CN106522273A - Reinforcement cage type form erecting device and construction method thereof - Google Patents

Reinforcement cage type form erecting device and construction method thereof Download PDF

Info

Publication number
CN106522273A
CN106522273A CN201610903893.XA CN201610903893A CN106522273A CN 106522273 A CN106522273 A CN 106522273A CN 201610903893 A CN201610903893 A CN 201610903893A CN 106522273 A CN106522273 A CN 106522273A
Authority
CN
China
Prior art keywords
template
reinforcing bar
horizontal longitudinal
horizontal
modular unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610903893.XA
Other languages
Chinese (zh)
Other versions
CN106522273B (en
Inventor
俞建强
汤步展
丁惟峰
王洪涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 1 Group Co Ltd
Original Assignee
Shanghai Construction No 1 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 1 Group Co Ltd filed Critical Shanghai Construction No 1 Group Co Ltd
Priority to CN201610903893.XA priority Critical patent/CN106522273B/en
Publication of CN106522273A publication Critical patent/CN106522273A/en
Application granted granted Critical
Publication of CN106522273B publication Critical patent/CN106522273B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them

Abstract

The invention discloses a reinforcement cage type form erecting device, and belongs to the field of building construction. The form erecting device comprises a plurality of horizontal longitudinal reinforcements and a plurality of horizontal positioning reinforcements, wherein one end of each horizontal longitudinal reinforcement is embedded into a wall body while the other end of each horizontal longitudinal reinforcement is horizontally suspended at the outside of the wall body; the horizontal positioning reinforcements and the horizontal longitudinal reinforcements are fixedly connected; the horizontal positioning reinforcements are on the same plane and can form a reinforcement cage with the horizontal longitudinal reinforcements; a first form board is fixedly connected to the reinforcement cage. According to the technical scheme, the reinforcement cage type form erecting device has the advantages that the reinforcement cage is arranged, and the form board is embedded into the reinforcement cage, so that the difficulty in construction of erecting a form in a narrow chamber can be solved, and moreover, the construction is convenient. The invention also discloses a construction method of the reinforcement cage type form erecting device.

Description

Reinforcing bar posture erecting device and its construction method
Technical field
The present invention relates to a kind of reinforcing bar posture erecting device and its construction method, belong to the realm of building construction.
Background technology
Diaphram wall rigidity is big, it is little to deform, and in construction, building enclosure frequently as the excavation of foundation pit stage and uses rank The basement structure outer wall of section, namely what is often called basement " unification of two walls ".However, in the presence of water pressure, diaphram wall Be likely to occur infiltration phenomenon, accordingly, it would be desirable to arrange inwall on the inside of diaphram wall, using diaphram wall and inwall it Between cavity as drainage channel.
However, in the case where inwall and diaphram wall gap are too small, the template that inwall is located at cavity side is difficult To install, construction requirement cannot be met with conventional formwork erection device and construction method.
The content of the invention
The technical barrier of difficulty is installed for small space situation lower liner wall form, the invention provides a kind of reinforcing bar Posture erecting device and its construction method, are implanted into horizontal longitudinal reinforcement, and weld horizontal spacer bar structure on diaphram wall Into framework of steel reinforcement, by template embedded framework of steel reinforcement, the difficult technical barrier of narrow and small cavity formwork, and structure is solved well Simply, easy construction.
For solving above technical problem, the present invention includes following technical scheme:
A kind of reinforcing bar posture erecting device, including,
Some horizontal longitudinal reinforcements, in the body of wall of one end implantation diaphram wall of the horizontal longitudinal reinforcement, the other end Horizontal suspended is outside the body of wall of the diaphram wall;And
Some horizontal location reinforcing bars, the horizontal location reinforcing bar are vertically arranged and the company of fixation with the horizontal longitudinal reinforcement Connect, the horizontal location reinforcing bar is located on same perpendicular;
Wherein, the horizontal longitudinal reinforcement constitutes framework of steel reinforcement with the horizontal location reinforcing bar, and the first template is fixedly connected On the framework of steel reinforcement.
Preferably, the structure of first template includes at least following one:
A1. first template is spliced by some modular units one, and the width of the modular unit one is more than adjacent The center distance of horizontal longitudinal reinforcement described in two rows, at least provided with two placing of reinforcement holes on the modular unit one;The template list Center distance of the length of unit one more than the adjacent two row horizontal longitudinal reinforcement, at least provided with two row on the modular unit one Reinforced hole;The center distance of the reinforced hole is equal to the center distance of the horizontal longitudinal reinforcement, and the modular unit one is by institute The multiple horizontal longitudinal reinforcement stretched out in stating reinforced hole is supported to be fixed, tight split between the two neighboring modular unit one;
A2. first template is formed by some modular units two and piece template splicing, the width of the modular unit two Clear spacing of the degree equal to horizontal longitudinal reinforcement described in adjacent two row, the length of the modular unit two is more than the adjacent two row water The center distance of flat longitudinal reinforcement, the modular unit two are embedded in described in adjacent two row between horizontal longitudinal reinforcement, upper and lower two Edge joint position described in block between modular unit two is provided with the piece template for closing gap between adjacent forms unit two, institute State piece template to be fixedly connected with the neighbouring modular unit two, reinforced hole is provided with the piece template, institute The center distance for stating reinforced hole is equal to the center distance of the horizontal longitudinal reinforcement.
Preferably, between the modular unit and the framework of steel reinforcement, also including following at least one of fixed form:
B1. flitch is provided between first template and the horizontal location reinforcing bar, and the flitch is vertical and is fixed on On the horizontal location reinforcing bar, the modular unit is fixedly connected with the flitch;
B2. first template is fixed on the horizontal location reinforcing bar by some U-shaped card fasteners, the U-shaped buckle Part, including a fixing end and two free ends, the fixing end is fixedly connected with first template, two free ends Inner side be oppositely arranged a pair of projections, the U-shaped card fastener is fixed in the level by hoop on the inside of the projection and fixing end On the reinforcing bar of position;
B3. first template is fixed by the bar dowel being welded on the horizontal longitudinal reinforcement.
Preferably, the reinforced hole is ellipse, and the oval longer axis parallel is in the horizontal location reinforcing bar.
Preferably, on the horizontal location reinforcing bar, it is close to first template, setting prevents concrete slurry from described The leakage-preventing gasket that reinforced hole flows out.
Further, it is arranged with the second template with first template in parallel, second template is fixed by supporting row frame.
Preferably, the horizontal longitudinal reinforcement welds Screw arbor with nut at both-ends along extending direction, and the Screw arbor with nut at both-ends passes through described Second template, is fixed on steel pipe by nut and Screw arbor with nut at both-ends securing member and encloses on purlin.
Preferably, between first template and second template described horizontal longitudinal reinforcement or described pair of drawing Seal ring is set on screw rod.
Correspondingly, the invention also discloses a kind of construction method of reinforcing bar posture erecting device, comprises the steps:
S1. some horizontal longitudinal reinforcements are implanted on the body of wall of the diaphram wall built, form grid fulcrum;
S2. perpendicular to the horizontal longitudinal reinforcement, some horizontal location reinforcing bars are welded, at the horizontal location reinforcing bar In same perpendicular, the horizontal longitudinal reinforcement and the horizontal location reinforcing bar form latticed framework of steel reinforcement;
S3. by the reinforced hole being arranged in the first template, the first template is embedded in into the corresponding net of the framework of steel reinforcement On lattice.
One of preferably, step S3, at least also comprise the steps:
S3-11., on the direction vertical with the horizontal location reinforcing bar, the horizontal longitudinal reinforcement, flitch is set, it is described First template is fixed on the flitch;
S3-12. some U-shaped card fasteners are provided with the first template, by first template by the U-shaped card fastener card It is buckled on the horizontal location reinforcing bar;
S3-13. the welding short steel rod on the horizontal longitudinal reinforcement, fixes the first template.
Further, first template is made up of modular unit two and piece template, the joining method of first template Comprise the steps:
S3-21. first the modular unit two is embedded in described in adjacent two row between horizontal longitudinal reinforcement;
S3-22., the piece template is set between upper and lower two pieces adjacent modular units two, and the piece template passes through Some reinforced holes are embedded on the horizontal longitudinal reinforcement;
S3-23. the modular unit two and piece template are fixed together.
Further, after step S3, also comprise the steps:
S4. Screw arbor with nut at both-ends is welded along extending direction in the horizontal longitudinal reinforcement;
S5. the reinforcing bar of colligation inwall;
S6. the second template is fixed with supporting row frame, the Screw arbor with nut at both-ends passes through second template, by nut and to drawing Screw rod securing member encloses the steel pipe that the Screw arbor with nut at both-ends is fixed in the supporting row frame on purlin.
The present invention is due to using above technical scheme, being allowed to compared with prior art, have the following advantages that and actively imitate Really:By arranging the framework of steel reinforcement being made up of horizontal longitudinal reinforcement, horizontal location reinforcing bar, the first template of inwall can be very square Just it is fixed on framework of steel reinforcement, solves between diaphram wall and inwall a formwork erection difficult problem in narrow and small cavity well, and First template good fixing effect, can bear the larger lateral pressure of concrete generation, and easy construction, Stability Analysis of Structures.
Description of the drawings
The structural representation of the reinforcing bar posture erecting device that Fig. 1 is provided for one embodiment of the invention;
Fig. 2 is the enlarged drawing in G regions in Fig. 1;
The framework of steel reinforcement structural representation that Fig. 3 is provided for one embodiment of the invention;
A kind of modular unit structural representation that Fig. 4 is provided for one embodiment of the invention;
Fig. 4 a are the splicing schematic diagram of the modular unit one shown in Fig. 4;
A kind of fastener structural representation that Fig. 4 b are provided for one embodiment of the invention;
Modular unit two and piece formwork structure schematic diagram that Fig. 5 is provided for one embodiment of the invention;
The construction process block diagram of the reinforcing bar posture erecting device that Fig. 6 is provided for another embodiment of the present invention.
In figure, label is as follows:
Diaphram wall 100;Basement bottom board 110;Basement roof 120;Framework of steel reinforcement 200;Horizontal longitudinal reinforcement 210;Horizontal location reinforcing bar 220;Perpendicular positioning reinforcing bar 230;Flitch 240;Screw arbor with nut at both-ends 250;Nut 251;Screw arbor with nut at both-ends is fastened Part 252;Seal ring 260;First template 310;Modular unit 1;Modular unit 2 312;Piece template 313;Reinforced hole 311a、313a;U-shaped card fastener 314, fixing end 314a, free end 314b, projection 314c;Second template 320;Supporting row frame 400;Steel pipe encloses purlin 410.
Specific embodiment
The reinforcing bar posture erecting device present invention provided below in conjunction with the drawings and specific embodiments and its construction method It is described in further detail.With reference to following explanation and claims, advantages and features of the invention will become apparent from.Should be noted It is that accompanying drawing in the form of simplifying very much and uses non-accurately ratio, only conveniently, lucidly to aid in illustrating this The purpose of bright embodiment.
Refer to Fig. 1 and Fig. 2, the knot of the reinforcing bar posture erecting device that wherein Fig. 1 is provided by one embodiment of the invention Structure schematic diagram, Fig. 2 are the enlarged drawing in G regions in Fig. 1.The main points of the present invention are done furtherly below in conjunction with Fig. 1 and Fig. 2 It is bright.
Diaphram wall 100 in the construction stage, as foundation pit enclosure structure, in operational phase as the exterior wall of basement, is The problem of the lower infiltration of diaphram wall 100 of effectively solving groundwater pressure effect, needs in the inner side of diaphram wall 100, Inwall is built between room base plate 110 located underground and basement roof 120, using between inwall and diaphram wall 100 Cavity as drainage channel.As drainage channel is narrow, conventional formwork erection mode is not simultaneously applied to, and the main object of the present invention is just It is for the modulus problem for solving inwall in small space side.
As depicted in figs. 1 and 2, some levels of the side implantation in the arrangement of regular array formula in diaphram wall 100 are indulged To reinforcing bar 210, grid fulcrum is formed.The some horizontal location reinforcing bars 220 of vertical welding on horizontal longitudinal reinforcement 210, level is fixed Position reinforcing bar 220 is arranged on same vertical facade, and the vertical facade is spaced a distance with diaphram wall 100, logical as draining Road.Some horizontal longitudinal reinforcements 210 and horizontal location reinforcing bar 220 constitute constitutionally stable framework of steel reinforcement 200, and the first of inwall Template 310 is fixed on framework of steel reinforcement 200.In the present embodiment, by arranging framework of steel reinforcement 200 as the first template 310 Supporter, solves between diaphram wall 100 and inwall a formwork erection difficult problem, template fixed effect in narrow and small cavity well It is good, the larger lateral pressure of concrete generation, and easy construction, Stability Analysis of Structures can be born.
Fig. 3 illustrates a kind of schematic diagram of framework of steel reinforcement.In figure, horizontal longitudinal reinforcement 210 is arranged in array, and adjacent two Row, the two horizontal longitudinal reinforcements of row 210 center distance it is equal.Center distance, refers to the center of reinforcing bar in another reinforcing bar In the distance of the heart, such as figure, L1 represents the center distance of two row adjacent level longitudinal reinforcements 210;L2 represents two row adjacent levels The clear spacing of longitudinal reinforcement 210.In construction, reinforcing steel bar center spacing is chosen as 450mm, horizontal longitudinal reinforcement 210 and horizontal location steel Reinforcing bar of the muscle 220 from a diameter of 12mm.It is preferred embodiment also to include perpendicular positioning in the framework of steel reinforcement 200 Reinforcing bar 230, perpendicular positioning reinforcing bar 230 are welded on the infall of horizontal location reinforcing bar 220 and horizontal longitudinal reinforcement 210, the structure The framework of steel reinforcement of form has more preferable stability.For reducing amount of reinforcement, reduces cost, it is also possible to which it is vertical fixed to be substituted with flitch Position reinforcing bar 230, with iron wire by flitch colligation in horizontal longitudinal reinforcement 210 and the weld of horizontal location reinforcing bar 220, then by the One template 310 is followed closely on flitch with nail.
Fig. 4 illustrates one 311 structural representation of modular unit of the first template 310, and Fig. 4 a illustrate modular unit 1 Splicing schematic diagram.As shown in Fig. 4 and Fig. 4 a, the first template 310 is spliced by some modular units 1, modular unit Be provided with one 311 the diameter of the distance between reinforced hole 311a, reinforced hole 311a and reinforced hole with horizontal longitudinal reinforcement 210 Supporting setting, arranges the horizontal longitudinal reinforcement of at least two rows, at least two row row 210 on modular unit 1.As an example, template The size of unit 1 is 900mm × 1800mm, arranges the reinforcing bar that 2 rows 4 arrange totally 8 reinforced hole 311a, adjacent two row or two row Centre distance between the 311a of hole is 450mm, a diameter of 12mm of horizontal longitudinal reinforcement, then the diameter of reinforced hole 311a can be 16mm, the center of reinforced hole are 225mm to the vertical dimension on template side.Horizontal longitudinal reinforcement 210 passes through modular unit 1 On reinforced hole 311a, modular unit 1 is embedded on framework of steel reinforcement 200, closely splicing exists for polylith modular unit 1 The first template 310 is constituted together.By on modular unit 1 embedded framework of steel reinforcement 200, modular unit 1 is in level longitudinal direction Under the support of reinforcing bar 210 and the collective effect of horizontal location reinforcing bar 220, side-friction is fixed on framework of steel reinforcement 200.In order to Modular unit 1 is preferably fixed on framework of steel reinforcement 200, following measure can be taken:
Measure one:As shown in fig. 4 a, between horizontal location reinforcing bar 220 and modular unit 1, flitch 240 is set.Wood Side 240 is fixed on framework of steel reinforcement 200 with iron wire, and modular unit 1 is fixed on flitch 240 with iron nail or screw then On.
Measure two:As shown in Figure 4 b, some U-shaped card fasteners 314 are set in first template 310, the U-shaped card fastener 314, Including fixing end 314a and two free end 314b, fixing end 314a is fixedly connected with the first template, two free ends A pair of projection 314c are oppositely arranged on the inside of 314b, and 314 hoop of U-shaped card fastener is on horizontal location reinforcing bar 220.
Measure three:The side of modular unit 1 abuts horizontal location reinforcing bar 220, and opposite side is by being welded on level longitudinal direction Bar dowel waste material on reinforcing bar 210 is fixed, or the both sides of the first template 310 are by being welded on horizontal longitudinal reinforcement Bar dowel on 210 is fixed.
Fig. 5 illustrates another kind of structural representation of the first template 310, and the first template 310 is by some modular units 2 312 It is spliced with piece template 313.Wherein, the width of modular unit 2 312 is approximately equal to the adjacent level longitudinal direction steel of adjacent two row The clear spacing of muscle 210, between the adjacent horizontal longitudinal reinforcement 210 of the embedded two rows of modular unit 2 312, neighbouring two Splicing seams are left between block modular unit 2 312, and edge joint position is provided with piece template 313, be provided with piece template 313 Reinforced hole 313a, the center distance of reinforced hole 313a are consistent with the center distance of horizontal longitudinal reinforcement 210.Then by piece template 313 and modular unit 2 312 be fixed together, formed the first template 310.As an example, adjacent two row of horizontal longitudinal reinforcement 210 Centre distance is 450mm, and bar diameter is 12mm, then the clear spacing between reinforcing bar be 438mm, the size of modular unit 2 312 It is chosen as 438mm × 1800mm, modular unit 2 312 is directly clamped among between the horizontal longitudinal reinforcement of two rows 210;Upper and lower two Leave the splicing seams of 12mm between block modular unit 2 312, arrange at the splicing seams size be 40mm × 900mm or 40mm × The piece template 313 of 1800mm, is spaced the reinforced hole that 450mm is correspondingly arranged 2 or 4 a diameter of 16mm in piece template 313 313a.The modular unit 2 312 of this version is directly snapped between adjacent two row of horizontal longitudinal reinforcement 210, easy for installation; 313 size of piece template is less, can be formed using the cutting of waste and old template, be capable of achieving refuse reclamation, and be easier to be fixed on On horizontal longitudinal reinforcement 210.In order that the first template 310 being made up of modular unit 2 312, piece template 313, preferably solid It is scheduled on framework of steel reinforcement 200, can also takes above-mentioned three kind measure, will not be described here.
Wherein, reinforced hole 311a, 313a are respectively arranged with modular unit 1, piece template 313, in order to prevent mixing Solidifying soil paste liquid is overflowed from reinforced hole 311a, 313a, can be in modular unit 1, piece template 313 away from horizontal location reinforcing bar 220 sides, are close to reinforced hole 311a, 313a and arrange the leakage-preventing gasket for preventing concrete spillage.In addition, modular unit for convenience One 311, the splicing operation of splice template 313, reinforced hole 311a, 313a are chosen as ellipse, and the oval longer axis parallel is in water Flat spacer bar 220.So modular unit 1,313 right position of piece template can be finely adjusted, then be fixed again.
As depicted in figs. 1 and 2, the template of inwall both sides is respectively the first template 310 and the second template 320.Second mould Plate 320 is be arranged in parallel with the first template 310, and is fixed by supporting row frame 400, and supporting row frame 400 is by crisscross steel pipe Build.It is preferred embodiment to weld Screw arbor with nut at both-ends 250 along extending direction in horizontal longitudinal reinforcement 210, to drawing spiral shell Bar 250 passes through the second template 320, and Screw arbor with nut at both-ends 250 is fixed on support row by nut 251 and Screw arbor with nut at both-ends securing member 252 Steel pipe on frame 400 is enclosed on purlin 410.Screw arbor with nut at both-ends 250 is set, coagulation earth lateral pressure Screw arbor with nut at both-ends 250 can be converted into Pulling force, reduction acts on the lateral pressure of supporting row frame 400, therefore, the steel pipe consumption of supporting row frame 400 can be reduced, while also Improve efficiency of construction.
Wherein, in order to avoid during basement use percolate penetrate into along horizontal longitudinal reinforcement 210, Screw arbor with nut at both-ends 250 Basement, is being arranged on the horizontal longitudinal reinforcement 210 or Screw arbor with nut at both-ends 250 between the first template 310 and the second template 320 Seal ring 260, seal ring 260 are chosen as resilient rubbber cushion.
Present invention also offers a kind of construction method of reinforcing bar posture erecting device, referring to Fig. 6, and combines Fig. 1 to Fig. 6 Shown, the method comprises the steps:
S1. some horizontal longitudinal reinforcements 210 are implanted on the diaphram wall 100 built, form grid fulcrum.Level The arrangement of the array in rule of longitudinal reinforcement 210, preferably level interval are equal to longitudinal pitch.
S2. perpendicular to horizontal longitudinal reinforcement 210, some horizontal location reinforcing bars 220 are welded, horizontal location reinforcing bar 220 is in In same perpendicular, horizontal longitudinal reinforcement 210 and horizontal location reinforcing bar 220 form latticed framework of steel reinforcement 200.In order to increase Plus the stability of framework of steel reinforcement 200, perpendicular positioning reinforcing bar 230 can also be welded on the framework of steel reinforcement 200 or tied up with iron wire The flitch 240 of bundle, the framework of steel reinforcement of the version have more preferable stability.
S3. by be arranged in the first template 310 reinforced hole 311a, 313a, the first template 310 is embedded in into reinforcing bar On the corresponding grid of frame 200.When first template 310 is made up of modular unit 1, directly by the steel on modular unit 1 The corresponding horizontal longitudinal reinforcement 210 of muscle hole 311a correspondences, makes on the embedded framework of steel reinforcement 200 of modular unit 1.First template 310 when being made up of modular unit 2 312 and piece template 313, and its operating procedure is:Modular unit 2 312 is snapped in into reinforcing bar first In skeleton 200, then piece template 313 is embedded on horizontal longitudinal reinforcement 210, then with iron nail or screw by modular unit two 312nd, piece template 313 is fixed together.
By step S1, S2, S3, realize the first template of inwall 310 and fix, solve inwall side small space The construction difficult problem of formwork is difficult to, and the step operation is simple, easy construction.
In order to preferably the first template 310 is fixed on framework of steel reinforcement 200, also at least comprise the steps in step S3 One of:S3-11., on the direction vertical with horizontal location reinforcing bar 220, horizontal longitudinal reinforcement 220, flitch 240 is set, nail is used First template 310 is fixed on flitch 240;S3-12. some U-shaped card fasteners 314 are set in the first template 310, by first Template is buckled on horizontal location reinforcing bar 220 by U-shaped card fastener 314;S3-13. the welding on horizontal longitudinal reinforcement 210 is short Reinforcing bar, fixes the first template 310.
Further, fix in the first template 310 and finish, also comprise the steps:In the prolongation side of horizontal longitudinal reinforcement 210 Screw arbor with nut at both-ends 250 is welded upwards;Then the reinforcing bar of colligation inwall;Then the second template 320 is fixed with supporting row frame 400, it is right Draw screw rod 250 to pass through the second template 320, Screw arbor with nut at both-ends 250 is fixed on by nut 251 and Screw arbor with nut at both-ends securing member 252 and is propped up Steel pipe on support framed bent 400 is enclosed on purlin 410.The support work of two side template of inwall is this completes, liner can be poured The concrete of wall, after concrete reaches some strength, removes the second template 320, supporting row frame 400.
Foregoing description is only the description to present pre-ferred embodiments, not any restriction to the scope of the invention, this Any change that the those of ordinary skill in bright field is done according to the disclosure above content, modification, belong to the protection of claims Scope.

Claims (12)

1. a kind of reinforcing bar posture erecting device, it is characterised in that include,
Some horizontal longitudinal reinforcements, in the body of wall of one end implantation diaphram wall of the horizontal longitudinal reinforcement, other end level It is suspended in outside the body of wall of the diaphram wall;And
Some horizontal location reinforcing bars, the horizontal location reinforcing bar are vertically arranged and are fixedly connected with the horizontal longitudinal reinforcement, institute State horizontal location reinforcing bar to be located on same perpendicular;
Wherein, the horizontal longitudinal reinforcement constitutes framework of steel reinforcement with the horizontal location reinforcing bar, and the first template is fixedly connected on institute State on framework of steel reinforcement.
2. reinforcing bar posture erecting device as claimed in claim 1, it is characterised in that the structure of first template is at least wrapped Containing following one:
A1. first template is spliced by some modular units one, and the width of the modular unit one is more than adjacent two row The center distance of the horizontal longitudinal reinforcement, at least provided with two placing of reinforcement holes on the modular unit one;The modular unit one Length more than the adjacent two row horizontal longitudinal reinforcements center distances, at least provided with two row reinforcing bars on the modular unit one Hole;The center distance of the reinforced hole is equal to the center distance of the horizontal longitudinal reinforcement, and the modular unit one is by the steel The multiple horizontal longitudinal reinforcement stretched out in muscle hole is supported to be fixed, tight split between the two neighboring modular unit one;
A2. first template is formed by some modular units two and piece template splicing, width of the modular unit two etc. In the clear spacing of horizontal longitudinal reinforcement described in adjacent two row, the length of the modular unit two is indulged more than the adjacent two row level To the center distance of reinforcing bar, the modular unit two is embedded in described in adjacent two row between horizontal longitudinal reinforcement, in upper and lower two pieces of institutes State the edge joint position between modular unit two and be provided with the piece template for closing gap between adjacent forms unit two, the spelling Slit die plate is fixedly connected with the neighbouring modular unit two, is provided with reinforced hole, the steel in the piece template The center distance in muscle hole is equal to the center distance of the horizontal longitudinal reinforcement.
3. reinforcing bar posture erecting device as claimed in claim 2, it is characterised in that the modular unit and the reinforcing bar Between frame, also including following at least one of fixed form:
B1. flitch is provided between first template and the horizontal location reinforcing bar, and the flitch is vertical and is fixed on described On horizontal location reinforcing bar, the modular unit is fixedly connected with the flitch;
B2. first template is fixed on the horizontal location reinforcing bar by some U-shaped card fasteners, the U-shaped card fastener, bag Include a fixing end and two free ends, the fixing end is fixedly connected with first template, two free ends it is interior Side is oppositely arranged a pair of projections, and the U-shaped card fastener is by hoop on the inside of the projection and fixing end in the horizontal location steel On muscle;
B3. first template is fixed by the bar dowel being welded on the horizontal longitudinal reinforcement.
4. reinforcing bar posture erecting device as claimed in claim 2 or claim 3, it is characterised in that the reinforced hole is ellipse, institute The longer axis parallel of ellipse is stated in the horizontal location reinforcing bar.
5. reinforcing bar posture erecting device as claimed in claim 2 or claim 3, it is characterised in that on the horizontal location reinforcing bar, It is close to first template, setting prevents the leakage-preventing gasket that concrete slurry is flowed out from the reinforced hole.
6. the reinforcing bar posture erecting device as described in any one of claims 1 to 3, it is characterised in that with first template It is arranged with the second template in parallel, second template is fixed by supporting row frame.
7. reinforcing bar posture erecting device as claimed in claim 6, it is characterised in that the horizontal longitudinal reinforcement is along prolongation side Screw arbor with nut at both-ends is welded upwards, and the Screw arbor with nut at both-ends is passed through second template, is fixed on by nut and Screw arbor with nut at both-ends securing member Steel pipe is enclosed on purlin.
8. reinforcing bar posture erecting device as claimed in claim 7, it is characterised in that positioned at first template and described On described horizontal longitudinal reinforcement or the Screw arbor with nut at both-ends between two templates, seal ring is set.
9. the construction method of the reinforcing bar posture erecting device as described in any one of claim 1 to 8, it is characterised in that include Following steps:
S1. some horizontal longitudinal reinforcements are implanted on the body of wall of the diaphram wall built, form grid fulcrum;
S2. perpendicular to the horizontal longitudinal reinforcement, some horizontal location reinforcing bars are welded, the horizontal location reinforcing bar is in same In one perpendicular, the horizontal longitudinal reinforcement and the horizontal location reinforcing bar form latticed framework of steel reinforcement;
S3. by the reinforced hole being arranged in the first template, the first template is embedded on the corresponding grid of the framework of steel reinforcement.
10. the construction method of reinforcing bar posture erecting device as claimed in claim 9, it is characterised in that step S3, at least also One of comprise the steps:
S3-11. on the direction vertical with the horizontal location reinforcing bar, the horizontal longitudinal reinforcement, setting flitch, described first Template is fixed on the flitch;
S3-12. some U-shaped card fasteners are provided with the first template, and first template is buckled in by the U-shaped card fastener On the horizontal location reinforcing bar;
S3-13. the welding short steel rod on the horizontal longitudinal reinforcement, fixes the first template.
The construction method of 11. reinforcing bar posture erecting devices as claimed in claim 9, it is characterised in that first template It is made up of modular unit two and piece template, the joining method of first template comprises the steps:
S3-21. first the modular unit two is embedded in described in adjacent two row between horizontal longitudinal reinforcement;
S3-22. the piece template is set between upper and lower two pieces adjacent modular units two, the piece template is by some Reinforced hole is embedded on the horizontal longitudinal reinforcement;
S3-23. the modular unit two and piece template are fixed together.
The construction method of the 12. reinforcing bar posture erecting devices as described in any one of claim 9 to 11, it is characterised in that After step S3, also comprise the steps:
S4. Screw arbor with nut at both-ends is welded along extending direction in the horizontal longitudinal reinforcement;
S5. the reinforcing bar of colligation inwall;
S6. the second template is fixed with supporting row frame, the Screw arbor with nut at both-ends passes through second template, by nut and Screw arbor with nut at both-ends Securing member encloses the steel pipe that the Screw arbor with nut at both-ends is fixed in the supporting row frame on purlin.
CN201610903893.XA 2016-10-17 2016-10-17 Reinforcing bar posture erecting device and its construction method Active CN106522273B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610903893.XA CN106522273B (en) 2016-10-17 2016-10-17 Reinforcing bar posture erecting device and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610903893.XA CN106522273B (en) 2016-10-17 2016-10-17 Reinforcing bar posture erecting device and its construction method

Publications (2)

Publication Number Publication Date
CN106522273A true CN106522273A (en) 2017-03-22
CN106522273B CN106522273B (en) 2019-02-05

Family

ID=58332255

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610903893.XA Active CN106522273B (en) 2016-10-17 2016-10-17 Reinforcing bar posture erecting device and its construction method

Country Status (1)

Country Link
CN (1) CN106522273B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113700037A (en) * 2021-09-07 2021-11-26 浙江交工地下工程有限公司 Reverse construction method underground ultra-thick side wall pouring construction device and method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002061204A (en) * 2000-08-23 2002-02-28 Hitachi Zosen Corp Construction method of underground structural body
CN202611233U (en) * 2012-07-06 2012-12-19 宁波东新建筑有限公司 Template for pouring double-way shear wall with deformation joint in the middle
KR20130081971A (en) * 2012-01-10 2013-07-18 백인우 Precast concrete wall and method for constructing underground permanent wall using the precast concrete wall
CN104264984A (en) * 2014-10-15 2015-01-07 济南黄河路桥工程公司 Formwork for concrete structure pouring and pouring construction method
CN204780994U (en) * 2015-06-11 2015-11-18 中建一局集团第六建筑有限公司 Underground continuous wall inwall construction structures
CN105888108A (en) * 2016-05-25 2016-08-24 中大建设股份有限公司 Reinforced concrete shear wall with positioning prefabricated member inside and construction method of reinforced concrete shear wall
CN206328774U (en) * 2016-10-17 2017-07-14 上海建工一建集团有限公司 Reinforcing bar posture erecting device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002061204A (en) * 2000-08-23 2002-02-28 Hitachi Zosen Corp Construction method of underground structural body
KR20130081971A (en) * 2012-01-10 2013-07-18 백인우 Precast concrete wall and method for constructing underground permanent wall using the precast concrete wall
CN202611233U (en) * 2012-07-06 2012-12-19 宁波东新建筑有限公司 Template for pouring double-way shear wall with deformation joint in the middle
CN104264984A (en) * 2014-10-15 2015-01-07 济南黄河路桥工程公司 Formwork for concrete structure pouring and pouring construction method
CN204780994U (en) * 2015-06-11 2015-11-18 中建一局集团第六建筑有限公司 Underground continuous wall inwall construction structures
CN105888108A (en) * 2016-05-25 2016-08-24 中大建设股份有限公司 Reinforced concrete shear wall with positioning prefabricated member inside and construction method of reinforced concrete shear wall
CN206328774U (en) * 2016-10-17 2017-07-14 上海建工一建集团有限公司 Reinforcing bar posture erecting device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113700037A (en) * 2021-09-07 2021-11-26 浙江交工地下工程有限公司 Reverse construction method underground ultra-thick side wall pouring construction device and method thereof

Also Published As

Publication number Publication date
CN106522273B (en) 2019-02-05

Similar Documents

Publication Publication Date Title
CN107419824A (en) The full precast shear wall structural system of regenerative steel skeleton and construction method
KR100997509B1 (en) Flange-reinforced composite member and strut structure of retaining wall using the same
KR101903628B1 (en) Precast Double Wall Structure with Enhanced Seismic Performance and Construction method thereof
US10688685B2 (en) Formwork for providing a concrete foundation plinth with exposed horizontal reinforcing bars, plinth provided with such formwork, and structure comprising such plinth
CN106245678A (en) Outer wall of basement single side formwork construction method based on steel pipe truss
CN103628571B (en) Beam-column joint for reverse construction method and construction method
KR20110122310A (en) Construction method for basement structure without temporary structure
CN207017484U (en) Reinforced precast reinforced concrete shear wall and structural system
CN207017483U (en) The full precast shear wall structural system of regenerative steel skeleton
CN206328774U (en) Reinforcing bar posture erecting device
CN106522273B (en) Reinforcing bar posture erecting device and its construction method
CN208105474U (en) A kind of assembly node of upper and lower interior wall and floor
KR102548929B1 (en) Retaining wall that can reduce construction period and cost with modular construction method of pc concrete block and secure stability even in high-rise design by reinforced wire tension and integrated behavior of module
JPH10152998A (en) Earthquake-resistant reinforcing structure of existing building
KR101908943B1 (en) RC WALL STRUCTURE FOR TOP-DOWN AND METHOD FOR CONSTRUCTING THE STRUCTUREa
JP2005188102A (en) Structure of building and construction method
KR100856723B1 (en) System and method for underground downward construction using cantilever type steel frame
CN107419825A (en) The full precast shear wall of steel skeleton and its construction method of weak edge member arrangement of reinforcement
JP4757590B2 (en) Seismic reinforcement method for existing reinforced concrete structures
CN212405468U (en) Stiff concrete structure beam column core area structure
CN103572762B (en) The bracket of the oblique inner support lower end of foundation pit supporting construction and fabrication tool and construction method
CN108661080A (en) The manufacturing method in assembled underground one corridor
CN210369306U (en) Steel pipe takes assembled concrete frame beam column joint construction of U-shaped steel corbel
KR101147460B1 (en) Cutting the ground retaining wall using the pole and construction method of the same
CN216109032U (en) Reinforced rigid connection joint for steel beam and precast concrete column

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant