CN106513073A - Experiment table with shunting and water guiding functions - Google Patents
Experiment table with shunting and water guiding functions Download PDFInfo
- Publication number
- CN106513073A CN106513073A CN201611120497.6A CN201611120497A CN106513073A CN 106513073 A CN106513073 A CN 106513073A CN 201611120497 A CN201611120497 A CN 201611120497A CN 106513073 A CN106513073 A CN 106513073A
- Authority
- CN
- China
- Prior art keywords
- brassboard
- hole
- casing
- shunting
- experiment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000002474 experimental method Methods 0.000 title claims abstract description 39
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 21
- 238000012360 testing method Methods 0.000 claims abstract description 21
- 239000007788 liquid Substances 0.000 claims description 30
- 238000003860 storage Methods 0.000 claims description 29
- 239000008233 hard water Substances 0.000 claims description 16
- 239000002253 acid Substances 0.000 claims description 8
- 229910001220 stainless steel Inorganic materials 0.000 claims description 7
- 239000010935 stainless steel Substances 0.000 claims description 7
- 239000000463 material Substances 0.000 claims description 5
- 230000002378 acidificating effect Effects 0.000 claims description 4
- 238000009434 installation Methods 0.000 claims description 4
- 239000003153 chemical reaction reagent Substances 0.000 claims description 2
- 239000000203 mixture Substances 0.000 claims description 2
- 230000010355 oscillation Effects 0.000 claims description 2
- 239000007787 solid Substances 0.000 claims 1
- 238000004140 cleaning Methods 0.000 abstract description 8
- 108090000623 proteins and genes Proteins 0.000 abstract description 5
- 210000002683 foot Anatomy 0.000 description 13
- 238000010586 diagram Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 108020004414 DNA Proteins 0.000 description 2
- 238000003756 stirring Methods 0.000 description 2
- 239000000126 substance Substances 0.000 description 2
- 108010022579 ATP dependent 26S protease Proteins 0.000 description 1
- 102000053602 DNA Human genes 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010353 genetic engineering Methods 0.000 description 1
- 238000000338 in vitro Methods 0.000 description 1
- 230000014759 maintenance of location Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000002906 microbiologic effect Effects 0.000 description 1
- 238000010188 recombinant method Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000012827 research and development Methods 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01L—CHEMICAL OR PHYSICAL LABORATORY APPARATUS FOR GENERAL USE
- B01L9/00—Supporting devices; Holding devices
- B01L9/02—Laboratory benches or tables; Fittings therefor
Landscapes
- Health & Medical Sciences (AREA)
- Clinical Laboratory Science (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Devices For Use In Laboratory Experiments (AREA)
Abstract
The invention belongs to the technical field of gene engineering and particularly relates to an experiment table with shunting and water guiding functions. The experiment table with the shunting and water guiding functions allows adjustment of the height and the position of an experiment board, is simple to operate and allows cleaning of experiment appliances after an experiment is finished. The experiment table with the shunting and water guiding functions comprises a box, a first door, a second door, a first handle, a second handle, the experiment board, table legs, a connecting board, a first support rod, a second support rod, an accommodating board, a test tube rack and the like, wherein the first door is connected with the left side of the front side of the box in a hinge connection manner, and the second door is connected with the right side of the front side of the box in the hinge connection manner. According to the experiment table with the shunting and water guiding functions, the height and the position of the experiment board can be adjusted, so that the experiment can be conducted on the table, and experiment appliances can be cleaned after the experiment is finished.
Description
Technical field
The invention belongs to gene engineering technology field, more particularly to it is a kind of with shunting water guide experimental bench.
Background technology
Genetic engineering, also known as gene splicing technology and DNA recombinant techniques, is with molecular genetics as theoretical foundation, with molecule
Biology and microbiological modernism are means, by the gene of separate sources by the blueprint being pre-designed, are built in vitro
Hybrid DNA molecule, is then introduced into living cells, to change biological original hereditary capacity, obtain new varieties, production new product.Base
Because research of the engineering technology for the 26S Proteasome Structure and Function of gene provides strong means.
Laboratory table, is usually used in testing.Table top in test is provided.
Existing laboratory table presence can not adjust the height of brassboard and position, cumbersome, experiment can not be right after finishing
The shortcoming cleaned by experiment appliance, therefore need a kind of height that can adjust brassboard of research and development and position, simple to operate, real badly
Test experiment appliance can be cleaned after finishing with shunting water guide experimental bench.
The content of the invention
(1) technical problem to be solved
The present invention is in order to overcome existing laboratory table to exist can not to adjust the height of brassboard and position, cumbersome, real
The shortcoming that can not be cleaned to experiment appliance after finishing is tested, the technical problem to be solved in the present invention is to provide one kind and can adjust
It is real with shunting water guide that the height of brassboard and position, simple to operate, experiment can be cleaned to experiment appliance after finishing
Test platform.
(2) technical scheme is to solve above-mentioned technical problem, the invention provides such a has shunting water guide reality
Platform is tested, the testing stand includes that casing, brassboard, the brassboard and casing are flexibly connected, and the brassboard is provided with pyromagnetic unit
And operating unit, the roof box is provided with reagent unit and sample unit, and the pyromagnetic unit is the reality of pyromagnetic element composition
Pyromagnetic device is tested, the pyromagnetic element includes deep-well plates magnetic force frame module, deep-well plates carrier, temperature control module and oscillation module, institute
Stating brassboard also includes base plate, top board, siphoning installation, acid and alkali-resistance water-absorbing sponge, deflector, and the acid and alkali-resistance water-absorbing sponge is arranged
Between deflector and top board, the siphoning installation acid and alkali-resistance water-absorbing sponge two ends are connected to by shunt catheter, it is described
Siphoning installation is detachably connected the brassboard with shunt catheter and is provided with pod apertures.The deflector is provided with two-layer dividing plate, described
Acid and alkali-resistance water-absorbing sponge is arranged between ground floor dividing plate and top board, and shunt catheter is fixed on outside ground floor dividing plate and top board left
Right both sides, form siphon passage, and the brassboard is formed around discarded object holding tank, and the discarded object storage rooved face is less than real
Plate surface is tested, the discarded object holding tank is flexibly connected with brassboard;The discarded object holding tank includes liquid holding tank and consolidates
Body holding tank, the liquid holding tank be arranged at the brassboard left and right sides, and the second layer dividing plate is connected with liquid holding tank,
Second layer dividing plate and ground floor dividing plate directly form liquid storage chamber, and second layer dividing plate and ground floor dividing plate are connected by demarcation strip
Connect, liquid storage chamber is divided into two storage chambers by the demarcation strip.The left side liquid holding tank stores akaline liquid, right side liquid
Body holding tank stores acidic liquid;When being that left side shunt catheter carries out siphon, and liquid siphon is arrived for akaline liquid on brassboard
Left side liquid holding tank;When being that right side shunt catheter carries out siphon for acidic liquid on brassboard, by liquid siphon to right side liquid
Body holding tank.In the embedded brassboard of the pyromagnetic unit, operating unit, the pyromagnetic unit, operating unit surface and brassboard
Flush.The workbench include casing, first, second, the first handle, the second handle, brassboard, feet, connection
Plate, the first pole, the second pole, placement plate, rack for test tube, hard water pipe and tap, cabinet front pass on left gemel connection
Mode is connected with first, is connected with second on the right side of cabinet front by way of gemel connection, first upper right side central
The first handle is welded with, the second handle in the middle part of second upper left side, is welded with, casing top right side opening is fluted, four of casing
Angle is all welded with connecting plate, and before and after connecting plate, side is evenly spaced is provided with the second through hole, and brassboard is provided with directly over casing, experiment
The angle of plate bottom four is welded with feet, and before and after feet bottom, side is provided with first through hole, and first through hole is corresponding with the second through hole,
Casing top is welded with the first pole, the second pole and hard water pipe from left to right successively, and hard water pipe is located at the casing top on groove
On the left of portion, placement plate between the first pole and the second pole, is welded with, the evenly spaced oblique weld of the second pole right flank has
Rack for test tube, hard water pipe right-hand member are provided with tap, and the mode that tap is threaded connection is connected with hard water pipe, connecting plate left and right sides
Third through-hole is provided with, evenly spaced on the inside of feet to be provided with fourth hole, third through-hole is corresponding with fourth hole.
