CN106437169A - Manufacturing and installing method of prefabricated scaffold - Google Patents

Manufacturing and installing method of prefabricated scaffold Download PDF

Info

Publication number
CN106437169A
CN106437169A CN201510507380.2A CN201510507380A CN106437169A CN 106437169 A CN106437169 A CN 106437169A CN 201510507380 A CN201510507380 A CN 201510507380A CN 106437169 A CN106437169 A CN 106437169A
Authority
CN
China
Prior art keywords
scaffold
fastener
design drawing
plug
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510507380.2A
Other languages
Chinese (zh)
Inventor
张新强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510507380.2A priority Critical patent/CN106437169A/en
Publication of CN106437169A publication Critical patent/CN106437169A/en
Pending legal-status Critical Current

Links

Landscapes

  • Ladders (AREA)

Abstract

The invention discloses a manufacturing and installing method of a prefabricated scaffold. Connecting and inserting fasteners are fixed to steel tubes in advance on the indoor ground, and on a scaffold installing and erecting site, the scaffold can be erected and installed only by inserting and fixing a cone on the fastener fixed to one steel tube to a conical hole in the fastener in the other steel tube. Time and labor are saved. The manufacturing and installing method of the prefabricated scaffold can be widely applied to installing and erecting of scaffolds on building and decoration construction sites.

Description

Prefabricated scaffold fabrication and installation method
Technical field
The present invention relates to a kind of fabrication and installation method of architectural decoration scaffold, more particularly to one kind steel pipe and fastener fabrication and installation foot handss The method of frame.
Background technology
The method that conventional art steel pipe and fastener build scaffold, is to be interconnected steel pipe with fastener at the construction field (site), then will with bolt Fastener is fastened on steel pipe, and most applications are operative's bad environments in outdoor work high above the ground, easy climate impact;And, in condition high up in the air Under, workman helps steel pipe on the other hand, and the bolt sieve cap easily getting rusty twisted by another hand-held spanner, and its difficulty and labor intensity are all very big, there is also safely hidden danger.
Content of the invention
The present invention overcomes the above-mentioned deficiency of prior art, provides a kind of safe efficient, labour-saving major part can be operated in flooring and complete Prefabricated scaffold fabrication and installation method, reach planned, orderly, configuration the accurate target of material.
The present invention adopts the following technical scheme that:A kind of prefabricated scaffold fabrication and installation method, concrete steps and method are:
1. press construction purpose and the concrete condition of job site, make the design drawing of scaffold;
2. according to needed for scaffold design drawing calculates, the quantity of each scale lengths steel pipe and the plug-in type fastener of joint steel pipe all size divide door other The quantity of class;
3. according to above-mentioned steps 2 result of calculation, make parts list, described parts list is assigned warehouse or purchasing department, be equipped with by parts list neat Entirely;
4. by described scaffold design drawing, the bail of various different size plug-in type fasteners is clamped steel in described scaffold design drawing assigned position Pipe, tightens bolt and nut, makes to be not required to spanner at the construction field (site) just to install scaffold;
5. the steel pipe being fixed with different size plug-in type fastener is classified and be transported to job site, the cone of fastener will be corresponded to by described scaffold design drawing Body inserts the taper hole of corresponding cone seat, is touched with hand hammer, so that cone cone seat is coordinated and puts in place.
The invention has the beneficial effects as follows:Major part is originally gone to interior or ground in the outdoor building carrying out in high-altitude carry out, not climate Impact, improves the working environment of workers, time saving and energy saving, simple and effective;Planned, order, material outfit accuracy is reached on management.
Brief description
Accompanying drawing is the partial schematic diagram of prefabricated scaffold fabrication and installation method scaffold design drawing of the present invention;
Specific embodiment
The invention will be further described with the partial schematic diagram of scaffold design drawing below in conjunction with the accompanying drawings:
Accompanying drawing is embodiments of the invention, in figure, and fastener 1 is fixed on vertical steel tube, and it respectively has a cone seat, described cone in X, Y-direction The taper hole of seat can insert the cone of the fixing fastener in X, Y-direction and steel pipe one end respectively.Fastener 2, fastener 3, fastener 4 are identical with fastener 1; Fastener 5 is fixing on vertical steel tube, only one of which cone seat, the cone of fixing fastener on the pluggable X-direction steel pipe one end of its taper hole, fastener 6, Fastener 7, fastener 8 are identical with fastener 5.

Claims (1)

1. prefabricated scaffold fabrication and installation method, is characterized in that by following programs:(
(1) make scaffold design drawing;
(2) according to needed for described scaffold design drawing calculates the plug-in type fastener of the steel pipe quantity of each scale lengths and joint steel pipe each Specification disaggregatedly quantity;
(3) parts list is made according to the result that above-mentioned steps (2) calculate, described parts list is assigned warehouse or purchasing department, by described Parts list is equipped with complete;
(4) by described scaffold design drawing, the described scaffold that the bail of various different size plug-in type fasteners clamps corresponding steel pipe is set Meter figure predetermined portion, tightens bolt nut;
(5) steel pipe being fixed with the plug-in type fastener of different size is transported to job site, by described scaffold design drawing by described fastener Touched with hand hammer in the taper hole of the cone corresponding fastener of insertion, so that cone is put in place with taper hole cooperation, progressively build and complete described foot The task that hand cradle design drawing specifies;
(6) when removing scaffold, by plug-in type fastener with tiltedly carving the inclined hole inserting in described plug-in type fastener cone seat, touched described with hand hammer Tiltedly carve, described cone is extruded described taper hole.
CN201510507380.2A 2015-08-10 2015-08-10 Manufacturing and installing method of prefabricated scaffold Pending CN106437169A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510507380.2A CN106437169A (en) 2015-08-10 2015-08-10 Manufacturing and installing method of prefabricated scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510507380.2A CN106437169A (en) 2015-08-10 2015-08-10 Manufacturing and installing method of prefabricated scaffold

Publications (1)

Publication Number Publication Date
CN106437169A true CN106437169A (en) 2017-02-22

Family

ID=58093934

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510507380.2A Pending CN106437169A (en) 2015-08-10 2015-08-10 Manufacturing and installing method of prefabricated scaffold

Country Status (1)

Country Link
CN (1) CN106437169A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110080115A (en) * 2019-05-29 2019-08-02 中交一公局集团有限公司 Assembled pier shaft construction protection system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB489585A (en) * 1937-04-29 1938-07-29 Herbert Ernest Kingsman Improvements in scaffolding or tubular supports for gravity railways and other purposes
CN2573611Y (en) * 2002-08-19 2003-09-17 张兵 Combined floor type steel pipe scaffold
CN2916015Y (en) * 2006-01-27 2007-06-27 刘维俊 Scaffolding with cone-shaped plug
CN202430987U (en) * 2011-06-03 2012-09-12 宋永胜 Octagonal link plate scaffold
CN203097266U (en) * 2013-01-05 2013-07-31 袁炳华 Multifunctional adjustable fastening disk component
CN204059930U (en) * 2014-08-18 2014-12-31 陈智勇 Slip-knot PUSH NUT FASTENERS

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB489585A (en) * 1937-04-29 1938-07-29 Herbert Ernest Kingsman Improvements in scaffolding or tubular supports for gravity railways and other purposes
CN2573611Y (en) * 2002-08-19 2003-09-17 张兵 Combined floor type steel pipe scaffold
CN2916015Y (en) * 2006-01-27 2007-06-27 刘维俊 Scaffolding with cone-shaped plug
CN202430987U (en) * 2011-06-03 2012-09-12 宋永胜 Octagonal link plate scaffold
CN203097266U (en) * 2013-01-05 2013-07-31 袁炳华 Multifunctional adjustable fastening disk component
CN204059930U (en) * 2014-08-18 2014-12-31 陈智勇 Slip-knot PUSH NUT FASTENERS

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110080115A (en) * 2019-05-29 2019-08-02 中交一公局集团有限公司 Assembled pier shaft construction protection system
CN110080115B (en) * 2019-05-29 2024-05-10 中交一公局集团有限公司 Assembled pier construction protection system

Similar Documents

Publication Publication Date Title
CN205096590U (en) Simple and easy auxiliary device of ceiling punching operation
CN204919828U (en) Archaize building's wooden frame and steel structure column's connection structure
CN106437169A (en) Manufacturing and installing method of prefabricated scaffold
CN102966235A (en) Carrying tool
CN104372939A (en) Scaffold
CN204212390U (en) A kind of Construction of Steel Structure Worker carrying basket
CN207314850U (en) A kind of split bolt continued access combination unit
CN204252496U (en) Convenient installation device for constructional engineering suspender
CN204174904U (en) Scaffold
CN210361092U (en) Ceiling screw rod reinforcing tool and reinforcing structure thereof
CN210002914U (en) Suspension rod anchoring construction equipment for suspended ceilings
CN204609303U (en) A kind of template split bolt device
CN209990123U (en) Adjustable wall connecting piece device
CN206987410U (en) A kind of adjustable guard rail fixed mount
CN206839615U (en) A kind of boring device of top plate
CN202622700U (en) Hanger rod installation tool
CN204163359U (en) Scaffold
CN208072933U (en) A kind of scaffold easy to assemble
CN206289995U (en) For the temporary protection railing of architectural engineering stair
CN202952209U (en) Device applicable to fastening bolt at altitude of building
CN205742795U (en) A kind of security civilization standardized construction balustrade
CN210757522U (en) Novel adjustable support nut rapid screwing tool
CN205817670U (en) Hang muscle fast fixing tool
CN204326554U (en) A kind of device positioned for roof drain
CN203956804U (en) A kind of suspension rod quick-mounting instrument

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: Hangzhou City, Zhejiang province 310000 Binjiang District bin Kang Road South, 5-1502

Applicant after: Zhang Xinqiang

Address before: 310000 Zhejiang province Hangzhou Ding bridge garden of Nanyuan 7-1202

Applicant before: Zhang Xinqiang

CB02 Change of applicant information
CB02 Change of applicant information

Address after: 310000 Hangzhou City, Dingqiao garden, Nanyuan 7-1202, Zhejiang

Applicant after: Zhang Xinqiang

Address before: 310000 crystal 5-1502, south shore of BINKANG Road, Binjiang District, Hangzhou, Zhejiang

Applicant before: Zhang Xinqiang

CB02 Change of applicant information
CB02 Change of applicant information

Address after: Room 409, unit 2, building 2, moxitang East Village, Shangcheng District, Hangzhou City, Zhejiang Province 310000

Applicant after: Zhang Xinqiang

Address before: 310000 Hangzhou City, Dingqiao garden, Nanyuan 7-1202, Zhejiang

Applicant before: Zhang Xinqiang

CB02 Change of applicant information