CN106437126A - Guiding and force bearing device of floor type hydraulic lifting scaffold and detaching method - Google Patents
Guiding and force bearing device of floor type hydraulic lifting scaffold and detaching method Download PDFInfo
- Publication number
- CN106437126A CN106437126A CN201610720213.0A CN201610720213A CN106437126A CN 106437126 A CN106437126 A CN 106437126A CN 201610720213 A CN201610720213 A CN 201610720213A CN 106437126 A CN106437126 A CN 106437126A
- Authority
- CN
- China
- Prior art keywords
- guide rail
- rail bracket
- scaffold
- hydraulic lifting
- lifting scaffold
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
- E04G5/046—Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/06—Consoles; Brackets
- E04G5/061—Consoles; Brackets specially adapted for attachment to scaffolds
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/286—Mobile scaffolds; Scaffolds with mobile platforms mobile vertically
Abstract
The invention relates to a guiding and force bearing device of a floor type hydraulic lifting scaffold. The guiding and force bearing device of the floor type hydraulic lifting scaffold is arranged on one side of a building in a spaced mode and comprises a climbing platform, a guide rail bracket, an iron chain and a hydraulic jack. The guide rail bracket is erected on a fast foundation platform on the ground. The iron chain is suspended on the guide rail bracket. The hydraulic jack is in transmission connection with the iron chain and can slide up and down along the iron chain. The climbing platform is slidably connected to the guide rail bracket in the mode of being capable of sliding up and down along the guide rail bracket. The hydraulic jack is in transmission connection with the climbing platform and drives the climbing platform to slide up and down along the guide rail bracket. The guide rail bracket is formed by assembling a plurality of guide rail supports. The guiding and force bearing device has the beneficial effects that the floor type guide rail bracket is adopted to bear the scaffold, the scaffold can be pushed to a higher height, and technicians can construct the roof of the building conveniently; and a traditional gear transmission mode is replaced with the hydraulic jack, the loads of the climbing platform are increased, then the number of layers of the scaffold can be increased, and constructors can operate simultaneously, so that the construction efficiency is improved.
Description
Technical field
The invention belongs to engineering field, more particularly, to a kind of console model hydraulic lifting scaffold guiding bearing and dismounting
Method.
Background technology
The scaffold being currently used for major structure of construction is all attached in building structure, and that is, scaffold is built in a cantilever
On the platform of building structure, therefore the standard of building structure is had high demands, be simultaneously based on the load-bearing safety of contilever platform, its
Upper scaffold highly typically not can exceed that highly above 6 meters of building structure, and it is height-limited that this makes scaffold build.If foot handss
Frame is built height and is exceeded this requirement for height, needs to increase a series of attachment mechanism, and this makes scaffold building structure complicated, becomes
This height.
Also have at present a kind of land platform-type scaffold, whole operation platform can move on the column landing, construction
The movement of platform is driven by rack and pinion drive mechanism, is limited by the restriction of drive mechanism, and operation platform lifting height is generally
One layer (2 meters), most two layers (4 meters), thus this operation platform suitability is low, is normally only used as the finishing of building it is impossible to use
Scaffold as major structure of construction.
Content of the invention
For above-mentioned the deficiencies in the prior art, the present invention proposes a kind of console model hydraulic lifting scaffold guiding load dress
Put, specifically implemented by below scheme:
Described console model hydraulic lifting scaffold guiding bearing with leaving spacing located at the side of building body, including climbing
Rise platform, guide rail bracket, iron chains and hydraulic jack, described guide rail bracket stands on the quick basic platform on ground, described iron chains
It is suspended from guide rail bracket, described hydraulic jack is in transmission connection in iron chains and can slide up and down along iron chains, and climbing platforms can be along guide rail
Frame slides up and down to and is slidably connected to guide rail bracket, and hydraulic jack is in transmission connection in described climbing platforms, drives climbing platforms edge
Guide rail bracket slides up and down, and described guide rail bracket is assembled by some section rail bracketses.
The design further that described console model hydraulic lifting scaffold guides bearing is, described climbing platforms bag
Include some horizontal truss and some and described guide rail bracket corresponding number power transmission leading truck, described power transmission leading truck passes through described water
Plane frame work connects, and each power transmission leading truck is respectively equipped with a directed cavity being adapted with guide rail bracket and described hydraulic jack
Top, power transmission leading truck is slidably connected with corresponding guide rail bracket by directed cavity.
