soil
CN113125224A (en) * 2021-04-14 2021-07-16 海检检测有限公司 Test piece of cable target layer, test piece manufacturing method and thickness measuring method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5242794A (en) * 1975-09-30 1977-04-02 Chuo Kaihatsu Kk Air feed type sand sampler
US20010042641A1 (en) * 2000-05-16 2001-11-22 Young-Chin Kim Large diameter sampler for gathering an undisturbed sample
CN201417219Y (en) * 2009-07-02 2010-03-03 中国科学院沈阳应用生态研究所 Multifunctional soil sample collecting device
CN101936823A (en) * 2010-09-26 2011-01-05 西安建筑科技大学 Method for sampling large-sized unsaturated structural undisturbed soil samples
CN201935823U (en) * 2010-12-18 2011-08-17 西安迅腾科技有限责任公司 U-shaped ring groove multifunctional soil sampling shovel capable of being detached and assembled
CN203101095U (en) * 2012-12-11 2013-07-31 长安大学 Dual-layer soil sampling ring knife
CN105547743A (en) * 2016-02-01 2016-05-04 中国电建集团成都勘测设计研究院有限公司 Undisturbed soil sampling device and sampling method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5242794A (en) * 1975-09-30 1977-04-02 Chuo Kaihatsu Kk Air feed type sand sampler
US20010042641A1 (en) * 2000-05-16 2001-11-22 Young-Chin Kim Large diameter sampler for gathering an undisturbed sample
CN201417219Y (en) * 2009-07-02 2010-03-03 中国科学院沈阳应用生态研究所 Multifunctional soil sample collecting device
CN101936823A (en) * 2010-09-26 2011-01-05 西安建筑科技大学 Method for sampling large-sized unsaturated structural undisturbed soil samples
CN201935823U (en) * 2010-12-18 2011-08-17 西安迅腾科技有限责任公司 U-shaped ring groove multifunctional soil sampling shovel capable of being detached and assembled
CN203101095U (en) * 2012-12-11 2013-07-31 长安大学 Dual-layer soil sampling ring knife
CN105547743A (en) * 2016-02-01 2016-05-04 中国电建集团成都勘测设计研究院有限公司 Undisturbed soil sampling device and sampling method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108195615A (en) * 2018-02-02 2018-06-22 浙江中林勘察研究股份有限公司 Original state three-phase soil sample sampler and sampling method
CN109141957A (en) * 2018-08-13 2019-01-04 中国科学院南京土壤研究所 A kind of acquisition and production method of 1 m original state monolith of sand
CN109141957B (en) * 2018-08-13 2020-08-18 中国科学院南京土壤研究所 Method for collecting and manufacturing undisturbed monolith with 1 m sandy soil
CN109459460A (en) * 2018-12-25 2019-03-12 长安大学 A kind of scanning electron microscope observation device and method of intact loess humidification sample
CN109459460B (en) * 2018-12-25 2023-10-27 长安大学 Scanning electron microscope observation device and method for undisturbed loess humidification sample
CN111366406A (en) * 2020-04-28 2020-07-03 吉林大学 Sampling device and sampling method for undisturbed sample of residual granite soil
CN113125224A (en) * 2021-04-14 2021-07-16 海检检测有限公司 Test piece of cable target layer, test piece manufacturing method and thickness measuring method

Similar Documents

Publication Publication Date Title
CN106525483A (en) Original sandy soil sampling method and sampling device
Majer An improved pitfall trap for sampling ants and other epigaeic invertebrates
CN100570319C (en) Original soft clay hollow cylinder sample manufacture method
CN106680022B (en) Sampling device and method for infiltration experiment of easily loosened undisturbed coarse-grained soil
CN108444770A (en) A kind of garden rice field Mixed cultivation of prawn and crab water quality detection sampler
CN204439395U (en) A kind of deep soil fixed point sampler
CN206002338U (en) A kind of original state sandy soil sampler
CN101629876A (en) Pressed rotary vane sampler used for sludge yard and reclaimed yard and sampling method
CN102692340A (en) Multi-depth rotating-wheel closed sampler and method thereof
CN109141957A (en) A kind of acquisition and production method of 1 m original state monolith of sand
US2779195A (en) Device for subsoil testing and taking of specimens
CN205506639U (en) Low permeability ground diffusion coefficient apparatus
CN108195615A (en) Original state three-phase soil sample sampler and sampling method
CN105136518A (en) Cylindrical layered dredge and method for collecting underwater sludge
CN106525484A (en) Sampling method and sampling device for original state sandy soil
CN103674607B (en) A kind of integrated apparatus for the sampling of pot experiment soil layering
CN108216961A (en) A kind of deep-sea hydrothermal fidelity storage device
CN103293022B (en) A kind of small-sized earth boring auger with soil sample collection and filling functions
CN203465119U (en) Rice field soil water extraction device
CN201417219Y (en) Multifunctional soil sample collecting device
CN207964358U (en) Shallow Groundwater and earth's surface water sampler
CN206369639U (en) A kind of sampler for easily loose original state coarse-grained soil permeability test
CN206177615U (en) Original state grittiness soil sampling device
CN207937185U (en) Original state three-phase soil sample sampler
CN206987807U (en) A kind of Portable deep soil layering sampling apparatus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170322

RJ01 Rejection of invention patent application after publication