CN106480874A - 采用h型钢与混凝土的组合桩及其施工方法 - Google Patents
采用h型钢与混凝土的组合桩及其施工方法 Download PDFInfo
- Publication number
- CN106480874A CN106480874A CN201611112875.6A CN201611112875A CN106480874A CN 106480874 A CN106480874 A CN 106480874A CN 201611112875 A CN201611112875 A CN 201611112875A CN 106480874 A CN106480874 A CN 106480874A
- Authority
- CN
- China
- Prior art keywords
- steel
- concrete
- channel
- section
- shaped steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 139
- 239000010959 steel Substances 0.000 title claims abstract description 139
- 239000004567 concrete Substances 0.000 title claims abstract description 40
- 238000010276 construction Methods 0.000 title claims abstract description 14
- 230000002787 reinforcement Effects 0.000 claims description 3
- 238000009417 prefabrication Methods 0.000 claims 1
- 238000007493 shaping process Methods 0.000 claims 1
- 239000002689 soil Substances 0.000 claims 1
- 230000006835 compression Effects 0.000 abstract description 2
- 238000007906 compression Methods 0.000 abstract description 2
- 239000000463 material Substances 0.000 abstract 1
- 239000002131 composite material Substances 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/20—Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/16—Shapes
- E02D2200/165—Shapes polygonal
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
本发明提供一种H型钢与混凝土的组合桩及其施工方法,其中采用H型钢与混凝土的组合桩,其特征在于,包括H型钢和固定设在H型钢两侧开口内且槽口相背设置的两槽钢,所述两槽钢的槽口位置设有封闭钢板,所述两槽钢的槽口与封闭钢板形成的腔体内浇筑有混凝土。本发明结构设计简单实用,充分结合了钢材和混凝土材料各自的优点,钢材的使用,减少了桩的自重,提高了桩的水平承载力,同时,在钢桩内部填充混凝土,一方面可以增强H型钢内壁的几何稳定性,可延缓或避免其发生局部屈曲,从而提高其承载力,另一方面,由于钢材对混凝土的约束,使混凝土处于三向受力的应力的状态,延缓其纵向微裂缝的发生和发展,从而提高其抗压强度和压缩变形能力。
Description
技术领域:
本发明涉及一种采用H 型钢与混凝土的组合桩及其施工方法。
背景技术:
目前,我国大多数工程采用的桩基均为钢筋混凝土桩基结构,混凝土桩竖向承载力很高,然而其水平承载力相对于竖向承载力来说就显得非常低,对于承受风浪作用的码头桩基,地震荷载作用下的桩基础,承受推土产生的水平推力的挡土墙桩基等等,均要求桩有着较高的水平承载力。而混凝土桩基在水平力作用下,受压区混凝土容易开裂,从而引起结构的破坏:对于国外广泛采用的H型钢桩,虽然其能够承受较大的水平荷载,然而在将其打入地下的过程中,受打桩机的影响,容易造成钢桩的局部屈曲,影响其稳定性。
发明内容:
本发明针对上述现有技术的不足,即提供一种采用H 型钢与混凝土的组合桩及其施工方法。该采用H 型钢与混凝土的组合桩有利于提高现有桩基水平承载力的问题。
本发明采用H 型钢与混凝土的组合桩,其特征在于,包括H型钢和固定设在H型钢两侧开口内且槽口相背设置的两槽钢,所述两槽钢的槽口位置设有封闭钢板,所述两槽钢的槽口与封闭钢板形成的腔体内浇筑有混凝土。
进一步的,上述H型钢桩的腹板和翼缘处均开有螺栓开孔,在两槽钢的相应位置也设有螺栓开孔,在螺栓开孔上穿设螺栓和螺母锁紧H型钢桩和两槽钢。
