CN106436711A - Novel anchor cable removing machine - Google Patents

Novel anchor cable removing machine Download PDF

Info

Publication number
CN106436711A
CN106436711A CN201610864871.7A CN201610864871A CN106436711A CN 106436711 A CN106436711 A CN 106436711A CN 201610864871 A CN201610864871 A CN 201610864871A CN 106436711 A CN106436711 A CN 106436711A
Authority
CN
China
Prior art keywords
fixed pulley
waist rail
transmission device
anchor cable
steering fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610864871.7A
Other languages
Chinese (zh)
Inventor
郝绍金
吴文超
曾涛
李安生
曹宝进
顾丽艳
詹玉伟
李久石
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Railway Investment Construction Group Co Ltd
Original Assignee
Shenyang Huachang Geotechnical Engineering Co Ltd
China Construction Third Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Huachang Geotechnical Engineering Co Ltd, China Construction Third Engineering Bureau Co Ltd filed Critical Shenyang Huachang Geotechnical Engineering Co Ltd
Priority to CN201610864871.7A priority Critical patent/CN106436711A/en
Publication of CN106436711A publication Critical patent/CN106436711A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
    • E02D9/02Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof by withdrawing

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The invention belongs to the field of construction engineering machinery, and particularly relates to a novel anchor cable removing machine suitable for removing various anchor cables. The novel anchor cable removing machine comprises a transmission device (1), a first steering fixed pulley (2), a movable pulley block (3), a waist rail (4) and a fixture assembly (5), wherein the transmission device (1) is fixedly arranged above the waist rail (4); the first steering fixed pulley (2) is horizontally arranged in the waist rail (4); output power of the transmission device (1) is transmitted to the movable pulley block (3) by a steel wire rope (7) through the first steering fixed pulley (2); a second steering fixed pulley (501) is horizontally and fixedly arranged on the fixture assembly (5); and one end of the movable pulley block (3) is lifted above the waist rail (4), and the other end of the movable pulley block (3) is fixedly connected with an anchor rod (6) which passes through the second steering fixed pulley (501). The novel anchor cable removing machine has the advantages of simple structure, convenience in installation and high adaptability, and the anchor cables in narrow gaps can be effectively removed.

Description

New Anchor Cable removes machine
Technical field
The invention belongs to constructional engineering machinery field, more particularly, to a kind of New Anchor Cable being applied to all kinds of anchor cables dismounting operations Dismounting machine.
Background technology
The today constantly developed in urban construction, the exploitation to the underground space are increasingly taken seriously, and positive big Depth, large span direction are developed.Based on this, the support work of deep basal pit becomes particularly important.At present, pile-anchor retaining is as the most normal The method for supporting deep foundation pit seen widely is reported.But as a kind of temporary supporting measure, anchor cable both causes to waste, and is formed Building waste has occupied the underground space again, to urban underground space using bringing inconvenience.And recyclable anchor can solve this A little stubborn problems, so Recyclable anchor rope is the development trend in temporary supporting in future field.Due to deep basal pit edge with build Build the spacing very little of beyond the region of objective existence wall, lead to anchor cable cannot remove.The appearance of such situation brings new challenge to pile-anchor supporting system.
Content of the invention
It is contemplated that providing a kind of structure simple in place of overcoming the deficiencies in the prior art, easy for installation, strong adaptability, The New Anchor Cable that anchor cable in narrow gap effectively can be removed removes machine.
For solving above-mentioned technical problem, the present invention is realized in.
New Anchor Cable removes machine, and it includes transmission device, the first steering fixed pulley, running block, waist rail and fixture assembly; Described transmission device fixation is placed on waist rail;Described first turns to fixed pulley laterally in waist rail;Described transmission device Output power reaches running block by steel wire rope through the first steering fixed pulley;Laterally it is fixed with second turn on described fixture assembly To fixed pulley;One end of described running block is lifted on waist rail, its other end with via second steering fixed pulley anchor pole It is fixedly connected.
As a kind of preferred version, waist rail of the present invention can adopt i-beam structure.
Present configuration is simple, easy for installation, strong adaptability, and reliability is high, is easy to execute-in-place, can be in narrow gap Anchor cable effectively removed, the difficulty that spacing between foundation ditch and outer wall of basement can be overcome narrow and small and cannot construct.
Brief description
The invention will be further described with reference to the accompanying drawings and detailed description.Protection scope of the present invention not only office It is limited to the statement of following content.
Fig. 1 is overall structure diagram of the present invention.
Fig. 2 is the top view of the present invention.
In figure:1st, transmission device;2nd, the first steering fixed pulley;3rd, running block;4th, waist rail;5th, fixture assembly;501st, Two steering fixed pulleys;6th, anchor pole;7th, steel wire rope;8th, anchor slab;9th, outer wall of basement;10th, basement roof;11st, support pile.
Specific embodiment
As shown in figure 1, New Anchor Cable removes machine, it includes transmission device 1, first and turns to fixed pulley 2, running block 3, waist Beam 4 and fixture assembly 5;Described transmission device 1 fixation is placed on waist rail 4;Described first turns to fixed pulley 2 laterally located at waist rail In 4;The output power of described transmission device 1 reaches running block 3 by steel wire rope 7 through the first steering fixed pulley 2;Described fixture group Second steering fixed pulley 501 is laterally fixed with part 5;Described fixture assembly 5 and anchor slab 8 are fixedly connected;Described running block 3 One end be lifted on waist rail 4, its other end with via second steering fixed pulley 501 anchor pole 6 be fixedly connected.Institute of the present invention State waist rail 4 and adopt i-beam structure.
Shown in Figure 2,9 is outer wall of basement;10 is basement roof;11 is support pile.The present invention is by a set of transmission Device, waist rail, running block and fixture assembly composition.Change Impact direction using movable pulley device, it is perpendicular for becoming horizontal working face To working face, meet site operation feasibility.
Shown in Figure 1, in figure anchor cable is removed machine and is adopted a set of transmission device, steel waist rail, makes the first steering fixed pulley It is fixed on waist rail, the output power of transmission device 1 reaches running block 3 by steel wire rope 7 through the first steering fixed pulley 2;Will be single Root anchor pole passes through the second steering fixed pulley 501, is fixed on suspension hook using suspender, and signalman commander operating personnel draw steel to twist Line(Anchor pole 6), the length of measurement pull-out in time, when being left last 2m, commander's transmission device utilizes running block slowly by steel strand wires It is completely pulled out, prevents from pulling out too fast, steel strand wires eject and hurt sb.'s feelings.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.All within the spirit and principles in the present invention, made any repair Change, equivalent, improvement etc., should be included within the scope of the present invention.

Claims (2)

1. New Anchor Cable removes machine it is characterised in that including transmission device(1), first steering fixed pulley(2), running block (3), waist rail(4)And fixture assembly(5);Described transmission device(1)Fixation is placed in waist rail(4)On;Described first turns to fixed cunning Wheel(2)Laterally located at waist rail(4)Interior;Described transmission device(1)Output power by steel wire rope(7)Through the first steering fixed pulley (2)Reach running block(3);Described fixture assembly(5)On be laterally fixed with the second steering fixed pulley(501);Described dynamic cunning Wheel group(3)One end be lifted on waist rail(4)On, its other end turns to fixed pulley with via second(501)Anchor pole(6)Fixing Connect.
2. New Anchor Cable according to claim 1 remove machine it is characterised in that:Described waist rail(4)Using i-beam structure.
CN201610864871.7A 2016-09-30 2016-09-30 Novel anchor cable removing machine Pending CN106436711A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610864871.7A CN106436711A (en) 2016-09-30 2016-09-30 Novel anchor cable removing machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610864871.7A CN106436711A (en) 2016-09-30 2016-09-30 Novel anchor cable removing machine

Publications (1)

Publication Number Publication Date
CN106436711A true CN106436711A (en) 2017-02-22

Family

ID=58170649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610864871.7A Pending CN106436711A (en) 2016-09-30 2016-09-30 Novel anchor cable removing machine

Country Status (1)

Country Link
CN (1) CN106436711A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113481890A (en) * 2021-07-20 2021-10-08 重庆万桥交通科技发展有限公司 Stay cable anchor ring dismounting device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0020820B1 (en) * 1979-06-29 1983-05-11 Ballast-Nedam Groep N.V. Anchor pile hoisting device
CN2232938Y (en) * 1995-08-03 1996-08-14 东台工程机械股份有限公司 Tamping tube pulling-out and transfering mechanism
CN102635115A (en) * 2012-05-11 2012-08-15 上海强劲地基工程股份有限公司 Anchoring structure of foundation pit support capable of recycling anchor bars, and method for efficiently recycling anchor bars
CN205530267U (en) * 2016-04-26 2016-08-31 尹庆龙 Water conservancy construction handling device
CN206396757U (en) * 2016-09-30 2017-08-11 中建三局集团有限公司 New Anchor Cable removes machine

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0020820B1 (en) * 1979-06-29 1983-05-11 Ballast-Nedam Groep N.V. Anchor pile hoisting device
CN2232938Y (en) * 1995-08-03 1996-08-14 东台工程机械股份有限公司 Tamping tube pulling-out and transfering mechanism
CN102635115A (en) * 2012-05-11 2012-08-15 上海强劲地基工程股份有限公司 Anchoring structure of foundation pit support capable of recycling anchor bars, and method for efficiently recycling anchor bars
CN205530267U (en) * 2016-04-26 2016-08-31 尹庆龙 Water conservancy construction handling device
CN206396757U (en) * 2016-09-30 2017-08-11 中建三局集团有限公司 New Anchor Cable removes machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113481890A (en) * 2021-07-20 2021-10-08 重庆万桥交通科技发展有限公司 Stay cable anchor ring dismounting device
CN113481890B (en) * 2021-07-20 2022-12-23 重庆万桥交通科技发展有限公司 Stay cable anchor ring dismounting device

Similar Documents

Publication Publication Date Title
CN104088449B (en) Safe and fast double-track construction platform of super high-rise curtain wall
CN102900021B (en) Split mounting type bridge wet joint construction method
CN101967796B (en) Method for arranging parallel steel wire stay cable
CN204982628U (en) Horizontal pull rope bridge
CN106436711A (en) Novel anchor cable removing machine
CN204022201U (en) A kind of weight-lifting equipment for vertical transport
CN206396757U (en) New Anchor Cable removes machine
CN105048726B (en) A kind of equipment removed for power station stator bar
CN108199300A (en) A kind of high-rise building cable lifting construction method
CN204689509U (en) A kind of cable bridge formation winch
CN204675726U (en) Purlin lifting auxiliary device
CN203461720U (en) Simple cantilever hoisting machine
CN206447493U (en) Turbine-generator units scroll case hoisting suspender
CN202492845U (en) Ground anchor capable of serially anchoring
CN206289544U (en) A kind of simple electric nacelle device
CN201843509U (en) Quick power head lifting device and vehicle-mounted drill using same
CN203359892U (en) Device for assembling and disassembling construction trolley inside tunnel
CN102635115B (en) Method for efficiently recycling anchor bars
CN206971257U (en) A kind of mountain area pulling plate anchor pole composite foundation
CN102296610B (en) Device for removing square pile and construction method thereof
CN204326486U (en) Outrigger oblique pull wire rope fixing device
CN104989274A (en) Positioning and moving device for rock jumbolter of power transmission line
CN201507142U (en) Stabilizing device of high-voltage telegraph pole
CN206034458U (en) Structure of falling is prevented in steel shotcrete in SMW worker method stake envelope foundation ditch
CN201626778U (en) Sky anchor in grotto

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180510

Address after: 102600 room 905, 3 building, 10 Gua Xiang Road, Pang Zhuang Town, Daxing District, Beijing.

Applicant after: China Construction Railway Investment and Construction Group Co., Ltd.

Applicant after: Shenyang Huachang Geotechnical Engineering Co., Ltd.

Address before: No. 52, Guan Shan Road, Wuhan, Hubei Province

Applicant before: Group Co.,Ltd of ZhongJian No.3 bureau

Applicant before: Shenyang Huachang Geotechnical Engineering Co., Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication