CN106481983A - Urban gate station Gas Pressure Regulating Equipment - Google Patents

Urban gate station Gas Pressure Regulating Equipment Download PDF

Info

Publication number
CN106481983A
CN106481983A CN201610988278.3A CN201610988278A CN106481983A CN 106481983 A CN106481983 A CN 106481983A CN 201610988278 A CN201610988278 A CN 201610988278A CN 106481983 A CN106481983 A CN 106481983A
Authority
CN
China
Prior art keywords
valve
adapter
connection
header
blowdown
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610988278.3A
Other languages
Chinese (zh)
Other versions
CN106481983B (en
Inventor
先东
吴禹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Beichuang Machinery Manufacturing Co., Ltd.
Original Assignee
LESHAN SHANYING MOLD CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LESHAN SHANYING MOLD CO Ltd filed Critical LESHAN SHANYING MOLD CO Ltd
Priority to CN201610988278.3A priority Critical patent/CN106481983B/en
Publication of CN106481983A publication Critical patent/CN106481983A/en
Application granted granted Critical
Publication of CN106481983B publication Critical patent/CN106481983B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D1/00Pipe-line systems
    • F17D1/02Pipe-line systems for gases or vapours
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D3/00Arrangements for supervising or controlling working operations
    • F17D3/01Arrangements for supervising or controlling working operations for controlling, signalling, or supervising the conveyance of a product
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D5/00Protection or supervision of installations
    • F17D5/005Protection or supervision of installations of gas pipelines, e.g. alarm
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D5/00Protection or supervision of installations
    • F17D5/02Preventing, monitoring, or locating loss

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Pipeline Systems (AREA)
  • Control Of Fluid Pressure (AREA)

Abstract

The invention discloses a kind of urban gate station Gas Pressure Regulating Equipment, including following ten systems:1. filtration, purification system;2. metering system;3. safety protection facility;4. voltage-regulating system;5. valve;6. heat changes system;7. leakage alarm controller+acoustooptic alarm system;8. pressure inverting system;9. temperature transmitting system;10. data acquisition.Urban gate station gas pressure regulating(Skid is put), it is the key equipment of Gao Long-distance Transmission Pipeline entrance urban pipe network, with functions such as purification, metering, pressure regulation, distribution, safeguard protections, gas alarm system, robot control system(RCS), device for adding odor can be configured according to demand, skid version is generally used at regulation door station.It is widely used in:Transmission & distribution station, urban gate station, region pressure regulation etc..

Description

Urban gate station Gas Pressure Regulating Equipment
Technical field
The present invention relates to gas pressure regulating field, especially a kind of urban gate station Gas Pressure Regulating Equipment.
Background technology
City gas door station, gas holder station are the important infrastructures of Urban Gas Distribution Networks.Wherein door station is city The gas source point of city's distributing system, and the gas distribution station of Gao Long-distance Transmission Pipeline entrance pipeline network of fuel gas in city, its task is to receive length The combustion gas that defeated pipelined is come, carry out filtering in station, pressure regulation, metering, plus smelly, distribution after, send into city transmission and distribution network or directly Pick into large user.And the major function of natural gas high pressure gas holder station is storage combustion gas, the backward city gas transmission network conveying of decompression Combustion gas.In order to ensure gas holder station normal work, higher pressure main carrys out gas also to be needed before pressure regulator is entered to filter, adds smelly and metering.Existing Some its functions of urban gate station Gas Pressure Regulating Equipment are limited, are subject to many limitation in use.
Content of the invention
It is an object of the invention to overcoming the deficiencies in the prior art, here provides a kind of urban gate station Gas Pressure Regulating Equipment, Urban gate station gas pressure regulating(Skid is put), it is the key equipment of Gao Long-distance Transmission Pipeline entrance urban pipe network, with purification, meter The functions such as amount, pressure regulation, distribution, safeguard protection, can configure gas alarm system, robot control system(RCS), device for adding odor, pressure regulation according to demand Skid version is generally used in door station.It is widely used in:Transmission & distribution station, urban gate station, region pressure regulation etc..
The present invention is achieved in that a kind of urban gate station Gas Pressure Regulating Equipment of construction, it is characterised in that:DN200 air inlet Pipe is connected with header 1 by DN200 electrical ball valve, and header 1 is connected with DN150 filter by DN150 ball valve, and filter is followed by Pipe is connected with header 2 by DN150 ball valve, and header 2 is connected with adapter before flowmeter by DN150 ball valve,
The corresponding flowmeter rear tube of DN150 turbine flowmeter is connected with adapter before heat exchanger by DN150 ball valve, heat exchanger pair The heat exchanger rear tube that answers is connected before stop valve by DN150 ball valve to be taken over, and DN80 quick action emergency valve is by connecing before pressure regulator Pipe connects pressure regulator, and pressure regulator rear tube is connected with header 3 by DN250 ball valve, and header 3 passes through DN300 electrical ball valve and goes out Tracheae connects;
DN80 ball valve is connected with DN80 safety valve, and DN80 safety valve, air inlet pipe safety valve rear tube, air inlet pipe emptying bypass connect Pipe, the emptying adapter 1 of DN80 atmospheric valve, high pressure form connection, and DN50 ball valve, header 1 diffuse adapter, DN50 atmospheric valve, header 2 Diffuse adapter, DN25 ball valve, DN25 atmospheric valve, diffuse adapter 1, flowmeter after flowmeter after diffuse adapter 2, DN25 safety valve, Adapter before diffusion valve after heat exchanger, diffuse adapter 1, heat exchanger after heat exchanger after diffuse adapter 2, heat exchanger after diffuse adapter 3, change Diffuse after hot device adapter 4, DN25 atmospheric valve, DN25 ball valve, diffuse adapter after pressure regulation, adapter, DN80 safety before 3 safety valve of header Valve, 3 safety valve rear tube of header, header 3 diffuse adapter, DN80 atmospheric valve, DN80 ball valve, escape pipe and diffuse adapter, height and press Dissipate adapter 2, sub-high pressure blow-down pipe, the high pressure emptying formation connection of adapter 3;
Blowdown connection 1, blowdown connection 2, DN50 blowoff valve, blowdown connection after filter, blowdown main, water route blowdown after filter Adapter, blowdown connection 2, blowdown connection 3,2 blowdown connection of header, blowdown connection 4 form connection;
Heat exchanger blowdown connection, DN50 blowoff valve, blowdown connection 5, blowdown connection 6,3 blowdown connection of header, blowdown connection 7 are formed Connection;
DN50 stop valve, heat exchanger water inlet adapter, water inlet pipe 1, water inlet pipe 2, water inlet pipe 3 form connection;
Heat exchanger water outlet pipe, outlet pipe 1, outlet pipe 2, outlet pipe 3 form connection.
The urban gate station gas pressure regulating provided by the design(Skid is put), including following ten systems:1. filtration, purification system System;2. metering system;3. safety protection facility;4. voltage-regulating system;5. valve;6. heat changes system:7. leakage alarm controller+sound 8. pressure inverting system of light alarm system, 9. temperature transmitting system, 10. data acquisition.Equipment is using " single entry, single channel export;Cross Filter, metering, heat exchange, pressure regulation, safety protection facility adopt double structure.All it is designed by 50% flow per road pipeline.Normal work When making, main road pressure regulation, secondary road are standby, if the pressure regulator on main road breaks down(Such as pressure regulator diaphragm damage etc.)Cause outlet Pressure value is raised, and promptly electronic stop valve automatically cuts off air-flow, when outlet pressure is down to secondary road pressure regulator and sets pressure, secondary road Pressure regulator automatic works, so as to superpressure can be avoided to supply gas, it is ensured that dirty continuous safe supply.The device collection:Filter, adjust Pressure, superpressure safety cut-off, superpressure are diffused safely, are measured, heat exchange(Temperature automatic control), leakage automatic alarm, pressure show, temperature Degree display, sound and light alarm, regulator can be distinguished automatic start-stop, and can work simultaneously;And once the faulty cut-out in a road, another Road should be able to automatically turn on supply;When outlet pressure reaches the setting upper limit, supply is automatically stopped, under outlet pressure is less than setting Limit, automatically turns on supply;Ensure a wherein road at full capacity start and stop when do not affect other road normal works.And possess on-site manual and open Dynamic stopping function.Device is entered using single channel, single outlet, Trouble Report function(Superpressure sound and light alarm), and carry remote stored program controlled Function.
It is an advantage of the current invention that:Urban gate station gas pressure regulating(Skid is put), it is that Gao Long-distance Transmission Pipeline enters city pipe The key equipment of net, with functions such as purification, metering, pressure regulation, distribution, safeguard protections, can configure gas alarm system according to demand System, robot control system(RCS), device for adding odor, regulation door station generally use skid version.It is widely used in:Transmission & distribution station, urban gate station, region Pressure regulation etc..
Description of the drawings
Fig. 1 is side schematic view of the present invention
Fig. 2 is top view of the present invention
Fig. 3 is Fig. 1 front-end view of the present invention
Fig. 4 is Fig. 1 middle-end schematic diagram of the present invention
Fig. 5 is Fig. 1 rear end of the present invention schematic diagram
Fig. 6 is Fig. 2 front-end view of the present invention
Fig. 7 is Fig. 2 middle-end schematic diagram of the present invention
Fig. 8 is Fig. 2 rear end of the present invention schematic diagram
Fig. 9 is A-A position view in Fig. 1
Figure 10 is B-B position view in Fig. 1
Figure 11 is C-C position view in Fig. 1
Figure 12 is D-D position view in Fig. 1
Figure 13 is E-E position view in Fig. 1
Figure 14 is F-F position view in Fig. 1.
Wherein:1st, framework 1,2, air inlet pipe, 3, ball valve, 4, safety valve, 5, electrical ball valve, 6, air inlet pipe safety valve is followed by Pipe, 7, air inlet pipe emptying bypass adapter, 8, atmospheric valve, 9, high pressure emptying adapter 1,10, header 1,11, ball valve, 12, header 1 puts Dissipate adapter, 13, atmospheric valve, 14, blowdown connection 1,15, blowdown connection 2,16, blowoff valve, 17, stainless steel pressure table, 18, pressure Transmitter+Surge Protector, 19, temperature transmitter+Surge Protector, 20, bimetallic thermometer, 21, ball valve, 22, filter 10um(Join difference gauge), 23, filter rear tube, 24,1800 stainless steel needle valves, 25, header 2,26, header 2 diffuse adapter, 27th, take over before flowmeter, 28, turbine flowmeter, 29, flowmeter rear tube, 30, ball valve, 31, atmospheric valve, 32, put after flowmeter Diffuse after dissipating adapter 1,33, flowmeter before adapter 2,34, heat exchanger and take over, 35, stop valve, 36, heat exchanger water inlet take over, 37, Heat exchanger, 38, ball valve, 39, safety valve, 40, heat exchanger water outlet pipe, 41, heat exchanger rear tube, 42, bimetallic thermometer, 43rd, temperature transmitter+Surge Protector, 44, safety valve, 45, take over before diffusion valve after heat exchanger, 46, take over before stop valve, 47th, quick action emergency valve+valve position teletransmission, 48, take over before pressure regulator, 49, pressure regulator+heat tracing, 50, pressure regulator rear tube, 51, stainless Steel pressure gauge, 52, pressure transmitter+Surge Protector, 53, atmospheric valve, 54, ball valve, 55, ball valve, 56, header 3,57, electronic Ball valve, 58, escape pipe, 59, atmospheric valve, 60, ball valve, 61, filter frame, 62, blowdown connection after filter, 63, filter Blowdown main afterwards, 64,2 framework of header, 65, ball valve, 66, metering sled framework 1,67, metering sled framework 2,68, high pressure diffuse adapter 2,69, heat exchange sled framework, 70, copper ball valve, 71, water inlet pipe 1,72, water inlet pipe 2,73, water route blowdown connection, 74, water inlet pipe 3, 75th, outlet pipe 1,76, outlet pipe 2,77, outlet pipe 3,78, heat exchanger blowdown connection, 79, high pressure emptying adapter 3,80, pry regulator Framework 1,81, pry regulator framework 2,82, sub-high pressure blow-down pipe, 83, sled framework of giving vent to anger, 84, bimetallic thermometer, 85, temperature becomes Send device+Surge Protector, 86, pressure transmitter+Surge Protector, 87, blowoff valve, 88, blowdown connection 2,89, blowdown connection 3, 90th, 2 blowdown connection of header, 91, blowdown connection 4,92, blowdown connection 5,93, blowdown connection 6,94,3 blowdown connection of header, 95, Diffuse after diffusing adapter 2,98, heat exchanger after diffusing adapter 1,97, heat exchanger after blowdown connection 7,96, heat exchanger adapter 3,99, Diffuse after adapter 4,100, pressure regulation is diffused after heat exchanger adapter, 101, take over before 3 safety valve of header, 102, safety valve, 103, converge 3 safety valve rear tube of pipe, 104, header 3 diffuse adapter, 105, escape pipe diffuse adapter, 106, explosion-proof wiring box, 107, leakage Alarm controller+sound and light alarm.
Specific embodiment
Below in conjunction with accompanying drawing, the present invention is described in detail, and the technical scheme in the embodiment of the present invention is carried out clearly Chu, it is fully described by, it is clear that described embodiment is only a part of embodiment of the present invention, rather than whole embodiments. Based on the embodiment in the present invention, it is all that those of ordinary skill in the art are obtained under the premise of creative work is not made Other embodiment, belongs to the scope of protection of the invention.
The present invention provides a kind of urban gate station Gas Pressure Regulating Equipment by improving, and implements as follows:
Working procedure is as follows:
During normal ventilation, A, B two-way pipeline is as follows:A, B road:5 → header of DN200 air inlet pipe 2 → DN200 electrical ball valve 1 10 → DN150 ball valve 21 → DN150 filter 22 → filter rear tube, 23 → DN150 ball valve → header 2 25 → DN150 ball valve → Adapter 34 before 27 → DN150 of adapter turbine flowmeter, 28 → flowmeter rear tube, 29 → DN150 ball valve → heat exchanger before flowmeter Adapter 46 → DN80,47 → pressure regulation of quick action emergency valve before → heat exchanger 37 → heat exchanger rear tube, 41 → DN150 ball valve → stop valve 48 → pressure regulator of adapter, 49 → pressure regulator rear tube, 50 → DN250 ball valve 55 → header, 3 56 → DN300 electrical ball valve 57 before device → escape pipe 58;
Blow-down pipe is as follows:6 → air inlet pipe of DN80 ball valve 3 → DN80 safety valve 4 → air inlet pipe safety valve rear tube emptying bypass 8 → high pressure of adapter 7 → DN80 atmospheric valve emptying adapter 19 → DN50 ball valve, 11 → header 1 diffuses adapter 12 → DN50 atmospheric valve After 13 → header 2 diffuses 1 32 → flowmeter of adapter after diffusing adapter 26 → DN25 ball valve 30 → DN25,31 → flowmeter of atmospheric valve Diffuse adapter 1 96 → change after diffusing adapter 2 33 → DN25,44 → heat exchanger of safety valve before diffusion valve after 45 → heat exchanger of adapter Diffuse after diffusing 3 98 → heat exchanger of adapter after 2 97 → heat exchanger of adapter is diffused after hot device 4 99 → DN25 of adapter atmospheric valve 53 Before diffusing 100 → header of adapter, 3 safety valve after → DN25 54 → pressure regulation of ball valve, 102 → header of adapter 101 → DN80 safety valve 3 is pacified 103 → header of full valve rear tube 3 diffuses adapter 104 → DN80 atmospheric valve 59 → DN80,60 → escape pipe of ball valve and diffuses adapter 105 → high pressure diffuses the emptying adapter 3 79 of 82 → high pressure of adapter 2 68 → sub-high pressure blow-down pipe.
Blowdown pipeline is as follows:Blowdown after blowdown connection 1 14 → blowdown connection, 2 15 → DN50,16 → filter of blowoff valve connects 63 → water route of blowdown main blowdown connection, 73 → blowdown connection, 2 88 → blowdown connection, 3 89 → header, 2 row after 62 → filter of pipe Dirty adapter 90 → blowdown connection, 4 91 → heat exchanger blowdown connection 78 → DN50 blowoff valve 87 → blowdown connection, 5 92 → blowdown connects 6 93 → header of pipe, 3 94 → blowdown connection of blowdown connection 7 95;
Heat exchanger entery and delivery port pipeline is as follows:
1st, water inlet pipeline:Water inlet 36 → water inlet pipe of adapter 1 71 → water inlet pipe, the 2 72 → water inlet of 35 → heat exchanger of DN50 stop valve Pipe 3 74;
2nd, delivery port pipeline:2 76 → outlet pipe of heat exchanger water outlet pipe 40 → outlet pipe, 1 75 → outlet pipe 3 77.
Control system is as follows:
1st, pressure is shown as:17、24、51;
2nd, pressure transmission controller is:18、52、86;
3rd, temperature is shown as:20、42、84;
4th, temperature transmission controller is:19、43、85;
5th, explosion-proof wiring box is:106;
6th, leakage alarm controller+sound and light alarm is:107.
Use:
1st, totally associated pipeline must be purged using front.
2nd, all through acceptance(check), the pry regulator for putting into operation all should reach requirement, and periodically be tieed up
Shield maintenance operation.
3rd, never Quick open valve door, equipment in the fragile pry regulator of violent valve opening gate pole;
4th, never excess pressure is filled with to outlet conduit, can otherwise damage pry regulator inner body.
5th, setting pressure should follow principle from high to low, and by step one, one is carried out, and can not be grasped
Too urgent.
6th, after pressure sets, its closing presure need to be detected, verifies its performance, if reach required value.
7th, pressure can open outlet valve after setting and meeting the requirements, and must not open outlet before this
Valve, in case unexpected occur.
8th, in debugging process, No Open Flames, prevents electrostatic from producing, forbid colliding, tap pipeline and
Equipment.
9th, precision instrument should be noted that protection, in case pressure oscillation is big, damage instrument.
10th, when heat exchanger is heated, the group heater power source can only be used, it is impossible to while the power supply of two groups of heaters is opened, Power supply with burnout-proof heater.
11st, the reset operation of stop valve:
(1) manual reset operation must be carried out after stop valve performs cut-out action in the duct.
(2) cut-out reason should be found out before reset operation is carried out, be compression shock or the fault of pressure regulator in pipe network, row Go out rear and can be reset operation.
(3) when stop valve reset operation is carried out, it is necessary to close turnover valve and the outlet pressures table of regulator Under needle valve.
(4) slowly imported valve is opened, outlet pressure is observed, pressure normally opens outlet valve afterwards.
Maintaining:
1st, according to the filter core of the fine or not periodic cleaning high pressure filter of makings, periodical blowdown process is done.
2nd, the heat transferring medium in heat exchanger must be anti-icing fluid, depending on the model of anti-icing fluid is according to the local lowest temperature.When More than the minimum use temperature of anti-icing fluid,(Freezing point is at -40 DEG C)Anti-icing fluid need to be put only, change anti-icing fluid.
3rd, during maintenance activity, power supply should be closed, need to first confirms that surrounding does not have gas leakage or combustion gas to be detained.
4th, the gas of inside, when pipe arrangement need to be pulled down, should be emptied in advance.
When the 5th, carrying out electrical repair and changing electric fittings, it is necessary to be initially switched off power supply.
6th, gas displacement should being re-started after keeping in repair, and carrying out every preparation that pry regulator restarts, details are such as Under:
(1) airtight experiment:Check that each interface, flange etc. have No leakage with suds.
(2) press supply program and start pry regulator.
7th, cleaning pressure regulator inside, when in gas medium containing relatively restore dirt when, should periodically to pressure regulator internal maintenance, Cleaning, to easily swelling or aging rubber parts, such as gasket seal etc. should periodically be checked or be changed, with ensure safe way and Normal use.
The urban gate station gas pressure regulating that this secondary design is provided(Skid is put), including following ten systems:1. filtration, purification system System;2. metering system;3. safety protection facility;4. voltage-regulating system;5. valve;6. heat changes system:7. leakage alarm controller+sound 8. pressure inverting system of light alarm system, 9. temperature transmitting system, 10. data acquisition.Equipment is using " single entry, single channel export;Cross Filter, metering, heat exchange, pressure regulation, safety protection facility adopt double structure.All it is designed by 50% flow per road pipeline.Normal work When making, main road pressure regulation, secondary road are standby, if the pressure regulator on main road breaks down(Such as pressure regulator diaphragm damage etc.)Cause outlet Pressure value is raised, and promptly electronic stop valve automatically cuts off air-flow, when outlet pressure is down to secondary road pressure regulator and sets pressure, secondary road Pressure regulator automatic works, so as to superpressure can be avoided to supply gas, it is ensured that dirty continuous safe supply.The device collection:Filter, adjust Pressure, superpressure safety cut-off, superpressure are diffused safely, are measured, heat exchange(Temperature automatic control), leakage automatic alarm, pressure show, temperature Degree display, sound and light alarm, regulator can be distinguished automatic start-stop, and can work simultaneously;And once the faulty cut-out in a road, another Road should be able to automatically turn on supply;When outlet pressure reaches the setting upper limit, supply is automatically stopped, under outlet pressure is less than setting Limit, automatically turns on supply;Ensure a wherein road at full capacity start and stop when do not affect other road normal works.And possess on-site manual and open Dynamic stopping function.Device is entered using single channel, single outlet, Trouble Report function(Superpressure sound and light alarm), and carry remote stored program controlled Function.
Feature:
1. Applicable media:Natural gas, compressed natural gas body, liquefied petroleum, artificial coal gas and corrosion-free gas
2. it is applied to:Transmission & distribution station, urban gate station, region pressure regulation etc.
3. operating system is simple, on-line maintenance is convenient, can unmanned
4. compact conformation, dependable performance, precision of voltage regulation height, noise are low
5. layout and configuration are reasonable, meet safety and environmental protection requirement
6. there is filtration, pressure regulation, metering, superpressure Safety relief valve, limiting pressure closing valve, overpressure alarm monitoring, leakage alarm, acousto-optic Warning system, heat-exchange system, pressure inverting system, temperature transmitting system, operation control system, the using and the reserved skid are in one.
7. data acquisition:Collection site pressure, temperature, differential pressure, flow, Gas Components, equipment running status as needed Etc. parameter.
8. range:This operational procedure is only applicable to urban gate station gas pressure regulating skid and puts(Highest inlet pressure is 2.5-3.6MPa)The scope such as installation, debugging, use, current check, maintaining and dismounting.
3rd, major parameter:
1. import:DN200;Outlet DN300
2. inlet pressure P1:2.5~3.6Mpa
3. outlet pressure P2:1.2Mpa;
4. excess pressure cutout pressure:3.8Mpa
5. superpressure is diffused pressure and is:1.4Mpa
6. flow is:40000Nm3/h
7. heat-exchange temperature is:70~80 DEG C
8. filtering accuracy:10um
9. metering grade is:Business one-level
10. power load:65KW
11. single channel abilities:20000Nm3/h
12. operating temperatures:-20℃-60℃
13. ambient humidities:Annual relative humidity 75%
14. explosive-proof gradves:ExdⅡBT4
15. earthquake intensity:Set up defences by 8 degree
16. data acquisitions:Collection site pressure, temperature, differential pressure, flow, Gas Components, equipment running status etc. are joined as needed Number.
The foregoing description of the disclosed embodiments, enables professional and technical personnel in the field to realize or uses the present invention. Multiple modifications to these embodiments will be apparent for those skilled in the art, as defined herein General Principle can be realized without departing from the spirit or scope of the present invention in other embodiments.Therefore, the present invention The embodiments shown herein is not intended to be limited to, and is to fit to and principles disclosed herein and features of novelty phase one The most wide scope for causing.

Claims (1)

1. a kind of urban gate station Gas Pressure Regulating Equipment, it is characterised in that:DN200 air inlet pipe(2)By DN200 electrical ball valve(5) With header 1(10)Connection, header 1(10)By DN150 ball valve(21)With DN150 filter(22)Connection, filter rear tube (23)By DN150 ball valve and header 2(25)Connection, header 2(25)By taking over before DN150 ball valve and flowmeter(27)Even Connect,
DN150 turbine flowmeter(28)Corresponding flowmeter rear tube(29)By taking over before DN150 ball valve and heat exchanger(34) Connection, heat exchanger(37)Corresponding heat exchanger rear tube(41)Connected before stop valve by DN150 ball valve and take over(46), DN80 Quick action emergency valve(47)By taking over before pressure regulator(48)Connection pressure regulator(49), pressure regulator rear tube(50)By DN250 ball Valve(55)With header 3(56)Connection, header 3(56)By DN300 electrical ball valve(57)With escape pipe(58)Connection;
DN80 ball valve(3)With DN80 safety valve(4)Connection, DN80 safety valve(4)、(6)Air inlet pipe safety valve rear tube, air inlet Pipe emptying bypass adapter(7), DN80 atmospheric valve(8), high pressure emptying adapter 1(9)Form connection, DN50 ball valve(11), header 1 Diffuse adapter(12), DN50 atmospheric valve(13), header 2 diffuse adapter(26), DN25 ball valve(30), DN25 atmospheric valve(31), stream Adapter 1 is diffused after gauge(32), diffuse adapter 2 after flowmeter(33), DN25 safety valve(44), take over before diffusion valve after heat exchanger (45), diffuse adapter 1 after heat exchanger(96), diffuse adapter 2 after heat exchanger(97), diffuse adapter 3 after heat exchanger(98), heat exchange Adapter 4 is diffused after device(99), DN25 atmospheric valve(53), DN25 ball valve(54), diffuse adapter after pressure regulation(100), 3 safety valve of header Front adapter(101), DN80 safety valve(102), 3 safety valve rear tube of header(103), header 3 diffuse adapter(104), DN80 puts Empty valve(59), DN80 ball valve(60), escape pipe diffuse adapter(105), high pressure diffuse adapter 2(68), sub-high pressure blow-down pipe(82)、 High pressure is vented adapter 3(79)Form connection;
Blowdown connection 1(14), blowdown connection 2(15), DN50 blowoff valve(16), blowdown connection after filter(62), after filter Blowdown main(63), water route blowdown connection(73), blowdown connection 2(88), blowdown connection 3(89), 2 blowdown connection of header(90)、 Blowdown connection 4(91)Form connection;
Heat exchanger blowdown connection(78), DN50 blowoff valve(87), blowdown connection 5(92), blowdown connection 6(93), 3 blowdown of header connects Pipe(94), blowdown connection 7(95)Form connection;
DN50 stop valve(35), heat exchanger water inlet adapter(36), water inlet pipe 1(71), water inlet pipe 2(72), water inlet pipe 3(74)Formed Connection;
Heat exchanger water outlet pipe(40), outlet pipe 1(75), outlet pipe 2(76), outlet pipe 3(77)Form connection.
CN201610988278.3A 2016-11-10 2016-11-10 Urban gate station Gas Pressure Regulating Equipment Active CN106481983B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610988278.3A CN106481983B (en) 2016-11-10 2016-11-10 Urban gate station Gas Pressure Regulating Equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610988278.3A CN106481983B (en) 2016-11-10 2016-11-10 Urban gate station Gas Pressure Regulating Equipment

Publications (2)

Publication Number Publication Date
CN106481983A true CN106481983A (en) 2017-03-08
CN106481983B CN106481983B (en) 2019-03-08

Family

ID=58272502

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610988278.3A Active CN106481983B (en) 2016-11-10 2016-11-10 Urban gate station Gas Pressure Regulating Equipment

Country Status (1)

Country Link
CN (1) CN106481983B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106402656A (en) * 2016-11-21 2017-02-15 乐山倍创机械制造有限公司 Fuel gas pressure regulating device of urban gate station
CN108730773A (en) * 2017-04-18 2018-11-02 气体产品与化学公司 Reach the control system in the natural gas line network of satisfied pressure limit
CN112393122A (en) * 2020-10-30 2021-02-23 盐城新奥燃气有限公司 Natural valve station control system of urban gas pipe network

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202012742U (en) * 2011-01-17 2011-10-19 上海万事红燃气技术发展有限公司 Compressed natural gas multi-stage temperature and pressure adjusting device
CN202338775U (en) * 2011-11-03 2012-07-18 中国石油天然气股份有限公司 Online blowdown device of high-pressure natural gas pipeline
CN204328479U (en) * 2014-11-20 2015-05-13 天津华迈燃气装备股份有限公司 A kind of Gas Pressure Regulating Equipment adopting the uninterrupted air feed of monitoring guarantee in parallel
JP2016084923A (en) * 2014-10-29 2016-05-19 株式会社Ihi Gas supply facility
CN205402242U (en) * 2016-03-08 2016-07-27 沧州市天龙燃烧设备有限公司 Compressed natural gas pressure regulator
CN105822902A (en) * 2016-06-01 2016-08-03 乐山市山鹰模具有限责任公司 CNG gas device
CN206176038U (en) * 2016-11-10 2017-05-17 乐山市山鹰模具有限责任公司 City door station gas pressure regulating device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202012742U (en) * 2011-01-17 2011-10-19 上海万事红燃气技术发展有限公司 Compressed natural gas multi-stage temperature and pressure adjusting device
CN202338775U (en) * 2011-11-03 2012-07-18 中国石油天然气股份有限公司 Online blowdown device of high-pressure natural gas pipeline
JP2016084923A (en) * 2014-10-29 2016-05-19 株式会社Ihi Gas supply facility
CN204328479U (en) * 2014-11-20 2015-05-13 天津华迈燃气装备股份有限公司 A kind of Gas Pressure Regulating Equipment adopting the uninterrupted air feed of monitoring guarantee in parallel
CN205402242U (en) * 2016-03-08 2016-07-27 沧州市天龙燃烧设备有限公司 Compressed natural gas pressure regulator
CN105822902A (en) * 2016-06-01 2016-08-03 乐山市山鹰模具有限责任公司 CNG gas device
CN206176038U (en) * 2016-11-10 2017-05-17 乐山市山鹰模具有限责任公司 City door station gas pressure regulating device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106402656A (en) * 2016-11-21 2017-02-15 乐山倍创机械制造有限公司 Fuel gas pressure regulating device of urban gate station
CN108730773A (en) * 2017-04-18 2018-11-02 气体产品与化学公司 Reach the control system in the natural gas line network of satisfied pressure limit
CN112393122A (en) * 2020-10-30 2021-02-23 盐城新奥燃气有限公司 Natural valve station control system of urban gas pipe network
CN112393122B (en) * 2020-10-30 2022-05-10 盐城新奥燃气有限公司 Natural valve station control system of urban gas pipe network

Also Published As

Publication number Publication date
CN106481983B (en) 2019-03-08

Similar Documents

Publication Publication Date Title
CN106402656A (en) Fuel gas pressure regulating device of urban gate station
CN106481983A (en) Urban gate station Gas Pressure Regulating Equipment
CN106838605B (en) A kind of process and device for LNG receiving stations BOG systems
CN105822902A (en) CNG gas device
CN109340570B (en) Skid-mounted oil-gas mixing and conveying device
RU93928U1 (en) UNIT OF FUEL GAS PREPARATION UNIT
CN206176038U (en) City door station gas pressure regulating device
CN106731313B (en) Gas filter of natural gas compression system
CN206637249U (en) A kind of modularization, the small-sized LNG gasification station of standardization
CN202442107U (en) Independent liquefied natural gas supply device
CN202673797U (en) Seal flush monitoring device for high-temperature pump
CN107270119A (en) LNG, BOG, EAG air temperature type gasification air supply system device
CN212539297U (en) Intelligent flow metering device for compressed air
CN203500808U (en) Highly efficient combined type thin oil lubricating device
CN205606172U (en) Liquid nitrogen gasification equipment
CN204142446U (en) A kind of engine general assembly line seal checks hydraulic system
CN210715385U (en) Accurate control device for oil temperature in hydraulic test system
CN211371926U (en) Pressure regulating and leakage alarming integrated device of Internet of things
CN211551155U (en) Movable liquefied natural gas gasification pressure regulating equipment
CN207279269U (en) LNG Intelligent bottle group air supply systems
CN217635102U (en) Safe pressure regulating measurement cabinet suitable for industrial enterprise
CN205261234U (en) Measurement integrated device cools down
CN203148453U (en) Instrument heat tracing device
CN205535761U (en) Total oxygen kiln burning control system is used with to coal tar natural gas
CN205278782U (en) Utilize CNG release that pressure potential can generate electricity

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200108

Address after: 614000 Sichuan Province, Leshan City District Su Ji Zhen Su Road No. 25

Patentee after: Sichuan Beichuang Machinery Manufacturing Co., Ltd.

Address before: 614000 Sichuan high tech Zone in Leshan City, the New South Road No. 8 Science Park

Patentee before: Leshan Shanying Mold Co., Ltd.