进一步的,上述槽钢长边略小于H型钢的腹板长,腿宽比翼缘小1-2厘米,并嵌于H型钢腹板凹槽处。
进一步的,上述腔体内插设有竖向钢筋。
进一步的,上述封闭钢板为平板状钢板。
进一步的,上述槽钢的下端部设有底板片。
本发明采用H 型钢与混凝土的组合桩的施工方法,其特征在于,所述采用H 型钢与混凝土的组合桩包括H型钢和固定设在H型钢两侧开口内且槽口相背设置的两槽钢,所述两槽钢的槽口位置设有封闭钢板,所述两槽钢的槽口与封闭钢板形成的腔体内浇筑有混凝土;包含以下步骤;
1)将工厂预制的H型钢,槽钢及附属组件运送至施工现场,并将H型钢安置妥当;
2)将槽钢的槽底面贴靠于H型钢的腹板,并使槽钢的螺栓开孔与H型钢的螺栓开孔对齐;
3)槽钢定位完毕后,在所有螺栓开孔处放置螺栓并进行连接固定;
4)采用封闭钢板封住槽钢的槽口,并在槽内放置竖向钢筋;
5)在槽口与封闭钢板形成的腔体内进行混凝土的浇筑,并将混凝土养护至成型。
与现有技术相比,本发明具有以下有益效果:结构简单,有效提高了桩的水平承载力及稳定性,同时,也减少了桩的自重,减少施工难度;另外,本发明的组件均可在工厂预制,实现了结构的装配化施工,可明显提高施工速度和精度,减少人工成本及对环境造成的污染,具有施工方便,显著缩短工期,绿色经济,节约成本,安全高效等显著优点。
附图说明:
图1为本发明结构爆炸示意图;
图2为本发明纵向剖面结构示意图;
图3为本发明俯视状态结构示意图;
图中:1-H型钢,2-槽钢,3-封闭钢板,4-竖向钢筋,5-螺杆,6-螺母,7-混凝土,8-螺栓开孔,9-腔体,10-底板片,101-腹板。
具体实施方式:
下面结合附图和具体实施方式对本发明做进一步详细的说明。
如图1~3所示,本实施例中的一种采用H 型钢与混凝土的组合桩,包括一H型钢1,两个槽钢2、封闭钢板3,两对竖向钢筋4以及螺母6,螺杆5若干,H型钢桩的腹板,翼缘处均有螺栓开孔8,垂直于其腹板处均有一槽钢2,其长边略小于H型钢1的腹板长,腿宽比翼缘小1-2厘米,并嵌于H型钢1腹板凹槽处,槽钢2通过螺栓连接固定在所述的H型钢板1上,其槽口由一封闭钢板3封住,并在槽钢2内放置竖向钢筋4,然后浇筑混凝土7。
两槽钢2的底面贴近H型钢1的腹板101,在两槽钢的槽口与封闭钢板形成的腔体9内浇筑有混凝土,螺栓开孔8和螺栓、螺母安装位置处于H型钢1和两槽钢2上、下部,从而方便安装。上述槽钢的下端部设有底板片10,该底板片10可承载混凝土。
上述H 型钢与混凝土的组合桩的施工方法,包括以下步骤:
1)将工厂预制的H型钢,槽钢及附属组件运送至施工现场,并将H型钢安置妥当;
2)将槽钢的槽底面贴靠于H型钢的腹板,并使槽钢的螺栓开孔与H型钢的螺栓开孔对齐;
3)槽钢定位完毕后,在所有螺栓开孔处放置螺栓并进行连接固定;
4)采用封闭钢板封住槽钢的槽口,并在槽内放置竖向钢筋;
5)在槽口与封闭钢板形成的腔体内进行混凝土的浇筑,并将混凝土养护至成型。
另外,上述本发明公开的任一技术方案中所应用的用于表示位置关系或形状的术语除另有声明外其含义包括与其近似、类似或接近的状态或形状。本发明提供的任一部件既可以是由多个单独的组成部分组装而成,也可以为一体成形工艺制造出来的单独部件。
最后应当说明的是:以上实施例仅用以说明本发明的技术方案而非对其限制;尽管参照较佳实施例对本发明进行了详细的说明,所属领域的普通技术人员应当理解:依然可以对本发明的具体实施方式进行修改或者对部分技术特征进行等同替换;而不脱离本发明技术方案的精神,其均应涵盖在本发明请求保护的技术方案范围当中。
Claims (7)
1.一种采用H 型钢与混凝土的组合桩,其特征在于,包括H型钢和固定设在H型钢两侧开口内且槽口相背设置的两槽钢,所述两槽钢的槽口位置设有封闭钢板,所述两槽钢的槽口与封闭钢板形成的腔体内浇筑有混凝土。
2.根据权利要求1所述的采用H 型钢与混凝土的组合桩,其特征在于,所述H型钢桩的腹板和翼缘处均开有螺栓开孔,在两槽钢的相应位置也设有螺栓开孔,在螺栓开孔上穿设螺栓和螺母锁紧H型钢桩和两槽钢。
3.根据权利要求1所述的采用H 型钢与混凝土的组合桩,其特征在于,所述槽钢长边略小于H型钢的腹板长,腿宽比翼缘小1-2厘米,并嵌于H型钢腹板凹槽处。
4.根据权利要求1所述的采用H 型钢与混凝土的组合桩,其特征在于,所述腔体内插设有竖向钢筋。
5.根据权利要求1所述的采用H 型钢与混凝土的组合桩,其特征在于,所述封闭钢板为平板状钢板。
6.根据权利要求1所述的采用H 型钢与混凝土的组合桩,其特征在于,所述槽钢的下端部设有底板片。
7.一种采用H 型钢与混凝土的组合桩的施工方法,其特征在于,所述采用H 型钢与混凝土的组合桩包括H型钢和固定设在H型钢两侧开口内且槽口相背设置的两槽钢,所述两槽钢的槽口位置设有封闭钢板,所述两槽钢的槽口与封闭钢板形成的腔体内浇筑有混凝土;包含以下步骤;
(1)将工厂预制的H型钢,槽钢及附属组件运送至施工现场,并将H型钢安置妥当;
(2)将槽钢的槽底面贴靠于H型钢的腹板,并使槽钢的螺栓开孔与H型钢的螺栓开孔对齐;
(3)槽钢定位完毕后,在所有螺栓开孔处放置螺栓并进行连接固定;
(4)采用封闭钢板封住槽钢的槽口,并在槽内放置竖向钢筋;
(5)在槽口与封闭钢板形成的腔体内进行混凝土的浇筑,并将混凝土养护至成型。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201611112875.6A CN106480874B (zh) | 2016-12-07 | 2016-12-07 | 采用h型钢与混凝土的组合桩及其施工方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201611112875.6A CN106480874B (zh) | 2016-12-07 | 2016-12-07 | 采用h型钢与混凝土的组合桩及其施工方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106480874A true CN106480874A (zh) | 2017-03-08 |
| CN106480874B CN106480874B (zh) | 2018-09-18 |
Family
ID=58275857
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201611112875.6A Expired - Fee Related CN106480874B (zh) | 2016-12-07 | 2016-12-07 | 采用h型钢与混凝土的组合桩及其施工方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106480874B (zh) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109056774A (zh) * | 2018-09-21 | 2018-12-21 | 苏州光彩建筑钢品有限公司 | 一种集成型钢类住宅的墙体基础结构 |
| CN114382312A (zh) * | 2022-01-10 | 2022-04-22 | 北京科技大学 | 一种装配式槽钢-混凝土屈曲约束加固体系 |
| CN114775624A (zh) * | 2022-01-20 | 2022-07-22 | 中国建筑第八工程局有限公司 | 桩基坑防水支护结构及其施工方法 |
| CN117365009A (zh) * | 2023-10-16 | 2024-01-09 | 宁波建工工程集团有限公司 | 一种部分包覆钢-混凝土组合梁及其加工方法和设备 |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2008188666A (ja) * | 2007-01-09 | 2008-08-21 | Hino Motors Ltd | 部材接合構造 |
| JP2010209546A (ja) * | 2009-03-09 | 2010-09-24 | Railway Technical Res Inst | プレボーリングh形鋼杭 |
| CN101845854A (zh) * | 2010-05-14 | 2010-09-29 | 北京工业大学 | 具有悬链线效应的框架梁柱抗火节点及其施工方法 |
| CN201610639U (zh) * | 2010-02-25 | 2010-10-20 | 周仁财 | 放置式双开口形围束挫屈拘束韧性支撑结构改良 |
| CN104790383A (zh) * | 2013-08-15 | 2015-07-22 | 东通岩土科技(杭州)有限公司 | 一种基坑用立柱桩 |
| CN205369578U (zh) * | 2016-02-03 | 2016-07-06 | 北京堡瑞思减震科技有限公司 | 一种组合钢管混凝土h型钢大轴力屈曲约束支撑 |
| CN206298892U (zh) * | 2016-12-07 | 2017-07-04 | 福州大学 | 采用h 型钢与混凝土的组合桩 |
-
2016
- 2016-12-07 CN CN201611112875.6A patent/CN106480874B/zh not_active Expired - Fee Related
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2008188666A (ja) * | 2007-01-09 | 2008-08-21 | Hino Motors Ltd | 部材接合構造 |
| JP2010209546A (ja) * | 2009-03-09 | 2010-09-24 | Railway Technical Res Inst | プレボーリングh形鋼杭 |
| CN201610639U (zh) * | 2010-02-25 | 2010-10-20 | 周仁财 | 放置式双开口形围束挫屈拘束韧性支撑结构改良 |
| CN101845854A (zh) * | 2010-05-14 | 2010-09-29 | 北京工业大学 | 具有悬链线效应的框架梁柱抗火节点及其施工方法 |
| CN104790383A (zh) * | 2013-08-15 | 2015-07-22 | 东通岩土科技(杭州)有限公司 | 一种基坑用立柱桩 |
| CN205369578U (zh) * | 2016-02-03 | 2016-07-06 | 北京堡瑞思减震科技有限公司 | 一种组合钢管混凝土h型钢大轴力屈曲约束支撑 |
| CN206298892U (zh) * | 2016-12-07 | 2017-07-04 | 福州大学 | 采用h 型钢与混凝土的组合桩 |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109056774A (zh) * | 2018-09-21 | 2018-12-21 | 苏州光彩建筑钢品有限公司 | 一种集成型钢类住宅的墙体基础结构 |
| CN109056774B (zh) * | 2018-09-21 | 2024-01-30 | 苏州光彩建筑钢品有限公司 | 一种集成型钢类住宅的墙体基础结构 |
| CN114382312A (zh) * | 2022-01-10 | 2022-04-22 | 北京科技大学 | 一种装配式槽钢-混凝土屈曲约束加固体系 |
| CN114775624A (zh) * | 2022-01-20 | 2022-07-22 | 中国建筑第八工程局有限公司 | 桩基坑防水支护结构及其施工方法 |
| CN114775624B (zh) * | 2022-01-20 | 2023-09-01 | 中国建筑第八工程局有限公司 | 桩基坑防水支护结构及其施工方法 |
| CN117365009A (zh) * | 2023-10-16 | 2024-01-09 | 宁波建工工程集团有限公司 | 一种部分包覆钢-混凝土组合梁及其加工方法和设备 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN106480874B (zh) | 2018-09-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103883034B (zh) | 一种带边缘约束构件的装配式剪力墙及墙-梁连接结构 | |
| CN205840047U (zh) | 一种预制剪力墙新型竖缝连接结构 | |
| CN107143034A (zh) | 一种装配式混凝土框架结构梁柱刚性连接节点 | |
| CN112593644B (zh) | 一种预制装配式剪力墙竖缝连接结构及其施工方法 | |
| CN106480874B (zh) | 采用h型钢与混凝土的组合桩及其施工方法 | |
| CN105952044B (zh) | 一种全预制预应力混凝土楼板结构及预应力装配方法 | |
| CN211473051U (zh) | 一种预应力桁架墙板及使用该墙板制作的墙体 | |
| CN108571071A (zh) | 装配式预应力混凝土梁柱连接节点及施工方法 | |
| CN103352471B (zh) | 集装箱式活动房装配式型钢混凝土单双柱基础及施工方法 | |
| CN111663794A (zh) | 一种纵肋叠合剪力墙用墙体调平机构及施工方法 | |
| CN206298892U (zh) | 采用h 型钢与混凝土的组合桩 | |
| CN212927239U (zh) | 一种钢管混凝土柱-H钢梁-支撑-π形组合式角柱底部节点 | |
| CN210117712U (zh) | 一种搅拌成槽插入式预制组合箱基础结构 | |
| CN110685404A (zh) | 一种预制组合结构构造柱的施工方法 | |
| CN209040861U (zh) | 一种装配式仰拱结合拱墙喷射钢架混凝土的钢混连接结构 | |
| CN203795599U (zh) | 暗柱式预制钢筋混凝土构件连接节点 | |
| CN206815366U (zh) | 一种预制装配式基础 | |
| CN214831817U (zh) | 一种矮墩连续刚构桥 | |
| CN212375922U (zh) | 一种预应力封桩结构 | |
| CN111764401B (zh) | 全装配组合板撑 | |
| CN109629709B (zh) | 通过带螺栓砌块施加预压应力的填充墙及施工方法 | |
| CN114319642A (zh) | 一种装配式混凝土剪力墙竖向连接节点及施工方法 | |
| CN211499467U (zh) | 一种适用于钢结构建筑的预制组合结构构造柱 | |
| CN207032474U (zh) | 一种装配式混凝土框架结构梁柱刚性连接节点 | |
| CN206570996U (zh) | 一种带墙脚加强件的新型装配式剪力墙 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180918 Termination date: 20211207 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |