CN106498982B - The construction technology of immersed tube sinking and locking backfill - Google Patents

The construction technology of immersed tube sinking and locking backfill Download PDF

Info

Publication number
CN106498982B
CN106498982B CN201611224593.5A CN201611224593A CN106498982B CN 106498982 B CN106498982 B CN 106498982B CN 201611224593 A CN201611224593 A CN 201611224593A CN 106498982 B CN106498982 B CN 106498982B
Authority
CN
China
Prior art keywords
backfill
immersed tube
sinking
hull
locking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611224593.5A
Other languages
Chinese (zh)
Other versions
CN106498982A (en
Inventor
刘德进
冯海暴
苏长玺
国强
马宗田
曲俐俐
李增军
张乃受
冯甲鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201611224593.5A priority Critical patent/CN106498982B/en
Publication of CN106498982A publication Critical patent/CN106498982A/en
Application granted granted Critical
Publication of CN106498982B publication Critical patent/CN106498982B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/063Tunnels submerged into, or built in, open water
    • E02D29/077Tunnels at least partially built beneath the water-bed characterised by being made by methods involving disturbance thereof all along the location line, e.g. by cut-and-cover or caisson methods

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Underground Or Underwater Handling Of Building Materials (AREA)

Abstract

The present invention proposes a kind of immersed tube sinking and locking backfill integrated ship and construction technology, belongs to immersed tube tunnel technical field of construction.The integrated ship includes catamaran, and the catamaran includes the first hull and the second hull disposed in parallel, and the top of first hull and the second hull is connected by deck bridge;To sinking immersed tube between first hull and the second hull, and it is located at below the deck bridge;The sinking equipment for sinking immersed tube is provided between the deck bridge and immersed tube;The backfill conduit of backfill sand is separately provided between first hull and the second hull, at left and right sides of the immersed tube, the backfill conduit is connected to the bottom of the deck bridge vertically, and passes through the deck bridge.The present invention integrates immersed tube sinking and locking backfill, simplifies immersed tube tunnel construction technology, improves construction efficiency.

Description

The construction technology of immersed tube sinking and locking backfill
Technical field
The invention belongs to immersed tube tunnel technical field of construction more particularly to a kind of immersed tube sinking and locking backfill integrated ship and Construction technology.
Background technique
Currently, the main construction method of subaqueous tunnel is prefabricated tube section sinking method, the tunnel for using the method to build is heavy Pipe tunnel.In immersed tube tunnel construction, usually first with sinking equipment and aided positioning system by the accurate sinking of immersed tube to foundation trench In, the position of positioning system locking immersed tube is recycled, sand is backfilled into the foundation trench of immersed tube two sides using backfill equipment, it is heavy to complete The locking of pipe backfills, and makes immersed tube is firm to be installed in foundation trench.However, this existing immersed tube sinking and locking backfilling process, need It will be by positioning at least twice, complicated construction technique;And two sets of equipment of sinking ship and dedicated backfill ship is needed to complete construction, ship Schedule between oceangoing ship is complicated, long construction period, and operating efficiency is low.Therefore, how to simplify immersed tube sinking and locking backfill is applied Work technique, raising construction efficiency are a current technical problems urgently to be solved.
Summary of the invention
The present invention is asked for the above-mentioned existing immersed tube sinking technology low with locking backfill complicated construction technique, construction efficiency Topic proposes a kind of immersed tube sinking and locking backfill integrated ship and construction technology, integrates immersed tube sinking and locking backfill, simplify Immersed tube tunnel construction technology, improves construction efficiency.
In order to achieve the above object, the technical solution adopted by the present invention are as follows:
An aspect of of the present present invention provides a kind of immersed tube sinking and locking backfill integrated ship, including catamaran, the binary Ship includes the first hull and the second hull disposed in parallel, and the top of first hull and the second hull is connected by deck bridge It connects;To sinking immersed tube between first hull and the second hull, and it is located at below the deck bridge;The deck bridge with The sinking equipment for sinking immersed tube is provided between immersed tube;Between first hull and the second hull, a left side for the immersed tube Right two sides are separately provided for the backfill conduit of backfill sand, and the backfill conduit is connected to the bottom of the deck bridge vertically Portion, and pass through the deck bridge.
Preferably, one end that the backfill conduit stretches out above the deck bridge is connected with loading hopper.
Preferably, the length of the backfill conduit is adjustable.
Preferably, the quantity of the backfill conduit is more, the more backfill conduits are distributed in a left side for the immersed tube Right two sides.
Preferably, being provided with the loop wheel machine for installing and removing the backfill conduit on the deck bridge.
Preferably, the sinking equipment includes the hanger rope being connected between the deck bridge and immersed tube, and it is set to Elevating mechanism on the deck bridge, for controlling the hanger rope lifting.
Preferably, being provided with positioning system on the catamaran.
Immersed tube sinking described in any of the above-described technical solution and locking are utilized another aspect provides a kind of Backfill the construction technology that integrated ship carries out immersed tube sinking and locking backfill, comprising the following steps:
Sinking immersed tube: one will be lifted on using the sinking equipment being arranged on integrated ship by positioning system auxiliary positioning The accurate sinking of immersed tube below ship is into foundation trench;
Locking backfill: after sinking immersed tube, at least two haul ship difference berthing are to the left and right sides of integrated ship, by described The conveying equipment carried on haul ship, the backfill conduit conveying sand being arranged on integrated ship, sand draw through the backfill conduit It leads and accurately falls into the foundation trench at left and right sides of the immersed tube, the effect for surveying locking backfill is swept using measuring and controlling equipment, when backfill sand Height meet the requirements after, stop backfill, the haul ship makes a return voyage.
Preferably, further including installing the backfill by the loop wheel machine being arranged on integrated ship before backfilling sand step The step of conduit, further includes the steps that removing the backfill conduit by the loop wheel machine after stopping backfill.
Compared with prior art, the advantages and beneficial effects of the present invention are:
1, immersed tube sinking provided by the invention and locking backfill integrated ship and construction technology, collection immersed tube sinking and locking backfill In one, the sinking of immersed tube can be completed by the sinking equipment of setting and is locked back by the backfill conduit completion of setting It fills out, improves construction efficiency, shorten construction period, reduce construction cost;
2, immersed tube sinking provided by the invention and locking backfill integrated ship and construction technology, it is only necessary to once be positioned, both The sinking and locking backfill construction of achievable immersed tube, are not necessarily to multiple bearing, construction technology is simpler.
Detailed description of the invention
Fig. 1 is the main view of immersed tube sinking provided by the embodiment of the present invention and locking backfill integrated ship;
Fig. 2 is the top view of immersed tube sinking provided by the embodiment of the present invention and locking backfill integrated ship;
Use when Fig. 3 is using immersed tube sinking provided by the embodiment of the present invention and locking backfill integrated ship sinking immersed tube State diagram;
Fig. 4 is use when backfilling sand using immersed tube sinking provided by the embodiment of the present invention and locking backfill integrated ship State diagram;
In above each figure: 1, the first hull;2, the second hull;3, deck bridge;4, immersed tube;5, conduit is backfilled;6, charging leakage Bucket;7, loop wheel machine;8, hanger rope;9, elevating mechanism;10, positioning system;11, foundation trench;12, haul ship;13, conveying equipment.
Specific embodiment
In the following, the present invention is specifically described by illustrative embodiment.It should be appreciated, however, that not into one In the case where step narration, element, structure and features in an embodiment can also be advantageously incorporated into other embodiments In.
In the description of the present invention, it should be noted that the orientation of the instructions such as term "left", "right", "upper", "lower" or Positional relationship is to be merely for convenience of description of the present invention and simplification of the description based on attached positional relationship shown in FIG. 1, rather than indicate Or imply that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore cannot understand For limitation of the present invention.In addition, term " first ", " second " are used for description purposes only, it is not understood to indicate or imply Relative importance.
As shown in Figure 1, the one side of the embodiment of the present invention provides a kind of immersed tube sinking and locking backfill integrated ship, including Catamaran, the catamaran include the first hull 1 disposed in parallel and the second hull 2, the first hull 1 and the second hull 2 it is upper Portion is connected by deck bridge 3;To sinking immersed tube 4 between the first hull 1 and the second hull 2, and it is located under deck bridge 3 Side;The sinking equipment for sinking immersed tube 4 is provided between deck bridge 3 and immersed tube 4;Between first hull 1 and the second hull 2, The left and right sides of immersed tube 4 is separately provided for the backfill conduit 5 of backfill sand, and backfill conduit 5 is connected to deck bridge 3 vertically Bottom, and pass through deck bridge 3.In use, by the sinking equipment can by the accurate sinking of immersed tube 4 into foundation trench, meanwhile, setting The foundation trench of 4 left and right sides of immersed tube is locked naturally in the backfill conduit 5 on the catamaran, positioned at 4 left and right sides of immersed tube, is no longer needed to Sand can accurately be inserted in the foundation trench of 4 left and right sides of immersed tube by the guidance of backfill conduit 5, realize the lock of immersed tube by secondary positioning Fixed backfill.
For the ease of sand is imported in backfill conduit 5, one end of backfill 5 overhanging deck bridge of conduit 3 top be connected with into Funnel 6.By the guidance of loading hopper 6, sand can be directly entered in backfill conduit 5, when can avoid loading sand, due to returning The nozzle for filling out conduit 5 is smaller and the problem of cause sand to be scattered, be conducive to keep the environmental sanitation on catamaran.
In order to guarantee locking backfill accuracy of placement, the length of backfill conduit 5 is set as adjustable.Backfill sand When, its nozzle underwater is made by elongation backfill conduit 5 until avoidable sand is when falling due to water impact at foundation trench Caused drop point offset.Meanwhile the length by adjusting backfill conduit 5, it is applicable to the construction of different water depth.
In order to improve locking backfill efficiency, the quantity of backfill conduit 5 is more, as shown in Fig. 2, backfill conduit 5 is exemplary It is 6,6 backfill conduits 5 are distributed in the left and right sides of immersed tube 4, realize the uniform backfill of 4 left and right sides sand of immersed tube.
Due to backfill conduit 5 installed and removed according to the usage requirement, for the ease of backfill conduit 5 installation with tear open It removes, as shown in Figure 1, being provided with the loop wheel machine 7 for installing and removing backfill conduit 5 on deck bridge 3.When backfilling sand, pass through Loop wheel machine 7 is installed on conduit 5 is backfilled on the catamaran, and removes backfill conduit 5 after backfill, then through loop wheel machine 7, in this way The space of the catamaran can be saved, also can avoid, which leads to backfill due to water impact during navigation conduit 5, damages The problem of.
As shown in Figure 1, the sinking equipment includes the hanger rope 8 being connected between deck bridge 3 and immersed tube 4, and it is set to Elevating mechanism 9 on deck bridge 3, for controlling the lifting of hanger rope 8.The sinking equipment that this hanger rope 8 is matched with elevating mechanism 9, Structure is simple, occupies little space, and easy to operate.It is understood that those skilled in the art can also be using other conjunctions The sinking equipment of reason.
In addition, being additionally provided with positioning system 10 for the ease of positioning on the catamaran, realizing to the real-time of catamaran Positioning positions the sinking of immersed tube more acurrate.
The another aspect of the embodiment of the present invention, which additionally provides, a kind of utilizes immersed tube sinking described in any of the above-described embodiment The construction technology of immersed tube sinking and locking backfill is carried out with locking backfill integrated ship, comprising the following steps:
Sinking immersed tube: one will be lifted on using the sinking equipment being arranged on integrated ship by 10 auxiliary positioning of positioning system The accurate sinking of immersed tube 4 below body ship is into foundation trench 11;
Locking backfill: after sinking immersed tube 4, at least two haul ships 12 distinguish berthing to the left and right sides of integrated ship, pass through The conveying equipment 13 carried on haul ship 12, the backfill conduit 5 being arranged on integrated ship convey sand, and sand is through backfilling conduit 5 Guidance is accurately fallen into the foundation trench 11 of 4 left and right sides of immersed tube, and the effect for surveying locking backfill is swept using measuring and controlling equipment, when backfill sand Height meet the requirements after, stop backfill, haul ship 12 makes a return voyage.
It in a preferred embodiment, further include being installed by the loop wheel machine 7 being arranged on integrated ship before locking refilling step The step of backfilling conduit 5 further includes the steps that removing backfill conduit 5 by loop wheel machine 7 after stopping backfill.In the present embodiment, Backfill conduit 5 is installed and removed according to the needs of use, the space of the catamaran can be saved, also can avoid navigating by water Cause to backfill the problem of conduit 5 damages due to water impact in journey.

Claims (6)

1. immersed tube sinking and locking backfill construction technology, it is characterised in that: using immersed tube sinking and locking backfill integrated ship into Row immersed tube sinking and locking backfill construction;
The immersed tube sinking and locking backfill integrated ship include catamaran, the catamaran include the first hull disposed in parallel and The top of second hull, first hull and the second hull is connected by deck bridge;It is located at described first to sinking immersed tube Between hull and the second hull, and it is located at below the deck bridge;It is heavy for sinking to be provided between the deck bridge and immersed tube The sinking equipment of pipe;It is separately provided for backfilling between first hull and the second hull, at left and right sides of the immersed tube The backfill conduit of sand, the backfill conduit is connected to the bottom of the deck bridge vertically, and passes through the deck bridge;
The construction technology the following steps are included:
Sinking immersed tube: it will be lifted under integrated ship by positioning system auxiliary positioning using the sinking equipment being arranged on integrated ship The accurate sinking of immersed tube of side is into foundation trench;
Locking backfill: after sinking immersed tube, at least two haul ship difference berthing pass through the haul to the left and right sides of integrated ship The conveying equipment carried on ship, the backfill conduit conveying sand being arranged on integrated ship, sand guides quasi- through the backfill conduit It really falls into the foundation trench at left and right sides of the immersed tube, the effect for surveying locking backfill is swept using measuring and controlling equipment, when the height of backfill sand After degree is met the requirements, stop backfill, the haul ship makes a return voyage;
Before backfilling sand, further includes the steps that the backfill conduit is installed by the loop wheel machine being arranged on integrated ship, stopping Further include the steps that removing the backfill conduit by the loop wheel machine after backfill.
2. the construction technology of immersed tube sinking according to claim 1 and locking backfill, it is characterised in that: the backfill conduit The one end stretched out above the deck bridge is connected with loading hopper.
3. the construction technology of immersed tube sinking according to claim 2 and locking backfill, it is characterised in that: the backfill conduit Length be adjustable.
4. the construction technology of immersed tube sinking according to claim 3 and locking backfill, it is characterised in that: the backfill conduit Quantity be more, the more backfill conduits are distributed in the left and right sides of the immersed tube.
5. the construction technology of immersed tube sinking according to claim 1 and locking backfill, it is characterised in that: the sinking equipment Including the hanger rope being connected between the deck bridge and immersed tube, and it is set on the deck bridge, for controlling the hanger rope The elevating mechanism of lifting.
6. the construction technology of immersed tube sinking according to claim 1 and locking backfill, it is characterised in that: on the catamaran It is provided with positioning system.
CN201611224593.5A 2016-12-27 2016-12-27 The construction technology of immersed tube sinking and locking backfill Active CN106498982B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611224593.5A CN106498982B (en) 2016-12-27 2016-12-27 The construction technology of immersed tube sinking and locking backfill

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611224593.5A CN106498982B (en) 2016-12-27 2016-12-27 The construction technology of immersed tube sinking and locking backfill

Publications (2)

Publication Number Publication Date
CN106498982A CN106498982A (en) 2017-03-15
CN106498982B true CN106498982B (en) 2019-06-28

Family

ID=58334225

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611224593.5A Active CN106498982B (en) 2016-12-27 2016-12-27 The construction technology of immersed tube sinking and locking backfill

Country Status (1)

Country Link
CN (1) CN106498982B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107021187A (en) * 2017-04-21 2017-08-08 广船国际有限公司 A kind of working ship and under water thing transportation installation method
CN107032248A (en) * 2017-06-12 2017-08-11 中交航局第二工程有限公司 The sinking system and immersion method of submerged structure component
CN112344096B (en) * 2020-11-13 2022-07-29 中船华南船舶机械有限公司 Construction method of submarine pipeline leveling, laying, locking and burying equipment

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3042184A1 (en) * 1980-11-08 1982-09-30 Friedrich von Essen KG GmbH & Co, 2902 Rastede Packing and laying protective underwater weighting mats - involves variable buoyancy platform slung between catamaran box hulls
CN102642601A (en) * 2012-04-28 2012-08-22 上海利策科技股份有限公司 Movable full-rotation type hoisting catamaran
CN103911999A (en) * 2013-01-08 2014-07-09 中交第一航务工程局有限公司 Material backfilling system
CN204662454U (en) * 2015-02-16 2015-09-23 中交一航局第二工程有限公司 A kind of deep water backfill operation navigation system
CN205242443U (en) * 2015-11-06 2016-05-18 王燏斌 A immersed tube construction equipment for building tunnel
CN105672186A (en) * 2014-11-19 2016-06-15 上海勘测设计研究院有限公司 Deepwater riprapping method and equipment
CN206512748U (en) * 2016-12-27 2017-09-22 中交一航局第二工程有限公司 Immersed tube sinking and locking backfill integrated ship

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3042184A1 (en) * 1980-11-08 1982-09-30 Friedrich von Essen KG GmbH & Co, 2902 Rastede Packing and laying protective underwater weighting mats - involves variable buoyancy platform slung between catamaran box hulls
CN102642601A (en) * 2012-04-28 2012-08-22 上海利策科技股份有限公司 Movable full-rotation type hoisting catamaran
CN103911999A (en) * 2013-01-08 2014-07-09 中交第一航务工程局有限公司 Material backfilling system
CN105672186A (en) * 2014-11-19 2016-06-15 上海勘测设计研究院有限公司 Deepwater riprapping method and equipment
CN204662454U (en) * 2015-02-16 2015-09-23 中交一航局第二工程有限公司 A kind of deep water backfill operation navigation system
CN205242443U (en) * 2015-11-06 2016-05-18 王燏斌 A immersed tube construction equipment for building tunnel
CN206512748U (en) * 2016-12-27 2017-09-22 中交一航局第二工程有限公司 Immersed tube sinking and locking backfill integrated ship

Also Published As

Publication number Publication date
CN106498982A (en) 2017-03-15

Similar Documents

Publication Publication Date Title
CN104652348B (en) Deep-water foundation bed rock throwing system
CN109056684A (en) The split type jacket structure of Large marine platform and its installation method of the installation of support method are floated suitable for shallow sea water
CN106498982B (en) The construction technology of immersed tube sinking and locking backfill
CN106592633B (en) Immersed tube tunnel construction system and construction technology
CN100419164C (en) Method for moving large-scale heavy member to launch and float on water, and member mounting method
CN104480865B (en) A kind of Large Steel open caisson accurate positioning method
CN105804758A (en) Shallow-earthing, large-section and small-distance construction method for rectangular pipe jacking overpass subway tunnel
CN209178967U (en) The split type jacket structure of Large marine platform of support method installation is floated suitable for shallow sea water
CN102268871B (en) Construction method of turnover platform for underwater pile foundation of bridge
CN107763307A (en) A kind of water filling nature immersed tube crosses the installation method of river pipeline
CN109137885A (en) A kind of construction method of underground continuous wall
CN208184738U (en) jacking construction structure
CN206512748U (en) Immersed tube sinking and locking backfill integrated ship
CN104652406B (en) Deep water bedding tamper system
US2693085A (en) Hydraulic submarine ditcher
CN110258443A (en) Bagged sand sand pocket and its preparation process and construction technology
CN204662343U (en) Deep water bedding jackstone system
CN106400807B (en) Extra large work barge grouting method and its equipment
CN102704512B (en) Immersed tube bottom jack type deviation rectifying fine adjusting system and adjusting technology
CN206438538U (en) Immersed tube tunnel construction system
CN206752413U (en) A kind of extra large work barge implement
CN103410181B (en) Burying-before-guiding type step-by-step burying method for monitoring instruments in synchronous construction with loess high fill
CN106400745B (en) A kind of sea work barge operational method and equipment
CN103556640B (en) A kind of pile-sinking method based on shallow sea reclamation area soldier piles
CN109555078A (en) A kind of Gravity Type Casisson Berth and its construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20170421

Address after: 300461 Tianjin Free Trade Zone Yuejin Road shipping service center, building 8

Applicant after: CCCC First Harbor Engineering Co., Ltd.

Applicant after: The Second Engineering Co. of CCCC First Harbor Engineering Co., Ltd.

Address before: 266071 Shandong city of Qingdao province Fuzhou City Road No. 16

Applicant before: The Second Engineering Co. of CCCC First Harbor Engineering Co., Ltd.

Applicant before: CCCC First Harbor Engineering Co., Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant