CN103898873B - To Construction of Silo seam infiltration leak-blocking construction method under high water head - Google Patents

To Construction of Silo seam infiltration leak-blocking construction method under high water head Download PDF

Info

Publication number
CN103898873B
CN103898873B CN201410115114.0A CN201410115114A CN103898873B CN 103898873 B CN103898873 B CN 103898873B CN 201410115114 A CN201410115114 A CN 201410115114A CN 103898873 B CN103898873 B CN 103898873B
Authority
CN
China
Prior art keywords
grouting
pressure
hole
construction
sealing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410115114.0A
Other languages
Chinese (zh)
Other versions
CN103898873A (en
Inventor
汪和平
李锐
刘丙瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ASCG Co Ltd
Original Assignee
ASCG Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ASCG Co Ltd filed Critical ASCG Co Ltd
Priority to CN201410115114.0A priority Critical patent/CN103898873B/en
Publication of CN103898873A publication Critical patent/CN103898873A/en
Application granted granted Critical
Publication of CN103898873B publication Critical patent/CN103898873B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

To Construction of Silo seam infiltration leak-blocking construction method under a kind of high water head of the present invention, I, II, III sequence grout hole is arranged in the certain limit of gap, by high pressure grouting pump, soluble polyurethane chemical material is injected distress in concrete, the moisture meeting dispersion rapidly in distress in concrete, emulsification, expansion, consolidation is run into when slurries, current are fully blocked in outside concrete structure by the elastomer-filled concrete all slits of such consolidation.Simultaneously in the side, the face that leaks in per pass crack, use chemical grouting material to fill with the space between steel plate and metope, thus ensure steel plate and body of wall seamless combination.At infiltration side blocking construction, not by the impact of outer water level, do not affect the normal operation of water conservancy code simultaneously yet, improve project benefit.It has the advantages such as construction safety, speed is fast, reliable in quality, cost are low.

Description

To Construction of Silo seam infiltration leak-blocking construction method under high water head
Technical field
The present invention relates to To Construction of Silo field, power station, particularly To Construction of Silo seam infiltration leak-blocking construction method under a kind of high water head.
Background technology
In hydraulic engineering construction, air vent or gate shaft are the shaft structures often run into.Due to the characteristic of engineering itself, shaft structure is generally highly all at about tens meters, even higher.During construction, all to be built to top section by bottom at anhydrous condition to form, every section of contact surface is referred to as constuction joint, if constuction joint is before building concrete last time, fail strictly to carry out technical finesse by code requirement, this bonding surface will be the weak floor of structure, generation be destroyed under external force, under hydraulic pressure effect, this constuction joint can have water leakage.In China's hydraulic engineering construction, it is one of hidden danger affecting hydraulic engineering safe operation that vertical shaft high water head seeps water by force always, is the safety of water conservancy construction and a technical difficult problem, and how effectively under blocking high-pressure power, strong infiltration does not but have practicable construction method.
Leak stopping under current high water head generally adopts is down to below leakage by outer water level, ensures that leakage carries out the packing materials such as pass cement injection or cement mortar without when hydraulic pressure.Main method is:
The outer water level of leakage is reduced below leakage, to ensure that seepage place is without inside and outside differential water pressures.Arrange plug in leakage side, hole at leakage opposite side by I, II, III sequence hole site, boring adopts air drill or electric drilling machine pore-forming, and hole depth is generally not less than 2/3. of structure thickness and then carries out hole clearly.Bury grout pipe and return pipe underground, adopt high-pressure grouting machine, grout injection or cement mortar.Pouring quality to be checked qualified after carry out sealing of hole.
But there is following shortcoming in the method:
In a variety of situation, outer water level to reduce in passing, cannot ensure be in the milk without under water pressures.Gap is little, and cement mortar can not pay the seam completely, causes leak stopping thorough, can not solve seepy question at all.Cement paste or cement mortar setting time long, solidify rear easy contraction and produce gap, that causes recharges often, and the construction period is long, and construction cost is large.During blocking construction, affect the normal operation of hydraulic engineering.
Therefore, To Construction of Silo seam infiltration leak-blocking construction method under a kind of brand-new high water head is provided, under the prerequisite not affecting normal water yield engineering, blocking construction can be carried out, and the later stage can solve seepy question just seems particularly important at all.
Summary of the invention
For solving the problem, under the invention provides a kind of high water head, To Construction of Silo stitches infiltration leak-blocking construction method, this method overcomes the deficiencies in the prior art, solve at the technical barrier having leak stopping under hydraulic pressure effect, not only less investment, cost is low, safe and reliable, construction speed is fast, and does not affect hydraulic engineering and normally run.
For achieving the above object, technical scheme of the present invention is:
To Construction of Silo seam infiltration leak-blocking construction method under a kind of high water head, concrete steps are as follows:
Step one: pouring material is selected: select soluble polyurethane chemical slip casting material as fissure filling material;
Step 2: open fire process: block pervious seam sealing to create safe construction environment and to prevent chemical material from leaking outside with fibrous material before grouting treatment;
Step 3: boring: 5-10cm arranges bore position above gap, boring adopts electric drilling machine, and alloy bit creeps into, and boring aperture is 14mm; Guarantee that the Water slop injector of diameter 10mm can be put into extrude and expand;
Step 4: crack is rinsed: pass into enough current with conduit, rinse from the method for rinsing to hole at the bottom of hole; Terminate until the rear 10min of backwater clarification or total washing time are no less than 20min; The water pressure that crack is rinsed adopts 80% grouting pressure;
Step 5: with slurry: guarantee that grouting agent and solidfied material reach following technical indicator: slurries: serum density >1.11g/cm 3, initial viscosity <30/mpa.s, operable time >30min; Solidfied material: tensile strength>=20MPa, dry bonding>=4.0MPa, wet bonding>=3.0MPa, impermeability pressure>=2.5MPa, impermeability pressure are than>=400%;
Step 6: grouting:
(1) grouting method: grouting employing aperture is closed, pure pressure type grouting; Select grouting pressure to reach 700kgf/cm2, the high-pressure grouting machine in the gap of more than 0.02mm can be entered;
(2) grouting pressure: grouting pressure chooses 1.0MPa; Along with grouting position is different, grouting pressure progressively strengthens; Grouting pressure is as the criterion according to experiment value with orifice pressure gage intermediate value, and beat of pointer scope is less than 20% of grouting pressure; Grouting pressure should reach experiment value as early as possible, the hole section that permeability rate is large, injection rate is larger, takes classification boost, namely on the basis of crack flushing or packer permeability test pressure, 1MPa basis is one-level by every 0.2 ~ 0.4MPa, and the stabilization time of every stage pressure should not be less than 5min; Voltage stabling control should be extended to being not more than ten minutes when beat of pointer distortion is abnormal; Gang up hole when being in the milk simultaneously, both sides differing pressure 0.2MPa should be made by controlled pressure respectively;
(3) injecting process finished criteria: grout compartment is under maximum design pressure, and injection rate is not more than 0.02L/ (min.m) to be continued perfusion 30min or reach gelling time to stop grouting afterwards;
After grouting terminates, in time with absolute ethyl alcohol by clean to grout pump, grouting pipeline and grouting cleaning container, use in order to next time;
Step 7: sealing of hole: after grout compartment grouting terminates, close slurry-inlet valve door immediately to carry out closing slurry, after gauge hand nature back to zero, carry out grouting sealing of hole, grouting sealing of hole adopts " displacement and pressure grouting method of pore sealing ", after whole hole section has been in the milk, adopt 0.5:1 cement underflow, carry out grout replacement and pure pressure type grouting sealing of hole, sealing of hole grouting pressure is for being in the milk maximum controlled pressure in this hole, Grain filling duration is not less than 1h, and sealing of hole terminates.
Further, after step 7 sealing of hole terminates, steel plate reinforcement process is carried out to per pass pervious seam; Steel plate thickness 12mm, paint preservative treatment is done on surface, and steel plate reserves grout hole, peephole, is used as extruding buffer strip guarantees in metope closely knit inside metope contact surface with the thick rubber strip of 1cm; Steel plate is connected with metope and adopts the expansion anchor of 12mm to fix, and spacing is 20cm, and steel plate surface and metope gap use soluble polyurethane chemical slip casting material to fill.
Further, being specifically set to of bore position in described step 4:
One sequence hole: pitch-row controls at 0.5cm, hole depth is wall thickness 1/2;
Two sequence holes: hole site is in the middle of a sequence hole, and hole depth is wall thickness 1/2-2/3; Prevent and Lou fill with phenomenon, thus play reinforcement effect;
Three sequence holes: position, hole hole depth between one or two sequence holes is wall thickness 2/3 place, guarantees to stretch into and consolidates plugging effect.
Further, when there is height multilayer constuction joint, leak stopping order is carried out to lower from eminence.
Relative to prior art, beneficial effect of the present invention is:
1, adopt soluble polyurethane chemical grouting material, after using high pressure grouting leak stopping, a leak stopping is successful.
2, at infiltration side blocking construction, not by the impact of outer water level, do not affect the normal operation of water conservancy code simultaneously yet, improve project benefit.
We are for the situation of mill pool pumped storage power plant inducer vertical shaft infiltration, utilize high-pressure grouting machine that soluble polyurethane chemical material is injected distress in concrete, and at infiltration facial cleft seam place by the blocking construction scheme that steel plate pressure rubber strip is reinforced, successfully complete the blocking construction of many infiltration constuction joints in vertical shaft.Mill pool pumped storage power plant inducer vertical shaft has the infiltration of 5 constuction joints, and milliosmolarity is at about 0.1m3/s, and through the method leak stopping, 20 days construction periods, disposable blocking is leaked, and is constantly changed, do not find that the phenomenon of leaking occurs by the past few years reservoir level.This construction method has construction safety, and construction speed is fast, reliable construction quality, good in economic efficiency construction characteristic.
Accompanying drawing explanation
Fig. 1 is that grout hole of the present invention arranges schematic diagram.
Wherein: 1-leaks sample body, 2-leaks crack, I-I sequence grout hole, II-II sequence grout hole, III-III sequence grout hole.
Detailed description of the invention
Below in conjunction with the drawings and the specific embodiments, the present invention program is described in further details:
To Construction of Silo seam infiltration leak-blocking construction method under a kind of high water head, concrete steps are as follows:
Step one: pouring material is selected: select soluble polyurethane chemical slip casting material as fissure filling material;
Step 2: open fire process: block pervious seam sealing to create safe construction environment and to prevent chemical material from leaking outside with fibrous material before grouting treatment;
Step 3: boring: 5-10cm arranges bore position above gap, boring adopts electric drilling machine, and alloy bit creeps into, and boring aperture is 14mm; Guarantee that the Water slop injector of diameter 10mm can be put into extrude and expand;
Step 4: crack is rinsed: pass into enough current with conduit, rinse from the method for rinsing to hole at the bottom of hole; Terminate until the rear 10min of backwater clarification or total washing time are no less than 20min; The water pressure that crack is rinsed adopts 80% grouting pressure;
Step 5: with slurry: guarantee that grouting agent and solidfied material reach following technical indicator: slurries: serum density >1.11g/cm 3, initial viscosity <30/mpa.s, operable time >30min; Solidfied material: tensile strength>=20MPa, dry bonding>=4.0MPa, wet bonding>=3.0MPa, impermeability pressure>=2.5MPa, impermeability pressure are than>=400%;
Step 6: grouting:
(1) grouting method: grouting employing aperture is closed, pure pressure type grouting; Select grouting pressure to reach 700kgf/cm2, the high-pressure grouting machine in the gap of more than 0.02mm can be entered;
(2) grouting pressure: grouting pressure chooses 1.0MPa; Along with grouting position is different, grouting pressure progressively strengthens; Grouting pressure is as the criterion according to experiment value with orifice pressure gage intermediate value, and beat of pointer scope is less than 20% of grouting pressure; Grouting pressure should reach experiment value as early as possible, the hole section that permeability rate is large, injection rate is larger, takes classification boost, namely on the basis of crack flushing or packer permeability test pressure, 1MPa basis is one-level by every 0.2 ~ 0.4MPa, and the stabilization time of every stage pressure should not be less than 5min; Voltage stabling control should be extended to being not more than ten minutes when beat of pointer distortion is abnormal; Gang up hole when being in the milk simultaneously, both sides differing pressure 0.2MPa should be made by controlled pressure respectively;
(3) injecting process finished criteria: grout compartment is under maximum design pressure, and injection rate is not more than 0.02L/ (min.m) to be continued perfusion 30min or reach gelling time to stop grouting afterwards;
After grouting terminates, in time with absolute ethyl alcohol by clean to grout pump, grouting pipeline and grouting cleaning container, use in order to next time;
Step 7: sealing of hole: after grout compartment grouting terminates, close slurry-inlet valve door immediately to carry out closing slurry, after gauge hand nature back to zero, carry out grouting sealing of hole, grouting sealing of hole adopts " displacement and pressure grouting method of pore sealing ", after whole hole section has been in the milk, adopt 0.5:1 cement underflow, carry out grout replacement and pure pressure type grouting sealing of hole, sealing of hole grouting pressure is for being in the milk maximum controlled pressure in this hole, Grain filling duration is not less than 1h, and sealing of hole terminates.
Further, after step 7 sealing of hole terminates, steel plate reinforcement process is carried out to per pass pervious seam; Steel plate thickness 12mm, paint preservative treatment is done on surface, and steel plate reserves grout hole, peephole, is used as extruding buffer strip guarantees in metope closely knit inside metope contact surface with the thick rubber strip of 1cm; Steel plate is connected with metope and adopts the expansion anchor of 12mm to fix, and spacing is 20cm, and steel plate surface and metope gap use soluble polyurethane chemical slip casting material to fill.
Further, being specifically set to of bore position in described step 4:
One sequence hole: pitch-row controls at 0.5cm, hole depth is wall thickness 1/2;
Two sequence holes: hole site is in the middle of a sequence hole, and hole depth is wall thickness 1/2-2/3; Prevent and Lou fill with phenomenon, thus play reinforcement effect;
Three sequence holes: position, hole hole depth between one or two sequence holes is wall thickness 2/3 place, guarantees to stretch into and consolidates plugging effect.
Further, when there is height multilayer constuction joint, leak stopping order is carried out to lower from eminence.
Mill pool pumped storage power plant inducer vertical shaft has the infiltration of 5 constuction joints, and milliosmolarity is at about 0.1m3/s, and through the method leak stopping, 20 days construction periods, disposable blocking is leaked, and is constantly changed, do not find that the phenomenon of leaking occurs by the past few years reservoir level.
The above, be only the specific embodiment of the present invention, but protection scope of the present invention is not limited thereto, and any change of expecting without creative work or replacement, all should be encompassed within protection scope of the present invention.Therefore, the protection domain that protection scope of the present invention should limit with claims is as the criterion.

Claims (4)

1. a To Construction of Silo seam infiltration leak-blocking construction method under high water head, it is characterized in that, concrete steps are as follows:
Step one: pouring material is selected: select soluble polyurethane chemical slip casting material as fissure filling material;
Step 2: open fire process: block pervious seam sealing to create safe construction environment and to prevent chemical material from leaking outside with fibrous material before grouting treatment;
Step 3: boring: 5-10cm arranges bore position above gap, boring adopts electric drilling machine, and alloy bit creeps into, and boring aperture is 14mm; Guarantee that the Water slop injector of diameter 10mm can be put into extrude and expand;
Step 4: crack is rinsed: pass into enough current with conduit, rinse from the method for rinsing to hole at the bottom of hole; Terminate until the rear 10min of backwater clarification or total washing time are no less than 20min; The water pressure that crack is rinsed adopts 80% grouting pressure;
Step 5: with slurry: guarantee that grouting agent and solidfied material reach following technical indicator: slurries: serum density >1.11g/cm 3, initial viscosity <30/mpa.s, operable time >30min; Solidfied material: tensile strength>=20MPa, dry bonding>=4.0MPa, wet bonding>=3.0MPa, impermeability pressure>=2.5MPa, impermeability pressure are than>=400%;
Step 6: grouting:
(1) grouting method: grouting employing aperture is closed, pure pressure type grouting; Select grouting pressure to reach 700kgf/cm2, the high-pressure grouting machine in the gap of more than 0.02mm can be entered;
(2) grouting pressure: grouting pressure chooses 1.0MPa; Along with grouting position is different, grouting pressure progressively strengthens; Grouting pressure is as the criterion according to experiment value with orifice pressure gage intermediate value, and beat of pointer scope is less than 20% of grouting pressure; Grouting pressure should reach experiment value as early as possible, the hole section that permeability rate is large, injection rate is larger, takes classification boost, namely on the basis of crack flushing or packer permeability test pressure, 1MPa basis is one-level by every 0.2 ~ 0.4MPa, and the stabilization time of every stage pressure should not be less than 5min; Voltage stabling control should be extended to being not more than ten minutes when beat of pointer distortion is abnormal; Gang up hole when being in the milk simultaneously, both sides differing pressure 0.2MPa should be made by controlled pressure respectively;
(3) injecting process finished criteria: grout compartment is under maximum design pressure, and injection rate is not more than 0.02L/ (min.m) to be continued perfusion 30min or reach gelling time to stop grouting afterwards;
After grouting terminates, in time with absolute ethyl alcohol by clean to grout pump, grouting pipeline and grouting cleaning container, use in order to next time;
Step 7: sealing of hole: after grout compartment grouting terminates, close slurry-inlet valve door immediately to carry out closing slurry, after gauge hand nature back to zero, carry out grouting sealing of hole, grouting sealing of hole adopts " displacement and pressure grouting method of pore sealing ", after whole hole section has been in the milk, adopt 0.5:1 cement underflow, carry out grout replacement and pure pressure type grouting sealing of hole, sealing of hole grouting pressure is for being in the milk maximum controlled pressure in this hole, Grain filling duration is not less than 1h, and sealing of hole terminates.
2. the method for claim 1, is characterized in that, after step 7 sealing of hole terminates, carry out steel plate reinforcement process to per pass pervious seam; Steel plate thickness 12mm, paint preservative treatment is done on surface, and steel plate reserves grout hole, peephole, is used as extruding buffer strip guarantees in metope closely knit inside metope contact surface with the thick rubber strip of 1cm; Steel plate is connected with metope and adopts the expansion anchor of 12mm to fix, and spacing is 20cm, and steel plate surface and metope gap use soluble polyurethane chemical slip casting material to fill.
3. method as claimed in claim 2, is characterized in that, being specifically set to of bore position in described step 3:
One sequence hole: pitch-row controls at 0.5cm, hole depth is wall thickness 1/2;
Two sequence holes: hole site is in the middle of a sequence hole, and hole depth is wall thickness 1/2-2/3; Prevent and Lou fill with phenomenon, thus play reinforcement effect;
Three sequence holes: position, hole hole depth between one or two sequence holes is wall thickness 2/3 place, guarantees to stretch into and consolidates plugging effect.
4. method as claimed in claim 3, is characterized in that, when there is height multilayer constuction joint, leak stopping order is carried out to lower from eminence.
CN201410115114.0A 2014-03-25 2014-03-25 To Construction of Silo seam infiltration leak-blocking construction method under high water head Active CN103898873B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410115114.0A CN103898873B (en) 2014-03-25 2014-03-25 To Construction of Silo seam infiltration leak-blocking construction method under high water head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410115114.0A CN103898873B (en) 2014-03-25 2014-03-25 To Construction of Silo seam infiltration leak-blocking construction method under high water head

Publications (2)

Publication Number Publication Date
CN103898873A CN103898873A (en) 2014-07-02
CN103898873B true CN103898873B (en) 2015-12-30

Family

ID=50990428

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410115114.0A Active CN103898873B (en) 2014-03-25 2014-03-25 To Construction of Silo seam infiltration leak-blocking construction method under high water head

Country Status (1)

Country Link
CN (1) CN103898873B (en)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105625447A (en) * 2014-12-26 2016-06-01 中国铁建大桥工程局集团有限公司 Plugging construction method for underground structure in soft soil area
CN104612108B (en) * 2015-01-14 2016-06-01 重庆三峡学院 The construction technology of a kind of hidden large fracture of the leak stopping dam foundation
CN105369833A (en) * 2015-10-15 2016-03-02 昆明风行防水材料有限公司 Grouting maintenance construction method for basement roof leakage
CN105735200B (en) * 2016-04-25 2019-04-30 长江勘测规划设计研究有限责任公司 The water-stop slurry grouting method and device that slot blocks are checked for sealing
CN105970879A (en) * 2016-05-16 2016-09-28 浙江广川工程咨询有限公司 Method for quick recovery of vertical water stoppage of water gate
CN106638475B (en) * 2016-11-18 2019-01-15 中国电建集团成都勘测设计研究院有限公司 A kind of restorative procedure of earth and rockfill dam crack in dam body
CN106836311A (en) * 2017-03-31 2017-06-13 辽宁华三建设工程技术有限公司 A kind of hypogee treating seepage water drainage structure
RU2669302C1 (en) * 2017-06-07 2018-10-09 Федеральное Государственное Бюджетное Образовательное Учреждение Высшего Образования "Донской Государственный Аграрный Университет" (Фгбоу Во Дгау) Method of repair and sealing of damage in concrete facings of channels
CN108086407B (en) * 2017-12-25 2019-12-27 上海市水利工程集团有限公司 Method for manufacturing second-stage concrete construction joint of vertical shaft
CN108487249B (en) * 2018-03-06 2020-09-11 中国电建集团华东勘测设计研究院有限公司 Method for reinforcing wind turbine foundation
CN109555559B (en) * 2018-11-16 2020-06-16 北京中煤矿山工程有限公司 Water prevention and treatment technical method for thousand-meter-level blind shaft of metal mine
CN109611121A (en) * 2018-12-25 2019-04-12 中铁六局集团天津铁路建设有限公司 Tunnel leaching infiltration water hole section blocks water grouting method
CN109681244B (en) * 2019-03-07 2021-03-19 安徽马钢矿业资源集团有限公司 Grouting method for micro-fractured rock mass
CN111535773B (en) * 2020-04-30 2021-01-12 中国水电基础局有限公司 Drilling method adopting fiber type weighted mud under high-head flowing water condition
CN111809913A (en) * 2020-07-21 2020-10-23 四川童燊防水工程有限公司 Construction method for water seepage and leakage stoppage of front-mounted roof
CN117209235B (en) * 2023-11-09 2024-02-13 中铁四局集团第三建设有限公司 Slurry and construction joint grouting method suitable for reverse construction method structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003193503A (en) * 2001-12-27 2003-07-09 Kanto Regional Development Bureau Ministry Of Land Infrastructure & Transport Method for filling cavity caused under sluice
CN101509264A (en) * 2009-03-25 2009-08-19 李旺雷 One-step pore-creating, segmenting high pressure cement grout construction method
CN101538860A (en) * 2009-04-28 2009-09-23 李旺雷 Consolidated grouting method for anchoring cement of bedrock contact segment
CN102070874A (en) * 2010-12-21 2011-05-25 中科院广州化学有限公司 High-permeability and high-strength epoxy grouting material, preparation method thereof and application thereof
CN102425421A (en) * 2011-11-08 2012-04-25 中蓝连海设计研究院 Novel water control method suitable for mine shafts

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003193503A (en) * 2001-12-27 2003-07-09 Kanto Regional Development Bureau Ministry Of Land Infrastructure & Transport Method for filling cavity caused under sluice
CN101509264A (en) * 2009-03-25 2009-08-19 李旺雷 One-step pore-creating, segmenting high pressure cement grout construction method
CN101538860A (en) * 2009-04-28 2009-09-23 李旺雷 Consolidated grouting method for anchoring cement of bedrock contact segment
CN102070874A (en) * 2010-12-21 2011-05-25 中科院广州化学有限公司 High-permeability and high-strength epoxy grouting material, preparation method thereof and application thereof
CN102425421A (en) * 2011-11-08 2012-04-25 中蓝连海设计研究院 Novel water control method suitable for mine shafts

Also Published As

Publication number Publication date
CN103898873A (en) 2014-07-02

Similar Documents

Publication Publication Date Title
CN103898873B (en) To Construction of Silo seam infiltration leak-blocking construction method under high water head
CN101638987B (en) Tunnel construction method for crossing high-pressure water-enriched fracture zone with curtain grouting and grout stopping wall
CN111485922B (en) Method for treating water leakage, block falling and slurry turning of ELF railway tunnel
CN100591866C (en) Drifting sand layer and gravel stratum water-moving double-liquid high pressure slip-casting water-blocking construction method
CN105350953A (en) Measuring method for coal seam gas pressure in complicated geological condition
CN101666234B (en) Fracture rock no-slurry-blocking wall compound grouting construction method
CN112482415B (en) Consolidation grouting method for underground cavern under high external water pressure and flowing water condition
CN101260672A (en) Weak surface rock slope grouting method and anchor tube for grouting
CN105201448A (en) Method for water-stopping grouting plugging in high-pressure high-flow water gush channel
CN206015669U (en) Pile foundation reinforcement system based on reinforcement synthesis pillared clay
CN105986580B (en) A kind of subway station basement construction method for supporting
CN215669744U (en) Masonry structure basement seepage slip casting repair structure
CN103388338A (en) Novel rapid water stopping and soil mass improving method
CN106013078B (en) Construction method of strong permeable stratum reinforcing curtain structure
CN105731978B (en) A kind of grouting serous fluid and grouting method for fine sand layer jacking culvert solidifying of the working face
CN103572764A (en) Ultra-deep manual hole digging pile dado water stop structure and construction method thereof
CN103993902A (en) Gas extraction drilled hole two-step grouting hole sealing method
CN111395263B (en) Leakage treatment method for roller compacted concrete dam body
CN102174818A (en) Controlled impermeable leaking stoppage grout-extruding water-stopping technology of strong water permeable stratum of quaternary system
CN113445527A (en) Method for treating leakage of grouting waterproof curtain in underground platform of rail transit
CN104529339B (en) A kind of polypropylene cross-linked copolymer fiber concrete leak stopping slurry
CN106939619A (en) A kind of anti-vibration for underground engineering disturbs the leak stopping reinforcement means of voids and pits
CN209816830U (en) A slip casting structure for interlock formula campshed construction cold joint
CN103243728B (en) Water stop and plugging method for punching underground space wall
CN111809669A (en) Basement post-cast strip leaking stoppage grouting and reinforcing construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant