CN106499420B CN201610979890.4A CN201610979890A CN106499420B CN 106499420 B CN106499420 B CN 106499420B CN 201610979890 A CN201610979890 A CN 201610979890A CN 106499420 B CN106499420 B CN 106499420B
Authority
CN
China
Prior art keywords
rod
prop
high constant
cylinder body
resistance individual
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610979890.4A
Other languages
Chinese (zh)
Other versions
CN106499420A (en
Inventor
缪协兴
陈彦龙
张吉雄
张强
吴宇
邓雪杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201610979890.4A priority Critical patent/CN106499420B/en
Publication of CN106499420A publication Critical patent/CN106499420A/en
Priority to PCT/CN2017/109693 priority patent/WO2018086509A1/en
Application granted granted Critical
Publication of CN106499420B publication Critical patent/CN106499420B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D15/00Props; Chocks, e.g. made of flexible containers filled with backfilling material
    • E21D15/58Devices for setting props or chocks

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The invention discloses a kind of mechanical constant-resistance individual prop installation methods: (1) according to mine inscribe eye or tunnel actual profile height, the body of rod being socketed on cylinder body and adjusting sleeve spreading degree;(2) steel ball sleeve is inserted between the body of rod and cylinder body, making the body of rod compress steel ball sleeve, is formed self-locking;(3) limited cover is fixedly connected on the body of rod and cylinder body socket place;(4) jacking disk is installed and is locked to body of rod upper end;(5) the vertical component for erecting the completion assembling in (4) of mechanical high constant-resistance individual prop, and be installed on pedestal.The invention also discloses a kind of mechanical constant-resistance individual prop erection methods: (1) installing mechanical constant-resistance individual prop according to above-mentioned mechanical constant-resistance individual prop installation method;(2) body of rod is driven to move up relative to cylinder body by prop raising tool, until jacking disk and mine inscribe eye or the top plate in tunnel connect reality;(3) prop raising tool is dismantled.Installation is simple, quick, efficient, saves human and material resources.

Description

A kind of mechanically high constant-resistance individual prop installation method and erection method
Technical field
The present invention relates to coal mines and metal mine to exploit roadway support applied technical field, more particularly to a kind of mechanical High constant-resistance individual prop installation method and erection method.
Background technique
The existing method for generally taking double grillage to add monomer column in China's coal-mine underground carry out stope drift active workings advance support or It reinforces, and with working face mining, grillage and individual prop sequence is moved forward.For wherein crib protection, existing protrusion Problem can be concluded are as follows: initial installation effectiveness is low, support material waste is serious, labor intensity of workers is big and it is super to adopt period tunnel Preceding supporting region roof stability is poor.Therefore, a kind of mechanical high constant-resistance individual prop, safer economic, construction are had developed It is high-efficient, the effectiveness of roof control is good, realize the substitution in order of a large amount of grillages in underground stope drift active workings advance support region.
However during mechanical high constant-resistance individual prop is installed and installed, due to the use lack of standardization of device, make scene Complexity is installed and installed, production efficiency is greatly reduced.For the above practical site problems, mechanical high constant-resistance list how is realized The simple, fast and efficient installation of pillar body, saving human and material resources is mechanical high constant-resistance individual prop installation and installs process In a main problem.
Summary of the invention
The object of the present invention is to provide a kind of mechanical high constant-resistance individual prop installation method and erection methods, on solving Problem of the existing technology is stated, the mechanical high simple, fast and efficient installation of constant-resistance individual prop is realized, saves manpower, object Power.
In order to achieve the above object, the present invention the following technical schemes are provided:
The present invention provides a kind of mechanical high constant-resistance individual prop installation method, comprising the following steps:
Step 1: the body of rod of mechanical high constant-resistance individual prop and cylinder body are laid flat, real according to mine inscribe eye or tunnel The body of rod is socketed on the cylinder body and adjusts the socket length of the body of rod Yu the cylinder body, the bar by border profile height Total length after body and cylinder body socket is less than the height of mine inscribe eye or tunnel actual profile;
Step 2: being provided with the cylinder body conical surface in the cylinder body upper end, the cylinder body conical surface is to be inverted the conical surface, certainly by steel ball sleeve The body of rod top is inserted between the body of rod and the cylinder body, and the body of rod is continued to promote into the cylinder body, is made The body of rod compresses the steel ball sleeve, and the steel ball sleeve is stuck between the body of rod and the intracorporal cylinder body conical surface of the cylinder, is formed It is self-locking, prevent the body of rod slide downward, the height after the fixed body of rod and cylinder body socket;
Step 3: limited cover is inserted in from the body of rod top, and by the limited cover be fixedly connected on the body of rod with The cylinder body socket place, makes the limited cover cover the cylinder body;
Step 4: jacking disk is installed and is locked to the body of rod upper end;
Pedestal: being placed in the fixation position of the pedestal by step 5, erects the mechanical high constant-resistance monomer branch vertically Column completes the component of assembling in step 4, and is installed on the pedestal, the mechanical high constant-resistance individual prop peace It installs complete.
Preferably, the body of rod described in step 1 and the total length after cylinder body socket are practical than mine inscribe eye or tunnel Small 10~the 30cm of the height of section.
Preferably, the side wall of the limited cover is equipped with caging bolt, and the limited cover is tightened in by the caging bolt On the cylinder body lateral wall.
Preferably, jacking valve snail bolt is provided on the jacking disk, the body of rod upper end is provided with and the jacking valve snail The corresponding bolt hole of bolt, the jacking valve snail bolt pass through the bolt hole and the jacking disk are locked on the body of rod End.
Preferably, it is described mechanical after mechanical high constant-resistance individual prop described in step 5 is mounted on the base High constant-resistance individual prop is perpendicular to mine inscribe eye or the top plate in tunnel.
The present invention also provides a kind of mechanical high constant-resistance individual prop erection methods, comprising the following steps:
Step 1: according to mechanical as described in preceding described in any item mechanical high constant-resistance individual prop installation method installations High constant-resistance individual prop;
Step 2: the mechanical high constant-resistance individual prop installed in step 1 is buttressed, prop raising tool is installed, is passed through Pressurizing device pressurizes to the oil cylinder of prop raising tool, makes the oil cylinder of the prop raising tool that the prop raising tool be driven to move up, thus Make the prop raising tool that the body of rod be driven to move up relative to the cylinder body, until the jacking disk and the lane mine inscribe Yan Huo The top plate in road connects reality;
Step 3: disassembly prop raising tool, mechanical high constant-resistance individual prop, which installs, to be finished.
Preferably, the prop raising tool both ends are separately mounted on the body of rod and the cylinder body.
Preferably, when the in-oil cylinder oil pressure of prop raising tool described in step 2 reaches 15MPa, stop the oil cylinder to prop raising tool Pressurization.
Preferably, the stroke of the prop raising tool is 10cm~30cm.
The present invention achieves following technical effect compared with the existing technology:
A kind of mechanical high constant-resistance individual prop mounting process and erection method disclosed by the invention, have standardized mechanical height Constant-resistance individual prop mounting process and erection method.The mounting process is easy to operate with erection method, realizes mechanical Gao Heng The simple, fast and efficient installation of individual prop is hindered, human and material resources are saved, is had in mechanical high constant-resistance individual prop use Wide applicability and reference.
Detailed description of the invention
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention Example, for those of ordinary skill in the art, without any creative labor, can also be according to these attached drawings Obtain other attached drawings.
Fig. 1 is a kind of structural schematic diagram of mechanical high constant-resistance individual prop of the present invention;
Fig. 2 is a kind of mechanical high constant-resistance individual prop mounting process of the present invention and erection method flow diagram.
In figure: the mechanically high constant-resistance individual prop of 1-, 2- pedestal, 3- cylinder body, 4- jacking disk, the 5- body of rod, 6- steel ball sleeve, 7- Limited cover, 8- limit bonnet bolt, 9- jacking valve snail bolt, the 10- cylinder body conical surface.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
The object of the present invention is to provide a kind of mechanical high constant-resistance individual prop installation method and erection methods, on solving Problem of the existing technology is stated, the mechanical high simple, fast and efficient installation of constant-resistance individual prop is realized, saves manpower, object Power.
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, with reference to the accompanying drawing and specific real Applying mode, the present invention is described in further detail.
Embodiment one
The present embodiment provides a kind of mechanical high constant-resistance individual prop installation methods to be removed as shown in Figure 1, 2 with certain mine 8216 For moving back working face, tilt length 230m, coal seam thickness is 5.55~24.20m, and 3.5 meters of head-room, specific implementation step is such as Under:
Step 1: the body of rod 3 of mechanical high constant-resistance individual prop 1 and cylinder body 5 are laid flat first, the body of rod 3 is socketed on cylinder Body 5, and according to mine inscribe eye, the actual profile height in tunnel, it adjusts the body of rod 5 and cylinder body 3 is socketed length, the present embodiment adjustment The height of mechanical high constant-resistance individual prop 1 after the body of rod 5 and the socket of cylinder body 3 is 3.4m;
Step 2: being provided with the cylinder body conical surface 10 in 3 upper end of cylinder body, the cylinder body conical surface 10 is inverted conical face, by steel ball sleeve 6 from 5 top of the body of rod is inserted between the body of rod 5 and cylinder body 3, is highly 3.4m after the body of rod 5 and the socket of cylinder body 3, the body of rod 5 is continued to cylinder It being promoted in body 3, the body of rod 5 is made to compress steel ball sleeve 6, steel ball sleeve 6 is stuck between the cylinder body conical surface 10 of 3 upper inside wall of the body of rod 5 and cylinder body, Self-locking, height after preventing 5 slide downward of the body of rod, the body of rod 5 and cylinder body 3 of the high constant-resistance individual prop 1 of solid mechanical formula from being socketed is formed, The fixed body of rod 5 of steel ball sleeve 6 and the height of the mechanical high constant-resistance individual prop 1 after the socket of cylinder body 3 are in the present embodiment 3.35m;
Step 3: being provided with sleeve joint hole on limited cover 6, sleeve joint hole matches with the body of rod 5, by limited cover 6 from 5 top of the body of rod It is inserted in the body of rod 5 and 3 socket place of cylinder body, the side wall of limited cover 6 is equipped with caging bolt 8, limit bonnet bolt 8 is tightened, by limited cover 6 It is fixedly connected on the body of rod 5 and 3 socket place of cylinder body, limited cover 6 is made to cover cylinder body 3, limitation steel ball sleeve 6 shifts up;
Step 4: being provided with jacking valve snail bolt 9 on jacking disk 4,5 upper end of the body of rod is provided with corresponding with jacking valve snail bolt 9 Bolt hole locks the jacking valve snail bolt 9 at jacking disk 4 and the body of rod 5, jacking disk 4 is installed on the body of rod 5;
Step 5: pedestal 2 is placed in the position for needing to install or install mechanical high constant-resistance individual prop 1 and by pedestal 2 is fixed, and the vertical mechanically high constant-resistance individual prop 1 that erects completes the component of assembling in step 4, and is installed in pedestal 2 On, mechanical high constant-resistance individual prop 1 installs, and the pedestal in the present embodiment is recoverable base, repeated multiple times can use.
Embodiment two
The present embodiment provides a kind of mechanical high constant-resistance individual prop erection methods to be removed as shown in Figure 1, 2 with certain mine 8216 For moving back working face, tilt length 230m, coal seam thickness is 5.55~24.20m, and 3.5 meters of head-room, specific implementation step is such as Under:
Step 1: mechanical high constant-resistance list is installed according to the mechanical high constant-resistance individual prop installation method in embodiment one Pillar body 1, and place it in the position for needing to install mechanical high constant-resistance individual prop 1;
Step 2: buttressing the mechanical high constant-resistance individual prop 1 installed in step 1, installs prop raising tool, prop raising tool Both ends are separately mounted on the body of rod 5 and cylinder body 3, are pressurizeed by oil cylinder of the pressurizing device to prop raising tool, are made the oil of prop raising tool Cylinder drives prop raising tool to move up, to make prop raising tool that the body of rod 5 be driven to move up relative to cylinder body 3, when the oil cylinder of prop raising tool When interior oil pressure reaches 15MPa, after the top plate of jacking disk 4 and mine inscribe eye, tunnel connects reality, stopping adds the oil cylinder of prop raising tool Pressure.
Specific examples are applied in the present invention, and principle and implementation of the present invention are described, above embodiments Illustrate to be merely used to help understand method and its core concept of the invention;At the same time, for those skilled in the art, according to According to thought of the invention, there will be changes in the specific implementation manner and application range.In conclusion the content of the present specification It should not be construed as limiting the invention.

Claims (9)

1. a kind of mechanical high constant-resistance individual prop installation method, it is characterised in that: the following steps are included:
Step 1: the body of rod of mechanical high constant-resistance individual prop and cylinder body are laid flat, practical disconnected according to mine inscribe eye or tunnel The body of rod is socketed on the cylinder body and adjusts the socket length of the body of rod Yu the cylinder body by face height, the body of rod with Total length after the cylinder body socket is less than the height of mine inscribe eye or tunnel actual profile;
Step 2: the cylinder body conical surface is provided in the cylinder body upper end, the cylinder body conical surface is to be inverted the conical surface, by steel ball sleeve described in Body of rod top is inserted between the body of rod and the cylinder body, and the body of rod is continued to promote into the cylinder body, is made described The body of rod compresses the steel ball sleeve, and the steel ball sleeve is stuck between the body of rod and the intracorporal cylinder body conical surface of the cylinder, and formation is self-locking, Prevent the body of rod slide downward, the height after the fixed body of rod and cylinder body socket;
Step 3: limited cover is inserted in from the body of rod top, and by the limited cover be fixedly connected on the body of rod with it is described Cylinder body socket place makes the limited cover cover the cylinder body;
Step 4: jacking disk is installed and is locked to the body of rod upper end;
Pedestal: being placed in the fixation position of the pedestal by step 5, is erected the mechanical high constant-resistance individual prop vertically and is existed The component of assembling is completed in step 4, and is installed on the pedestal, and the mechanical high constant-resistance individual prop installs Finish.
2. mechanical high constant-resistance individual prop installation method according to claim 1, it is characterised in that: described in step 1 Total length after the body of rod and cylinder body socket is 10~30cm smaller than the height of mine inscribe eye or tunnel actual profile.
3. mechanical high constant-resistance individual prop installation method according to claim 1, it is characterised in that: the limited cover Side wall is equipped with caging bolt, and the limited cover is tightened on the cylinder body lateral wall by the caging bolt.
4. mechanical high constant-resistance individual prop installation method according to claim 1, it is characterised in that: on the jacking disk It is provided with jacking valve snail bolt, the body of rod upper end is provided with bolt hole corresponding with the jacking valve snail bolt, the jacking disk Bolt passes through the bolt hole and the jacking disk is locked at the body of rod upper end.
5. mechanical high constant-resistance individual prop installation method according to claim 1, it is characterised in that: described in step 5 After mechanical high constant-resistance individual prop is mounted on the base, the mechanical high constant-resistance individual prop is perpendicular to mine inscribe Eye or the top plate in tunnel.
6. a kind of mechanical high constant-resistance individual prop erection method, it is characterised in that: the following steps are included:
Step 1: according to described in mechanical high constant-resistance individual prop installation method installation according to any one of claims 1 to 5 Mechanical high constant-resistance individual prop;
Step 2: the mechanical high constant-resistance individual prop installed in step 1 is buttressed, prop raising tool is installed, pressurization is passed through Device pressurizes to the oil cylinder of prop raising tool, makes the oil cylinder of the prop raising tool that the prop raising tool be driven to move up, to make institute Stating prop raising tool drives the body of rod to move up relative to the cylinder body, until the jacking disk and mine inscribe eye or tunnel Top plate connects reality;
Step 3: disassembly prop raising tool, mechanical high constant-resistance individual prop, which installs, to be finished.
7. mechanical high constant-resistance individual prop erection method according to claim 6, it is characterised in that: the prop raising tool two End is separately mounted on the body of rod and the cylinder body.
8. mechanical high constant-resistance individual prop erection method according to claim 6, it is characterised in that: described in step 2 When the in-oil cylinder oil pressure of prop raising tool reaches 15MPa, stop pressurizeing to the oil cylinder of prop raising tool.
9. mechanical high constant-resistance individual prop erection method according to claim 6, it is characterised in that: the prop raising tool Stroke is 10cm~30cm.
CN201610979890.4A 2016-11-03 2016-11-08 A kind of mechanically high constant-resistance individual prop installation method and erection method Expired - Fee Related CN106499420B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201610979890.4A CN106499420B (en) 2016-11-03 2016-11-08 A kind of mechanically high constant-resistance individual prop installation method and erection method
PCT/CN2017/109693 WO2018086509A1 (en) 2016-11-03 2017-11-07 Methods for mounting and erecting mechanical constant-resistance single prop

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201610952804 2016-11-03
CN2016109528040 2016-11-03
CN201610979890.4A CN106499420B (en) 2016-11-03 2016-11-08 A kind of mechanically high constant-resistance individual prop installation method and erection method

Publications (2)

Publication Number Publication Date
CN106499420A CN106499420A (en) 2017-03-15
CN106499420B true CN106499420B (en) 2019-02-15

Family

ID=58323445

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610979890.4A Expired - Fee Related CN106499420B (en) 2016-11-03 2016-11-08 A kind of mechanically high constant-resistance individual prop installation method and erection method

Country Status (2)

Country Link
CN (1) CN106499420B (en)
WO (1) WO2018086509A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106499420B (en) * 2016-11-03 2019-02-15 中国矿业大学 A kind of mechanically high constant-resistance individual prop installation method and erection method
CN117007225B (en) * 2023-08-09 2024-03-22 新疆生产建设兵团建设工程(集团)有限责任公司 Rock mass stress monitoring device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2348895A (en) * 1999-04-14 2000-10-18 James Eric Marianski Compressible roof support
CN201358796Y (en) * 2009-02-12 2009-12-09 王伟竹 High-tenacity full-stroke suspending outward injection type individual hydraulic prop
CN202544869U (en) * 2012-04-17 2012-11-21 泸州市新力液压机械制造有限公司 Combined enhanced individual hydraulic prop
CN203796292U (en) * 2014-05-07 2014-08-27 中国矿业大学(北京) Automatic mining double-stand-column hydraulic beam installation device
CN104879145A (en) * 2015-06-05 2015-09-02 江苏中矿立兴能源科技有限公司 Mechanically-extendable constant-resistance shrinkable high-strength single prop

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU542884B2 (en) * 1980-07-31 1985-03-21 Dipl.Ing. Dr. Mont. Franz Powondra Resilient yieldable device
CN105179402A (en) * 2015-06-05 2015-12-23 江苏中矿立兴能源科技有限公司 Rigid sphere conical face position clamping self-locking device
CN106499421B (en) * 2016-11-03 2019-01-08 中国矿业大学 A kind of mechanical constant-resistance individual prop withdrawing technique and recovery method
CN106285737A (en) * 2016-11-03 2017-01-04 江苏中矿立兴能源科技有限公司 A kind of mechanical compressible individual prop of adjustable constant-resistance
CN106499420B (en) * 2016-11-03 2019-02-15 中国矿业大学 A kind of mechanically high constant-resistance individual prop installation method and erection method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2348895A (en) * 1999-04-14 2000-10-18 James Eric Marianski Compressible roof support
CN201358796Y (en) * 2009-02-12 2009-12-09 王伟竹 High-tenacity full-stroke suspending outward injection type individual hydraulic prop
CN202544869U (en) * 2012-04-17 2012-11-21 泸州市新力液压机械制造有限公司 Combined enhanced individual hydraulic prop
CN203796292U (en) * 2014-05-07 2014-08-27 中国矿业大学(北京) Automatic mining double-stand-column hydraulic beam installation device
CN104879145A (en) * 2015-06-05 2015-09-02 江苏中矿立兴能源科技有限公司 Mechanically-extendable constant-resistance shrinkable high-strength single prop

Also Published As

Publication number Publication date
WO2018086509A1 (en) 2018-05-17
CN106499420A (en) 2017-03-15

Similar Documents

Publication Publication Date Title
CN205301313U (en) A simulation modeling experiment device for sloping or inclined coal seams
CN109183807A (en) Removable bracing members and its construction method
CN103711518A (en) Portable mine filling retaining wall
CN107780955B (en) Controllable grouting reinforcement device for breaking surrounding rock roadway and construction method
CN103216107A (en) Method for installing concrete light board wall and jacking and fixing device
CN106499420B (en) A kind of mechanically high constant-resistance individual prop installation method and erection method
CN103758529A (en) Coal mine gob-side entry retaining side supporting method
CN109322241A (en) Trestle work structure and construction method
CN103982206A (en) Underground engineering roadway yielding support system
CN102121390B (en) Telescopic tunneling immediate support device
CN108049898B (en) Supporting system and supporting method for weak broken roof of coal roadway
CN107060876B (en) Steel pipe concrete pier column gob-side entry retaining active supporting structure and construction method thereof
CN104453964B (en) A kind of telescopic anchor rope truss device and method for back supporting
CN209493940U (en) A kind of roofbolt construction arrangement of architectural engineering
CN102493819B (en) Method for controlling stability of surrounding rocks of laneway in coal seam
CN106761873A (en) It is a kind of for Underground Metallic Mines tunnel Collapsed zone and the method for protecting support of crushed zone
JPH0347305A (en) Repairing of settling of concrete paving board
CN103557007B (en) Cross the construction method of geological anomaly zone soft-rock tunnel smashed to pieces
CN203476218U (en) Drilling machine stabilizing device
CN203769849U (en) Portable mine filling barricade
CN113586140B (en) Arch-shaped grouting device and method
CN213203782U (en) Bridge expansion joint device for bridge
CN104453966A (en) large mining height end-mining fully-mechanized excavating machine manufacturing removing frame channel collapse column passing leg-less supporting erecting construction method
CN209082512U (en) Removable bracing members
CN204112325U (en) A kind of for anchor jacked pile pile pressing device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Jiu Xiexing

Inventor after: Chen Yanlong

Inventor after: Zhang Jixiong

Inventor after: Zhang Qiang

Inventor after: Wu Yu

Inventor after: Deng Xuejie

Inventor before: Chen Yanlong

Inventor before: Zhang Jixiong

Inventor before: Zhang Qiang

Inventor before: Wu Yu

Inventor before: Qiao Ming

Inventor before: Cui Can

Inventor before: Liu Huaping

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170621

Address after: 221000 Jiangsu city of Xuzhou province university Quanshan District Road No. 1

Applicant after: China University of Mining & Technology

Address before: 221000 Xuzhou University Road, Jiangsu, No. 1

Applicant before: China University of Mining & Technology

Applicant before: Jiangsu CMLX Energy Technology Co.,Ltd.

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190215

Termination date: 20191108