CN106437603A - Resin hole sealing device - Google Patents

Resin hole sealing device Download PDF

Info

Publication number
CN106437603A
CN106437603A CN201510491408.8A CN201510491408A CN106437603A CN 106437603 A CN106437603 A CN 106437603A CN 201510491408 A CN201510491408 A CN 201510491408A CN 106437603 A CN106437603 A CN 106437603A
Authority
CN
China
Prior art keywords
hole
sealing
waiting time
hdpe
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510491408.8A
Other languages
Chinese (zh)
Other versions
CN106437603B (en
Inventor
段克信
刘刚
国风
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIAONING RAND TECHNOLOGY DEVELOPMENT CO LTD
Original Assignee
Fuxin Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuxin Technology Co Ltd filed Critical Fuxin Technology Co Ltd
Priority to CN201510491408.8A priority Critical patent/CN106437603B/en
Publication of CN106437603A publication Critical patent/CN106437603A/en
Application granted granted Critical
Publication of CN106437603B publication Critical patent/CN106437603B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

Provided is a hole sealing device used for blocking pressure fluid in a coal drill hole. The hole sealing device is composed of structural adhesives special for stone bonding, a PU expanding agent and an impermeable HDPE composite film, the shear bond strength of the pressure sealing component structural adhesive film is high, and the impermeability of the permeability sealing component three-layer composite structure is strong. The length of a sealing body is 0.37 m, the construction waiting time is of an I type when being longer than 6 h and is of an II type when being 0.5-6 h, and the pressure sealing capacity is 31 Mpa (the diameter of the drill hole is 9.5 cm) to 53 Mpa (the diameter of the drill hole is 5.5 cm) and the permeability coefficient is 1.3x10<-7>m/s if the I type construction waiting time is 8 h; and the pressure sealing capacity is 15 Mpa (the diameter of the drill hole is 12.5 cm) to 24 Mpa (the diameter of the drill hole is 7.5 cm) and the permeability coefficient is 2.5x10<-7>m/s if the II type construction waiting time is 30 min.

Description

Resin hole packer
Technical field
The present invention relates to pump pressure water filling, the pressure fluid of pump pressure inlet well block in a kind of mine and Geotechnical Engineering, it is coal rock layer high pressure water injection, water Defeat split, grouting for water plugging, breaking surrounding rock slip casting solidification, the requisite device of special engineering such as gas pressure measurement.
Background technology
The closure of rock coal bed drilling pressure fluid is related to the hydraulic pressure scope of 0.3~40Mpa, and (firedamp taking-out discharging drilling envelope body two ends pressure reduction only about 0.2 is big The negative pressure of air pressure, is not related to the present invention) and several tens cm to more than ten meters hole sealing depth.Consider to be divided into two classes, pressure > by hydraulic pressure (pump pressure) 5Mpa should belong to high pressure, and pressure≤5Mpa should belong to mesolow;Consider also can be divided into two classes by hole sealing depth, envelope depth≤2m should belong to superficial part sealing of hole, Feng Shen > 2m should belong to deep sealing of hole.Superficial part sealing of hole hydraulic pressure is generally mesolow, and such as grouting for water plugging is pumped about 0.3~2Mpa, breaking surrounding rock solidification fluid injection pump pressure About 5Mpa, moistening coal seam dust-proof pump pressure < 5Mpa etc.;Deep sealing of hole hydraulic pressure is generally high pressure, and such as coal-bed flooding erosion control protrusion-dispelling is pumped 10~30Mpa, Coal seam hydraulic fracture protrusion-dispelling pump pressure > 20Mpa etc..Prior art superficial part sealing of hole uses rubber hole packer or quick-hardening cement.Rubber hole packer is using solid The frictional force that the elasticity of body rubber produces in hole wall carries out the device of sealing of hole, and it, to irregular rough and uneven in surface coal hole wall bad adaptability, tends to occur Lou Liquid, need to have inflation or filling device, and cost is very high, and application is restricted.Quick-hardening cement is to be with Portland cement or portland slag cement Base material, is doped with the rapid hardening hydraulic cementing materials that additive is made, and cementing strength is larger, and construction waiting time is shorter, but between hole wall and liquid pipe Narrow and small annular space feeding tamping difficult, deep sealing of hole can not be used for.Prior art deep sealing of hole uses polyurethane (PU) foam plasticss or water Mudstone sealing of hole.PU foam plasticss hole sealing structure is made up of the stifled liquid section at two ends and middle pumping double-component liquid material section, and stifled liquid section is by towelling circumvolution PU Feed liquid forms, and forms foam plasticss annulated column, annulated column long > 8m after feed liquid solidification between boring and water injection pipe.PU foam plasticss annulated column external boundary and rock The adhesion shearing strength of coal hole wall is low, and porous body easily permeates, and resistance to compression impermeability is low, construction waiting time longer (> 8h), operation need manual, Pumping two procedures, use cost is high.Behavior of Hardened Cement Paste sealing of hole body is also made up of the stifled slurry section and middle pumping cement mortar section at two ends, blocks up slurry section by patent PU foaming bag described in 200710098325.8 or towelling circumvolution PU feed liquid or cement mortar cloth bag formation, cement mortar is patent Cement material described in ZL200810019493.8 or the slurry of other cement admixture, Behavior of Hardened Cement Paste annulated column long > 8m.Due to Behavior of Hardened Cement Paste and rock coal borer hole wall Bond comes from the less intermolecular force of active force (Van der Waals force or hydrogen bond force etc.), adds that cement softness colloid is still within construction waiting time It is in solidification intensity and increase the starting stage, so the external boundary of cement softness annulated column is very low with the cementing shearing strength of rock coal hole wall, i.e. ability resistant to pressure Very low;Soft cement annulated column in the solidification starting stage is porous body again, and impermeability is also low, and (infiltration coefficient differs from 6 quantity compared with set cement Level);Also has construction waiting time length (general > 2d), operation needs manual, pumping two procedures.In a word, resistance to compression impermeability is low, waiting of constructing Time length and multi-process handling is three common problems of prior art pressure fluid sealing of hole.
Content of the invention
Need for pressure fluid in closure rock coal bed drilling, provide that a kind of short envelope body, resistance to compression impermeability are strong, construction waiting time is short, manual grasp Make resin hole packer convenient, that use cost is low.It is divided into plain edition (I) and fast curable type (II) by construction waiting time, plain edition is applied to be applied Work waiting time > 6h, fast curable type is applied to construction waiting time 0.5~6h.
Medium-sized feature is:1 bonding rock coal wall member is the epoxy adhesive sealing subpackage by proportioning, and physical and mechanical property requires conformance with standard The 5th article of JC887-2001;2 components applying glue laminated on rock coal hole wall are dual-component polyurethane extender, cream time > 2min, expansion rate > 400%;3 have water resistant concurrently to ooze, send the mounting structure of hole carrier be the composite geo-membrane bag having intermediate isolating for smearing outward the double-component of subpackage 2 in 1, Bag long two ends coated high density polyethylene (HDPE) (HDPE) film bar simultaneously has two detached HDPE film truncated cones, composite geo-membrane, HDPE bar film and HDPE Truncated cone film physical and mechanical property requires the 4th article of conformance with standard GB/T17642-1998.
The feature of II type is:1 bonding rock coal wall member presses, for double-component, the unsaturated polyester (UP) adhesive that proportioning seals subpackage, and physical and mechanical property will Seek the 6th article of conformance with standard JC/T989-2006;2 glue laminated is applied components on rock coal hole wall is dual-component polyurethane extender, cream time 1.5~ 4min, expansion rate > 400%;3 have water resistant concurrently to ooze, send the mounting structure of hole carrier be to have intermediate isolating for smearing outward the double-component of subpackage 2 in 1 Composite geo-membrane bag, composite geo-membrane, HDPE article of film and HDPE truncated cone film physical and mechanical property require conformance with standard GB/T17642-1998 the Article 4,.
Envelope body structure:After predetermined position in boring sent into by bag 3, in bag, polyurethane extender expands, and the paste glue laminated of bag outer surface is spread on hole wall, Material forms solid-state sealing of hole ring cylinder through gel solidification, and the structure of sealing of hole ring cylinder is divided into three components, sees Fig. 1.(1) resist fluids pressure member Structural film adhesive for external boundary;(2) compressive resistance fluid permeability component is three layers of waterproof HDPE film and the PU expander of composite construction;(3) resist The connecting elements pressing impervious component is glue infiltration building layer of cloth.
Material and construction featuress:(1) strengthening of resist fluids pressure texture part.Sealing of hole annulated column external boundary is that envelope body bears stream with the bonding plane of rock coal hole wall The constraint bearing of body pressure effect, the position that is, shearing force is concentrated.The present invention is used the application specific architecture glue of bonding stone material and steel force part as anti-current Body pressure member, because on the one hand it is the cohesive material using chemical bond force as bonding main contributions, chemical bond force is big one or two than intermolecular force The individual order of magnitude, on the other hand it is relatively short cohesive material hardening time, has been in the later stage of solidification process, cohesive force to construction waiting time Close to maximum.And the cohesive material that prior art uses and the cementation of stone material are mostly derived from intermolecular active force (Van der Waals force or hydrogen bond force Deng), little one or two order of magnitude than chemical bond force;On the other hand, the complete setting time of cement is 28d, is in only soft to applying Behavior of Hardened Cement Paste of lower waiting time Soft solid state, has just been in solidification initial stage, bond very little.(2) water-resisting property of compressive resistance fluid permeability component.Material permeability depends primarily on Porosity.The present invention uses three layers of waterproof HDPE film and PU expander composite structure impervious, and wherein infiltration coefficient is 10-11~-13cm/s HDPE film belong to non-porous water proof material, although PU expander is porous material, from encrypting the impervious and closely knit consideration of moulding, PU in bag Material is about 200% dress weight, big 4 times about of density ratio prior art PU foam plastic density by expansion rate in hole.To construction waiting time, existing Technologic material is all porous material, and wherein PU foam plasticss seal 1/4 that body density is about PU expansion body opening Midst density, the infiltration of flexible body Behavior of Hardened Cement Paste Big 6 orders of magnitude of coefficient ratio complete solidified water mudstone.(3) selection of II type rapid hardening structure glue and suitable cream time, gel time PU extender Preparation.For the requirement of engineering that construction waiting time is short, the selection of II type rapid hardening structure glue of the present invention achieves the early strong of envelope pressure component;PU is swollen Swollen dose of preparation meets cream time and is slightly less than to be done the time at the beginning of structure glue, gel time be slightly larger than the dry time at the beginning of structure glue it is achieved that smoothly send hole and Deposited glue.This 2 points deep sealing of holes solving the problems, such as short construction waiting time.
Beneficial effect:The beneficial effect of hole packer of the present invention embodies a concentrated reflection of oozes ability in the envelope pressure energy power of unit envelope body length and envelope.By simulation test Determine the present invention and prior art unit seals the envelope pressure energy power of body length and envelope oozes ability, and it is contrasted.
Sealing of hole annulated column is that uniform Fluid pressure effect is born in one end, and the other end is the hanging pillar of free end, and the shearing force of external boundary is equal to fluid pressure and brill Hole sectional area is long-pending.If shearing force is uniform on shear surface, then the expression formula of sealing of hole annulated column resist fluids pressure ability is:
σ in formula-by envelope fluid maximum pressure (MPa), [τ]-sealing of hole annulated column outer boundary adhesive shear strength (MPa), L- sealing of hole annulated column length (m), R Boring radius (m).For a concrete sealing of hole annulated column, dimensionless number 2L/R is constant, and therefore, [τ] is sealing of hole annulated column resist fluids pressure ability Sole indicator.According to Darcy's law, the expression formula of sealing of hole annulated column compressive resistance fluid neuron network amount is:
Q- sealing of hole annulated column seepage discharge (m in formula3/ h), K- sealing of hole annulated column infiltration coefficient (m/s), the same to formula (1) of other symbolic significance.For a concrete envelope Orifice ring post, ratio 1.13 × 106σR2/ L is constant, and therefore K is the sole indicator of sealing of hole annulated column compressive resistance fluid neuron network amount.
Measure [τ] and the K value of the present invention and prior art each pore self-sealing annulated column using simulation experiment, and then converted their envelope by formula (1) (2) Pressure energy power and envelope ooze ability.Analogue experiment installation is shown in Fig. 2, the long 35cm of borehole simulation steel pipe, internal diameter 6cm;Water filling pipe range 25cm, external diameter 2.7cm; Infiltration receives the long 20cm of steel pipe, internal diameter 6cm;The sealing long 20cm of steel compression leg;External diameter 5.97cm;Sealing of hole annulated column length 10~12cm;Pressurized water is long 23~25cm.I type of the present invention and prior art PU foam plasticss sealing of hole annulated column curing time (age) in borehole simulation steel pipe be respectively 4h, 8h and 24h, II type sealing of hole annulated column curing time 0.5h of the present invention, prior art Behavior of Hardened Cement Paste sealing of hole annulated column curing time 48h, care environments temperature 23 °±2°.Test quantity every kind of sealing of hole each age of annulated column tests 3 pieces, takes its meansigma methods as measurement result.Sealing of hole annulated column, Water hydraulic static pressure loading All take from prototype (engineering is in kind), accomplish completely similar.In order to solve the Similar Problems of borehole simulation steel pipe and prototype rock coal hole, carry out first Stone plate-stone material version and steel plate-steel plate gluing connect, cementing and PU foam adhesion compression shear strength test, the maintenance of testpieces cohesive material Time is 48 hours.Compression shear strength result of the test connects steel-steel 18.4Mpa, stone material-stone material 17.0Mpa for gluing;Cementing steel-steel 0.68Mpa, stone material-stone material 1.36Mpa;PU foam adheres to steel-steel 0.96Mpa, stone material-stone material 0.59Mpa.Show that prototype is sheared with model The ratio chi of intensity is respectively gluing access n=17.0/18.4=0.92, cementing λ n=1.36/0.68=2, and PU foam adheres to λ N=0.59/0.96=0.61.
Test result calculates model [τ] by formula (1), then calculates prototype [τ] n=λ n [τ] than chi by force by cutting, and result is listed in table 1.Rock coal in prototype In hole wall and model, steel pipe walls are all solid wall surface, and two mobile phases answer boundary property identical, meet boundary condition similar.The survey of sealing of hole annulated column seepage flow Test result calculates to obtain corresponding K value, as the K value of prototype by formula (2), and result is listed in table 1.
Table 1 sealing of hole annulated column external boundary shearing strength and infiltration coefficient test result
Test result shows, compared with prior art unit length sealing of hole annulated column, the present invention seals body construction waiting time 4h, 8h, 24h to the present invention Resist fluids pressure capability is 35 times, 46 times, 37 times that PU foam seals body respectively;Be construction waiting time 48h Behavior of Hardened Cement Paste seal 11 times of body, 20 times, 23 times, compressive resistance fluid permeability ability is 26 times, 18 times, 5 times that PU foam seals body respectively, is construction waiting time 48h cement Stone seals 2.9 times, 4.6 times, 4.7 times of body.Hole packer of the present invention seals body effective length 0.37m, I type construction waiting time 8h envelope pressure energy power 31Mpa (bore diameter 9.5cm)~53Mpa (bore diameter 5.5cm), infiltration coefficient 1.3 × 10-7m/s;II type construction waiting time 0.5h envelope pressure energy Power 15Mpa (bore diameter 12.5cm)~24Mpa (bore diameter 7.5cm), infiltration coefficient 2.5 × 10-7m/s.
Advantage:(1) envelope body is short, and it is strong that envelope press seal oozes ability.Hole packer of the present invention seals body effective length 0.37m, construction waiting time 8h deep envelope pressure Ability 31~53Mpa, infiltration coefficient 1.3 × 10-7M/s, envelope body length is about 1/22 that prior art seals body length (> 8m), unit Feng Tichang Degree envelope pressure energy power and envelope ooze 46 times and 18 times that ability is prior art respectively.(2) construction waiting time is short, can carry out superficial part or deep sealing of hole. II type construction waiting time 30min of the present invention, and deep sealing of hole can be carried out.Prior art quick-hardening cement can be constructed waiting time 30min sealing of hole, but It is unable to deep sealing of hole;The construction waiting time of other envelope bodies is longer than 8h.(3) manual operations is convenient and easy.Hole packer of the present invention is by 2~3 staff Work operates, operating time about 4min.Prior art deep sealing of hole needs manual and liquid pump two procedure operation, operating time about > 10min.(4) make Use low cost.Hole packer material of the present invention weighs about 1000~1500g, is 1/3~1/4, the Liang Zhedan that PU foam Feng Tixu material weighs about 3500~6000g Quite, that is, use cost saves more than 65% than prior art to valency;Rubber hole packer cost is higher.
Brief description
Fig. 1 is resin hole packer structure chart, Fig. 2 sealing of hole aptitude tests structure drawing of device
Specific embodiment
I type operating procedure:2~3 people's manual operationss.Take one section of liquid injection pipe, two HDPE truncated cone major parts are inserted in from liquid injection pipe two ends respectively;Beat Opening structure poly-bag intermediate isolating fully rubbing is held more than 30 times, and part-structure glue is put in two HDPE truncated cones on liquid injection pipe tear structure poly-bag Between the long 40cm in predetermined sealing of hole position at;Open composite geo-membrane bag intermediate isolating quickly rubbing to hold about 30 times, the composite geo-membrane bag after holding will be rubbed Two ends HDPE film bar adhesive tape covers and is bundled at liquid injection pipe daub;Apply daub in composite geo-membrane bagging length range, by two HDPE truncated cones Sliding is enclosed within composite geo-membrane bag two ends blend compounds band and bundlees truncated cone microcephaly position.Afterwards, a little structure is smeared at joint coin silk in manual heat crossover side Glue, until send hole sealing bag to hole sealing depth.Just bundled with adhesive tape before end liquid injection pipe arranges an adapter and rubbed the PU holding when sending hole Aluminium plastic membrane bag, its effect is to cut stifled infiltration and support liquid injection pipe.
Hold composite geo-membrane bag and start it is allowed to operating time 6min from rubbing.
II type operating procedure:2 people's manual operationss.Take one section of liquid injection pipe, two HDPE truncated cone major parts are inserted in from liquid injection pipe two ends respectively;Open Rapid hardening structure poly-bag intermediate isolating fully rubbing is held more than 30 times, tear poly-bag part glue is put on pre- in the middle of two HDPE truncated cones on liquid injection pipe Determine at the long 40cm in sealing of hole position;Open composite geo-membrane bag intermediate isolating quickly rubbing to hold 30 times, the composite geo-membrane bag two ends HDPE after holding will be rubbed Film bar adhesive tape covers and is bundled at liquid injection pipe daub;Apply daub in composite geo-membrane bagging length range, two HDPE truncated cone slidings are enclosed within multiple Close geomembrane bag two ends blend compounds band and bundle truncated cone microcephaly position.Afterwards, a little structure glue is smeared at joint coin silk in manual heat crossover side, until sending Hole sealing bag is to hole sealing depth.
Hold composite geo-membrane bag and start it is allowed to operating time 4min from rubbing.
Embodiment 1:Coal seam high pressure water injection prevention bump and coal and gas prominent.Bore diameter 6.5cm, water filling pipe diameter 2.7cm, plugman Make pressure 15Mpa, hole sealing depth 9m, construct waiting time 8h.Using I type hole packer sealing of hole of the present invention, the aluminum plastic film bag of intermediate isolating is by joining Ratio 1: 1 subpackage epoxy adhesive 300g, long 45cm width 22cm composite geo-membrane bag subpackage PU extender double-component 300g of intermediate isolating, in Between isolation aluminum plastic film support pouches subpackage PU extender double-component 200g, by specific embodiment operating process operation, actual operating time 4min, Feng Tichang 0.37m.Using polyurethane foam sealing of hole, material weight 4000g, 3 people are manual, the operation of hydraulic pump two procedure, operating time 10min.Knot Fruit is that both compare hole packer of the present invention and save artificial 2 people, material-saving and material cost 80%.
Embodiment 2:Coal seam high pressure water injection prevention bump and coal and gas prominent.Bore diameter 5.5cm, water filling pipe diameter 2.7cm, plugman Make pressure 18Mpa, hole sealing depth 9m, construct waiting time 8h.Using I type hole packer sealing of hole of the present invention, the aluminum plastic film bag of intermediate isolating is by joining Ratio 1: 1 subpackage epoxy adhesive 240g, long 45cm width 19cm composite geo-membrane bag subpackage PU extender double-component 240g of intermediate isolating, in Between isolation aluminum plastic film support pouches subpackage PU extender double-component 200g, by specific embodiment operating process operation, actual operating time 4min, Feng Tichang 0.37m.Using polyurethane foam sealing of hole, material weight 3200g, 3 people are manual, the operation of hydraulic pump two procedure, operating time 10min.Knot Fruit is that both compare hole packer of the present invention and save artificial 2 people, material-saving and material cost 80%.

Claims (1)

1. during a kind of closure coal rock layer is holed, the hole packer of pressure fluid, is divided into plain edition (I) and fast curable type (II) by construction waiting time, Plain edition is applied to construction waiting time > 6h, and fast curable type is applied to construction waiting time 0.5~6h, it is characterized in that:Hole packer Epoxy adhesive or the unsaturated polyester (UP) adhesive that double-component is sealed subpackage by proportioning is applied, the built-in double-component of hole packer is gathered outside surface Urethane extender, I type cream time > 2min, II type cream time 1.5~4min, expansion rate > 400%, hole packer table Smear double-component outside face to gather with the built-in double-component of hole packer by the epoxy adhesive of proportioning sealing subpackage or unsaturated polyester (UP) adhesive There is the composite geo-membrane bag of isolation, the long two ends of bag coated high density polyethylene (HDPE) (HDPE) film bar is simultaneously standby between urethane extender There are two detached HDPE film truncated cones, composite geo-membrane, HDPE bar film and HDPE truncated cone film.
CN201510491408.8A 2015-08-09 2015-08-09 Resin hole packer Active CN106437603B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510491408.8A CN106437603B (en) 2015-08-09 2015-08-09 Resin hole packer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510491408.8A CN106437603B (en) 2015-08-09 2015-08-09 Resin hole packer

Publications (2)

Publication Number Publication Date
CN106437603A true CN106437603A (en) 2017-02-22
CN106437603B CN106437603B (en) 2018-11-02

Family

ID=58092911

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510491408.8A Active CN106437603B (en) 2015-08-09 2015-08-09 Resin hole packer

Country Status (1)

Country Link
CN (1) CN106437603B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113339043A (en) * 2021-07-05 2021-09-03 山东科技大学 Uniform water injection disaster prevention method for high-impact-tendency coal seam
CN114673469A (en) * 2022-03-06 2022-06-28 辽宁兰特科技发展有限公司 Semi-overlapping sleeve bag type gas drilling and sealing device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040007147A1 (en) * 2001-09-12 2004-01-15 Stemlock, Incorporated Inflatable gas bag for use as a borehole plug
CN101942842A (en) * 2010-09-01 2011-01-12 偃师市天宇土工合成材料有限公司 Composite geomembrane anti-seepage construction splicing method
CN201794607U (en) * 2010-06-24 2011-04-13 阜新实达科技开发有限公司 Bag for synthesizing mining polyurethane foam on the spot
CN202690114U (en) * 2011-06-21 2013-01-23 高珍会 Sealant-injection hole sealing device for gas drilling hole of coal mine
CN103452519A (en) * 2013-07-29 2013-12-18 洛阳嘉冠化工产品有限公司 Double-bag sealing device for gas drainage holes
CN203994956U (en) * 2014-07-09 2014-12-10 仪征易力土工合成材料有限公司 A kind of novel polyethylene, polyester waterproof coiled material
WO2015094897A1 (en) * 2013-12-19 2015-06-25 Ge Oil & Gas Esp, Inc. Method for reducing permeability of downhole motor protector bags

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040007147A1 (en) * 2001-09-12 2004-01-15 Stemlock, Incorporated Inflatable gas bag for use as a borehole plug
CN201794607U (en) * 2010-06-24 2011-04-13 阜新实达科技开发有限公司 Bag for synthesizing mining polyurethane foam on the spot
CN101942842A (en) * 2010-09-01 2011-01-12 偃师市天宇土工合成材料有限公司 Composite geomembrane anti-seepage construction splicing method
CN202690114U (en) * 2011-06-21 2013-01-23 高珍会 Sealant-injection hole sealing device for gas drilling hole of coal mine
CN103452519A (en) * 2013-07-29 2013-12-18 洛阳嘉冠化工产品有限公司 Double-bag sealing device for gas drainage holes
WO2015094897A1 (en) * 2013-12-19 2015-06-25 Ge Oil & Gas Esp, Inc. Method for reducing permeability of downhole motor protector bags
CN203994956U (en) * 2014-07-09 2014-12-10 仪征易力土工合成材料有限公司 A kind of novel polyethylene, polyester waterproof coiled material

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113339043A (en) * 2021-07-05 2021-09-03 山东科技大学 Uniform water injection disaster prevention method for high-impact-tendency coal seam
CN113339043B (en) * 2021-07-05 2022-04-08 山东科技大学 Uniform water injection disaster prevention method for high-impact-tendency coal seam
CN114673469A (en) * 2022-03-06 2022-06-28 辽宁兰特科技发展有限公司 Semi-overlapping sleeve bag type gas drilling and sealing device

Also Published As

Publication number Publication date
CN106437603B (en) 2018-11-02

Similar Documents

Publication Publication Date Title
Xiang et al. A flexible gel sealing material and a novel active sealing method for coal-bed methane drainage boreholes
CN103898873B (en) To Construction of Silo seam infiltration leak-blocking construction method under high water head
CN102443383B (en) High-dehydration hardenable plugging sealing agent
CN102434194B (en) Gas drainage drill hole structure formed in coal layer and method for fabricating same
CN106596400B (en) A kind of evaluating apparatus and experimental method of second contact surface bonding quality of cementing the well
CN106381863B (en) Drilling and grouting composite device for grouting and reinforcing water-rich sand layer and construction process
CN107589020B (en) A kind of hydraulic fracturing test method based on stress path
CN108409937A (en) A kind of polyurethane waterglass composite grouting material and preparation method thereof
CN110671119A (en) High-performance bentonite for shield construction and preparation process of mud film of high-performance bentonite
CN106437603A (en) Resin hole sealing device
Wang et al. A novel self-generating nitrogen foamed cement: The preparation, evaluation and field application
Guo et al. Physical simulation of water inrush through the mine floor from a confined aquifer
CN104449609A (en) Active pressure maintaining and hole sealing material for gas extraction drill hole and hole sealing process thereof
CN105421475A (en) Air bag type curtain leakage blocking device and method
CN1936270B (en) Multilayer enclosing-rock cement-grouting consolidation ring tunnel bearing structure and its construction method
Bodi et al. Polyurethane grouting technologies
CN104962249A (en) Load-bearing plugging agent for land drilling fluids and application method thereof
CN104987856A (en) Pressure bearable plugging agent for marine drilling fluid and application method therefor
Wang et al. Diffusion mechanism of cement-based slurry in frozen and thawed fractured rock mass in alpine region
CN109633098A (en) Cementing concrete ring microcrack sealing agent enters merit rating device and evaluation method
CN112252491A (en) Seepage-proofing device for concrete structure deformation joint and construction process thereof
CN209356472U (en) Cementing concrete ring microcrack sealing agent enters merit rating device
CN107201753B (en) It is a kind of for basement or the high-pressure slip-casting blocking method of top plate of underground parking garage
CN109882203A (en) A kind of joint filling reinforcement process
CN106468153A (en) Wall rock drill-hole high-pressure fluid locks pressure system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
DD01 Delivery of document by public notice

Addressee: FUXIN BEIGE TECHNOLOGY CO.,LTD.

Document name: Notification of Publication and of Entering the Substantive Examination Stage of the Application for Invention

DD01 Delivery of document by public notice
CB02 Change of applicant information
CB02 Change of applicant information

Address after: Fuxin City, Liaoning Province, East Ring Road 123000 Xihe District 2-7-103

Applicant after: FUXIN BEIGE TECHNOLOGY CO.,LTD.

Address before: 123000 Fuxin, Taiping District, Liaoning Taiping Street, room 3, No. 107

Applicant before: FUXIN BEIGE TECHNOLOGY CO.,LTD.

DD01 Delivery of document by public notice

Addressee: FUXIN BEIGE TECHNOLOGY CO.,LTD.

Document name: the First Notification of an Office Action

DD01 Delivery of document by public notice
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230529

Address after: No. 17, East Section of Yanshan Road, Zone A, Dongdaihe New Area, Huludao City, Liaoning Province

Patentee after: Liaoning Rand Technology Development Co.,Ltd.

Address before: 123000 2-7-103, East Ring Road, Xihe District, Fuxin City, Liaoning Province

Patentee before: FUXIN BEIGE TECHNOLOGY CO.,LTD.

TR01 Transfer of patent right