Preferably, illuminating lamp is also included, brassboard top right side is provided with illuminating lamp, and illuminating lamp passes through the side being welded to connect
Formula is connected with brassboard top right side.
Preferably, storage tank is also included, casing left surface bottom is provided with storage tank, and storage tank passes through the side being welded to connect
Formula is connected with casing left surface bottom.
Preferably, the material of casing is stainless steel.
Preferably, the aperture of first through hole, the second through hole, third through-hole and fourth hole is all equal.
Operation principle:When the present invention will be used, some experiment appliances in casing, can be placed, it is when being tested, real
The person of testing stirs table leg and moves upwards, is adjusted height, when being adjusted to the second through hole of proper height and feet bottom and be connected
When the first through hole of proper height is corresponding in plate, the second through hole and first through hole are passed through with latch, and be fixed.Fix
Afterwards, experimenter can be tested on brassboard.When experiment is finished needs cleaning experiment apparatus, experiment appliance is placed casing
Top, then latch is extracted from the second through hole with first through hole.Then again the 3rd of top on the inside of feet and bottommost
The fourth hole of through hole correspondence connecting plate left and right sides top and bottommost, and third through-hole and four-way are passed through with latch
Hole, is fixed, and now brassboard is located on rear side of casing, and such brassboard would not hinder experimenter's cleaning experiment apparatus.So
After open tap, experiment appliance is cleaned, rack for test tube be used for place cleaning after test tube, place plate can place other realities
Test apparatus.After experiment appliance cleaning is finished, tap is closed.
Because also including illuminating lamp, brassboard top right side is provided with illuminating lamp, and illuminating lamp is by way of being welded to connect
Be connected with brassboard top right side, when light than it is dark when, open illuminating lamp, illuminating lamp plays a role in lighting.When need not use
During illuminating lamp, illuminating lamp is closed.
Storage tank included also, casing left surface bottom is provided with storage tank, storage tank is by way of being welded to connect and case
Body left surface bottom connects, and can place the instrument needed for some, so as to reach easily effect in storage tank.
The material of casing be stainless steel, stainless steel through chemical treatment, can increase the present invention service life.
(3) beneficial effect
It is provided by the present invention a kind of with shunting water guide experimental bench, by height and the position that can adjust brassboard
Put, can be tested on the table so as to reach, experiment can be cleaned to experiment appliance after finishing, and can also be put after having cleaned
Put the effect of experiment appliance.
Description of the drawings
Fig. 1 is the three-dimensional main structure diagram of the present invention.
Fig. 2 is the first main structure diagram of the present invention.
Fig. 3 is the right side structural representation of casing of the present invention.
Fig. 4 is second main structure diagram of the present invention.
Fig. 5 is the third main structure diagram of the present invention.
Mark in accompanying drawing for:1- casings, 2- first, 3- second, 4- first are shaken hands, and 5- second shakes hands, 6- grooves,
7- brassboards, 8- feets, 9- first through hole, 10- connecting plates, the second through holes of 11-, the first poles of 12-, the second poles of 13-, 14-
Place plate, 15- rack for test tubes, 16- hard water pipes, 17- taps, 18- third through-holes, 19- fourth holes, 20- illuminating lamps, 21- storages
Thing case.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
It is a kind of that there is shunting water guide experimental bench, as Figure 1-5, include casing 1, first 2, second 3, first
The 4, second handle 5, brassboard 7 of handle, feet 8, connecting plate 10, the first pole 12, the second pole 13, placement plate 14, rack for test tube
15th, hard water pipe 16 and tap 17, the mode that gemel connection is passed on left on front side of casing 1 are connected with first 2, on front side of casing 1
Right side is connected with second 3 by way of gemel connection, and on first 2, right side central is welded with the first handle 4, second 3
The second handle 5 is welded with the middle part of upper left side, 1 top right side of casing is provided with groove 6, and four angles of casing 1 are all welded with connecting plate
10, before and after connecting plate 10, side is evenly spaced is provided with the second through hole 11, and brassboard 7,7 bottom of brassboard are provided with directly over casing 1
Four angles are welded with feet 8, and before and after 8 bottom of feet, side is provided with first through hole 9, and first through hole 9 and the second through hole 11 are corresponding,
It is welded with the first pole 12, the second pole 13 and hard water pipe 16 at the top of casing 1 from left to right successively, hard water pipe 16 is located at groove 6
On 1 top left side of casing, placement plate 14 is welded between the first pole 12 and the second pole 13,13 right flank of the second pole is equal
The oblique weld at even interval has rack for test tube 15, and 16 right-hand member of hard water pipe is provided with tap 17, the side that tap 17 is threaded connection
Formula is connected with hard water pipe 16, and 10 left and right sides of connecting plate is provided with third through-hole 18, evenly spaced on the inside of feet 8 to be provided with fourth hole
19, third through-hole 18 is corresponding with fourth hole 19.
Illuminating lamp 20 is included also, 7 top right side of brassboard is provided with illuminating lamp 20, and illuminating lamp 20 passes through the side being welded to connect
Formula is connected with 7 top right side of brassboard.
Storage tank 21 is included also, 1 left surface bottom of casing is provided with storage tank 21, and storage tank 21 passes through the side being welded to connect
Formula is connected with 1 left surface bottom of casing.
The material of casing 1 is stainless steel.
The aperture of first through hole 9, the second through hole 11, third through-hole 18 and fourth hole 19 is all equal.
Operation principle:When the present invention will be used, in casing 1, some experiment appliances can be placed, it is when being tested, real
The person of testing stirs table leg and moves upwards, is adjusted height, when the second through hole 11 for being adjusted to proper height and 8 bottom of feet and even
When in fishplate bar 10, the first through hole 9 of proper height is corresponding, with latch through the second through hole 11 and first through hole 9, and consolidated
It is fixed.After fixing, experimenter can be tested on brassboard 7.When experiment is finished needs cleaning experiment apparatus, experiment is used
Tool is placed at the top of casing 1, then latch is extracted from the second through hole 11 with first through hole 9.Then again 8 inner side top of feet
The fourth hole 19 of 10 left and right sides top of connecting plate and bottommost is corresponded to the third through-hole 18 of bottommost, and is worn with latch
Third through-hole 18 and fourth hole 19 are crossed, is fixed, now brassboard 7 is located on rear side of casing 1, and such brassboard 7 would not
Hinder experimenter's cleaning experiment apparatus.Then tap 17 is opened, experiment appliance is cleaned, rack for test tube 15 is used for placing clear
Test tube after washing, places plate 14 and can place other experiment appliances.After experiment appliance cleaning is finished, tap 17 is closed.
Because also including illuminating lamp 20,7 top right side of brassboard is provided with illuminating lamp 20, and illuminating lamp 20 is by the company of welding
The mode for connecing is connected with 7 top right side of brassboard, when light than it is dark when, open illuminating lamp 20, illuminating lamp 20 plays a role in lighting.
When illuminating lamp 20 need not be used, illuminating lamp 20 is closed.
Storage tank 21 is included also, 1 left surface bottom of casing is provided with storage tank 21, and storage tank 21 passes through the side being welded to connect
Formula is connected with 1 left surface bottom of casing, can place the instrument needed for some, so as to reach easily effect in storage tank 21.
The material of casing 1 be stainless steel, stainless steel through chemical treatment, can increase the present invention service life.
Embodiment described above only expresses the preferred embodiment of the present invention, and its description is more concrete and detailed, but and
Therefore the restriction to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art
For, without departing from the inventive concept of the premise, some deformations, improvement can also be made and substituted, these belong to this
Bright protection domain.Therefore, the protection domain of patent of the present invention should be defined by claims.
Claims (9)
- It is 1. a kind of that there is shunting water guide experimental bench, it is characterised in that:The testing stand includes casing (1), brassboard (7), described Brassboard and casing are flexibly connected, and the brassboard (7) is provided with pyromagnetic unit and operating unit, and casing (1) top board is provided with Reagent unit and sample unit, the pyromagnetic unit is the experiment hot magnetic device of pyromagnetic element composition, and the pyromagnetic element includes Deep-well plates magnetic force frame module, deep-well plates carrier, temperature control module and oscillation module, the brassboard also include base plate, top board, siphon Device, acid and alkali-resistance water-absorbing sponge, deflector, the acid and alkali-resistance water-absorbing sponge is arranged between deflector and top board, the siphon Device is connected to acid and alkali-resistance water-absorbing sponge two ends by shunt catheter, and the siphoning installation is detachably connected with shunt catheter The brassboard is provided with pod apertures.
- 2. it is according to claim 1 a kind of with shunting water guide experimental bench, it is characterised in that the deflector is provided with two Layer dividing plate, the acid and alkali-resistance water-absorbing sponge are arranged between ground floor dividing plate and top board, and shunt catheter is fixed on ground floor dividing plate With the left and right sides outside top board, siphon passage is formed, the brassboard (7) is formed around discarded object holding tank, the discarded object Storage rooved face is less than brassboard (7) surface, and the discarded object holding tank is flexibly connected with brassboard (7);The discarded object is deposited Storage tank includes liquid holding tank and solid holding tank, and the liquid holding tank is arranged at brassboard (7) left and right sides, described second Layer dividing plate is connected with liquid holding tank, and second layer dividing plate and ground floor dividing plate directly form liquid storage chamber, second layer dividing plate Connected by demarcation strip with ground floor dividing plate, liquid storage chamber is divided into two storage chambers by the demarcation strip.
- 3. it is according to claim 1 a kind of with shunting water guide experimental bench, it is characterised in that the left side liquid storage Groove stores akaline liquid, right side liquid holding tank storage acidic liquid;When on brassboard (7) for akaline liquid being, left side shunting Conduit carries out siphon, by liquid siphon to left side liquid holding tank;When on brassboard (7) for acidic liquid being, right side shunting is led Pipe carries out siphon, by liquid siphon to right side liquid holding tank.
- 4. it is according to claim 1 a kind of with shunting water guide experimental bench, it is characterised in that the pyromagnetic unit, behaviour Make in the embedded brassboard (7) of unit, the pyromagnetic unit, operating unit surface and brassboard (7) flush.
- 5. it is according to claim 1 a kind of to there is shunting water guide experimental bench, it is characterised in that the workbench also includes the One (2), second (3), the first handle (4), the second handle (5), feet (8), connecting plate (10), the first pole (12), the Two poles (13), placement plate (14), rack for test tube (15), hard water pipe (16) and tap (17), casing pass on left conjunction on front side of (1) The mode of page connection is connected with first (2), and on front side of casing (1), right side is connected with second (3) by way of gemel connection, On first (2), right side central is welded with the first handle (4), is welded with the second handle (5), case in the middle part of second (3) upper left side Body (1) top right side is provided with groove (6), and before and after four angles of casing (1) are all welded with connecting plate (10), connecting plate (10), side is equal Even interval is provided with the second through hole (11), and brassboard (7) is provided with directly over casing (1), and the angle of brassboard (7) bottom four welds There is feet (8), side is provided with first through hole (9) before and after feet (8) bottom, first through hole (9) and the second through hole (11) are corresponding, case It is welded with the first pole (12), the second pole (13) and hard water pipe (16), hard water pipe (16) position at the top of body (1) from left to right successively Casing (1) top left side on groove (6), is welded with placement plate (14) between the first pole (12) and the second pole (13), The evenly spaced oblique weld of second pole (13) right flank has rack for test tube (15), and hard water pipe (16) right-hand member is provided with tap (17) mode that, tap (17) is threaded connection is connected with hard water pipe (16), and connecting plate (10) left and right sides is provided with threeway Hole (18), evenly spaced on the inside of feet (8) to be provided with fourth hole (19), third through-hole (18) is relative with fourth hole (19) Should.
- 6. it is according to claim 6 a kind of with shunting water guide experimental bench, it is characterised in that also to include illuminating lamp (20), brassboard (7) top right side is provided with illuminating lamp (20), illuminating lamp (20) by way of being welded to connect with brassboard (7) Top right side connects.
- 7. it is according to claim 6 a kind of with shunting water guide experimental bench, it is characterised in that also to include storage tank (21), casing (1) left surface bottom is provided with storage tank (21), and storage tank (21) is left with casing (1) by way of being welded to connect Side lower connects.
- 8. it is according to claim 6 a kind of to there is shunting water guide experimental bench, it is characterised in that the material of casing (1) is Stainless steel.
- 9. it is according to claim 6 a kind of to there is shunting water guide experimental bench, it is characterised in that first through hole (9), second The aperture of through hole (11), third through-hole (18) and fourth hole (19) is all equal.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611120497.6A CN106513073B (en) | 2016-12-08 | 2016-12-08 | One kind having shunting water guide experimental bench |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611120497.6A CN106513073B (en) | 2016-12-08 | 2016-12-08 | One kind having shunting water guide experimental bench |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106513073A true CN106513073A (en) | 2017-03-22 |
CN106513073B CN106513073B (en) | 2018-09-11 |
Family
ID=58342125
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611120497.6A Active CN106513073B (en) | 2016-12-08 | 2016-12-08 | One kind having shunting water guide experimental bench |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106513073B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108479884A (en) * | 2017-12-29 | 2018-09-04 | 南京惊兰谷根自动化科技有限公司 | Teaching water suction experimental bench |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060150317A1 (en) * | 2003-03-26 | 2006-07-13 | Thomas Maetzke | Laboratory equipment having drain grooves on a worktop |
CN201701951U (en) * | 2010-04-22 | 2011-01-12 | 张丽华 | Chemical experiment table |
CN102488437A (en) * | 2011-12-27 | 2012-06-13 | 陈梓平 | Plane drainage device |
CN204211742U (en) * | 2014-11-12 | 2015-03-18 | 中国人民解放军南京军区军事医学研究所 | Cause of disease nucleic acid constant-temperature Site Detection dedicated box |
CN204544254U (en) * | 2015-04-07 | 2015-08-12 | 中国农业科学院兰州畜牧与兽药研究所 | A kind of adjustable-height experimental bench |
CN204544251U (en) * | 2015-01-04 | 2015-08-12 | 廊坊兴安木业有限公司 | Multifunctional electric lifting experimental bench |
CN205128514U (en) * | 2015-11-12 | 2016-04-06 | 山东科技大学 | Experiment table water absorption device |
CN205288483U (en) * | 2015-12-07 | 2016-06-08 | 南阳医学高等专科学校 | Pharmaceutical experiment table |
CN205659703U (en) * | 2016-05-14 | 2016-10-26 | 陈昭宇 | Chemical laboratory table |
CN106188199A (en) * | 2016-08-26 | 2016-12-07 | 江苏领坤生物科技有限公司 | A kind of hard board bogey for DNA synthesizer |
-
2016
- 2016-12-08 CN CN201611120497.6A patent/CN106513073B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060150317A1 (en) * | 2003-03-26 | 2006-07-13 | Thomas Maetzke | Laboratory equipment having drain grooves on a worktop |
CN201701951U (en) * | 2010-04-22 | 2011-01-12 | 张丽华 | Chemical experiment table |
CN102488437A (en) * | 2011-12-27 | 2012-06-13 | 陈梓平 | Plane drainage device |
CN204211742U (en) * | 2014-11-12 | 2015-03-18 | 中国人民解放军南京军区军事医学研究所 | Cause of disease nucleic acid constant-temperature Site Detection dedicated box |
CN204544251U (en) * | 2015-01-04 | 2015-08-12 | 廊坊兴安木业有限公司 | Multifunctional electric lifting experimental bench |
CN204544254U (en) * | 2015-04-07 | 2015-08-12 | 中国农业科学院兰州畜牧与兽药研究所 | A kind of adjustable-height experimental bench |
CN205128514U (en) * | 2015-11-12 | 2016-04-06 | 山东科技大学 | Experiment table water absorption device |
CN205288483U (en) * | 2015-12-07 | 2016-06-08 | 南阳医学高等专科学校 | Pharmaceutical experiment table |
CN205659703U (en) * | 2016-05-14 | 2016-10-26 | 陈昭宇 | Chemical laboratory table |
CN106188199A (en) * | 2016-08-26 | 2016-12-07 | 江苏领坤生物科技有限公司 | A kind of hard board bogey for DNA synthesizer |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108479884A (en) * | 2017-12-29 | 2018-09-04 | 南京惊兰谷根自动化科技有限公司 | Teaching water suction experimental bench |
Also Published As
Publication number | Publication date |
---|---|
CN106513073B (en) | 2018-09-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204999894U (en) | Full -automatic genetic test appearance | |
CN107126996A (en) | One kind teaching bench for chemistry experiment | |
CN106513073A (en) | Experiment table with shunting and water guiding functions | |
CN204338204U (en) | A kind of laboratory inspection man's station | |
CN106622435A (en) | Biochemical experiment workbench | |
CN206906116U (en) | A kind of haemocyte detector easy to operation | |
CN206096262U (en) | Constant temperature DC resistance measuring device | |
CN206587798U (en) | A kind of Multi-functional chemical experiment table | |
CN107051607A (en) | A kind of genetic engineering laboratory table | |
CN208865671U (en) | A kind of biological test platform for the rare disease research of children's heredity | |
CN206121799U (en) | High school is experiment table for chemistry | |
CN213813536U (en) | Chemical reagent measuring device | |
CN208771466U (en) | A kind of movable type Biochemical manipulation platform | |
CN210308379U (en) | Mortar test block curing box | |
CN211026426U (en) | Laboratory bench for chemistry experiments | |
CN208443971U (en) | The test fixture of visual extension set PCBA intelligent measurement machine | |
CN206298596U (en) | A kind of kit of PDGFR genetic tests | |
CN207102659U (en) | Experimental teaching platform | |
CN209450858U (en) | A kind of multifunctional human Dissection test platform | |
CN207462776U (en) | A kind of biological detection laboratory filter device | |
CN212383735U (en) | Clinical laboratory is with inspection table | |
CN205925753U (en) | Homothermal water bath | |
CN209602527U (en) | A kind of cell superclean bench | |
CN214457874U (en) | Kit for detecting circular RNA in plasma | |
CN208188122U (en) | A kind of thrombelastogram instrument |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20211230 Address after: 201600 no.66-2, Yujia West Road, Songjiang District, Shanghai Patentee after: SHANGHAI DAFENG LABORATORY EQUIPMENT Co.,Ltd. Address before: 236800 63-2, chuzhaizhuang, limeng village, Chengguan Town, Lixin County, Bozhou City, Anhui Province Patentee before: Chu Hui |