The design further that described console model hydraulic lifting scaffold guides bearing is, the described bottom
Build scaffold upright rod on climbing platforms, described scaffold upright rod has been built horizontal truss and has formed multi-layer scaffold platform.
The design further that described console model hydraulic lifting scaffold guides bearing is, described directed cavity is in square
Shape, the corner of directed cavity is respectively equipped with two directive wheels, and the corner of described guide rail bracket Dui Yingyu not be provided with guide rod by described directive wheel.
The design further that described console model hydraulic lifting scaffold guides bearing is, also includes water resistant and divides equally
Force mechanisms, described water resistant is divided force mechanisms equally and is included being arranged on the guide rail at climbing platforms two ends and be arranged on building body and one end sets
The support bar of limited location roller system, the section of described guide rail is in I-shaped, and described roller system is by two rollings being arranged side by side
Wheel group forms, and each guide wheel group is made up of with swinging mounting the roller that two shaft parallels are arranged, the rotatable twelve Earthly Branches of two rollers
Support, on swinging mounting, leaves gap between two introductions, the cell wall of described guide rail side passes through described gap, in roller and
Displacement under swinging mounting effect, in constraint two mutually orthogonal directions of guide rail.
The design further that described console model hydraulic lifting scaffold guides bearing is, the end of described support bar
Portion is provided with the cuboid inserted terminal vertical with the body of rod, is detachably interconnected between the swinging mounting of each roller group described, turns
Dynamic support forms the cavity matching with described cuboid connection end when connecting, and described roller system is plugged in by inserted terminal
Described cavity realizes the connection with support bar.
The design further that described console model hydraulic lifting scaffold guides bearing is, described guide rail bracket passes through
Wall-attached frame is connected to building body, and described wall-attached frame includes the front portion being fixed on guide rail bracket and the rear portion being fixed on building body, institute
State front portion and be provided with guide pipe, described rear portion is provided with the insertion pipe being adapted with described guide pipe, and rear portion is connected to by insertion pipe
Realize in guide pipe and anterior connection.
The design further that described console model hydraulic lifting scaffold guides bearing is, described anterior with respect to
The connection end of guide rail bracket is provided with backing plate, and described backing plate and guide rail bracket offset to constrain wall-attached frame away from guide rail bracket, described backing plate
Be connected with guide rail bracket by hexagon socket head cap screw, described connection end be respectively provided on two sides with firm bolt, the anterior heavily fortified point by tightening
Fixing bolt and guide rail bracket offset realize affixed with guide rail bracket;Described guide pipe with corresponding installation is respectively equipped with insertion pipe
Hole, guide pipe and insertion pipe pass through grafting bolt or latch realization fixation to each other in described installing hole.
The design further that described console model hydraulic lifting scaffold guides bearing is, adjacent described guide rail
Support is connected by connecting bolt, and often the height of section rail brackets is 1-1.1 rice.
Bearing is guided according to above-mentioned console model hydraulic lifting scaffold, a kind of console model hydraulic lifting foot handss are provided
Frame guides the method for dismounting of bearing, comprises the steps:
1) pass through to control the height of hydraulic jack adjustment climbing platforms, make the bottom of the guide rail bracket support positioned at highest point
Maintain an equal level with the top landing stage of scaffold, the connecting bolt between rail brackets is removed;
2) manually the rail brackets of top is moved on the landing stage of scaffold, manually rail brackets removal scaffold is put down
Platform, to floor face, then is transported rail brackets to the stacking of special place by construction elevator;
3) repeat step 1), 2), until guide rail bracket remove finish.
Beneficial effects of the present invention
The console model hydraulic lifting scaffold guiding bearing of the present invention and method for dismounting, because guide rail bracket exceeds building
Scaffold therefore can be built higher, be easy to technical staff and the roof of building body is constructed by body.On the other hand above-mentioned lead
Rail gantry adopts the dismounting mode of rail brackets so that the installation and removal of guide rail bracket are very convenient, greatly increases construction effect
Rate.
This console model hydraulic lifting scaffold guides bearing to be passed through to replace traditional gear biography using hydraulic jack
Flowing mode, the load improving climbing platforms is applied to the scaffold of major structure of construction.
Brief description
Fig. 1 is the structural representation that console model hydraulic lifting scaffold guides bearing.
Fig. 2 is the structural representation that console model hydraulic lifting scaffold guides when bearing climbing platforms raise.
Fig. 3 is the structural representation of the climbing platforms of console model hydraulic lifting scaffold guiding bearing of the present invention.
Fig. 4 is the structural representation of power transmission leading truck.
Specific embodiment
Below in conjunction with the accompanying drawings technical scheme is further illustrated.
As Fig. 1, the console model hydraulic lifting scaffold guiding bearing of the present embodiment is with leaving spacing located at building body
Side, be mainly made up of climbing platforms 2, guide rail bracket 3, iron chains 6 and hydraulic jack 5.Guide rail bracket 3 stands on the quick of ground
On basic platform 1.Iron chains 6 is suspended from guide rail bracket 3, and hydraulic jack 5 is in transmission connection in iron chains 6 and can slide up and down along iron chains 6.
Climbing platforms 2 can slide up and down to along guide rail bracket 3 and are slidably connected to guide rail bracket 3.Hydraulic jack 5 is in transmission connection in climbing platforms
2, drive climbing platforms 2 to slide up and down along guide rail bracket 3.
In the present embodiment, climbing platforms 2 by the power transmission leading truck 21 of four horizontal truss 24 and three, referring to Fig. 2.Guide rail
The number of frame 3 is corresponding with the number of power transmission leading truck 21 to be also three.Power transmission leading truck 21 is connected by horizontal truss 24,
One directed cavity being adapted with guide rail bracket 3 22 is respectively equipped with each power transmission leading truck 21.Power transmission leading truck 21 passes through guiding
Chamber 22 is slidably connected with corresponding guide rail bracket 3.
Scaffold upright rod 8 is built on the climbing platforms 2 of the bottom, scaffold upright rod 8 has been built horizontal truss 24 shape
Become multi-layer scaffold platform, because the present invention adopts the guide rail bracket of console model as support, and using hydraulic pressure a thousand pieces of gold top as climbing
Rise the drive mechanism of platform, the load of therefore climbing platforms greatly improves, and the number of plies of the sustainable landing stage of scaffold also has greatly
The raising of amplitude, can cover architecture storey 5 layer height, improve efficiency of construction.
The guide rail bracket 3 of the present embodiment is assembled by some rail bracketses 31.Guide rail bracket 3 is in cube, and four inclines
It is respectively equipped with outward one and lead rib 31.Directed cavity 22 is semi-enclosed rectangular cavities, referring to Fig. 3.On directed cavity 22 each edge frame two
End be respectively equipped with a guide wheel 23, and each lead rib with lead rib 31 accordingly roll be connected.Adjacent rail brackets passes through to connect
Bolt connection, often the height of section rail brackets is 1-1.1 rice, and the present embodiment adopts preferred value to be 1.05 meters.
The console model hydraulic lifting scaffold guiding bearing of the present embodiment also includes further, console model hydraulic pressure liter
Fall connection system for guide rail also includes a water resistant and divides force mechanisms 6 equally.Water resistant divide equally force mechanisms 6 main by being arranged on climbing platforms 2 two ends
Guide rail 61 be arranged on building body 10 and one end is provided with the support bar 63 of limited roller system 62.The section of guide rail 61 is in work
Font.Roller system 62 is made up of two roller groups 621 being arranged side by side.Each guide wheel group 621 is arranged by two shaft parallels
Roller 622 form with swinging mounting 623.Two rollers 622 are rotatably supported on swinging mounting, two guide wheels 622 it
Between leave gap.The cell wall of guide rail 61 side passes through gap, and under roller and swinging mounting act on, two, guide rail of constraint is mutually
Displacement on vertical direction, elimination of level component, so that the distance between scaffold and building body keeps stable, reaches reduction foot
The effect rocked of hand cradle platform.
The end of support bar 63 is provided with the cuboid inserted terminal 631 vertical with the body of rod.The swinging mounting of each roller group 621
It is detachably interconnected between 623.Swinging mounting 623 forms the cavity matching with cuboid inserted terminal 631, rolling when connecting
Wheel system 62 is plugged in cavity by inserted terminal and realizes the connection with support bar.
Guide rail bracket 3 is connected to building body 10 by wall-attached frame 7.Wall-attached frame 7 is by the front portion being fixed on guide rail bracket and fixation
Rear portion composition in building body 10.Front portion is provided with guide pipe 71, and rear portion is provided with the insertion pipe 72 being adapted with guide pipe 71.Rear portion
It is connected in guide pipe 71 by insertion pipe 72 and realize and anterior connection.
Front portion is provided with backing plate 711 with respect to the connection end of guide rail bracket 3.Backing plate 711 and guide rail bracket 3 offset to constrain attached wall
Frame is away from the motion of guide rail bracket.Backing plate leads to 711 to be crossed hexagon socket head cap screws and is connected with guide rail bracket 3, and being respectively provided on two sides with of connection end
Firm bolt.Anterior offseted the affixed of realization and guide rail bracket 3 by the firm bolt tightened and guide rail bracket 3.
Bearing is guided according to above-mentioned console model hydraulic lifting scaffold, a kind of console model hydraulic lifting scaffold is provided
The method for dismounting of guiding bearing, comprises the steps:
1) pass through to control the height of hydraulic jack adjustment climbing platforms, make the bottom of the guide rail bracket support positioned at highest point
Maintain an equal level with the top landing stage of scaffold, the connecting bolt between rail brackets is removed;
2) manually the rail brackets of top is moved on the landing stage of scaffold, manually rail brackets removal scaffold is put down
Platform, to floor face, then is transported rail brackets to the stacking of special place by construction elevator;
3) repeat step 1), 2), until guide rail bracket remove finish.
The console model hydraulic lifting scaffold guiding bearing of the present embodiment and method for dismounting, build because guide rail bracket exceeds
Scaffold therefore can be built higher, be easy to technical staff and the roof of building body is constructed by building body.On the other hand above-mentioned
Guide rail bracket adopts the dismounting mode of rail brackets so that the installation and removal of guide rail bracket are very convenient, greatly increases construction
Efficiency.
This console model hydraulic lifting scaffold guides bearing to be passed through to replace traditional gear biography using hydraulic jack
Flowing mode, the load improving climbing platforms is applied to the scaffold of major structure of construction.
The above, the only present invention preferably specific embodiment, but protection scope of the present invention is not limited to this, appoints
What those familiar with the art the invention discloses technical scope in, technology according to the present invention scheme and its this
Inventive concept equivalent or change in addition, is all included within the scope of the present invention.
Claims (10)
1. a kind of console model hydraulic lifting scaffold guiding bearing is it is characterised in that described console model hydraulic lifting scaffold
Guide bearing with leaving spacing located at the side of building body, including climbing platforms, guide rail bracket, iron chains and hydraulic jack
Top, described guide rail bracket stands on the quick basic platform on ground, and described iron chains is suspended from guide rail bracket, described hydraulic jack transmission
It is connected to iron chains and can slide up and down along iron chains, climbing platforms can slide up and down to along guide rail bracket and are slidably connected to guide rail bracket, liquid
Pressure jack is in transmission connection in described climbing platforms, drives climbing platforms to slide up and down along guide rail bracket, described guide rail bracket is by some
Section rail brackets assembles.
2. console model hydraulic lifting scaffold guiding bearing according to claim 1 is it is characterised in that described climb
Platform includes some horizontal truss and some and described guide rail bracket corresponding number power transmission leading truck, and described power transmission leading truck passes through
Described horizontal truss connects, and each power transmission leading truck is respectively equipped with a directed cavity being adapted with guide rail bracket and described hydraulic pressure
Jack, power transmission leading truck is slidably connected with corresponding guide rail bracket by directed cavity.
3. console model hydraulic lifting scaffold according to claim 1 guiding bearing is it is characterised in that described bottom
Build scaffold upright rod on the climbing platforms of layer, described scaffold upright rod has been built horizontal truss formation multi-layer scaffold and has put down
Platform.
4. console model hydraulic lifting scaffold according to claim 2 guiding bearing is it is characterised in that described guiding
Chamber is rectangular, and the corner of directed cavity is respectively equipped with two directive wheels, and the corner of described guide rail bracket Dui Yingyu described directive wheel not set
There is guide rod.
5. console model hydraulic lifting scaffold guiding bearing according to claim 1 is it is characterised in that also include resisting
Horizontal component mechanism, described water resistant divide equally force mechanisms include being arranged on the guide rail at climbing platforms two ends be arranged on building body and
One end is provided with the support bar of limited roller system, the section of described guide rail is in I-shaped, and described roller system is by being arranged side by side
Two roller group compositions, each guide wheel group is made up of with swinging mounting the roller that two shaft parallels are arranged, and two rollers can turn
It is supported on swinging mounting dynamicly, leave gap between two introductions, the cell wall of described guide rail side passes through described gap, in rolling
Displacement under wheel and swinging mounting effect, in constraint two mutually orthogonal directions of guide rail.
6. console model hydraulic lifting scaffold according to claim 5 guiding bearing is it is characterised in that described support
The end of bar is provided with the cuboid inserted terminal vertical with the body of rod, removably mutually interconnects between the swinging mounting of each roller group described
Connect, swinging mounting forms the cavity matching with described cuboid connection end when connecting, described roller system passes through inserted terminal
It is plugged in described cavity and realize the connection with support bar.
7. console model hydraulic lifting scaffold according to claim 1 guiding bearing is it is characterised in that described guide rail
Frame is connected to building body by wall-attached frame, and described wall-attached frame includes the front portion be fixed on guide rail bracket and is fixed on after building body
Portion, described front portion is provided with guide pipe, and described rear portion is provided with the insertion pipe being adapted with described guide pipe, and rear portion is worn by insertion pipe
It is connected in guide pipe and realize and anterior connection.
8. console model hydraulic lifting scaffold according to claim 7 guiding bearing is it is characterised in that described front portion
It is provided with backing plate with respect to the connection end of guide rail bracket, described backing plate and guide rail bracket offset to constrain wall-attached frame away from guide rail bracket, institute
State backing plate to be connected with guide rail bracket by hexagon socket head cap screw, described connection end be respectively provided on two sides with firm bolt, anterior by twisting
Tight firm bolt and guide rail bracket offset the affixed of realization and guide rail bracket;Described guide pipe be respectively equipped with insertion pipe corresponding
Installing hole, the fixation that guide pipe and insertion pipe pass through in described installing hole grafting bolt or latch is realized to each other.
9. console model hydraulic lifting scaffold according to claim 1 guides bearing it is characterised in that adjacent institute
State rail brackets to connect by connecting bolt, often the height of section rail brackets is 1-1.1 rice.
10. the console model hydraulic lifting scaffold according to any one of claim 1-9 guides the method for dismounting of bearing,
It is characterized in that methods described comprises the steps:
1) pass through the height that controls hydraulic jack to adjust climbing platforms, make the bottom of guide rail bracket support positioned at highest point with
The high-rise landing stage of scaffold maintains an equal level, and the connecting bolt between rail brackets is removed;
2) manually the rail brackets of top is moved on the landing stage of scaffold, manually rail brackets is removed the landing stage of scaffold,
To floor face, then by construction elevator, rail brackets is transported to the stacking of special place;
3) repeat step 1), 2), until guide rail bracket remove finish.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610720213.0A CN106437126B (en) | 2016-08-24 | 2016-08-24 | A kind of console mode hydraulic lifting scaffold guiding bearing and method for dismounting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610720213.0A CN106437126B (en) | 2016-08-24 | 2016-08-24 | A kind of console mode hydraulic lifting scaffold guiding bearing and method for dismounting |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106437126A true CN106437126A (en) | 2017-02-22 |
CN106437126B CN106437126B (en) | 2019-02-05 |
Family
ID=58181802
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610720213.0A Active CN106437126B (en) | 2016-08-24 | 2016-08-24 | A kind of console mode hydraulic lifting scaffold guiding bearing and method for dismounting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106437126B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109296191A (en) * | 2018-09-26 | 2019-02-01 | 中交武汉港湾工程设计研究院有限公司 | A kind of automatic climbing platform for head tower construction |
CN109296190A (en) * | 2018-09-26 | 2019-02-01 | 中交武汉港湾工程设计研究院有限公司 | A kind of climbing device of head tower operation platform |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08120915A (en) * | 1994-10-26 | 1996-05-14 | Nikko Co Ltd | Movable suspended scaffold |
CN2457268Y (en) * | 2000-02-24 | 2001-10-31 | 李训悌 | Climbing scaffold with lift mechanism |
CN1544783A (en) * | 2003-11-25 | 2004-11-10 | 上海市第一建筑有限公司 | Double-acting hydraulic climbing die block system |
CN201016217Y (en) * | 2007-02-09 | 2008-02-06 | 深圳市特辰科技有限公司 | Scaffold |
CN102296800A (en) * | 2011-06-22 | 2011-12-28 | 花周建 | Hydraulic elevating mechanism of scaffold |
CN203701557U (en) * | 2014-01-24 | 2014-07-09 | 广东建星建筑设备有限公司 | Attachment type liftable scaffold falling-preventing device |
CN205077845U (en) * | 2015-09-08 | 2016-03-09 | 中国建筑第二工程局有限公司 | Building core section of thick bamboo well hydraulic pressure intelligence operation scaffold that climbs |
-
2016
- 2016-08-24 CN CN201610720213.0A patent/CN106437126B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08120915A (en) * | 1994-10-26 | 1996-05-14 | Nikko Co Ltd | Movable suspended scaffold |
CN2457268Y (en) * | 2000-02-24 | 2001-10-31 | 李训悌 | Climbing scaffold with lift mechanism |
CN1544783A (en) * | 2003-11-25 | 2004-11-10 | 上海市第一建筑有限公司 | Double-acting hydraulic climbing die block system |
CN201016217Y (en) * | 2007-02-09 | 2008-02-06 | 深圳市特辰科技有限公司 | Scaffold |
CN102296800A (en) * | 2011-06-22 | 2011-12-28 | 花周建 | Hydraulic elevating mechanism of scaffold |
CN203701557U (en) * | 2014-01-24 | 2014-07-09 | 广东建星建筑设备有限公司 | Attachment type liftable scaffold falling-preventing device |
CN205077845U (en) * | 2015-09-08 | 2016-03-09 | 中国建筑第二工程局有限公司 | Building core section of thick bamboo well hydraulic pressure intelligence operation scaffold that climbs |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109296191A (en) * | 2018-09-26 | 2019-02-01 | 中交武汉港湾工程设计研究院有限公司 | A kind of automatic climbing platform for head tower construction |
CN109296190A (en) * | 2018-09-26 | 2019-02-01 | 中交武汉港湾工程设计研究院有限公司 | A kind of climbing device of head tower operation platform |
Also Published As
Publication number | Publication date |
---|---|
CN106437126B (en) | 2019-02-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106064798A (en) | A kind of electric power overhaul hoistable platform | |
CN101462672B (en) | Big elevating capacity and big elevating height hoisting crane | |
CN201338911Y (en) | Lifting cane with large lifting capacity and great lifting height | |
CN106320713B (en) | 3D building printing operation platform | |
CN205713147U (en) | A kind of quick positioning apparatus of precast floor slab | |
US20200173185A1 (en) | Deck and hoist for use in construction | |
CN206467994U (en) | A kind of novel hanging basket support | |
CN109694024A (en) | A kind of self-propelled lifting hoisting platform device | |
CN106437126A (en) | Guiding and force bearing device of floor type hydraulic lifting scaffold and detaching method | |
CN206785022U (en) | Micro-scale stand-alone intelligent three-dimensional parking stall | |
CN206486255U (en) | A kind of thermal power plant boiler burner hearth rail mounted overhauls hoistable platform | |
CN206616846U (en) | Exterior wall finishing engineering movable Scaffold | |
CN206128599U (en) | Console mode hydraulic pressure lifting foot hand rack system | |
CN209721418U (en) | A kind of assembling type steel structure tower crane platform | |
CN108193660A (en) | A kind of vapour-pressure type vertical ship lift | |
CN206767399U (en) | Combined type machine bed | |
CN207144442U (en) | A kind of console mode hydraulic lifting scaffold is oriented to bearing | |
CN106351451A (en) | Modularized 3D (three-dimensional) wall printing robot | |
CN109879179A (en) | A kind of assembling type steel structure tower crane platform | |
CN204754150U (en) | Dish -type node formula scaffold | |
CN202296734U (en) | Six-guide-rail car frame | |
CN106567533B (en) | A kind of console mode hydraulic lifting scaffold system | |
CN207003972U (en) | A kind of portable construction operation platform | |
CN209259612U (en) | A kind of feeding device for construction | |
CN106363771A (en) | Full-range packaging type printing head |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |