CN106481983B - Urban gate station Gas Pressure Regulating Equipment - Google Patents

Urban gate station Gas Pressure Regulating Equipment Download PDF

Info

Publication number
CN106481983B
CN106481983B CN201610988278.3A CN201610988278A CN106481983B CN 106481983 B CN106481983 B CN 106481983B CN 201610988278 A CN201610988278 A CN 201610988278A CN 106481983 B CN106481983 B CN 106481983B
Authority
CN
China
Prior art keywords
valve
adapter tube
header
blowdown
connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610988278.3A
Other languages
Chinese (zh)
Other versions
CN106481983A (en
Inventor
先东
吴禹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Beichuang Machinery Manufacturing Co., Ltd.
Original Assignee
LESHAN SHANYING MOLD CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LESHAN SHANYING MOLD CO Ltd filed Critical LESHAN SHANYING MOLD CO Ltd
Priority to CN201610988278.3A priority Critical patent/CN106481983B/en
Publication of CN106481983A publication Critical patent/CN106481983A/en
Application granted granted Critical
Publication of CN106481983B publication Critical patent/CN106481983B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D1/00Pipe-line systems
    • F17D1/02Pipe-line systems for gases or vapours
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D3/00Arrangements for supervising or controlling working operations
    • F17D3/01Arrangements for supervising or controlling working operations for controlling, signalling, or supervising the conveyance of a product
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D5/00Protection or supervision of installations
    • F17D5/005Protection or supervision of installations of gas pipelines, e.g. alarm
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D5/00Protection or supervision of installations
    • F17D5/02Preventing, monitoring, or locating loss

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Pipeline Systems (AREA)
  • Control Of Fluid Pressure (AREA)

Abstract

The invention discloses a kind of urban gate station Gas Pressure Regulating Equipments, including following ten systems: 1. filtration, purification systems;2. metering system;3. safety protection facility;4. voltage-regulating system;5. valve;6. heat changes system;7. leakage alarm controller+acoustooptic alarm system;8. pressure inverting system;9. temperature transmitting system;10. data acquire.Urban gate station gas pressure regulating (skid is set); it is the key equipment that Gao Long-distance Transmission Pipeline enters urban pipe network; have the function of purification, metering, pressure regulation, distribution, safeguard protection etc.; gas alarm system, robot control system(RCS), device for adding odor can be configured according to demand, and skid structure type is usually used at regulation door station.It is widely used in: transmission & distribution station, urban gate station, region pressure regulation etc..

Description

Urban gate station Gas Pressure Regulating Equipment
Technical field
The present invention relates to gas pressure regulating field, especially a kind of urban gate station Gas Pressure Regulating Equipment.
Background technique
City gas door station, gas holder station are the important infrastructures of Urban Gas Distribution Networks.Wherein door station is city The gas source point and Gao Long-distance Transmission Pipeline of city's distributing system enter the gas distribution station of pipeline network of fuel gas in city, and task is to receive length The combustion gas that defeated pipeline conveying comes is filtered, after pressure regulation, metering plus smelly, distribution in station, is sent into city transmission and distribution network or straight It picks into large user.And the major function of natural gas high pressure gas holder station is to convey after storing combustion gas, decompression to city gas transmission network Combustion gas.In order to guarantee that gas holder station works normally, high pressure main pipe carrys out gas also needs filtering plus smelly and metering before entering pressure regulator.It is existing Some its functions of urban gate station Gas Pressure Regulating Equipment are limited, in use by many limitations.
Summary of the invention
It is an object of the invention to overcome the deficiencies in the prior art, provide a kind of urban gate station Gas Pressure Regulating Equipment herein, Urban gate station gas pressure regulating (skid is set) is the key equipment that Gao Long-distance Transmission Pipeline enters urban pipe network, has purification, meter The functions such as amount, pressure regulation, distribution, safeguard protection can configure gas alarm system, robot control system(RCS), device for adding odor, pressure regulation according to demand Usually use skid structure type in door station.It is widely used in: transmission & distribution station, urban gate station, region pressure regulation etc..
The invention is realized in this way constructing a kind of urban gate station Gas Pressure Regulating Equipment, it is characterised in that: DN200 air inlet Pipe is connect by DN200 electrical ball valve with header 1, and header 1 is connect by DN150 ball valve with DN150 filter, and filter is followed by Pipe is connect by DN150 ball valve with header 2, and header 2 is connected by taking over before DN150 ball valve and flowmeter,
The corresponding flowmeter rear tube of DN150 turbine flowmeter is connected by taking over before DN150 ball valve and heat exchanger, heat exchange The corresponding heat exchanger rear tube of device is taken over before connecting stop valve by DN150 ball valve, before DN80 quick action emergency valve passes through pressure regulator Adapter tube connection pressure regulator, pressure regulator rear tube connects by DN250 ball valve with header 3, header 3 pass through DN300 electrical ball valve and Escape pipe connection;
DN80 ball valve B is connect with DN80 safety valve B, DN80 safety valve B, air inlet pipe safety valve rear tube, air inlet pipe emptying Bypass adapter tube, DN80 blow valve B, high pressure emptying adapter tube 1 formed connect, DN50 ball valve, header 1 release adapter tube, DN50 blow valve, Header 2 diffuses release adapter tube 2, DN25 after adapter tube 1, flowmeter after diffusing adapter tube, DN25 ball valve B, DN25 blow valve B, flowmeter It is diffused after diffusing adapter tube 2, heat exchanger after release adapter tube 1, heat exchanger after adapter tube, heat exchanger before diffusion valve after safety valve, heat exchanger Release is taken over, is connect before 3 safety valve of header after diffusing adapter tube 4, DN25 blow valve A, DN25 ball valve A, pressure regulation after adapter tube 3, heat exchanger Pipe, DN80 safety valve A, 3 safety valve rear tube of header, header 3 diffuse adapter tube, DN80 blow valve A, DN80 ball valve A, escape pipe are put It dissipates adapter tube, high pressure release adapter tube 2, sub-high pressure blow-down pipe, high pressure emptying adapter tube 3 and forms connection;
Blowdown general pipeline, water route after blowdown connection, filter after blowdown connection 1, blowdown connection A, DN50 blowdown valve, filter Blowdown connection, blowdown connection B, blowdown connection 3,2 blowdown connection of header, blowdown connection 4 form connection;
Heat exchanger blowdown connection, DN50 blowdown valve, blowdown connection 5, blowdown connection 6,3 blowdown connection of header, blowdown connection 7 Form connection;
DN50 shut-off valve, heat exchanger water inlet adapter tube, water inlet pipe 1, water inlet pipe 2, water inlet pipe 3 form connection;
Heat exchanger water outlet pipe, outlet pipe 1, outlet pipe 2, outlet pipe 3 form connection.
Urban gate station gas pressure regulating (skid is set) provided by the design, including following ten systems: 1. filtration, purification systems System;2. metering system;3. safety protection facility;4. voltage-regulating system;5. valve;6. heat changes system: 7. leakage alarm controllers+sound The acquisition of 8. pressure inverting system of light alarm system, 9. temperature transmitting system, 10. data.Equipment is using " single entry, single channel outlet;It crosses Filter, metering, heat exchange, pressure regulation, safety protection facility use double structure.Every road pipeline is designed by 50% flow.Normal work When making, main road pressure regulation, secondary road is spare, if the pressure regulator on main road breaks down, (such as pressure regulator diaphragm damages) causes to export Pressure value increases, and urgent electronic stop valve automatically cuts off air-flow, when outlet pressure is down to secondary road pressure regulator setting pressure, secondary road Pressure regulator starts work automatically, supplies gas to can avoid superpressure, guarantees the continuous safe gas supply that flows down.The device collection: filtering is adjusted Release, metering, heat exchange (temperature automatic control), leakage automatic alarm, pressure show, are warm safely for pressure, superpressure safety cut-off, superpressure Degree display, sound-light alarm, regulator can distinguish automatic start-stop, and can work at the same time;And once faulty cutting all the way, it is another Road should be able to automatically turn on gas supply;When outlet pressure reaches the setting upper limit, it is automatically stopped gas supply, when outlet pressure is lower than under setting Limit automatically turns on gas supply;Guarantee wherein all the way at full capacity start and stop when do not influence other roads and work normally.And has on-site manual and open Dynamic stopping function.Device using single channel into, single outlet, Trouble Report function (superpressure sound-light alarm), and with remote stored program controlled Function.
The present invention has the advantages that urban gate station gas pressure regulating (skid is set), is that Gao Long-distance Transmission Pipeline enters city pipe The key equipment of net has the function of purification, metering, pressure regulation, distribution, safeguard protection etc., can configure gas alarm system according to demand Skid structure type is usually used at system, robot control system(RCS), device for adding odor, regulation door station.It is widely used in: transmission & distribution station, urban gate station, region Pressure regulation etc..
Detailed description of the invention
Fig. 1 is side schematic view of the present invention
Fig. 2 is top view of the present invention
Fig. 3 is Fig. 1 front-end view of the present invention
Fig. 4 is Fig. 1 middle-end schematic diagram of the present invention
Fig. 5 is the rear end Fig. 1 of the present invention schematic diagram
Fig. 6 is Fig. 2 front-end view of the present invention
Fig. 7 is Fig. 2 middle-end schematic diagram of the present invention
Fig. 8 is the rear end Fig. 2 of the present invention schematic diagram
Fig. 9 is A-A position view in Fig. 1
Figure 10 is B-B position view in Fig. 1
Figure 11 is C-C position view in Fig. 1
Figure 12 is D-D position view in Fig. 1
Figure 13 is E-E position view in Fig. 1
Figure 14 is F-F position view in Fig. 1.
Wherein: 1, frame 1,2, air inlet pipe, 3, DN80 ball valve B, 4, DN80 safety valve B, 5, electrical ball valve, 6, air inlet pipe peace Full valve rear tube, 7, air inlet pipe emptying bypass adapter tube, 8, DN80 blow valve B, 9, high pressure emptying adapter tube 1,10, header 1,11, ball Valve, 12, the release adapter tube of header 1,13, blow valve, 14, blowdown connection 1,15, blowdown connection A, 16, blowdown valve, 17, stainless steel pressure Power table, 18, pressure transmitter+Surge Protector, 19, temperature transmitter+Surge Protector, 20, bimetallic thermometer, 21, ball Valve, 22, filter 10um(match difference gauge), 23, filter rear tube, 24,1800 stainless steel needle valves, 25, header 2,26, converge The release adapter tube of pipe 2,27, take over before flowmeter, 28, turbine flowmeter, 29, flowmeter rear tube, 30, DN25 ball valve B, 31, DN25 blow valve B, 32, diffuse after flowmeter diffuse adapter tube 2,34, heat exchanger after adapter tube 1,33, flowmeter before take over, 35, end Valve, 36, heat exchanger water inlet adapter tube, 37, heat exchanger, 38, ball valve, 39, safety valve, 40, heat exchanger water outlet pipe, 41, heat exchanger Rear tube, 42, bimetallic thermometer, 43, temperature transmitter+Surge Protector, 44, safety valve, 45, after heat exchanger before diffusion valve Adapter tube, 46, take over before stop valve, 47, quick action emergency valve+valve position teletransmission, 48, take over before pressure regulator, 49, pressure regulator+heat tracing, 50, pressure regulator rear tube, 51, stainless steel pressure table, 52, pressure transmitter+Surge Protector, 53, DN25 blow valve A, 54, DN25 ball valve A, 55, ball valve, 56, header 3,57, electrical ball valve, 58, escape pipe, 59, DN80 blow valve A, 60, DN80 ball valve A, 61, filter frame, 62, blowdown connection after filter, 63, blowdown general pipeline after filter, 64,2 frame of header, 65, ball valve, 66, metering sled frame 1,67, metering sled frame 2,68, high pressure release adapter tube 2,69, heat exchange prize frame, 70, copper ball valve, 71, into Water pipe 1,72, water inlet pipe 2,73, water route blowdown connection, 74, water inlet pipe 3,75, outlet pipe 1,76, outlet pipe 2,77, outlet pipe 3, 78, heat exchanger blowdown connection, 79, high pressure emptying adapter tube 3,80, pry regulator frame 1,81, pry regulator frame 2,82, sub-high pressure put Blank pipe, 83, outlet sled frame, 84, bimetallic thermometer, 85, temperature transmitter+Surge Protector, 86, pressure transmitter+wave Surge protector, 87, blowdown valve, 88, blowdown connection B, 89, blowdown connection 3,90,2 blowdown connection of header, 91, blowdown connection 4, 92, blowdown connection 5,93, blowdown connection 6,94,3 blowdown connection of header, 95, blowdown connection 7,96, adapter tube 1 is diffused after heat exchanger, 97, it is diffused after diffusing adapter tube 4,100, pressure regulation after release adapter tube 3,99, heat exchanger after release adapter tube 2,98, heat exchanger after heat exchanger Adapter tube, 101, take over before 3 safety valve of header, 102, DN80 safety valve A, 103,3 safety valve rear tube of header, 104, header 3 puts Dissipate adapter tube, 105, escape pipe release adapter tube, 106, explosion-proof wiring box, 107, leakage alarm controller+sound-light alarm.
Specific embodiment
Below in conjunction with attached drawing, the present invention is described in detail, and technical solution in the embodiment of the present invention carries out clear Chu is fully described by, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments. Based on the embodiments of the present invention, obtained by those of ordinary skill in the art without making creative efforts all Other embodiments shall fall within the protection scope of the present invention.
The present invention provides a kind of urban gate station Gas Pressure Regulating Equipment by improving, and implements as follows:
Working procedure is as follows:
When normal ventilation, A, B two-way pipeline are as follows: the road B A: 5 → header of DN200 air inlet pipe 2 → DN200 electrical ball valve 1 10 → DN150 ball valve 21 → DN150 filter 22 → filter rear tube, 23 → DN150 ball valve → header 2 25 → DN150 ball It is connect before 27 → DN150 of adapter tube turbine flowmeter, 28 → flowmeter rear tube, 29 → DN150 ball valve → heat exchanger before valve → flowmeter 46 → DN80 of adapter tube quick action emergency valve 47 before pipe 34 → heat exchanger, 37 → heat exchanger rear tube, 41 → DN150 ball valve → stop valve → 48 → pressure regulator of adapter tube, 49 → pressure regulator rear tube, 50 → DN250 ball valve 55 → header, 3 56 → DN300 electric ball before pressure regulator 57 → escape pipe of valve 58;
Blow-down pipe is as follows: DN80 ball valve B3 → DN80 safety valve B4 → air inlet pipe safety valve 6 → air inlet pipe of rear tube is put Sky bypass 7 → DN80 of adapter tube blow valve B8 → high pressure emptying 19 → DN50 of adapter tube ball valve, 11 → header 1 diffuses 12 → DN50 of adapter tube 13 → header of blow valve 2 diffuse 26 → DN25 of adapter tube ball valve B30 → DN25 blow valve B31 → flowmeter after release adapter tube 1 32 → Adapter tube 1 is diffused after 45 → heat exchanger of adapter tube before diffusion valve after release 2 33 → DN25 of adapter tube, 44 → heat exchanger of safety valve after flowmeter Release 4 99 → DN25 of adapter tube is put after diffusing 3 98 → heat exchanger of adapter tube after release 2 97 → heat exchanger of adapter tube after 96 → heat exchanger Adapter tube 101 → DN80 safety valve A102 before release 100 → header of adapter tube, 3 safety valve after empty valve A53 → DN25 ball valve A54 → pressure regulation 3 103 → header of safety valve rear tube 3 of → header diffuses 104 → DN80 of adapter tube blow valve A59 → DN80 ball valve A60 → escape pipe It diffuses 105 → high pressure of adapter tube release 2 68 → sub-high pressure of adapter tube, 82 → high pressure of blow-down pipe and is vented adapter tube 3 79.
Blowdown pipeline is as follows: blowdown connects after blowdown connection 1 14 → blowdown connection A15 → DN50 16 → filter of blowdown valve 63 → the water route blowdown general pipeline, 73 → blowdown connection of blowdown connection B88 → 3 89 → header of blowdown connection, 2 row after 62 → filter of pipe Dirty adapter tube 90 → blowdown connection, 4 91 → heat exchanger blowdown connection 78 → DN50 blowdown valve 87 → blowdown connection, 5 92 → blowdown connects 6 93 → header of pipe, 3 94 → blowdown connection of blowdown connection 7 95;
Heat exchanger entery and delivery port pipeline is as follows:
1, water inlet pipeline: DN50 35 → heat exchanger of shut-off valve water inlet 36 → water inlet pipe of adapter tube, 1 71 → water inlet pipe 2 72 → Water inlet pipe 3 74;
2, water outlet pipeline: 2 76 → outlet pipe of heat exchanger water outlet pipe 40 → outlet pipe, 1 75 → outlet pipe 3 77.
Control system is as follows:
1, pressure is shown are as follows: 17,24,51;
2, pressure transmission controller are as follows: 18,52,86;
3, temperature display are as follows: 20,42,84;
4, temperature transmission controller are as follows: 19,43,85;
5, explosion-proof wiring box are as follows: 106;
6, leakage alarm controller+sound-light alarm are as follows: 107.
It uses:
1, clean associated pipeline must be purged using preceding.
2, all to pass through acceptance(check), the pry regulator to put into operation should all reach requirement, and periodically be tieed up
Shield maintenance operation.
3, never Quick open valve door, equipment in violent valve opening gate pole pry regulator easy to damage;
4, it never is filled with excess pressure to outlet conduit, otherwise can damages pry regulator inner body.
5, setting pressure should follow principle from high to low, by one Xiang Jinhang of step 1 item, can not grasp
It is too urgent.
6, after pressure setting, it need to be detected and close pressure, verify its performance, if reach required value.
7, pressure setting can open outlet valve after meeting the requirements, and must not open outlet before this
Valve, to prevent unexpected generation.
8, in debugging process, No Open Flames, prevents electrostatic from generating, forbid collision, tap pipeline and
Equipment.
9, precision instrument should be noted that protection, big to prevent pressure oscillation, damage instrument.
10, when heat exchanger heats, this group of heater power source can only be used, the power supply of two groups of heaters cannot be opened simultaneously, With the power supply of burnout-proof heater.
11, the reset operation of stop valve:
(1) stop valve must carry out manual reset operation after performing cutoff action in the duct.
(2) cutting reason should be found out before carrying out reset operation, is the failure of compression shock or pressure regulator in pipe network, arranged Rear can be reset operation out.
(3) when carrying out stop valve reset operation, it is necessary to close the disengaging valve and outlet pressures table of regulator Under needle valve.
(4) imported valve is slowly opened, outlet pressure is observed, pressure normally opens outlet valve afterwards.
Maintenance:
1, according to the filter core of the fine or not periodic cleaning high pressure filter of makings, periodical blowdown processing is done.
2, the heat transferring medium in heat exchanger must be anti-icing fluid, and the model of anti-icing fluid is depending on the local lowest temperature.When Minimum more than anti-icing fluid to use temperature, anti-icing fluid need to be put only, replace anti-icing fluid by (freezing point is at -40 DEG C).
3, when maintenance activity, power supply should be closed, need to first confirm that surrounding is detained without gas leakage or combustion gas.
4, when piping need to remove, internal gas should be emptied in advance.
5, when carrying out electrical repair and replacement electric fittings, it is necessary to be initially switched off power supply.
6, gas displacement should be re-started after repairing, and carries out the every of pry regulator restarting and prepares, details are such as Under:
(1) airtight experiment: check that each interface, flange etc. have No leakage with suds.
(2) start pry regulator by gas supply program.
7, clean inside pressure regulator, when in gas medium containing relatively heavy dirt, should periodically to pressure regulator internal maintenance, Cleaning periodically should be checked or be replaced to the rubber parts of easy swelling or aging, such as gasket seal, with guarantee safe way and Normal use.
The urban gate station gas pressure regulating (skid is set) that this secondary design provides, including following ten systems: 1. filtration, purification systems System;2. metering system;3. safety protection facility;4. voltage-regulating system;5. valve;6. heat changes system: 7. leakage alarm controllers+sound The acquisition of 8. pressure inverting system of light alarm system, 9. temperature transmitting system, 10. data.Equipment is using " single entry, single channel outlet;It crosses Filter, metering, heat exchange, pressure regulation, safety protection facility use double structure.Every road pipeline is designed by 50% flow.Normal work When making, main road pressure regulation, secondary road is spare, if the pressure regulator on main road breaks down, (such as pressure regulator diaphragm damages) causes to export Pressure value increases, and urgent electronic stop valve automatically cuts off air-flow, when outlet pressure is down to secondary road pressure regulator setting pressure, secondary road Pressure regulator starts work automatically, supplies gas to can avoid superpressure, guarantees the continuous safe gas supply that flows down.The device collection: filtering is adjusted Release, metering, heat exchange (temperature automatic control), leakage automatic alarm, pressure show, are warm safely for pressure, superpressure safety cut-off, superpressure Degree display, sound-light alarm, regulator can distinguish automatic start-stop, and can work at the same time;And once faulty cutting all the way, it is another Road should be able to automatically turn on gas supply;When outlet pressure reaches the setting upper limit, it is automatically stopped gas supply, when outlet pressure is lower than under setting Limit automatically turns on gas supply;Guarantee wherein all the way at full capacity start and stop when do not influence other roads and work normally.And has on-site manual and open Dynamic stopping function.Device using single channel into, single outlet, Trouble Report function (superpressure sound-light alarm), and with remote stored program controlled Function.
Feature:
1. Applicable media: natural gas, compressed natural gas body, liquefied petroleum, artificial coal gas and corrosion-free gas
2. being suitable for: transmission & distribution station, urban gate station, region pressure regulation etc.
3. operating system is simple, on-line maintenance is convenient, can be unattended
4. compact-sized, reliable performance, the precision of voltage regulation are high, low noise
5. layout and configuration are reasonable, meet safety and environmental protection requirement
6. have filtering, pressure regulation, metering, superpressure Safety relief valve, limiting pressure closing valve, overpressure alarm monitoring, leakage alarm, Acoustooptic alarm system, heat-exchange system, pressure inverting system, temperature transmitting system, operation control system, the using and the reserved skid are in one Body.
7. data acquire: collection site pressure, temperature, differential pressure, flow, Gas Components, equipment running status as needed Etc. parameters.
8. use scope: this operating instruction is only applicable to urban gate station gas pressure regulating skid and sets that (highest inlet pressure is The ranges such as installation, debugging, use, current check, maintenance and disassembly 2.5-3.6MPa).
Three, major parameter:
1. import: DN200;Export DN300
2. inlet pressure P1: 2.5~3.6Mpa
3. outlet pressure P2: 1.2Mpa;
4. excess pressure cutout pressure: 3.8Mpa
5. superpressure diffuses pressure are as follows: 1.4Mpa
6. flow are as follows: 40000Nm3/h
7. heat-exchange temperature are as follows: 70~80 DEG C
8. filtering accuracy: 10um
9. measuring grade are as follows: business level-one
10. power load: 65KW
11. single channel ability: 20000Nm3/h
12. operating temperature: -20 DEG C -60 DEG C
13. ambient humidity: annual relative humidity 75%
14. explosive-proof grade: II BT4 of Exd
15. earthquake intensity: setting up defences by 8 degree
16. data acquire: collection site pressure, temperature, differential pressure, flow, Gas Components, equipment running status as needed Etc. parameters.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.

Claims (1)

1. a kind of urban gate station Gas Pressure Regulating Equipment, it is characterised in that: DN200 air inlet pipe (2) passes through DN200 electrical ball valve (5) It is connect with header 1(10), header 1(10) it is connect by DN150 ball valve (21) with DN150 filter (22), filter rear tube (23) it is connect by DN150 ball valve with header 2(25), header 2(25) connected by adapter tube (27) before DN150 ball valve and flowmeter It connects,
The corresponding flowmeter rear tube (29) of DN150 turbine flowmeter (28) is by taking over (34) before DN150 ball valve and heat exchanger Connection, the corresponding heat exchanger rear tube (41) of heat exchanger (37) take over (46) before connecting stop valve by DN150 ball valve, DN80 Quick action emergency valve (47) passes through adapter tube (48) connection pressure regulator (49) before pressure regulator, and pressure regulator rear tube (50) passes through DN250 ball Valve (55) is connect, header 3(56 with header 3(56)) it is connect by DN300 electrical ball valve (57) with escape pipe (58);
DN80 ball valve B(3) connect with DN80 safety valve B(4), DN80 safety valve B(4), air inlet pipe safety valve rear tube (6), Air inlet pipe emptying bypass adapter tube (7), DN80 blow valve B(8), high pressure be vented adapter tube 1(9) formed connect, DN50 ball valve (11), Header 1 release adapter tube (12), DN50 blow valve (13), header 2 release adapter tube (26), DN25 ball valve B(30), DN25 blow valve B (31), adapter tube 1(32 is diffused after flowmeter), release adapter tube 2(33 after flowmeter), DN25 safety valve (44), diffuse after heat exchanger (45) are taken over before valve, diffuse adapter tube 1 (96), heat exchanger after heat exchanger after diffuse adapter tube 2(97), release adapter tube 3 after heat exchanger (98), adapter tube 4(99 is diffused after heat exchanger), DN25 blow valve A(53), DN25 ball valve A(54), release is taken over after pressure regulation (100), (101), DN80 safety valve A(102 are taken over before 3 safety valve of header), 3 safety valve rear tube (103) of header, header 3 put Dissipate adapter tube (104), DN80 blow valve A(59), DN80 ball valve A(60), escape pipe release adapter tube (105), high pressure diffuse adapter tube 2 (68), sub-high pressure blow-down pipe (82), high pressure are vented adapter tube 3(79) form connection;
Blowdown connection 1(14), blowdown connection A(15), DN50 blowdown valve (16), after filter after blowdown connection (62), filter Blowdown general pipeline (63), water route blowdown connection (73), blowdown connection B(88), blowdown connection 3(89), 2 blowdown connection of header (90), Blowdown connection 4(91) form connection;
Heat exchanger blowdown connection (78), DN50 blowdown valve (87), blowdown connection 5(92), blowdown connection 6(93), 3 blowdown of header connects Manage (94), blowdown connection 7(95) form connection;
DN50 shut-off valve (35), heat exchanger water inlet adapter tube (36), water inlet pipe 1(71), water inlet pipe 2(72), water inlet pipe 3(74) formed Connection;
Heat exchanger water outlet pipe (40), outlet pipe 1(75), outlet pipe 2(76), outlet pipe 3(77) formed connection.
CN201610988278.3A 2016-11-10 2016-11-10 Urban gate station Gas Pressure Regulating Equipment Active CN106481983B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610988278.3A CN106481983B (en) 2016-11-10 2016-11-10 Urban gate station Gas Pressure Regulating Equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610988278.3A CN106481983B (en) 2016-11-10 2016-11-10 Urban gate station Gas Pressure Regulating Equipment

Publications (2)

Publication Number Publication Date
CN106481983A CN106481983A (en) 2017-03-08
CN106481983B true CN106481983B (en) 2019-03-08

Family

ID=58272502

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610988278.3A Active CN106481983B (en) 2016-11-10 2016-11-10 Urban gate station Gas Pressure Regulating Equipment

Country Status (1)

Country Link
CN (1) CN106481983B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106402656A (en) * 2016-11-21 2017-02-15 乐山倍创机械制造有限公司 Fuel gas pressure regulating device of urban gate station
US9897259B1 (en) * 2017-04-18 2018-02-20 Air Products And Chemicals, Inc. Control system in a gas pipeline network to satisfy pressure constraints
CN112393122B (en) * 2020-10-30 2022-05-10 盐城新奥燃气有限公司 Natural valve station control system of urban gas pipe network

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202012742U (en) * 2011-01-17 2011-10-19 上海万事红燃气技术发展有限公司 Compressed natural gas multi-stage temperature and pressure adjusting device
CN202338775U (en) * 2011-11-03 2012-07-18 中国石油天然气股份有限公司 Online blowdown device of high-pressure natural gas pipeline
CN204328479U (en) * 2014-11-20 2015-05-13 天津华迈燃气装备股份有限公司 A kind of Gas Pressure Regulating Equipment adopting the uninterrupted air feed of monitoring guarantee in parallel
CN205402242U (en) * 2016-03-08 2016-07-27 沧州市天龙燃烧设备有限公司 Compressed natural gas pressure regulator
CN105822902A (en) * 2016-06-01 2016-08-03 乐山市山鹰模具有限责任公司 CNG gas device
CN206176038U (en) * 2016-11-10 2017-05-17 乐山市山鹰模具有限责任公司 City door station gas pressure regulating device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016084923A (en) * 2014-10-29 2016-05-19 株式会社Ihi Gas supply facility

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202012742U (en) * 2011-01-17 2011-10-19 上海万事红燃气技术发展有限公司 Compressed natural gas multi-stage temperature and pressure adjusting device
CN202338775U (en) * 2011-11-03 2012-07-18 中国石油天然气股份有限公司 Online blowdown device of high-pressure natural gas pipeline
CN204328479U (en) * 2014-11-20 2015-05-13 天津华迈燃气装备股份有限公司 A kind of Gas Pressure Regulating Equipment adopting the uninterrupted air feed of monitoring guarantee in parallel
CN205402242U (en) * 2016-03-08 2016-07-27 沧州市天龙燃烧设备有限公司 Compressed natural gas pressure regulator
CN105822902A (en) * 2016-06-01 2016-08-03 乐山市山鹰模具有限责任公司 CNG gas device
CN206176038U (en) * 2016-11-10 2017-05-17 乐山市山鹰模具有限责任公司 City door station gas pressure regulating device

Also Published As

Publication number Publication date
CN106481983A (en) 2017-03-08

Similar Documents

Publication Publication Date Title
CN106481983B (en) Urban gate station Gas Pressure Regulating Equipment
CN106838605B (en) A kind of process and device for LNG receiving stations BOG systems
RU93928U1 (en) UNIT OF FUEL GAS PREPARATION UNIT
CN103915124B (en) Nuclear power station conventional island demineralized water distribution system full cut-off repair method
CN106402656A (en) Fuel gas pressure regulating device of urban gate station
CN105822902A (en) CNG gas device
CN109340570B (en) Skid-mounted oil-gas mixing and conveying device
CN212819205U (en) Hydrogen energy source utilization gas mixing system
CN205560284U (en) Continuous pressure regulating system of liquefied natural gas
CN202673797U (en) Seal flush monitoring device for high-temperature pump
CN209014221U (en) Pipeline pressure testing device
CN206176038U (en) City door station gas pressure regulating device
CN202756726U (en) Gas-liquid linkage cut-off valve control system on oil-gas conveying pipeline
CN201206254Y (en) Prepressing type non-negative-pressure water-supply installation
CN215807901U (en) Gas pressure regulating device with maintenance bypass
CN215522886U (en) Natural gas pressure regulating station for supplying gas to supercritical circulating fluidized bed boiler
RU2224944C1 (en) Gas-distribution station and usage of pressure differential in reducing unit of gas-distribution station
CN209841751U (en) Online real-time detection device for water dew point of gas pipeline
CN204142446U (en) A kind of engine general assembly line seal checks hydraulic system
CN209927761U (en) Online real-time detection device for hydrocarbon dew point of gas pipeline
CN210511034U (en) CNG gas storage well CNG recovery system
CN217635102U (en) Safe pressure regulating measurement cabinet suitable for industrial enterprise
CN106989276B (en) A kind of on-line automatic method for discharging pollution of gas pipeline yard
CN204852939U (en) Natural gas is automatic with smelly system
CN112815223A (en) On-line oil filtering equipment emergency cut-off protection device based on sensor

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200108

Address after: 614000 Sichuan Province, Leshan City District Su Ji Zhen Su Road No. 25

Patentee after: Sichuan Beichuang Machinery Manufacturing Co., Ltd.

Address before: 614000 Sichuan high tech Zone in Leshan City, the New South Road No. 8 Science Park

Patentee before: Leshan Shanying Mold Co., Ltd.

TR01 Transfer of patent right