CN106436988A - Inner wall body structure - Google Patents

Inner wall body structure Download PDF

Info

Publication number
CN106436988A
CN106436988A CN201610976293.6A CN201610976293A CN106436988A CN 106436988 A CN106436988 A CN 106436988A CN 201610976293 A CN201610976293 A CN 201610976293A CN 106436988 A CN106436988 A CN 106436988A
Authority
CN
China
Prior art keywords
wall
concrete
situ
space
concrete cast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610976293.6A
Other languages
Chinese (zh)
Other versions
CN106436988B (en
Inventor
朱凤起
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610976293.6A priority Critical patent/CN106436988B/en
Publication of CN106436988A publication Critical patent/CN106436988A/en
Application granted granted Critical
Publication of CN106436988B publication Critical patent/CN106436988B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms
    • E04B2002/8682Mixed technique using permanent and reusable forms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses an inner wall body structure, which comprises a first wall body, a second wall body and a third wall body, wherein the third wall body is clamped between the first wall body and the second wall body; and a concrete pouring channel is formed in the space, between the first wall body and the second wall body, of the third wall body. The inner wall body structure has high strength, integrity and safety, can save the on-site construction time and can enhance the strength of the wall body connecting region.

Description

A kind of inner wall structure
Technical field
The present invention relates to building engineering field, particularly a kind of inner wall structure.
Background technology
The inner wall structure of existing architecture indoor includes the spaced body of wall of two panels, is placed with horizontal stroke between two panels body of wall Vertical staggered multiple tracks reinforcing bar, then becomes complete prefabricated inner wall structure with concreting.But, existing this prefabricated interior There is following defect in wall body structure:
1st, the intensity of wall body structure is poor;
2nd, need to fill the space between two panels body of wall during cast in situs, time-consuming in operation, and on-site construction time is nervous, Operation is simple and crude, pours the body of wall quality building up and is difficult to ensure that;
3rd, due to pouring the problem of material itself or the problem of construction technology, concrete easily produces in casting process Bubble, is difficult to be discharged, and can form many pits after the completion of pouring, and affects prefabricated inner wall end product quality.
4th, there is certain unstability in the material of grouting structure and technique, wastes time and energy, intensity, globality, safety Etc. poor.
Content of the invention
It is an object of the invention to provide a kind of intensity, globality, safe, on-site construction time, reinforcement can be saved The inner wall structure of wall connecting field strength.
To achieve these goals, a kind of inner wall structure that the present invention provides, including
First body of wall, the second body of wall and the 3rd body of wall;
Described 3rd body of wall is folded between the first body of wall and the second body of wall;
Described 3rd body of wall is constructed out filling concrete passage in the space between the first body of wall and the second body of wall.
Alternatively and preferably, the lower limb of the bottom of described 3rd body of wall and the first body of wall and the second body of wall leave away from From to form concrete cast-in-situ anchoring space, described concrete cast-in-situ anchoring space and described filling concrete channel connection.
Alternatively and preferably, described 3rd body of wall is overall structure, and described filling concrete passage is along vertical direction In the inside of the 3rd body of wall, the upper end of filling concrete passage is conducted to the 3rd body of wall upper end to construction, filling concrete passage Lower end is connected with concrete cast-in-situ anchoring space.
Alternatively and preferably, the cross section of described filling concrete passage is polygon or circle.
Alternatively and preferably, the bottom of described filling concrete passage has promotion slurry inflow concrete cast-in-situ anchoring The flow-guiding structure in space.
Alternatively and preferably, described flow-guiding structure includes being built into the water conservancy diversion of filling concrete vias inner walls bottom Face, described guide face is plane, inclined-plane or male and fomale(M&F).
Alternatively and preferably, it is provided with construction pillar in described concrete cast-in-situ anchoring space, construction pillar is folded in Between first body of wall and the second body of wall.
Alternatively and preferably, the upper end of described construction pillar is integral with the 3rd wall connecting, lower end and the first body of wall Concordant with the lower limb of the second body of wall, and the width along construction pillar offers the through hole that insertion constructs pillar body, Circulation for concrete;The cross section of construction pillar is circular or polygon.
Alternatively and preferably, described construction pillar is multiple, anchors space in being distributed in described concrete cast-in-situ Interior, form spot distribution, the cross section of construction pillar is circular or polygon.
Alternatively and preferably, it is provided with for supporting the first body of wall and the second body of wall in described concrete cast-in-situ anchoring space The Steel bar rack of bottom.
Alternatively and preferably, concordant with the lower limb of the first body of wall and/or the second body of wall below described 3rd body of wall or Project along lower limb, the template that the lower section of the first body of wall and/or the second body of wall is used for and scene installs connects, to constitute coagulation The cast-in-place anchoring space of soil, described concrete cast-in-situ anchoring space and filling concrete channel connection.
Alternatively and preferably, it is preset with support member below described 3rd body of wall, for space is anchored to concrete cast-in-situ It is supported.
Alternatively and preferably, it is provided with, in described 3rd body of wall, the oblique through hole being conducting to inner wall structural outer, be used for Discharge the gas in concrete cast-in-situ anchorage zone, enable concrete to be full of the space of whole concrete cast-in-situ anchorage zone.
Alternatively and preferably, the edge of described first body of wall and the second body of wall is provided with for scarce with what other bodies of wall docked Mouthful.
A kind of inner wall structure that the present invention provides, including the first body of wall, the second body of wall and the 3rd body of wall;Described 3rd wall Body is folded between the first body of wall and the second body of wall;In space between the first body of wall and the second body of wall for described 3rd body of wall Construct the passage for grouting.The 3rd prefabricated body of wall one side decreases the space needing cast during cast in situs, section The about time, on the other hand the 3rd body of wall can be prefabricated in the factory, and quality monitoring is convenient, improve inner wall structure Bulk strength.Additionally, this inner wall structure is cast-in-place concrete anchor structure, more traditional grouting anchor structure intensity is high, whole Body is good, safe, has the raising of great-leap-forward compared to traditional grouting anchor structure.
Brief description
The master of the inner wall structure that Fig. 1 is provided by the embodiment of the present invention 1 cuts open the schematic diagram of structure;
The overlooking the structure diagram of the inner wall structure that Fig. 2 is provided by the embodiment of the present invention 1;
The side structure schematic view of the inner wall structure that Fig. 3 is provided by the embodiment of the present invention 1;
The master of the inner wall structure that Fig. 4 is provided by the embodiment of the present invention 2 cuts open the schematic diagram of structure;
The side structure schematic view of the inner wall structure that Fig. 5 is provided by the embodiment of the present invention 2.
The master of the inner wall structure that Fig. 6 is provided by the embodiment of the present invention 3 cuts open the schematic diagram of structure;
The overlooking the structure diagram of the inner wall structure that Fig. 7 is provided by the embodiment of the present invention 3;
The side structure schematic view of the inner wall structure that Fig. 8 is provided by the embodiment of the present invention 3;
The master of the inner wall structure that Fig. 9 is provided by the embodiment of the present invention 4 cuts open the schematic diagram of structure;
The side structure schematic view of the inner wall structure that Figure 10 is provided by the embodiment of the present invention 5;
The master of the inner wall structure that Figure 11 is provided by the embodiment of the present invention 6 cuts open structural representation;
The side-looking structural representation of the inner wall structure that Figure 12 is provided by the embodiment of the present invention 6.
In figure:
1- first body of wall;2- second body of wall;3- the 3rd body of wall;4- filling concrete passage;The anchoring of 5- concrete cast-in-situ is empty Between;6- through hole;7- guide face;8- constructs pillar;9- through hole;10- breach;11- Steel bar rack;12- template.
Specific embodiment
In order that those skilled in the art more fully understand the present invention program, with reference to the accompanying drawings and detailed description The present invention is described in further detail.
Embodiment 1
Refer to Fig. 1-3, a kind of inner wall structure provided in an embodiment of the present invention, is prefabricated wall body structure, for making Interior wall for building (as building).Wall body structure includes the first body of wall 1, the second body of wall 2 and the 3rd body of wall 3.3rd body of wall 3 quilt First body of wall 1 and the second body of wall 2 are folded in centre, and the 3rd body of wall 3 is also prefabricated overall structure.3rd body of wall 3 is not filled with Between first body of wall 1 and the second body of wall 2, the space of formation is whole, and is constructed out filling concrete passage 4 in this space.The The prefabricated formation of three body of wall 3, and non-at-scene grouting obtains so that in site operation casting process it is only necessary to pass through concrete Perfusion channel 4 pours a part of concrete slurry, and remaining space between the first body of wall 1 and the second body of wall 2 is filled up, and Take a substantial amount of time without filling whole space as in prior art.Additionally, the 3rd body of wall 3 can be pre- in the factory System forms, and quality is compared and easily controlled compared with cast in situs, there is good intensity so that the globality of inner wall structure more Good, intensity is higher.The top of the 3rd body of wall 3 is preferably concordant with the top edge of the first body of wall 1 and the second body of wall 2, the 3rd body of wall 3 Lower section is provided with concrete cast-in-situ anchoring space 5, the bottom of the 3rd body of wall 3 lower limb preferably with the first body of wall 1 and the second body of wall 2 Leave distance so that this partial distance forms described concrete cast-in-situ anchoring space 5, this concrete cast-in-situ anchoring space 5 with Filling concrete passage 4 connects.It is so to form continuous overall structure in the bottom of body of wall, improving bond strength.Mixed Solidifying soil perfusion channel 4 and concrete cast-in-situ anchoring space 5 together constitute concrete cast-in-situ region.
In the casting process of concrete, can because material itself defect, or casting craft defect the reason produce Bubble, if these bubbles can not be discharged in time, will remain in concrete surface, a small amount of bubble can affect U.S. of body of wall See, substantial amounts of bubble can affect the durability of concrete, and concrete is also required to after pouring so that body of wall forms overall knot in addition Structure.In order to solve this problem, in certain embodiments, it is provided with the through hole 6 for aerofluxuss in the 3rd body of wall 3, this through hole 6 is oblique Hole, is conducting to the first body of wall 1 or the outside of the second body of wall 2, for discharging the bubble producing in concreting process, under solution The discharge of the gas in portion's anchorage zone, enables concrete to be full of the space in whole lower anchor region.
In certain embodiments, filling concrete passage 4 vertically constructs in the inside of the 3rd body of wall 3, the shape of this passage It is not construed as limiting the invention, can be the hole of circular hole, how lateral opening (such as square hole) or other geometries.Filling concrete The quantity of passage 4 can adjust according to practical situation (as width of body of wall), and in the present embodiment, inner wall structure has twice Filling concrete passage 4, is intervally arranged inside the 3rd body of wall 3 along identical, and its diameter is less than or equal to the thickness of the 3rd body of wall 3 Degree.The bottom connection concrete cast-in-situ anchoring space 5 of passage.In order to promote the flowing of concrete slurry, lead in filling concrete Road 4 substructure goes out flow-guiding structure.In one embodiment, flow-guiding structure includes two guide faces 7, one of guide face 7 It is built on filling concrete passage 4 inwall, another guide face 7 constructs in opposite side filling concrete passage 4 On inwall.Two guide faces 7 can be extended obliquely with fixing slope so that the bottom of filling concrete passage 4 and coagulation The docking port in the cast-in-place anchoring space 5 of soil constantly broadens, and helps lend some impetus to concrete and flows in concrete cast-in-situ anchoring space 5, fast Speed is filled up, and has saved the time of cast in situs.Certainly, guide face can also be other shapes, for example male and fomale(M&F), smooth Curved surface, plane etc., its specific shape does not constitute the restriction to invention.
In certain embodiments, the 3rd body of wall 3 is only the first body of wall 1 and support, bottom are formed at the top of the second body of wall 2 Concrete cast-in-situ anchoring space 5 be entirely hollow, it is uneven that this may result in support strength.For this reason, it is existing in concrete Pour in anchoring space 5 and be provided with construction pillar 8, it is also formed by concrete prefabricated, the quantity of construction pillar 8 and position can roots It is adjusted according to actual requirement, for example, in certain embodiments, the quantity of construction pillar 8 can be with the 3rd body of wall 3 by concrete The quantity that perfusion channel 4 is formed separately part is identical, and keeps corresponding with it in the height direction with these separate parts, this Sample can form in body of wall bottom and support, and improve the bulk strength of inner wall structure.The two ends of construction pillar 8 can be respectively with the The edge of three bodies of wall 3 and the first body of wall 1, the second body of wall 2 keep at a distance or fit with the 3rd body of wall 3 lower surface and/or Concordant with the lower limb of the first body of wall 1 and the second body of wall 2.When the upper end of construction pillar 8 is remained with the lower surface of the 3rd body of wall 3 Apart from when, can construction pillar 3 upper end setting flow-guiding structure (as V-type guide face), for promoting slurry in concrete cast-in-situ Anchoring is flowed in space.In a preferred embodiment, the upper end of construction pillar 8 is connected into the lower surface of the 3rd body of wall 3 One is overall, and lower end is concordant with the lower limb of the first body of wall 1 and the second body of wall 2 so that it defines in the vertical to interior wall The complete support of body structure.In this case, open up insertion along construction pillar 8 along width and construct pillar body Through hole 9, for concrete slurry, between each construction pillar 8, circulation, so that entirety is formed on wall body structure bottom, improves entirety Intensity.Through hole 9 can form dislocation arrangement in the height direction, to constitute the runner of S type it is ensured that concrete is easier full of whole Individual space.The concrete shape of construction pillar 8 cross section is not also construed as limiting the invention, for example, can be circular, polygon (as square) etc..
Adjacent wall body structure, after docking, does not often sternly produce crack because docking, in order to prevent fitting up layer cracking, the The edge of one body of wall 1 and the second body of wall 2 is equipped with the breach 10 for docking with other bodies of wall, after wall body structure docking, Smear mortar at breach 10 to tamp, prevent crack from occurring, the shape of breach 10 does not limit, and can be specifically L-type.
When the 3rd body of wall 3 is divided into multi-section timesharing by filling concrete passage 4, these the 3rd bodies of wall 3 and horizontal reinforcing bar one Play the structure defining similar " H " type in the first body of wall 1 with the second body of wall 2, and employ when being used for filling concrete passage 4 After above-mentioned guide face, define the flow-guiding structure of similar Y-shaped, therefore in this case the embodiment of the present invention can also be carried For inner wall structure be referred to as " YH1 " system.
Because inner wall structure provided in an embodiment of the present invention is to need vertically to place in pouring construction, therefore will erect Straight side is referred to as " high " of body of wall, and the side of level is referred to as " wide ", the space length being formed between the first body of wall 1 and the second body of wall 2 It is referred to as " thick " in this space.
Embodiment 2
Refer to Fig. 4-5, the inner wall structure that the present embodiment provides, the difference with embodiment 1 is, construction pillar 8 is adopted It is arranged in concrete cast-in-situ space 5 with the form of spot distribution, each construction pillar 8 is in spaced apart.Such as the present embodiment In construction pillar 8 be on the whole in the height direction be in dislocation type be distributed.The cross section of construction pillar 8 can be equally Various shapes, such as polygon or circle.
Embodiment 3
Refer to Fig. 6-8, the present embodiment is with the difference of embodiment 1, concrete cast-in-situ anchoring space 5 in be provided with for Support the first body of wall and the Steel bar rack 11 of the second body of wall bottom, that is, with Steel bar rack come alternative constructions pillar 8.Steel bar rack Structure can be various ways, the multiple tracks reinforcing bar that such as the present embodiment is arranged for straight line parallel, can also be flexure type in addition , or other irregular configurations.
Embodiment 4
Refer to Fig. 9, the present embodiment is with the difference of embodiment 1, the concrete cast-in-situ anchoring of the 3rd body of wall 3 lower section is empty Between be hollow out in 5, be not provided with constructing pillar.
Embodiment 5
Refer to Figure 10, the present embodiment is with the difference of embodiment 1, with the first body of wall and/or below the 3rd body of wall The lower limb of two bodies of wall is concordant or projects along lower limb, is used for and scene in the lower section of the first body of wall and/or the second body of wall If template connect, to constitute concrete cast-in-situ anchoring space, described concrete cast-in-situ anchoring space and filling concrete passage Connection.For example, in the present embodiment, the 3rd body of wall 3 is concordant with the second body of wall 2 lower limb, and leaves with the first body of wall 1 lower limb Distance, then passes through the lower section that the live template 12 installing is located at the second body of wall 2, thus constituting concrete cast-in-situ anchoring space 5, this space first carries out reinforcing bar binding after having found body of wall, then props up lifting plate, is subsequently poured.This space can and real Applying example 4 is equally hollow out (as shown in Figure 9), in order to distinguish with embodiment 1-4, by the inner wall structure of live supporting module It is properly termed as YH-2 system.Additionally, in some other embodiment, template can two-sided install.
Embodiment 6
Refer to Figure 11-12, this embodiment equally employs the live template 12 installing and carrys out the cast-in-place anchoring of constructional concrete Space 5, the present embodiment is with the difference of embodiment 5, and concrete cast-in-situ anchoring is provided with construction pillar 8 in space 5, also may be used in addition To be other supporting constructions, such as this supporting construction can also be the construction pillar of embodiment 2 or the steel of embodiment 3 Muscle support.
Above a kind of inner wall structure provided by the present invention is described in detail.Specific case used herein The principle and embodiment of the present invention is set forth, the explanation of above example is only intended to help understand the core of the present invention Thought is thought.It should be pointed out that for those skilled in the art, under the premise without departing from the principles of the invention, The present invention can also be carried out with some improvement and modify, these improve and modify the protection domain also falling into the claims in the present invention Interior.

Claims (14)

1. a kind of inner wall structure is it is characterised in that include
First body of wall, the second body of wall and the 3rd body of wall;
Described 3rd body of wall is folded between the first body of wall and the second body of wall;
Described 3rd body of wall is constructed out filling concrete passage in the space between the first body of wall and the second body of wall.
2. inner wall structure according to claim 1 it is characterised in that the bottom of described 3rd body of wall and the first body of wall and The lower limb of the second body of wall leaves distance, to form concrete cast-in-situ anchoring space, described concrete cast-in-situ anchoring space and institute State filling concrete channel connection.
3. inner wall structure according to claim 2 is it is characterised in that described 3rd body of wall is overall structure, described mixed Solidifying soil perfusion channel constructs in the inside of the 3rd body of wall along vertical direction, and the upper end of filling concrete passage is conducted to the 3rd wall Body upper end, the lower end of filling concrete passage is connected with concrete cast-in-situ anchoring space.
4. inner wall structure according to claim 3 is it is characterised in that the cross section of described filling concrete passage is many Side shape or circle.
5. inner wall structure according to claim 3 is it is characterised in that the bottom of described filling concrete passage has rush Enter slurry and flow into the flow-guiding structure that concrete cast-in-situ anchors space.
6. inner wall structure according to claim 5 is it is characterised in that described flow-guiding structure includes being built into concrete The guide face of perfusion channel inwall bottom, described guide face is plane, inclined-plane or male and fomale(M&F).
7. inner wall structure according to claim 2 is it is characterised in that be provided with structure in described concrete cast-in-situ anchoring space Make pillar, construction pillar is folded between the first body of wall and the second body of wall.
8. inner wall structure according to claim 7 is it is characterised in that the upper end of described construction pillar is connected with the 3rd body of wall It is connected into entirety, lower end is concordant with the lower limb of the first body of wall and the second body of wall, and the width along construction pillar offers Insertion constructs the through hole of pillar body, for the circulation of concrete;The cross section of construction pillar is circular or polygon.
9. inner wall structure according to claim 7 is it is characterised in that described construction pillar is multiple, in spaced apart In described concrete cast-in-situ anchoring space, form spot distribution, the cross section of construction pillar is circular or polygon.
10. inner wall structure according to claim 2 is it is characterised in that be provided with described concrete cast-in-situ anchoring space For supporting the Steel bar rack of the first body of wall and the second body of wall bottom.
11. inner wall structures according to claim 1 it is characterised in that below described 3rd body of wall with the first body of wall and/ Or second body of wall lower limb concordant or project along lower limb, the lower section of the first body of wall and/or the second body of wall is used for and scene The template installing connects, and to constitute concrete cast-in-situ anchoring space, described concrete cast-in-situ anchoring space is led to filling concrete Road connects.
12. inner wall structures according to claim 11 are it is characterised in that be preset with support below described 3rd body of wall Part, for being supported to concrete cast-in-situ anchoring space.
13. inner wall structures according to claim 2 are conducting to interior wall it is characterised in that being provided with described 3rd body of wall The oblique through hole of body structural outer, for discharging the gas in concrete cast-in-situ anchorage zone, enables concrete to be full of whole The space of concrete cast-in-situ anchorage zone.
14. according to the arbitrary described inner wall structure of claim 1-13 it is characterised in that described first body of wall and the second body of wall Edge be provided with the breach for docking with other bodies of wall.
CN201610976293.6A 2016-11-07 2016-11-07 A kind of inner wall structure Active CN106436988B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610976293.6A CN106436988B (en) 2016-11-07 2016-11-07 A kind of inner wall structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610976293.6A CN106436988B (en) 2016-11-07 2016-11-07 A kind of inner wall structure

Publications (2)

Publication Number Publication Date
CN106436988A true CN106436988A (en) 2017-02-22
CN106436988B CN106436988B (en) 2019-05-21

Family

ID=58180821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610976293.6A Active CN106436988B (en) 2016-11-07 2016-11-07 A kind of inner wall structure

Country Status (1)

Country Link
CN (1) CN106436988B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6612083B1 (en) * 2001-03-27 2003-09-02 William J. Richards System of building construction
CN101314987A (en) * 2008-07-11 2008-12-03 罗国军 Multifunctional built-up plate and construction method thereof
CN203795663U (en) * 2014-03-07 2014-08-27 北方工业大学 Composite shear wall with self-heat-preservation function
CN104314314A (en) * 2014-11-17 2015-01-28 中冶建筑研究总院有限公司 Grouting connection construction method
CN105604208A (en) * 2016-03-03 2016-05-25 华汇工程设计集团股份有限公司 Prefabricated shear wall in cast-in-situ connection mode
CN105735533A (en) * 2016-03-08 2016-07-06 万保金 Assembly type prefabricated non-bearing wall formwork
CN206143965U (en) * 2016-11-07 2017-05-03 朱凤起 Interior wall structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6612083B1 (en) * 2001-03-27 2003-09-02 William J. Richards System of building construction
CN101314987A (en) * 2008-07-11 2008-12-03 罗国军 Multifunctional built-up plate and construction method thereof
CN203795663U (en) * 2014-03-07 2014-08-27 北方工业大学 Composite shear wall with self-heat-preservation function
CN104314314A (en) * 2014-11-17 2015-01-28 中冶建筑研究总院有限公司 Grouting connection construction method
CN105604208A (en) * 2016-03-03 2016-05-25 华汇工程设计集团股份有限公司 Prefabricated shear wall in cast-in-situ connection mode
CN105735533A (en) * 2016-03-08 2016-07-06 万保金 Assembly type prefabricated non-bearing wall formwork
CN206143965U (en) * 2016-11-07 2017-05-03 朱凤起 Interior wall structure

Also Published As

Publication number Publication date
CN106436988B (en) 2019-05-21

Similar Documents

Publication Publication Date Title
CN104847014B (en) The vertical connecting structure of assembly concrete shear wall and construction method
CN103321421B (en) The one-time formed construction method of a kind of concrete water pool wall
CN205894313U (en) Prefabricated assembled steel pipe retrains frame node entirely
CN111926973A (en) Stably-connected laminated plate
CN106499093A (en) A kind of exterior wall attachment structure and its construction method
CN205576955U (en) Raft foundation's reinforced structure is displaced into to strip footing
CN107201792A (en) High-rise assembled single row of holes precast shear wall and its assembling structure and construction method
CN108867860A (en) A kind of precast reinforced concrete beam plate body system and prefabricated rod structure entirety assembling constructing method
CN207812741U (en) Pre-manufactured steel structure overlapped shear wall
CN207003723U (en) High-rise assembled single row of holes precast shear wall and its assembling structure
CN102383371B (en) Overpass concrete outside-hanged cantilever type flower bed and construction method thereof
KR101038945B1 (en) A filling structure of upper part of a tunnel and its procedure
CN109056595A (en) A kind of grout sleeve Joining Technology of prefabricated overhead guardrail board
CN213173336U (en) Novel prefabricated assembled anticollision wall
CN106368347B (en) Connecting structure of wall and construction method
CN206143965U (en) Interior wall structure
CN106567365B (en) Earth and rockfill dam longitudinal reinforcement construction method
CN206144011U (en) Outer wall structure
CN202416156U (en) Concrete external-mounted cantilever type parterre of flyover
CN206143956U (en) Wall connection structure
CN106436988A (en) Inner wall body structure
CN206693266U (en) concrete pipe gallery module
CN206428864U (en) A kind of inner wall structure
CN106436964B (en) A kind of external wall structure
CN110748221A (en) Prefabricated assembled pond guide wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant