CN106402656A - Fuel gas pressure regulating device of urban gate station - Google Patents

Fuel gas pressure regulating device of urban gate station Download PDF

Info

Publication number
CN106402656A
CN106402656A CN201611018739.0A CN201611018739A CN106402656A CN 106402656 A CN106402656 A CN 106402656A CN 201611018739 A CN201611018739 A CN 201611018739A CN 106402656 A CN106402656 A CN 106402656A
Authority
CN
China
Prior art keywords
valve
adapter
header
connect
heat exchanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611018739.0A
Other languages
Chinese (zh)
Inventor
先东
吴禹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LESHANG BEICHUANG MACHINERY MANUFACTURING Co Ltd
Original Assignee
LESHANG BEICHUANG MACHINERY MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LESHANG BEICHUANG MACHINERY MANUFACTURING Co Ltd filed Critical LESHANG BEICHUANG MACHINERY MANUFACTURING Co Ltd
Priority to CN201611018739.0A priority Critical patent/CN106402656A/en
Publication of CN106402656A publication Critical patent/CN106402656A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D1/00Pipe-line systems
    • F17D1/02Pipe-line systems for gases or vapours
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D3/00Arrangements for supervising or controlling working operations
    • F17D3/01Arrangements for supervising or controlling working operations for controlling, signalling, or supervising the conveyance of a product
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D3/00Arrangements for supervising or controlling working operations
    • F17D3/18Arrangements for supervising or controlling working operations for measuring the quantity of conveyed product

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Pipeline Systems (AREA)

Abstract

The invention discloses a fuel gas pressure regulating device of an urban gate station. The fuel gas pressure regulating device comprises the following ten systems: 1, a filtering and purifying system; 2, a metering system; 3, a safety protecting facility; 4, a pressure regulating system; 5, a valve; 6, a heat exchanging system; 7, a leakage alarming controller and a sound-light alarming system; 8, a pressure transmitting system; 9, a temperature transmitting system; and 10, a data acquiring system. The fuel gas pressure regulating (skid-mounted) device of the urban gate station is the key equipment for introducing long-distance natural gas pipelines into urban utilities and has a purifying function, a metering function, a pressure regulating function, a distributing function, a safety protecting function and the like; a fuel gas alarming system, a self-control system and a gas odorizing device can be arranged as requirements; the pressure regulating gate station is generally in a form of a skid-mounted structure; the fuel gas pressure regulating device is widely applied to a transportation and distribution station, an urban gate station, regional pressure regulation, etc.

Description

Urban gate station Gas Pressure Regulating Equipment
Urban gate station Gas Pressure Regulating Equipment.
Technical field
The present invention relates to gas pressure regulating field, especially a kind of urban gate station Gas Pressure Regulating Equipment.
Background technology
City gas door station, gas holder station are the important infrastructures of Urban Gas Distribution Networks.Wherein door station is city The gas source point of city's distributing system, is also the gas distribution station that Gao Long-distance Transmission Pipeline enters pipeline network of fuel gas in city, and its task is to receive length The combustion gas that defeated pipelined is come, carry out filtering in station, pressure regulation, metering, plus smelly, distribution after, send into city transmission and distribution network or straight Pick into users.And the major function of natural gas high pressure gas holder station be storage combustion gas, reduce pressure backward city gas transmission network defeated Send combustion gas.In order to ensure gas holder station normal work, higher pressure main carrys out gas also to be needed to filter before entering pressure regulator, adds smelly and metering. Existing its function of urban gate station Gas Pressure Regulating Equipment is limited, is subject to many limitation in use.
Content of the invention
It is an object of the invention to overcoming the deficiencies in the prior art, here provides a kind of urban gate station Gas Pressure Regulating Equipment, Urban gate station gas pressure regulating(Skid is put), it is the key equipment that Gao Long-distance Transmission Pipeline enters urban pipe network, there is purification, meter The functions such as amount, pressure regulation, distribution, safeguard protection, can configure gas alarm system, robot control system(RCS), device for adding odor, pressure regulation according to demand Skid version is generally used in door station.It is widely used in:Transmission & distribution station, urban gate station, region pressure regulation etc..
The present invention be achieved in that construction a kind of urban gate station Gas Pressure Regulating Equipment it is characterised in that:DN200 air inlet Gutron is crossed DN200 electrical ball valve and is connected with header 1, and header 1 is connected with DN150 filter by DN150 ball valve, and filter is followed by Gutron is crossed DN150 ball valve and is connected with header 2, and header 2 is passed through DN150 ball valve and is connected with adapter before effusion meter,
DN150 turbine flowmeter corresponding effusion meter rear tube is passed through DN150 ball valve and is connected with adapter before heat exchanger, heat exchanger pair The heat exchanger rear tube answered is connected by DN150 ball valve to be taken over before stop valve, and DN80 quick action emergency valve connects before passing through pressure regulator Pipe connects pressure regulator, and pressure regulator rear tube is connected with header 3 by DN250 ball valve, and header 3 passes through DN300 electrical ball valve and goes out Trachea connects;
DN80 ball valve is connected with DN80 relief valve, and DN80 relief valve, air inlet pipe relief valve rear tube, air inlet pipe emptying bypass connect Pipe, the emptying adapter 1 of DN80 atmospheric valve, high pressure form and connect, and DN50 ball valve, header 1 diffuse adapter, DN50 atmospheric valve, header 2 Diffuse adapter, DN25 ball valve, DN25 atmospheric valve, diffuse after effusion meter adapter 1, diffuse after effusion meter adapter 2, DN25 relief valve, Adapter before diffusion valve after heat exchanger, diffuse after heat exchanger adapter 1, diffuse after heat exchanger adapter 2, diffuse after heat exchanger adapter 3, Diffuse adapter 4, DN25 atmospheric valve, DN25 ball valve after heat exchanger, diffuse adapter, adapter, DN80 peace before header 3 relief valve after pressure regulation Full valve, header 3 relief valve rear tube, header 3 diffuse adapter, DN80 atmospheric valve, DN80 ball valve, escape pipe diffuse adapter, high pressure Diffuse adapter 2, sub-high pressure blow-down pipe, high pressure emptying adapter 3 formation connection;
Blowdown connection 1, blowdown connection 2, DN50 blowoff valve, blowdown connection after filter, blowdown main, water route blowdown after filter Adapter, blowdown connection 2, blowdown connection 3, header 2 blowdown connection, blowdown connection 4 form and connect;
Heat exchanger blowdown connection, DN50 blowoff valve, blowdown connection 5, blowdown connection 6, header 3 blowdown connection, blowdown connection 7 are formed Connect;
DN50 stop valve, heat exchanger water inlet adapter, water inlet pipe 1, water inlet pipe 2, water inlet pipe 3 form and connect;
Heat exchanger water outlet pipe, outlet pipe 1, outlet pipe 2, outlet pipe 3 form and connect.
The urban gate station gas pressure regulating that this secondary design provides(Skid is put), including following ten systems:1. filtration, purification system System;2. metering system;3. safety protection facility;4. voltage-regulating system;5. valve;6. heat changes system:7. leakage alarm controller+sound Light alarm system 8. pressure inverting system, 9. temperature transmitting system 10. data acquisition.Equipment is using " single entry, single channel exports;Cross Filter, metering, heat exchange, pressure regulation, safety protection facility adopt double structure.Every road pipeline is all designed by 50% flow.Normal work When making, main road pressure regulation, secondary road is standby, if the pressure regulator on main road breaks down(As pressure regulator diaphragm damage etc.)Lead to export Pressure value raises, and promptly electronic stop valve automatically cuts off air-flow, when outlet pressure is down to secondary road pressure regulator and is set pressure, secondary road Pressure regulator automatic works, thus superpressure can be avoided to supply gas it is ensured that dirty continuous safe supplies.This device collection:Filter, adjust Pressure, superpressure safety cut-off, superpressure are diffused safely, measure, heat exchange(Temperature automatic control), leakage automatic alarm, pressure show, temperature Degree display, sound and light alarm, regulator can be distinguished automatic start-stop, and can work simultaneously;And once the faulty cut-out in a road, another Road should be able to automatically turn on supply;When outlet pressure reaches the setting upper limit, it is automatically stopped supply, under outlet pressure is less than and sets Limit, automatically turns on supply;Ensure wherein one tunnel at full capacity start and stop when do not affect other roads normal work.And possess on-site manual and open Dynamic stopping function.Device is entered using single channel, single outlet, Trouble Report function(Superpressure sound and light alarm), and carry remote stored program controlled Function.
It is an advantage of the current invention that:Urban gate station gas pressure regulating(Skid is put), it is that Gao Long-distance Transmission Pipeline enters city pipe The key equipment of net, has the functions such as purification, metering, pressure regulation, distribution, safeguard protection, can configure gas alarm system according to demand System, robot control system(RCS), device for adding odor, skid version is generally used at regulation door station.It is widely used in:Transmission & distribution station, urban gate station, region Pressure regulation etc..
Brief description
Fig. 1 is front view of the present invention
Fig. 2 is top view of the present invention
Fig. 3 is A-A position view in Fig. 1
Fig. 4 is B-B position view in Fig. 1
Fig. 5 is C-C position view in Fig. 1
Fig. 6 is D-D position view in Fig. 1
Fig. 7 is E-E position view in Fig. 1
Fig. 8 is F-F position view in Fig. 1.
Wherein:1st, framework 1,2, air inlet pipe, 3, ball valve, 4, relief valve, 5, electrical ball valve, 6, air inlet pipe relief valve is followed by Pipe, 7, air inlet pipe emptying bypass adapter, 8, atmospheric valve, 9, high pressure emptying adapter 1,10, header 1,11, ball valve, 12, header 1 puts Dissipate adapter, 13, atmospheric valve, 14, blowdown connection 1,15, blowdown connection 2,16, blowoff valve, 17, stainless steel pressure table, 18, pressure Transmitter+Surge Protector, 19, temperature transmitter+Surge Protector, 20, bimetallic thermometer, 21, ball valve, 22, filter 10um(Join differential pressure gauge), 23, filter rear tube, 24,1800 rustless steel needle valvies, 25, header 2,26, header 2 diffuse adapter, 27th, take over before effusion meter, 28, turbine flowmeter, 29, effusion meter rear tube, 30, ball valve, 31, atmospheric valve, 32, put after effusion meter Diffuse adapter 2,34 after scattered adapter 1,33, effusion meter, take over before heat exchanger, 35, stop valve, 36, heat exchanger water inlet adapter, 37, Heat exchanger, 38, ball valve, 39, relief valve, 40, heat exchanger water outlet pipe, 41, heat exchanger rear tube, 42, bimetallic thermometer, 43rd, temperature transmitter+Surge Protector, 44, relief valve, 45, take over before diffusion valve after heat exchanger, 46, take over before stop valve, 47th, quick action emergency valve+valve position teletransmission, 48, take over before pressure regulator, 49, pressure regulator+heat tracing, 50, pressure regulator rear tube, 51, stainless Steel pressure gauge, 52, pressure transmitter+Surge Protector, 53, atmospheric valve, 54, ball valve, 55, ball valve, 56, header 3,57, electronic Ball valve, 58, escape pipe, 59, atmospheric valve, 60, ball valve, 61, filter frame, 62, blowdown connection after filter, 63, filter Blowdown main afterwards, 64, header 2 framework, 65, ball valve, 66, metering sled framework 1,67, metering sled framework 2,68, high pressure diffuse adapter 2,69, heat exchange sled framework, 70, copper ball valve, 71, water inlet pipe 1,72, water inlet pipe 2,73, water route blowdown connection, 74, water inlet pipe 3, 75th, outlet pipe 1,76, outlet pipe 2,77, outlet pipe 3,78, heat exchanger blowdown connection, 79, high pressure emptying adapter 3,80, pry regulator Framework 1,81, pry regulator framework 2,82, sub-high pressure blow-down pipe, 83, sled framework of giving vent to anger, 84, bimetallic thermometer, 85, temperature becomes Send device+Surge Protector, 86, pressure transmitter+Surge Protector, 87, blowoff valve, 88, blowdown connection 2,89, blowdown connection 3, 90th, header 2 blowdown connection, 91, blowdown connection 4,92, blowdown connection 5,93, blowdown connection 6,94, header 3 blowdown connection, 95, Diffuse after blowdown connection 7,96, heat exchanger adapter 1,97, diffuse after heat exchanger adapter 2,98, diffuse after heat exchanger adapter 3,99, Diffuse adapter 4,100 after heat exchanger, diffuse adapter after pressure regulation, 101, take over before header 3 relief valve, 102, relief valve, 103, converge Pipe 3 relief valve rear tube, 104, header 3 diffuse adapter, 105, escape pipe diffuse adapter, 106, explosion-proof wiring box, 107, leakage Alarm controller+sound and light alarm.
Specific embodiment
Below in conjunction with accompanying drawing, the present invention is described in detail, and the technical scheme in the embodiment of the present invention is carried out clearly Chu, it is fully described by it is clear that described embodiment is only a part of embodiment of the present invention, rather than whole embodiments. Based on the embodiment in the present invention, it is all that those of ordinary skill in the art are obtained under the premise of not making creative work Other embodiment, broadly falls into the scope of protection of the invention.
The present invention passes through to improve provides a kind of urban gate station Gas Pressure Regulating Equipment, implements as follows:
Working procedure is as follows:
During normal ventilation, A, B two-way pipeline is as follows:A, B road:DN200 air inlet pipe (2) → DN200 electrical ball valve (5) → header 1 (10) → (21) DN150 ball valve → (22) DN150 filter → filter rear tube (23) → DN150 ball valve → header 2 (25) Adapter (27) → (28) DN150 turbine flowmeter → effusion meter rear tube (29) → DN150 ball before → DN150 ball valve → effusion meter Take over before adapter (34) → heat exchanger (37) → heat exchanger rear tube (41) → DN150 ball valve → stop valve before valve → heat exchanger (46) adapter (48) → pressure regulator (49) → pressure regulator rear tube (50) before → DN80 quick action emergency valve (47) → pressure regulator → DN250 ball valve (55) → header 3 (56) → DN300 electrical ball valve (57) → escape pipe (58);
Blow-down pipe is as follows:DN80 ball valve (3) → DN80 relief valve (4) → air inlet pipe relief valve rear tube (6) → air inlet pipe is put Empty bypass adapter (7) → DN80 atmospheric valve (8) → high pressure emptying adapter 1 (9) → DN50 ball valve (11) → header 1 diffuses adapter (12) → DN50 atmospheric valve (13) → header 2 diffuses adapter (26) → DN25 ball valve (30) → DN25 atmospheric valve (31) → flow Connect before diffusion valve after diffusing adapter 2 (33) → DN25 relief valve (44) → heat exchanger after diffusing adapter 1 (32) → effusion meter after meter Diffuse after diffusing adapter 2 (97) → heat exchanger after diffusing adapter 1 (96) → heat exchanger after pipe (45) → heat exchanger adapter 3 (98) → Adapter (100) → remittance is diffused after diffusing adapter 4 (99) → DN25 atmospheric valve (53) → DN25 ball valve (54) → pressure regulation after heat exchanger Before pipe 3 relief valve, adapter (101) → DN80 relief valve (102) → header 3 relief valve rear tube (103) → header 3 diffuses adapter (104) → DN80 atmospheric valve (59) → DN80 ball valve (60) → escape pipe diffuse adapter (105) → high pressure diffuse adapter 2 (68) → Sub-high pressure blow-down pipe (82) → high pressure emptying adapter 3 (79).
Blowdown pipeline is as follows:Blowdown connection 1 (14) → blowdown connection 2 (15) → DN50 blowoff valve (16) → filter heel row Blowdown main (63) → water route blowdown connection (73) → blowdown connection 2 (88) → blowdown connection 3 after dirty adapter (62) → filter (89) → header 2 blowdown connection (90) → blowdown connection 4 (91) → heat exchanger blowdown connection (78) → DN50 blowoff valve (87) → Blowdown connection 5 (92) → blowdown connection, 6 (93) → header 3 blowdown connection (94) → blowdown connection 7 (95);
Heat exchanger entery and delivery port pipeline is as follows:
1st, water inlet pipeline:DN50 stop valve (35) → heat exchanger water inlet adapter (36) → water inlet pipe 1 (71) → water inlet pipe 2 (72) → water inlet pipe 3 (74);
2nd, outlet pipeline:Heat exchanger water outlet pipe (40) → outlet pipe 1 (75) → outlet pipe 2 (76) → outlet pipe 3 (77).
Control system is as follows:
1st, pressure is shown as:17、24、51;
2nd, pressure transmission controller is:18、52、86;
3rd, temperature is shown as:20、42、84;
4th, temperature transmission controller is:19、43、85;
5th, explosion-proof wiring box is:106;
6th, leakage alarm controller+sound and light alarm is:107.
Use:
1st, totally associated pipeline must be purged using front.
2nd, all through acceptance(check), the pry regulator putting into operation all should reach requirement, and periodically carries out maintaining work Industry.
3rd, never Quick open valve door, equipment in the fragile pry regulator of violent valve opening gate pole;
4th, never it is filled with excess pressure to outlet conduit, otherwise can damage pry regulator inner body.
5th, setting pressure should follow principle from high to low, and by step one, one is carried out, and can not act with undue haste.
6th, after pressure sets, its closing presure need to be detected, verify its performance, if reach required value.
7th, pressure can open outlet valve after setting and meeting the requirements, and must not open outlet valve before this, in case meaning Outer generation.
8th, in debugging process, No Open Flames, prevents electrostatic from producing, and forbids collision, taps pipeline and equipment.
9th, precision instrument, it should be noted that protection, in case pressure oscillation is big, damages instrument.
10th, heat exchanger heating when, can only using this group heater power source it is impossible to open the power supply of two groups of heaters simultaneously, Power supply with burnout-proof heater.
11st, the reset operation of stop valve:
(1) manual reset operation must be carried out after stop valve performs cut-out action in the duct.
(2) cut-out reason should be found out before carrying out reset operation, be compression shock or the fault of pressure regulator in pipe network, row Go out rear and can be reset operation.
(3) when carrying out stop valve reset operation it is necessary to close turnover valve and the outlet pressures table of regulator Under needle valve.
(4) slowly open imported valve, observe outlet pressure, pressure normally opens outlet valve afterwards.
Maintaining:
1st, the filter element of the fine or not routine cleaning high pressure filter according to makings, does periodical blowdown and processes.
2nd, the heat transferring medium in heat exchanger must be anti-icing fluid, depending on the model of anti-icing fluid is according to the local lowest temperature.When Exceed anti-icing fluid minimum use temperature,(Freezing point is at -40 DEG C)Anti-icing fluid need to be put only, change anti-icing fluid.
3rd, during maintenance activity, power supply should be closed, need to first confirm that surrounding does not have gas leakage or combustion gas to be detained.
4th, the gas of inside should when pipe arrangement need to be pulled down, be emptied in advance.
5th, carry out electrical repair and change during electric fittings it is necessary to be initially switched off power supply.
6th, gas displacement should be re-started after keeping in repair, and carry out every preparation that pry regulator restarts, details are such as Under:
(1) airtight experiment:Check that each interface, flange etc. have No leakage with suds.
(2) press supply program and start pry regulator.
7th, cleaning pressure regulator inside, when in gas medium contain compared with recuperation dirt when, should periodically to pressure regulator internal maintenance, Cleaning, to easily swelling or aging rubber parts, such as gasket seal etc. should periodically be checked or be changed, with ensure safe way and Normal use.
The urban gate station gas pressure regulating that this secondary design provides(Skid is put), including following ten systems:1. filtration, purification system System;2. metering system;3. safety protection facility;4. voltage-regulating system;5. valve;6. heat changes system:7. leakage alarm controller+sound Light alarm system 8. pressure inverting system, 9. temperature transmitting system 10. data acquisition.Equipment is using " single entry, single channel exports;Cross Filter, metering, heat exchange, pressure regulation, safety protection facility adopt double structure.Every road pipeline is all designed by 50% flow.Normal work When making, main road pressure regulation, secondary road is standby, if the pressure regulator on main road breaks down(As pressure regulator diaphragm damage etc.)Lead to export Pressure value raises, and promptly electronic stop valve automatically cuts off air-flow, when outlet pressure is down to secondary road pressure regulator and is set pressure, secondary road Pressure regulator automatic works, thus superpressure can be avoided to supply gas it is ensured that dirty continuous safe supplies.This device collection:Filter, adjust Pressure, superpressure safety cut-off, superpressure are diffused safely, measure, heat exchange(Temperature automatic control), leakage automatic alarm, pressure show, temperature Degree display, sound and light alarm, regulator can be distinguished automatic start-stop, and can work simultaneously;And once the faulty cut-out in a road, another Road should be able to automatically turn on supply;When outlet pressure reaches the setting upper limit, it is automatically stopped supply, under outlet pressure is less than and sets Limit, automatically turns on supply;Ensure wherein one tunnel at full capacity start and stop when do not affect other roads normal work.And possess on-site manual and open Dynamic stopping function.Device is entered using single channel, single outlet, Trouble Report function(Superpressure sound and light alarm), and carry remote stored program controlled Function.
Feature:
1. Applicable media:Natural gas, compressed natural gas body, liquefied petroleum, artificial coal gas and corrosion-free gas
2. it is applied to:Transmission & distribution station, urban gate station, region pressure regulation etc.
3. operating system is simple, on-line maintenance is convenient, can unmanned
4. compact conformation, dependable performance, precision of voltage regulation height, noise are low
5. layout and configuration are reasonable, meet safety and environmental protection requirement
6. there is filtration, pressure regulation, metering, superpressure Safety relief valve, limiting pressure closing valve, overpressure alarm monitoring, leakage alarm, acousto-optic Warning system, heat-exchange system, pressure inverting system, temperature transmitting system, operation control system, the using and the reserved skid are in one.
7. data acquisition:Collection site pressure, temperature, differential pressure, flow, Gas Components, equipment running status as needed Etc. parameter.
8. range:This rule of operation is only applicable to urban gate station gas pressure regulating skid and puts(Highest inlet pressure is 2.5-3.6MPa)The scope such as installation, debugging, use, current check, maintaining and dismounting.
3rd, major parameter:
1. import:DN200;Outlet DN300
2. inlet pressure P1:2.5~3.6Mpa
3. outlet pressure P2:1.2Mpa;
4. excess pressure cutout pressure:3.8Mpa
5. superpressure is diffused pressure and is:1.4Mpa
6. flow is:40000Nm3/h
7. heat-exchange temperature is:70~80 DEG C
8. filtering accuracy:10um
9. metering grade is:Business one-level
10. power load:65KW
11. single channel abilities:20000Nm3/h
12. operating temperatures:-20℃-60℃
13. ambient humidities:Annual relative humidity 75%
14. explosive-proof gradves:ExdⅡBT4
15. earthquake intensity:Set up defences by 8 degree
16. data acquisitions:The ginseng such as collection site pressure, temperature, differential pressure, flow, Gas Components, equipment running status as needed Number.
Described above to the disclosed embodiments, makes professional and technical personnel in the field be capable of or uses the present invention. Multiple modifications to these embodiments will be apparent from for those skilled in the art, as defined herein General Principle can be realized without departing from the spirit or scope of the present invention in other embodiments.Therefore, the present invention It is not intended to be limited to the embodiments shown herein, and be to fit to and principles disclosed herein and features of novelty phase one The scope the widest causing.

Claims (1)

1. a kind of urban gate station Gas Pressure Regulating Equipment it is characterised in that:DN200 air inlet pipe(2)By DN200 electrical ball valve(5) With header 1(10)Connect, header 1(10)By DN150 ball valve(21)With DN150 filter(22)Connect, filter rear tube (23)By DN150 ball valve and header 2(25)Connect, header 2(25)Take over by before DN150 ball valve and effusion meter(27)Even Connect,
DN150 turbine flowmeter(28)Corresponding effusion meter rear tube(29)Take over by before DN150 ball valve and heat exchanger(34) Connect, heat exchanger(37)Corresponding heat exchanger rear tube(41)Connected by DN150 ball valve and take over before stop valve(46), DN80 Quick action emergency valve(47)By taking over before pressure regulator(48)Connect pressure regulator(49), pressure regulator rear tube(50)By DN250 ball Valve(55)With header 3(56)Connect, header 3(56)By DN300 electrical ball valve(57)With escape pipe(58)Connect;
DN80 ball valve(3)With DN80 relief valve(4)Connect, DN80 relief valve(4)、(6)Air inlet pipe relief valve rear tube, air inlet Pipe emptying bypass adapter(7), DN80 atmospheric valve(8), high pressure emptying adapter 1(9)Formed and connect, DN50 ball valve(11), header 1 Diffuse adapter(12), DN50 atmospheric valve(13), header 2 diffuse adapter(26), DN25 ball valve(30), DN25 atmospheric valve(31), stream Adapter 1 is diffused after gauge(32), diffuse adapter 2 after effusion meter(33), DN25 relief valve(44), take over before diffusion valve after heat exchanger (45), diffuse adapter 1 after heat exchanger(96), diffuse adapter 2 after heat exchanger(97), diffuse adapter 3 after heat exchanger(98), heat exchange Adapter 4 is diffused after device(99), DN25 atmospheric valve(53), DN25 ball valve(54), diffuse adapter after pressure regulation(100), header 3 relief valve Front adapter(101), DN80 relief valve(102), header 3 relief valve rear tube(103), header 3 diffuse adapter(104), DN80 puts Empty valve(59), DN80 ball valve(60), escape pipe diffuse adapter(105), high pressure diffuse adapter 2(68), sub-high pressure blow-down pipe(82)、 High pressure is vented adapter 3(79)Formed and connect;
Blowdown connection 1(14), blowdown connection 2(15), DN50 blowoff valve(16), blowdown connection after filter(62), after filter Blowdown main(63), water route blowdown connection(73), blowdown connection 2(88), blowdown connection 3(89), header 2 blowdown connection(90)、 Blowdown connection 4(91)Formed and connect;
Heat exchanger blowdown connection(78), DN50 blowoff valve(87), blowdown connection 5(92), blowdown connection 6(93), header 3 blowdown connects Pipe(94), blowdown connection 7(95)Formed and connect;
DN50 stop valve(35), heat exchanger water inlet adapter(36), water inlet pipe 1(71), water inlet pipe 2(72), water inlet pipe 3(74)Formed Connect;
Heat exchanger water outlet pipe(40), outlet pipe 1(75), outlet pipe 2(76), outlet pipe 3(77)Formed and connect.
CN201611018739.0A 2016-11-21 2016-11-21 Fuel gas pressure regulating device of urban gate station Pending CN106402656A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611018739.0A CN106402656A (en) 2016-11-21 2016-11-21 Fuel gas pressure regulating device of urban gate station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611018739.0A CN106402656A (en) 2016-11-21 2016-11-21 Fuel gas pressure regulating device of urban gate station

Publications (1)

Publication Number Publication Date
CN106402656A true CN106402656A (en) 2017-02-15

Family

ID=58068497

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611018739.0A Pending CN106402656A (en) 2016-11-21 2016-11-21 Fuel gas pressure regulating device of urban gate station

Country Status (1)

Country Link
CN (1) CN106402656A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2639453C1 (en) * 2017-07-03 2017-12-21 Андрей Владиславович Курочкин Autonomous automated gas-distributing complex (versions)
RU2656771C1 (en) * 2017-09-08 2018-06-06 Федеральное государственное бюджетное образовательное учреждение высшего образования "Юго-Западный государственный университет "(ЮЗГУ) Unit of integrated cleaning of natural gas
CN108310854A (en) * 2018-01-23 2018-07-24 北京东方通捷燃气有限责任公司 A kind of gas filter and its combustion gas Gao Peizhan of application
CN109442216A (en) * 2018-12-27 2019-03-08 浙江海畅气体有限公司 A kind of nitrogen pressure regulating metering device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014234799A (en) * 2013-06-04 2014-12-15 トヨタ自動車株式会社 Fuel injection device
CN104259930A (en) * 2014-10-16 2015-01-07 清华大学 Protection system for numerically-controlled machine tool
CN106481983A (en) * 2016-11-10 2017-03-08 乐山市山鹰模具有限责任公司 Urban gate station Gas Pressure Regulating Equipment
CN206176038U (en) * 2016-11-10 2017-05-17 乐山市山鹰模具有限责任公司 City door station gas pressure regulating device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014234799A (en) * 2013-06-04 2014-12-15 トヨタ自動車株式会社 Fuel injection device
CN104259930A (en) * 2014-10-16 2015-01-07 清华大学 Protection system for numerically-controlled machine tool
CN106481983A (en) * 2016-11-10 2017-03-08 乐山市山鹰模具有限责任公司 Urban gate station Gas Pressure Regulating Equipment
CN206176038U (en) * 2016-11-10 2017-05-17 乐山市山鹰模具有限责任公司 City door station gas pressure regulating device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2639453C1 (en) * 2017-07-03 2017-12-21 Андрей Владиславович Курочкин Autonomous automated gas-distributing complex (versions)
RU2656771C1 (en) * 2017-09-08 2018-06-06 Федеральное государственное бюджетное образовательное учреждение высшего образования "Юго-Западный государственный университет "(ЮЗГУ) Unit of integrated cleaning of natural gas
CN108310854A (en) * 2018-01-23 2018-07-24 北京东方通捷燃气有限责任公司 A kind of gas filter and its combustion gas Gao Peizhan of application
CN109442216A (en) * 2018-12-27 2019-03-08 浙江海畅气体有限公司 A kind of nitrogen pressure regulating metering device

Similar Documents

Publication Publication Date Title
CN106402656A (en) Fuel gas pressure regulating device of urban gate station
CN105822902A (en) CNG gas device
CN106838605B (en) A kind of process and device for LNG receiving stations BOG systems
CN109340570B (en) Skid-mounted oil-gas mixing and conveying device
CN106481983B (en) Urban gate station Gas Pressure Regulating Equipment
RU93928U1 (en) UNIT OF FUEL GAS PREPARATION UNIT
CN206637249U (en) A kind of modularization, the small-sized LNG gasification station of standardization
CN206176038U (en) City door station gas pressure regulating device
CN205781983U (en) A kind of emergent LNG vaporization voltage-regulating system
CN202442107U (en) Independent liquefied natural gas supply device
CN102537656A (en) Independent liquefied natural gas supply device
CN202673797U (en) Seal flush monitoring device for high-temperature pump
CN209012792U (en) A kind of compressed natural gas pressure regulating gas station
CN104315337B (en) A kind of poisonous and harmful cryogenic liquid tapping equipment and method
CN106838606A (en) A kind of modularization, standardized small-sized LNG gasification station and its method for designing
CN207279269U (en) LNG Intelligent bottle group air supply systems
CN211551155U (en) Movable liquefied natural gas gasification pressure regulating equipment
CN210715385U (en) Accurate control device for oil temperature in hydraulic test system
CN208804467U (en) A kind of natural gas transportation device
CN215891993U (en) Metering pressure regulating pipeline of gasification pressure regulating metering pry
CN217635102U (en) Safe pressure regulating measurement cabinet suitable for industrial enterprise
CN205261234U (en) Measurement integrated device cools down
CN205535761U (en) Total oxygen kiln burning control system is used with to coal tar natural gas
CN204852939U (en) Natural gas is automatic with smelly system
CN215767846U (en) Trap and natural gas particulate matter sampling system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170215

RJ01 Rejection of invention patent application after publication