CN106522599A - Assembling type pool body structure with skating function and swimming function - Google Patents

Assembling type pool body structure with skating function and swimming function Download PDF

Info

Publication number
CN106522599A
CN106522599A CN201611137832.3A CN201611137832A CN106522599A CN 106522599 A CN106522599 A CN 106522599A CN 201611137832 A CN201611137832 A CN 201611137832A CN 106522599 A CN106522599 A CN 106522599A
Authority
CN
China
Prior art keywords
pond
cell body
skating
swimming
framework
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611137832.3A
Other languages
Chinese (zh)
Inventor
黄永超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201611137832.3A priority Critical patent/CN106522599A/en
Publication of CN106522599A publication Critical patent/CN106522599A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H4/00Swimming or splash baths or pools
    • E04H4/0018Easily movable or transportable swimming pools
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C13/00Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
    • E01C13/10Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds for artificial surfaces for outdoor or indoor practice of snow or ice sports
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H4/00Swimming or splash baths or pools
    • E04H4/14Parts, details or accessories not otherwise provided for

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

The invention provides an assembling type pool body structure with a skating function and a swimming function. The assembling type pool body structure with the skating function and the swimming function comprises a pool body frame, a water pool, a passage platform, a stair tread, a safety fence and an artificial skating rink assembly. The water pool is arranged in the pool body frame. The passage platform is arranged on the periphery of the water pool. The stair tread is mounted on the outer side of the passage platform. The safety fence is arranged on the periphery of the passage platform. The artificial skating rink assembly is mounted on the upper portion of the water pool and mainly defined by anti-slip floor rubber, ice boards, a rubber film protection layer, an anti-collision damping layer and vertical surrounding boards. According to the assembling type pool body structure with the skating function and the swimming function, the pool body construction cost is low, and the pool body structure can adapt to different installation fields; the modular assembling structure is adopted, rapid assembling of a pool body is achieved, a skating rink can be mounted rapidly based on the water pool, and the original pool is not damaged at all; and the pool body can operate in all seasons all year round, the artificial skating rink can be dismounted rapidly, and the skating function and the swimming function are achieved.

Description

The difunctional cell body structure of pin-connected panel swimming skating
Technical field
The present invention relates to physical fitness facility technology field, and in particular to a kind of difunctional cell body knot of pin-connected panel swimming skating Structure.
Background technology
Assembled swimming-pool is that the standard component by industrialized production out assembles, and construction duration is short, swimming pool by Standard component assembles, and installs simple, and unified, greatly reduces manually, and it is certain that Assembled swimming-pool is usually mounted to lower digging In the cell body of depth, common use swimming pool construction duration 6 months, the Assembled swimming-pool duration shortens into 10 days;Construction cost is low, Industrialized production reduces the production cost of standard component, installs simple, and short time limit reduces cost of labor, auxiliary material centralized purchasing, Reduce material cost;Installation requirement is low, it is only necessary to one piece of smooth place.
If but Assembled swimming-pool is installed outdoors or in the covered court for not possessing heating system, works as gas Temperature drop can only stop operation when low, this is a kind of wasting of resources, in recent years, with the increase of national income, the life bar of the masses Part is greatly improved and improves, and people are growing to the demand of health care and spirit.Economic bar is received in the development of ice-sports The restriction of part, is only limitted to northern frore area, with " the northern ice that General Administration of Sport Winter Sports Administrative Center proposes and advocates The policy of southern exhibition ", ice-sports obtain the concern of increasing its people and like, but how southern area is carried out is transported on ice The dynamic cost for building ice stadium is huge, carries out ice-sports and is extremely limited.
The content of the invention
A kind of problem that the present invention is present for prior art, there is provided the difunctional cell body structure of pin-connected panel swimming skating.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of difunctional cell body structure of pin-connected panel swimming skating, including cell body framework, pond, aisle platform, stair tread, Safety barrier and imitating true ice field assembly, pond are placed in cell body framework, and aisle platform is arranged on pond surrounding, and stair tread is installed In the outside of aisle platform, safety barrier is arranged on the surrounding of aisle platform, and imitating true ice field assembly is arranged on pond top, cell body Framework is formed by connecting cross beam and T-steel framework and being bolted;Pond is by multiple stainless steel inner lining plates with cell body framework To rely on, then the cell body of sealing is formed by bottom of pond glued membrane, bottom of pond bed course and pool wall glued membrane, cell body bottom arranges bottom of pond draining Device, pool wall arrange side water return outlet and admission port, and on the inside of pool wall, surrounding arranges spilling water grid;Imitating true ice field assembly is mainly by anti-skidding Glue, slab, rubber protective layer, anticollision buffer layer and vertical coaming plate composition, anticollision buffer layer are arranged on the pool wall film surface in pond, Vertical coaming plate arranges anticollision damping layer surface, and anticollision buffer layer, vertical coaming plate are fixedly connected by fixed fastener with the pool wall in pond, are stood Rest area and skating area are set inside coaming plate, and rest area ground laying anti-skidding ground glue, anti-skidding ground glue are laid on the bottom of pond glue in pond On film, the rubber protective layer on area ground of skating is laid on the bottom of pond glued membrane in pond, and slab is arranged at the top of rubber protective layer.
The T-steel framework of above-mentioned cell body framework is equidistantly arranged and forms closed-loop structure, the T-steel on T-steel framework and opposite Riveting device is set between framework, and riveting device includes anti-skid plate and connecting plate, and connecting plate is crisscross arranged, four of cell body framework Angle is connected using circular arc framework.
In above-mentioned pond arrange it is some enter water staircase, basin bottom arrange swimming lane line.
Above-mentioned spilling water grid while fix with the connecting cross beam of cell body framework, spilling water grid another side and stainless steel inner lining plate It is connected.
Above-mentioned aisle platform periphery arranges guardrail, and balustrade is installed in stair tread both sides, in the setting of cell body frame peripheral Upholstery border, lower upholstery border and outer wall boundary board.
The rest area of above-mentioned imitating true ice field assembly arranges in pond stair, shoe chest and changes shoe bench, between rest area and skating area Guard rail is set, pond bank guard rail is installed on the spilling water grid in pond.
Cell body construction cost of the present invention is low, is suitable for different fabricating yards, using Modularization assembled structure, realizes cell body Quick assembling, can quickly realize ice stadium is installed on the basis of pond, to former swimming pool without any destruction, realize the four seasons of cell body Annual operation, emulation ice stadium quickly can be removed, and realize swimming and skate difunctional.
Description of the drawings
The present invention is further described with reference to the accompanying drawings and examples.
Fig. 1 is the structural representation of difunctional cell body of the invention;
Fig. 2 is the side view of difunctional cell body of the invention;
Fig. 3 is the structural representation of cell body framework of the present invention;
Fig. 4 is the schematic diagram in C-C sections in Fig. 1;
Fig. 5 is the enlarged diagram of a-quadrant in Fig. 4;
Fig. 6 is the enlarged diagram in B regions in Fig. 4;
Structural representation when Fig. 7 is difunctional cell body of the invention non-installing simulation ice stadium component;
Schematic top plan view when Fig. 8 is difunctional cell body of the invention non-installing simulation ice stadium component;
Fig. 9 is the scheme of installation of bank guard rail in pond of the present invention.
10 cell body frameworks, 11 connecting cross beams, 12T structural steel frames, 13 riveting devices, 20 ponds, 21 stainless steel inner linings in figure Plate, 22 spilling water grids, 23 bottom of pond glued membranes, 24 swimming lane lines, 25 bottom of pond water traps, 26 enter water staircase, 27 side water return outlets, 28 bottom of pond pads Layer, 29 pool wall glued membranes, 30 aisle platforms, 31 stair treads, 32 balustrades, 40 safety barriers, 41 guardrails, upholstery border on 42, 43 times upholstery borders, 44 outer wall boundary boards, stair in 51 ponds, 52 shoe chest, 53 anti-skidding ground glue, 54 change shoe bench, 55 guard rails, 56 slabs, 57 rubber protective layers, 58 fixed fasteners, 59 anticollision buffer layers, 60 vertical coaming plate, 61 pond bank guard rails.
Specific embodiment
Difunctional cell body structure, including cell body framework 10, pond 20, aisle as illustrated, a kind of pin-connected panel swimming is skated Platform 30, stair tread 31, safety barrier 40 and imitating true ice field assembly, pond 20 are placed in cell body framework 10, aisle platform 40 20 surrounding of pond is arranged on, stair tread 31 is installed on the outside of aisle platform 30, and safety barrier 40 is arranged on aisle platform 30 Surrounding, imitating true ice field assembly is arranged on 20 top of pond, and cell body framework 10 is by connecting cross beam 11 and T-steel framework 12 and passes through Bolt connection is formed, and the T-steel framework 12 of cell body framework is equidistantly arranged and forms closed-loop structure, the T on T-steel framework 12 and opposite Riveting device 13 is set between structural steel frame 12, and riveting device 13 includes anti-skid plate and connecting plate, and connecting plate is crisscross arranged, cell body Four angles of framework are connected using circular arc framework;Pond 20 by multiple stainless steel inner lining plates 21 with cell body framework 10 as rely on, then By bottom of pond glued membrane 23, bottom of pond bed course 28 and pool wall glued membrane 29 formed sealing cell body, in the pond in setting it is some enter water staircase 26, Basin bottom arranges swimming lane 24, and cell body bottom arranges bottom of pond water trap 25, and pool wall arranges side water return outlet 27 and admission port, in pool wall Side surrounding arranges spilling water grid 22, and the connecting cross beam 11 of spilling water grid 22 and cell body framework 10 is fixed, and spilling water grid 22 is another While being connected with stainless steel inner lining plate 21;Imitating true ice field assembly is mainly by anti-skidding ground glue 53, slab 56, rubber protective layer 57, anti- Hit buffer layer 59 and vertical coaming plate 60 is constituted, anticollision buffer layer 59 is arranged on 29 surface of pool wall glued membrane in pond, vertical coaming plate 30 is arranged 59 surface of anticollision buffer layer, anticollision buffer layer 59, vertical coaming plate 60 are fixedly connected by fixed fastener 58 with the pool wall in pond, vertical to enclose Rest area and skating area are set inside plate 60, and rest area ground laying anti-skidding ground glue 53, anti-skidding ground glue 53 are laid on the pond in pond On primer film 23, the rubber protective layer 57 on area ground of skating is laid on the bottom of pond glued membrane 23 in pond, and slab 56 is arranged on glued membrane At the top of protective layer 57, the rest area of imitating true ice field assembly arranges in pond stair 51, shoe chest 52 and changes shoe bench 54, rest area and skating Guard rail 55 is set between area, installation pond bank guard rail 61 on the spilling water grid 22 in pond, platform 30 periphery in aisle arranges guardrail 41, balustrade 32 is installed in 31 both sides of stair tread, and 10 periphery of cell body framework arranges upper upholstery border 42, lower upholstery border 43 and exterior wall Coaming plate 44.

Claims (6)

1. a kind of difunctional cell body structure of pin-connected panel swimming skating, is characterized in that including cell body framework, pond, aisle platform, building Terraced pedal, safety barrier and imitating true ice field assembly, pond are placed in cell body framework, and aisle platform is arranged on pond surrounding, stair Pedal is installed on the outside of aisle platform, and safety barrier is arranged on the surrounding of aisle platform, and imitating true ice field assembly is arranged on pond Top, cell body framework are formed by connecting cross beam and T-steel framework and being bolted;Pond by multiple stainless steel inner lining plates with Cell body framework is support, then forms the cell body for sealing by bottom of pond glued membrane, bottom of pond bed course and pool wall glued membrane, and cell body bottom arranges pond Bottom water trap, pool wall arrange side water return outlet and admission port, and on the inside of pool wall, surrounding arranges spilling water grid;Imitating true ice field assembly mainly by Anti-skidding ground glue, slab, rubber protective layer, anticollision buffer layer and vertical coaming plate composition, anticollision buffer layer are arranged on the pool wall glue in pond Film surface, founds coaming plate and arranges anticollision damping layer surface, and the pool wall of anticollision buffer layer, vertical coaming plate and pond is fixed by fixed fastener Connection, stands, and rest area ground laying anti-skidding ground glue, anti-skidding ground glue are laid on pond On bottom of pond glued membrane, the rubber protective layer on area ground of skating is laid on the bottom of pond glued membrane in pond, and slab is arranged on rubber protective layer Top.
2. the difunctional cell body structure of pin-connected panel swimming skating according to claim 1, is characterized in that the T-steel of cell body framework Equidistantly arrangement to be formed and arrange riveting device, rivet clasp dress between the T-steel framework of closed-loop structure, T-steel framework and opposite framework Put including anti-skid plate and connecting plate, connecting plate is crisscross arranged, four angles of cell body framework are connected using circular arc framework.
3. the difunctional cell body structure of pin-connected panel swimming skating according to claim 1, is characterized in that arranging some in pond Enter water staircase, basin bottom arranges swimming lane line.
4. the difunctional cell body structure of pin-connected panel according to claim 1 swimming skating, it is characterized in that spilling water grid with The connecting cross beam of cell body framework is fixed, and spilling water grid another side is connected with stainless steel inner lining plate.
5. the difunctional cell body structure of pin-connected panel swimming skating according to claim 1, is characterized in that aisle platform periphery sets Guardrail is put, balustrade is installed in stair tread both sides, and cell body frame peripheral arranges upper upholstery border, lower upholstery border and outer wall boundary board.
6. the difunctional cell body structure of pin-connected panel swimming skating according to claim 1, is characterized in that imitating true ice field assembly Rest area arranges in pond and stair, shoe chest and changes shoe bench, arranges guard rail, on the spilling water grid in pond between rest area and skating area Pond bank guard rail is installed.
CN201611137832.3A 2016-12-02 2016-12-02 Assembling type pool body structure with skating function and swimming function Pending CN106522599A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611137832.3A CN106522599A (en) 2016-12-02 2016-12-02 Assembling type pool body structure with skating function and swimming function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611137832.3A CN106522599A (en) 2016-12-02 2016-12-02 Assembling type pool body structure with skating function and swimming function

Publications (1)

Publication Number Publication Date
CN106522599A true CN106522599A (en) 2017-03-22

Family

ID=58343060

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611137832.3A Pending CN106522599A (en) 2016-12-02 2016-12-02 Assembling type pool body structure with skating function and swimming function

Country Status (1)

Country Link
CN (1) CN106522599A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108533008A (en) * 2018-06-09 2018-09-14 郑州市卧龙游乐设备有限公司 A kind of competition type dismounting swimming pool
CN108533009A (en) * 2018-06-10 2018-09-14 郑州市卧龙游乐设备有限公司 A kind of boundless landscape Demountable swimming pool
CN108915307A (en) * 2018-08-30 2018-11-30 中节能城市节能研究院有限公司 A kind of suitable anti-season ice stadium swimming pool system of detachable
CN109113382A (en) * 2018-08-30 2019-01-01 中节能城市节能研究院有限公司 A kind of energy-saving and environment-friendly suitable anti-season ice stadium swimming pool system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001000950A1 (en) * 1999-06-24 2001-01-04 Scott Uram Retractable load-bearing cover
CN204492259U (en) * 2015-02-09 2015-07-22 武汉万众体育器材有限公司 A kind of Combined swimming pool
CN105664472A (en) * 2016-01-22 2016-06-15 湖北万众体育产业有限公司 Multifunctional playground area
CN205474707U (en) * 2016-03-08 2016-08-17 奥普乐体育运动(北京)有限公司 Emulation rink
CN206233651U (en) * 2016-12-02 2017-06-09 黄永超 The pin-connected panel swimming difunctional pond body structure of skating

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001000950A1 (en) * 1999-06-24 2001-01-04 Scott Uram Retractable load-bearing cover
CN204492259U (en) * 2015-02-09 2015-07-22 武汉万众体育器材有限公司 A kind of Combined swimming pool
CN105664472A (en) * 2016-01-22 2016-06-15 湖北万众体育产业有限公司 Multifunctional playground area
CN205474707U (en) * 2016-03-08 2016-08-17 奥普乐体育运动(北京)有限公司 Emulation rink
CN206233651U (en) * 2016-12-02 2017-06-09 黄永超 The pin-connected panel swimming difunctional pond body structure of skating

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108533008A (en) * 2018-06-09 2018-09-14 郑州市卧龙游乐设备有限公司 A kind of competition type dismounting swimming pool
CN108533009A (en) * 2018-06-10 2018-09-14 郑州市卧龙游乐设备有限公司 A kind of boundless landscape Demountable swimming pool
CN108915307A (en) * 2018-08-30 2018-11-30 中节能城市节能研究院有限公司 A kind of suitable anti-season ice stadium swimming pool system of detachable
CN109113382A (en) * 2018-08-30 2019-01-01 中节能城市节能研究院有限公司 A kind of energy-saving and environment-friendly suitable anti-season ice stadium swimming pool system

Similar Documents

Publication Publication Date Title
CN106522599A (en) Assembling type pool body structure with skating function and swimming function
CN206233651U (en) The pin-connected panel swimming difunctional pond body structure of skating
WO2009078032A4 (en) An architectural structure and method thereof
CN105155494A (en) Multifunctional combined type lifting platform in water
CN206815904U (en) Skating swimming pool
JP7162151B2 (en) Natural stone swimming reservoir
EP3631122B1 (en) Modular stadium for sporting and cultural events
CN108786054A (en) Fire-fighting life-saving, rock-climbing integrated training platform
CN206128713U (en) Multi -functional dismantled and assembled athletic ground of combined type
CN205077925U (en) Car garage parking of cast -in -place multilayer flat slab floor structure open -type
CN206071120U (en) A kind of integrated form timber structure solid track and field venue
CN109339487A (en) A kind of log cabin and its building method of fast construction
CN211523837U (en) Shock attenuation prefabricated staircase
CN212478740U (en) Ecological building with three-dimensional green space park
DE602004011690T2 (en) MULTIFUNCTIONAL BUILDING COMPLEX
CN206015875U (en) Multilayer large-span modified concrete comb shape space lattice box structure
DE102018102829A1 (en) Modular stadium for sports and cultural events
CN209874295U (en) Outdoor stair with stepped flower bed
CN215995448U (en) Simulation climbing ferry rescue technology training facility
Wyatt ON THE CONSTRUCTION OF THE BUILDING FOR THE EXHIBITION OF THE WORKS OF INDUSTRY OF ALL NATIONS IN 1851.(INCLUDES PLATE).
CN109441031A (en) The open spiral stairs structure of the concealed overhanging type of structural beams and its construction method
CN213297326U (en) Assembled swimming pool
JP2002356807A (en) Outdoor playground
CN206337483U (en) Assembled swimming-pool transforms the discharge structure of ice rink
CN206337749U (en) Concave rink stair

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170322