CN106498972B - A kind of concrete assembled basic and its installation method - Google Patents

A kind of concrete assembled basic and its installation method Download PDF

Info

Publication number
CN106498972B
CN106498972B CN201611228169.8A CN201611228169A CN106498972B CN 106498972 B CN106498972 B CN 106498972B CN 201611228169 A CN201611228169 A CN 201611228169A CN 106498972 B CN106498972 B CN 106498972B
Authority
CN
China
Prior art keywords
chassis
parts
convex block
bottom plate
stand column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611228169.8A
Other languages
Chinese (zh)
Other versions
CN106498972A (en
Inventor
张军
安增军
王庭华
吴雪
王波
卢璐
戴亚
崔厚坤
李伯颐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING ELECTRIC POWER ENGINEERING DESIGN Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
NANJING ELECTRIC POWER ENGINEERING DESIGN Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING ELECTRIC POWER ENGINEERING DESIGN Co Ltd, State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Economic and Technological Research Institute of State Grid Jiangsu Electric Power Co Ltd filed Critical NANJING ELECTRIC POWER ENGINEERING DESIGN Co Ltd
Priority to CN201611228169.8A priority Critical patent/CN106498972B/en
Publication of CN106498972A publication Critical patent/CN106498972A/en
Application granted granted Critical
Publication of CN106498972B publication Critical patent/CN106498972B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/35Foundations formed in frozen ground, e.g. in permafrost soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

The invention discloses a kind of concrete assembled basis and its installation methods.The concrete assembled basis includes chassis, bottom plate and basic stand column;Center chassis is equipped with convex block;Convex block is regular polygon;Bottom plate is two pieces, and side center is equipped with notch;Two pieces of bottom plates mutually splice, and are bolted set on chassis upper end;Two pieces of bottom plate splicing shapes are adapted with chassis, and notch splicing shape is adapted with the convex block on chassis;Basic stand column lower end is hollow cylinder;Basic stand column is placed on by lower end hollow cylinder on the convex block on chassis, and is secured by bolts on bottom plate;The inner circle of hollow cylinder and convex block are circumscribed;Hollow cylinder is equipped with pouring hole, and pouring hole is connected with boring part.The concrete assembled basis of the present invention carries out the positioning of bottom plate and basic stand column using the convex block of center chassis, conveniently while being directed at whole bolts, easier for installation, accurate, avoids the damage to bolt screw thread.

Description

A kind of concrete assembled basic and its installation method
Technical field
The present invention relates to a kind of assembling type bases, and in particular to a kind of concrete assembled basis.
Background technology
Assembling type base is also known as prefabricated foundation, is prefabrication, site-assembled base form.It is than cast-in-place concrete base Plinth saves the labour of 30-50%, shortens the construction period 1/3-1/2, and the quality of basis processing is guaranteed(In factory process condition It is good), construction operation is influenced small by seasonal climate, is conducive to mechanization or semi-mechanization operation, the operation for reducing construction personnel is strong Degree is the developing direction of transmission line foundation construction.
Assembling type base is divided into metal foundation and concrete prefabricated basis by the difference of material.Although metal foundation transport is applied Work is convenient, but its consumption steel material is big.Concrete prefabricated basis, the prefabricated reinforced concrete made of single or multiple parts assemblies Basis.Dispensing, manufacture are unified in concrete prefabricated basis in prefabricated component factory, and processing conditions is good, and quality can ensure, convenient for using New technology, new process reduce raw materials consumption.
Existing concrete prefabricated foundation mostly uses more than one piece combined type for convenient transportation, by chassis, bottom plate and column group At.Chassis is equipped with bolt(Totally 32 bolts), bottom plate be equipped with corresponding bolt hole, connected by bolt between chassis and bottom plate It connects.It needs to use crane lifting when mounted, bottom plate is sitting on chassis after bolt is directed at bolt hole, when alignment is right simultaneously Accurate all bolt and bolt hole, are a time-consuming and laborious job, and bottom plate weight is big, installation personnel may accidentally squeeze Wound is received not, while damage bolt screw thread is also possible to when bottom plate falls.
Simultaneously in permafrost region(Such as Qinghai-Tibet Platean)The construction for carrying out concrete prefabricated basis, since climate warming and engineering are made With permafrost degradation is accelerated, the problems such as exacerbating frost heave, the thaw collapse on transmission line of electricity frozen soil basis, this will seriously affect transmission line of electricity Safe operation.
Invention content
The purpose of the present invention is to solve defect existing in the prior art, a kind of concrete facilitating installation is provided and is filled With formula basis.
In order to achieve the above object, the present invention provides a kind of concrete assembled basis, including chassis, bottom plate and basis are stood Column;Chassis is equipped with more bolts, and bottom plate is equipped with corresponding bolt hole;Wherein, center chassis is equipped with convex block;Convex block is just more Side shape;Bottom plate is two pieces, and side center is equipped with notch;Two pieces of bottom plates mutually splice, and are bolted set on chassis upper end;Two Block bottom plate splicing shape is adapted with chassis, and notch splicing shape is adapted with the convex block on chassis;Basic stand column lower end is hollow Cylinder;Basic stand column is placed on by lower end hollow cylinder on the convex block on chassis, and is secured by bolts on bottom plate;Hollow cylinder Inner circle and convex block it is circumscribed;Hollow cylinder is equipped with pouring hole, and pouring hole is connected with boring part.
Convex block is preferably square;Two pieces of base plate configurations are in the same size.
The height of convex block is 30-50cm;The height of hollow cylinder is 2-3 times of bump height;Basic stand column lower end is sky Heart cylinder, upper end are the frustum of a cone;The height of hollow cylinder and frustum of a cone ratio is 2:1.
Basic stand column upper surface is equipped with foundation bolt;Protection cylinder is cased on foundation bolt;End closure on cylinder is protected, and is protected Froth bed is equipped in cylinder.
Frost-resistant concrete has been poured in the hollow cylinder of basic stand column;Frost-resistant concrete uses the raw material of following weight proportion It prepares:20-50 parts of cement, 5-8 parts of fine sand, 1-3 parts of basaltic broken stone, 2-3 parts of steel fibre, high-efficiency water-reducing agent of poly-carboxylic acid 1- 2 parts, 0.5-1 parts of gelatin, 0.1-0.2 parts of agar;The length of the steel fibre is 1-3mm;The grain size of the basaltic broken stone Size is 10mm-20mm.
Upper frost-resistant concrete preferred raw material weight proportion is:40 parts of cement, 5 parts of fine sand, 2 parts of basaltic broken stone, steel fibre 3 parts, 2 parts of high-efficiency water-reducing agent of poly-carboxylic acid, 0.8 part of gelatin, 0.1 part of agar;The length of steel fibre is 1-3mm;Basaltic broken stone Particle size be 10mm-20mm.
Above-mentioned frost-resistant concrete is prepared by the following method:Gelatin is added into hot water under stirring, waits for completely molten Continue stirring after solution and agar is added, is until completely dissolved cooled to room temperature solution;Then by solution and cement, fine sand, the Black Warrior Rock rubble, steel fibre, high-efficiency water-reducing agent of poly-carboxylic acid are stirred;The weight of hot water is 10-15 times of gelatin weight;The temperature of hot water Degree is 60-90 DEG C.
The present invention also provides the installation methods on above-mentioned concrete assembled basis, include the following steps:It is needing to be arranged Foundation pit is dug out in the position on basis by design requirement, after the tentatively leveling of foundation pit hole bottom, is laid with the rubble of 10cm thickness, compacting is whole It is flat;It is laid with chassis at foundation pit hole bottom, the notch of bottom plate is aligned to the convex block on the chassis, is laid with two pieces of bottom plates successively;Then The hollow cylinder of basic stand column is aligned to the convex block on the chassis, carries out the laying of basic stand column;Chassis, bottom plate and basic stand column It is fixed respectively by bolt;By the pouring hole of basic stand column, internally hollow parts pour frost-resistant concrete;Backfill base Hole.
The present invention has the following advantages compared with prior art:
1, the positioning of bottom plate and basic stand column is carried out using the convex block of center chassis, conveniently while being directed at whole bolts, is pacified It fills more convenient, accurate, avoids the damage to bolt screw thread.
2, basic stand column uses two-part structure, and hypomere uses hollow structure, reduces dead weight, convenience in transport.
3, the intensity and anti-freezing property of assembling type base are improved by pouring frost-resistant concrete inside basic stand column.It is freeze proof Concrete using gelatin and agar as antifreeze, and green pollution-free;High-efficiency water-reducing agent of poly-carboxylic acid is used in combination, can have Effect reduces the frostbite to freeze to concrete;The intensity of concrete is improved using steel fibre;In conjunction with the proportioning of cement and aggregate, into one Step increases the cracking resistance of concrete.
4, foundation bolt is protected using the protection cylinder with froth bed, its damage of outer bound pair can be prevented, it can be with Mitigate the degree of corrosion of foundation bolt.
5, the concrete assembled basis of the present invention, it is simple in structure, facilitate installation;And more than one piece combined type is used, convenience in transport, It is particularly suitable for the transmission line foundation construction of permafrost region.
Description of the drawings
Fig. 1 is the structural schematic diagram on the concrete assembled basis of the present invention;
Fig. 2 is the structural schematic diagram on chassis in Fig. 1;
Fig. 3 is the structural schematic diagram of Fig. 1 bottom plates;
Fig. 4 is the structural schematic diagram of basic stand column in Fig. 1.
In figure, the chassis 1-, 11- convex blocks, 2- bottom plates, 21- notches, 3- basic stand columns, 31- hollow cylinders, the 32- frustums of a cone, 33- pouring holes, 4- protect cylinder.
Specific implementation mode
The present invention is described in detail below in conjunction with the accompanying drawings.
As shown in Figure 1, the concrete assembled basis of the present invention includes chassis 1, the identical bottom plate 2 of two block size shapes and base Plinth column 3.Chassis 1 and basic stand column 3 are fixed by bolt and bottom plate 2 respectively.
In conjunction with Fig. 2 to Fig. 4,1 center of chassis is equipped with square convex block 11.The side center of bottom plate 2 is equipped with notch 21;Two pieces 2 phase of bottom plate is spliced, and the convex block 11 on chassis 1 is stuck in the notch 21 of splicing, and bottom plate 2 and chassis 1 are bolted.Basic stand column 3 include the frustum of a cone 32 of the hollow cylinder 31 and upper end of lower end.Basic stand column 3 is placed on the convex of chassis by lower end hollow cylinder 31 On block, and it is secured by bolts on bottom plate 2.The inner circle of hollow cylinder 31 and convex block are circumscribed.Hollow cylinder is equipped with pouring hole 33, pouring hole 33 is connected with boring part.The height of convex block 11 is 30-50cm;The height of hollow cylinder 31 is convex block 2-3 times of 11 height;The height ratio of hollow cylinder 31 and the frustum of a cone 32 is 2:1.32 upper surface of the frustum of a cone is equipped with foundation bolt, ground It is cased with protection cylinder 4 on foot bolt, protects end closure on cylinder 4, and protect and be equipped with froth bed in cylinder 4.
Frost-resistant concrete has been poured in the hollow cylinder of basic stand column.
Selection experiment is carried out to the formula of frost-resistant concrete:
Frost-resistant concrete a is prepared by the following method:0.5 part of gelatin is added into 5 parts of 90 DEG C of hot water under stirring, Continue stirring until completely dissolved and 0.1 part of agar is added, is until completely dissolved cooled to room temperature solution;Then by solution and 20 Part Portland cement, 5 parts of fine sands, 1 part of basaltic broken stone(Particle size is 10mm-20mm), 2 parts of steel fibres(Length is 1-3mm), 1 part of high-efficiency water-reducing agent of poly-carboxylic acid be stirred to get.
Frost-resistant concrete b is prepared by the following method:Into 15 parts 60 DEG C of hot water, 1 part of addition is bright under stirring Glue continues stirring and 0.2 part of agar is added, is until completely dissolved cooled to room temperature solution until completely dissolved;Then by solution With 50 parts of Portland cements, 8 parts of fine sands, 3 parts of basaltic broken stones(Particle size is 10mm-20mm), 3 parts of steel fibres(It is long Degree is 1-3mm), 2 parts of high-efficiency water-reducing agent of poly-carboxylic acid be stirred to get.
Frost-resistant concrete c is prepared by the following method:Into 10 parts 80 DEG C of hot water, 0.8 part of addition is bright under stirring Glue continues stirring and 0.1 part of agar is added, is until completely dissolved cooled to room temperature solution until completely dissolved;Then by solution With 40 parts of Portland cements, 5 parts of fine sands, 2 parts of basaltic broken stones(Particle size is 10mm-20mm), 3 parts of steel fibres(It is long Degree is 1-3mm), 2 parts of high-efficiency water-reducing agent of poly-carboxylic acid be stirred to get.
It takes above-mentioned frost-resistant concrete to prepare test specimen respectively, is tested for the property, it is as a result as follows.Wherein, freeze thawing resistance experiment is pressed It is measured according to " the freezing method soon " in GB/T 50082-2009, which provides that test specimen reaches the standard of destruction and termination test For:
1,300 cycles are had reached, it can termination test;
2, relative dynamic elastic modulus drop to 60% or less or mass loss rate up to 5%, that is, show that test specimen has been damaged by frost.
1 concrete crushing strength of table compares
2 concrete antifreezing performance of table(Mass loss rate)Comparison
3 concrete antifreezing performance of table(Relative dynamic elastic modulus)Comparison
As can be seen from the above table, the anti-freezing property of each group concrete and compression strength are preferable, with the performance of concrete c It is best.
When carrying out concrete assembled foundation construction of the invention:Needing the position that basis is arranged base is dug out by design requirement Plinth is cheated, and after the tentatively leveling of foundation pit hole bottom, is laid with the rubble of 10cm thickness, compacting leveling;It is laid with chassis 1 at foundation pit hole bottom, The notch 21 of bottom plate 2 is aligned to the convex block 11 on chassis 1, is laid with two pieces of bottom plates 2 successively;Then by the hollow cylinder of basic stand column 3 The convex block 11 on 31 alignment chassis 1, carries out the laying of hollow cylinder and the frustum of a cone successively.Chassis 1, bottom plate 2 and basic stand column 3 are distinguished It is fixed by bolt;By the pouring hole of basic stand column, internally hollow parts pour frost-resistant concrete c;In the frustum of a cone 32 A protection cylinder 4 is respectively put on the foundation bolt of upper surface, and fang bolt is made to be clamped in internal foam layer;Backfill foundation pit.

Claims (8)

1. a kind of concrete assembled basis, including chassis, bottom plate and basic stand column;The chassis is equipped with more bolts, institute It states bottom plate and is equipped with corresponding bolt hole;It is characterized in that:The center chassis is equipped with convex block;The convex block is regular polygon; The bottom plate is two pieces, and side center is equipped with notch;Two pieces of bottom plates mutually splice, and are bolted on the chassis End;Two pieces of bottom plate splicing shapes are adapted with the chassis, and notch splicing shape is adapted with the convex block on the chassis;The base Plinth column lower end is hollow cylinder;The basic stand column is placed on by lower end hollow cylinder on the convex block on the chassis, and is passed through Bolt is fixed on the bottom plate;The inner circle of the hollow cylinder and the convex block are circumscribed;The hollow cylinder is equipped with and pours Hole, the pouring hole are connected with boring part.
2. concrete assembled basis according to claim 1, it is characterised in that:The convex block is square;Described two Block base plate configuration is in the same size.
3. concrete assembled basis according to claim 2, it is characterised in that:The height of the convex block is 30-50cm; The height of the hollow cylinder is 2-3 times of bump height;The basic stand column lower end is hollow cylinder, and upper end is the frustum of a cone; The height of the hollow cylinder and frustum of a cone ratio is 2:1.
4. concrete assembled basis according to claim 3, it is characterised in that:The basic stand column upper surface is equipped with ground Foot bolt;Protection cylinder is cased on the foundation bolt;End closure on the protection cylinder, and protect and be equipped with froth bed in cylinder.
5. concrete assembled basis according to claim 1, it is characterised in that:In the hollow cylinder of the basic stand column Frost-resistant concrete is poured;The frost-resistant concrete is prepared using the raw material of following weight proportion:20-50 parts of cement, fine sand 5-8 parts, 1-3 parts of basaltic broken stone, 2-3 parts of steel fibre, 1-2 parts of high-efficiency water-reducing agent of poly-carboxylic acid, 0.5-1 parts of gelatin, agar 0.1-0.2 parts;The length of the steel fibre is 1-3mm;The particle size of the basaltic broken stone is 10mm-20mm.
6. concrete assembled basis according to claim 5, it is characterised in that:The frost-resistant concrete passes through following heavy It is prepared by the raw material of amount proportioning:40 parts of cement, 5 parts of fine sand, 2 parts of basaltic broken stone, 3 parts of steel fibre, high-efficiency water-reducing agent of poly-carboxylic acid 2 parts, 0.8 part of gelatin, 0.1 part of agar;The length of the steel fibre is 1-3mm;The particle size of the basaltic broken stone is 10mm-20mm。
7. concrete assembled basis according to claim 6, it is characterised in that:The frost-resistant concrete passes through with lower section It is prepared by method:Gelatin is added into hot water under stirring, continues stirring until completely dissolved and agar is added, until completely dissolved Solution is cooled to room temperature;Then by the solution and cement, fine sand, basaltic broken stone, steel fibre, high-efficiency water-reducing agent of poly-carboxylic acid It is stirred;The weight of the hot water is 10-15 times of gelatin weight;The temperature of the hot water is 60-90 DEG C.
8. the installation method on any concrete assembled basis of claim 1 to 7, it is characterised in that:Include the following steps: Foundation pit is dug out by design requirement in the position for needing setting basic, after the tentatively leveling of foundation pit hole bottom, laying 10cm thickness Rubble, compacting leveling;It is laid with chassis at foundation pit hole bottom, the notch of bottom plate is aligned to the convex block on the chassis, is laid with two successively Block bottom plate;Then the hollow cylinder of basic stand column is aligned to the convex block on the chassis, carry out the laying of basic stand column;Chassis, bottom Plate and basic stand column are fixed by bolt respectively;By the pouring hole of basic stand column, internally hollow parts pour freeze proof mix Solidifying soil;Backfill foundation pit.
CN201611228169.8A 2016-12-27 2016-12-27 A kind of concrete assembled basic and its installation method Active CN106498972B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611228169.8A CN106498972B (en) 2016-12-27 2016-12-27 A kind of concrete assembled basic and its installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611228169.8A CN106498972B (en) 2016-12-27 2016-12-27 A kind of concrete assembled basic and its installation method

Publications (2)

Publication Number Publication Date
CN106498972A CN106498972A (en) 2017-03-15
CN106498972B true CN106498972B (en) 2018-11-06

Family

ID=58334110

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611228169.8A Active CN106498972B (en) 2016-12-27 2016-12-27 A kind of concrete assembled basic and its installation method

Country Status (1)

Country Link
CN (1) CN106498972B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677203A (en) * 2016-12-30 2017-05-17 西安建筑科技大学 Prefabricated anchoring base for frozen soil foundation and installation method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202265835U (en) * 2011-10-12 2012-06-06 浙江巨匠钢业有限公司 Assembling base of prefabricated part
JP4999216B1 (en) * 2012-04-10 2012-08-15 株式会社東武防災建設 Basic block for earthquake-proof evacuation room
CN103626449A (en) * 2013-12-16 2014-03-12 天津工业大学 Frost-resisting concrete and preparation method thereof
CN103790158A (en) * 2012-10-26 2014-05-14 上海中技桩业股份有限公司 Square buckle plate mechanical pile splicing method for tubular piles
CN103981886A (en) * 2014-04-10 2014-08-13 浙江和勤通信工程有限公司 Detachable self-stabilization tenon buckle foundation
CN204919588U (en) * 2015-08-14 2015-12-30 中国能源建设集团安徽省电力设计院有限公司 A board -like assembly of cavity round platform basis for frozen soil area transmission line iron tower
US9284744B2 (en) * 2012-08-07 2016-03-15 Oldcastle Precast, Inc. Modular concrete pole base
CN105418010A (en) * 2015-09-01 2016-03-23 深圳海龙建筑制品有限公司 Ultra-high-performance concrete prefabricated component and preparation method thereof
CN205421318U (en) * 2016-03-21 2016-08-03 南京电力工程设计有限公司 Concrete assembled basis
CN206308705U (en) * 2016-12-27 2017-07-07 国网江苏省电力公司经济技术研究院 A kind of concrete assembled basis

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202265835U (en) * 2011-10-12 2012-06-06 浙江巨匠钢业有限公司 Assembling base of prefabricated part
JP4999216B1 (en) * 2012-04-10 2012-08-15 株式会社東武防災建設 Basic block for earthquake-proof evacuation room
US9284744B2 (en) * 2012-08-07 2016-03-15 Oldcastle Precast, Inc. Modular concrete pole base
CN103790158A (en) * 2012-10-26 2014-05-14 上海中技桩业股份有限公司 Square buckle plate mechanical pile splicing method for tubular piles
CN103626449A (en) * 2013-12-16 2014-03-12 天津工业大学 Frost-resisting concrete and preparation method thereof
CN103981886A (en) * 2014-04-10 2014-08-13 浙江和勤通信工程有限公司 Detachable self-stabilization tenon buckle foundation
CN204919588U (en) * 2015-08-14 2015-12-30 中国能源建设集团安徽省电力设计院有限公司 A board -like assembly of cavity round platform basis for frozen soil area transmission line iron tower
CN105418010A (en) * 2015-09-01 2016-03-23 深圳海龙建筑制品有限公司 Ultra-high-performance concrete prefabricated component and preparation method thereof
CN205421318U (en) * 2016-03-21 2016-08-03 南京电力工程设计有限公司 Concrete assembled basis
CN206308705U (en) * 2016-12-27 2017-07-07 国网江苏省电力公司经济技术研究院 A kind of concrete assembled basis

Also Published As

Publication number Publication date
CN106498972A (en) 2017-03-15

Similar Documents

Publication Publication Date Title
CN106284044B (en) A kind of novel steel-concrete combined bridge and its construction method
CN102383418B (en) Anti-seismic prefabricated concrete solid square pile and production method thereof
CN103898831B (en) Prefabricated assembled arch rib of ultrahigh-performance concrete and manufacturing and mounting method thereof
CN102180645B (en) Concrete ingredient and fast hardening concrete
CN111764216A (en) Construction method and application of fabricated concrete road plate
CN104294728A (en) Fabricated type reactive powder concrete prefabricated pavement slab without reinforcing rib and manufacturing method thereof
CN105133487B (en) Construction method for using combined type bridge temporary support to rapidly build continuous beams
CN104452591B (en) A kind of construction of cast-in-situ box-beam technique that is applied to science of bridge building
CN104499498B (en) A kind of construction method of mass concrete building
CN106869503A (en) A kind of concreting method of concrete heat-insulating curtain wall
CN103938767B (en) Trough type energy-saving bearing wall externally wrapped by steel wire mesh mortar plates and foamed concrete
CN107386246B (en) A kind of lock chamber wall Construction Through Form on Traveler method
CN111485716A (en) Application of waste concrete large aggregate in concrete structure construction
CN110820455A (en) Construction process for lapping and expanding roadbed of asphalt concrete highway
CN106498972B (en) A kind of concrete assembled basic and its installation method
CN104612142B (en) Integral abutment bridge structure based on composite flexible piles and construction method thereof
CN204139015U (en) The prefabricated road slab of a kind of assembling RPC unreinforced
CN106320374B (en) A kind of subway station steel pipe column and its construction technology
CN107012756A (en) A kind of scour and abrasion resistant concrete road
CN111502721A (en) Joint roadway concrete joint supporting structure and construction method thereof
CN109139039A (en) A kind of whole structure and construction method with the long trestle of self-propelled of tunnel inverted arch
CN110093948A (en) Variable cross-section Pipe rack and its construction method suitable for rapid construction
CN205035732U (en) Interim support of combined type bridge
CN101343154B (en) Anticlastic supplementary material for pump concrete and method of preparing the same
CN106592815A (en) Manufacturing method of brick wall with high shear resistance and shock resistance

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant