CN106436674A - Method for discriminating sand-gravel stratum liquefaction through standard penetration test - Google Patents

Method for discriminating sand-gravel stratum liquefaction through standard penetration test Download PDF

Info

Publication number
CN106436674A
CN106436674A CN201610953303.4A CN201610953303A CN106436674A CN 106436674 A CN106436674 A CN 106436674A CN 201610953303 A CN201610953303 A CN 201610953303A CN 106436674 A CN106436674 A CN 106436674A
Authority
CN
China
Prior art keywords
standard
sand
penetrator
penetration
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610953303.4A
Other languages
Chinese (zh)
Other versions
CN106436674B (en
Inventor
杨玉生
刘小生
温彦锋
赵剑明
刘启旺
李红军
孙平
朱凯斌
杨正权
梁文杰
王龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Institute of Water Resources and Hydropower Research
Original Assignee
China Institute of Water Resources and Hydropower Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Institute of Water Resources and Hydropower Research filed Critical China Institute of Water Resources and Hydropower Research
Priority to CN201610953303.4A priority Critical patent/CN106436674B/en
Publication of CN106436674A publication Critical patent/CN106436674A/en
Application granted granted Critical
Publication of CN106436674B publication Critical patent/CN106436674B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D1/00Investigation of foundation soil in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D1/00Investigation of foundation soil in situ
    • E02D1/02Investigation of foundation soil in situ before construction work
    • E02D1/022Investigation of foundation soil in situ before construction work by investigating mechanical properties of the soil

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

Provided is a method for discriminating sand-gravel stratum liquefaction through a standard penetration test. The method comprises the steps that a test sand-gravel stratum is drilled 5cm above the elevation of the test sand-gravel stratum; a standard penetration test device is connected and an injection device is put to the bottom of a drill hole after a connector of a feeler lever is inspected; then the injection device is driven into a saturated sand-gravel stratum by 5cm through a pilereing hammer, the standard penetration hammering number starts to be recorded for every 3cm of driving, and the total test range is 30cm and is divided into 10 test sections; a relation curve graph between the hammering number of each test section and the corresponding penetration degree is drawn, the invalid test sections affected by sand gravel of large grain sizes are removed according to the relation curve graph, and the standard penetration hammering number of 30cm of penetration is equivalently converted according to the standard penetration hammering number and the penetration degree of the valid test sections; and seismic liquefaction discrimination of saturated sand gravel is conducted according to the standard penetrate hammering number equivalent to 30cm of penetration into the saturated sand gravel. By adoption of the method for discriminating sand-gravel stratum liquefaction, the defect that in the prior art, the standard penetration hammering number tends to be large due to the effect of the sand gravels of the large grain sizes, and the seismic liquefaction discrimination result tends to unsafe accordingly is overcome.

Description

A kind of method that employing standard penetration test (SPT) differentiates sand gravel layer liquefaction
Technical field
The invention belongs to in-situ test technical field, it is related to a kind of employing standard penetration test (SPT) and differentiates sand gravel layer liquefaction Method.
Background technology
China's hydroelectric resources more than 80% is distributed in the west area that seismic activity is frequent and intensity is big, and this area riverbed is big Have cover layer more, in cover layer, be commonly present the sand gravel layer may liquefy under geological process.With strategy to develop western regions Implement, following increasing earth-rock works are built on sand gravel cover layer, stability under geological process for the sand gravel layer It is the major issue of the relation engineering safety that must take into.But because sand gravel layer cobble-stone particle diameter is larger, according to method for normalizing When carrying out standard penetration test (SPT) in sand gravel layer, Standard piercing blow counts are easily affected by the gravel of greater particle size and bigger than normal, When leading to the standard penetration test (SPT) method in existing specification to be applied to sand gravel layer Liquefaction, result can be led to be partial to uneasiness Entirely.Therefore, design a kind of improved standard penetration test (SPT) method, differentiate sand gravel layer in design earthquake by field test index Whether there is earthquake liquefaction under effect, significant to the earth and rockfill dam being built on sand gravel layer or gate dam safety evaluation.
Content of the invention
It is an object of the invention to overcoming the shortcoming that prior art exists, making up existing standard penetration test method can only fit For the deficiency of the fine grained soil seismic liquefaction evaluation such as sand, silt, seeking design provides one kind to differentiate using standard penetration test (SPT) The method of sand gravel layer liquefaction.Using the energy that drops hammer by penetrator injection sand gravel layer, hammered according to each examination segment standard injection Number and pile penetration graph of a relation, reject the invalid examination section that blow counts are affected by gravel, and remaining section Equivalent Conversion of effectively trying is to squeeze into The Standard piercing blow counts of 30cm in sand gravel layer, then with earthquake liquefaction Critical Standard injection blow countsContrast, differentiates full Whether liquefy with sand gravel.
To achieve these goals, the present invention realizes in standard penetration test (SPT) device, and it concretely comprises the following steps:
A kind of method using standard penetration test (SPT) differentiation sand gravel layer liquefaction is it is characterised in that comprise the following steps:
Step one, sand gravel layer will be tested using conventional drilling tool hole 5cm above to sand gravel layer absolute altitude, remove in the hole residual Soil, and carry out mud off;
Step 2, connect standard penetration test (SPT) device, tighten the joint of sounding rod it is ensured that the joint of sounding rod does not get loose, then Penetrator is put in the hole to bottom hole, and avoids impact opening bottom, measurement obtains drilling depth, keep penetrator, sounding rod, guiding Bar is in plumbness after connecting;
Step 3, using 63.5kg punching hammer, freely falling away from using automatic drop hammer method, by penetrator with every point with 76cm The some impacts of clock are buried after middle 5cm, then start recording often squeezes into the Standard piercing blow counts of 3cm, are divided into 10 examination section meters 30cm;
Step 4, draw the Standard piercing hammer with each examination section for the pile penetration according to the above-mentioned Standard piercing blow counts often squeezing into 3cm Hitting several variation relation curves, if increasing with Standard piercing blow counts, pile penetration with Standard piercing blow counts graph of a relation occurring Horizontal segment, illustrates that injection blow counts are affected by gravel, then gives up the part between horizontal segment starting point and end point, will remain Remaining blow countsWith corresponding pile penetration lengthAs effective examination section;Standard piercing is led to hammer for due to gravel impact The examination section that number increases suddenly, is invalid examination section, is designated as=0,=0;
Step 5, it is calculated as follows Standard piercing blow counts during injection 30cm
(1)
Standard piercing blow counts during injection 30cm;Give up remaining blow counts after horizontal segment;Correspond to Effective examination segment length;mExamination section number, its value is equal to 10;
Step 6, according to the following formula calculating Liquefaction Criterion in China injection critical count
The value of critical of standard penetration hammering number;Standard piercing blow counts a reference value, basic seismic design acceleration is Corresponding when 0.10g, 0.15g, 0.20g, 0.30g, 0.40gValue is respectively 7,10,12,16 and 19;Saturation sand gravel Standard piercing point depth, unit is m;Level of ground water, unit is m;Sticky content percentage, when less than 3, adopts 3;Regulation coefficient, determines corresponding regulation coefficient value according to classification of design earthquake, and first group of earthquake of design takes 0.80, second Group takes 0.95, and the 3rd group takes 1.05;
Step 7, contrastWithIf,, then sand gravel liquefy;If>, then sand gravel do not liquefy.
It is further preferred that described standard penetration test (SPT) device mainly includes punching hammer, pallet, sounding rod and penetrator. Punching hammers the steel-casting of the 63.5kg that attaches most importance to into shape, and there is the center hole of a diameter 45mm centre, and it is embedded that described guide post passes through center hole It is arranged in the middle of punching hammer;Described punching hammer carries automatic decoupling device, and its bottom is provided with pallet;The bottom of pallet is adopted It is fastenedly connected sounding rod with screw thread;The local inclination of described sounding rod is less than 1/1000, and its bottom is fastened with by screwed connection Penetrator;Described penetrator is made up of penetrator head, soil sampler and penetrator boots three part, and described penetrator crown end is provided with Apopore.
Additionally, penetrator is impacted, with per minute 15 ~ 30, the middle 5cm that buries.
It is further preferred that the examination section of described step 3 adopts more than 10 examination more than section meter 30m, in described step 4 formula M value take the corresponding value being more than 10.
Beneficial effects of the present invention:
Compared with prior art, the invention provides a kind of differentiate saturation sand gravel liquefaction standard penetration test (SPT) method, can When making up existing specification Plays injection blow counts liquifying method and being applied to saturation sand gravel layer and carry out Liquefaction, due to standard Injection blow counts are affected by the larger gravel of particle diameter, lead to Standard piercing blow counts bigger than normal, and then lead to differentiate result relatively not The defect of safety, provides crucial for the Geotechnical Engineering sand gravel ground seismic liquefaction evaluation such as highly seismic region Hydraulic and Hydro-Power Engineering Hold.
Brief description
Fig. 1 is the structural representation of standard penetration test (SPT) device according to the present invention;
Fig. 2 is the flow chart of steps of a kind of method of employing standard penetration test (SPT) differentiation sand gravel layer liquefaction of the present invention.
Reference:1- punching is hammered into shape;2- pallet;3-sounding rod;4-penetrator;5- apopore;6-soil sampler;7 - Penetrator boots.
Specific embodiment
Technological means, character of innovation, reached purpose and effect for making the present invention realize are easy to understand, below to this Invention further illustrates.
The embodiment that here is recorded is the specific specific embodiment of the present invention, for the design of the present invention is described, all It is explanatory and exemplary, should not be construed as the restriction to embodiment of the present invention and the scope of the invention.Except here record Implement exception, those skilled in the art can also be based on the application claims and specification disclosure of that using aobvious The other technical schemes being clear to, these technical schemes include any obvious using making of the embodiment that here is recorded The technical scheme of substitutions and modifications.
The present embodiment is realized by standard penetration test (SPT) device, and experiment process is as shown in Fig. 2 concretely comprise the following steps:
Step one, will be tested using conventional drilling tool saturation sand gravel layer hole to test the above 5cm of saturation sand gravel layer absolute altitude, Remove in the hole surflaes, and carry out mud off;
Step 2, connect standard penetration test (SPT) device, tighten the joint of sounding rod 3 it is ensured that the joint of sounding rod 3 does not get loose, Again penetrator 4 is put in the hole to bottom hole, and avoid impact opening bottom, measurement obtains drilling depth, keep penetrator 4, sounding rod 3rd, guide post is in plumbness after connecting;
Step 3, using with automatic decoupling device, weight 63.5kg punching hammer 1, freely falling away from using automatic drop hammer with 76cm Method, penetrator is impacted, with per minute 15 ~ 30, the middle 5cm that buries, then start recording often squeezes into the Standard piercing blow counts of 3cm, altogether Divide 10 examination section meter 30cm, the present invention can also be using following experiment method as being divided into more than 10 examination sections, 30cm altogether More than, according to the described step in lower section(5)It is converted into 30cm Standard piercing blow counts constantly, continue step(6)And step(7)I.e. Can;
Step 4, draw the Standard piercing hammer with each examination section for the pile penetration according to the above-mentioned Standard piercing blow counts often squeezing into 3cm Hitting several variation relation curves, if increasing with Standard piercing blow counts, pile penetration with Standard piercing blow counts graph of a relation occurring Horizontal segment, illustrates that injection blow counts are affected by gravel, then gives up the part between horizontal segment starting point and end point, will remain Remaining blow countsWith corresponding pile penetration lengthAs effective examination section;Standard piercing is led to hammer for due to gravel impact The examination section that number increases suddenly, is invalid examination section, is designated as=0,=0;
Step 5, it is calculated as follows Standard piercing blow counts during injection 30cm
In this formula,Standard piercing blow counts during injection 30cm;Give up remaining blow counts after horizontal segment;— Correspond toEffective examination segment length;mExamination section number, if examination section overall length is 30cm, m is equal to 10, if examination section overall length is more than 30cm, then m is more than 10;
Step 6, according to the following formula calculating Liquefaction Criterion in China injection critical count
The value of critical of standard penetration hammering number;Standard piercing blow counts a reference value, basic seismic design acceleration is Corresponding when 0.10g, 0.15g, 0.20g, 0.30g, 0.40gValue is respectively 7,10,12,16 and 19;Saturation sand gravel Standard piercing point depth(m);Level of ground water(m);Sticky content percentage, when less than 3, adopts 3;Adjustment Coefficient, determines corresponding regulation coefficient value according to classification of design earthquake, specifically can be according to《Earthquake In China moves parameter zoning Figure》(GB18306-2015)The classification of design earthquake dividing, one group of earthquake of design takes 0.80, and second group takes 0.95, and the 3rd group takes 1.05;
Step 7, contrastWithIf,, then sand gravel liquefy;If>, then sand gravel do not liquefy.
If step 8 need to carry out the penetration test of next depth, repeat aforesaid operations step and tested;This example relates to And standard penetration test (SPT) apparatus structure as shown in figure 1, mainly including punching hammer 1, sounding rod 3 and penetrator 4.Punching hammers 1 into shape The steel-casting of weight 63.5kg, there is the center hole of a diameter 45mm centre, passes through center hole installation by adhering for placing guide post In the middle of punching hammer 1, for controlling the free-falling direction of punching hammer;The bottom of the punching hammer 1 with automatic decoupling device sets It is equipped with pallet 2, punching hammer 1 energy freely falling body, on pallet, falls away from 76cm;The bottom of pallet 2 is fastenedly connected with directly using screw thread The sounding rod 3 of footpath 42mm;The local inclination of sounding rod 3 is less than 1/1000, and sounding rod 3 is provided with graduation mark, sees for directly perceived Survey depth of penetration;The penetrator 4 of the hollow metal tubular construction with cutting edge and sounding rod 3 are fastened by screwed connection, by penetrator Head, soil sampler(Split pipe)6 and penetrator boots 7 three part composition, the long 145mm of penetrator head, top is provided with a diameter of 30mm Apopore 5, soil sampler(Split pipe)6 long 500mm, external diameter is 51mm, and internal diameter is 35mm, penetrator boots 7 length 55mm, cutting edge 20 degree of angle, cutting edge single-blade thickness 2.5mm.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all spirit in the present invention and Within principle, any modification, equivalent substitution and improvement made etc., should be included within the scope of the present invention.

Claims (5)

1. a kind of method using standard penetration test (SPT) differentiation sand gravel layer liquefaction is it is characterised in that comprise the following steps:
Step one, sand gravel layer will be tested using conventional drilling tool hole 5cm above to sand gravel layer absolute altitude, remove in the hole residual Soil, and carry out mud off;
Step 2, connect standard penetration test (SPT) device, tighten sounding rod(3)Joint it is ensured that sounding rod(3)Joint not loose De-, then by penetrator(4)Put in the hole to bottom hole, and avoid impact opening bottom, measurement obtains drilling depth, keep penetrator(4)、 Sounding rod(3), guide post connect after be in plumbness;
Step 3, using 63.5kg punching hammer, freely falling away from using automatic drop hammer method, by penetrator with 76cm(4)With every The some impacts of minute are buried after middle 5cm, then start recording often squeezes into the Standard piercing blow counts of 3cm, are divided into 10 examination section meters 30cm;
Step 4, draw the Standard piercing hammer with each examination section for the pile penetration according to the above-mentioned Standard piercing blow counts often squeezing into 3cm Hitting several variation relation curves, if increasing with Standard piercing blow counts, pile penetration with Standard piercing blow counts graph of a relation occurring Horizontal segment, illustrates that injection blow counts are affected by gravel, then gives up the part between horizontal segment starting point and end point, will remain Remaining blow countsWith corresponding pile penetration lengthAs effective examination section;Standard piercing is led to hammer for due to gravel impact The examination section that number increases suddenly, is invalid examination section, is designated as=0,=0;
Step 5, it is calculated as follows Standard piercing blow counts during injection 30cm
(1)
Standard piercing blow counts during injection 30cm;Give up remaining blow counts after horizontal segment;Correspond to's Effectively examination segment length;mExamination section number, its value is equal to 10;
Step 6, according to the following formula calculating Liquefaction Criterion in China injection critical count
The value of critical of standard penetration hammering number;Standard piercing blow counts a reference value, basic seismic design acceleration is Corresponding when 0.10g, 0.15g, 0.20g, 0.30g, 0.40gValue is respectively 7,10,12,16 and 19;Saturation sand gravel Standard piercing point depth, unit is m;Level of ground water, unit is m;Sticky content percentage, when less than 3, adopts 3;Regulation coefficient, determines corresponding regulation coefficient value according to classification of design earthquake, and first group of earthquake of design takes 0.80, second Group takes 0.95, and the 3rd group takes 1.05;
Step 7, contrastWithIf,, then sand gravel liquefy;If>, then sand gravel do not liquefy.
2. as claimed in claim 1 a kind of employing standard penetration test (SPT) differentiate sand gravel layer liquefaction method it is characterised in that: Described standard penetration test (SPT) device mainly includes punching hammer(1), pallet(2), sounding rod(3)And penetrator(4).
3. punching hammer(1)Attach most importance to the steel-casting of 63.5kg, there is the center hole of a diameter 45mm centre, and described guide post passes through punching Hole installation by adhering is hammered into shape in punching(1)Middle;Described punching hammer(1)With automatic decoupling device, and its bottom is provided with hammer Pad(2);Pallet(2)Bottom sounding rod is fastenedly connected using screw thread(3);Described sounding rod(3)Local inclination be less than 1/ 1000, its bottom is fastened with penetrator by screwed connection(4);Described penetrator(4)By penetrator head, soil sampler(6)With pass through Enter device boots(7)Three part compositions, described penetrator crown end is provided with apopore(5).
4. as claimed in claim 1 a kind of employing standard penetration test (SPT) differentiate sand gravel layer liquefaction method it is characterised in that: By penetrator(4)Impact the middle 5cm that buries with per minute 15 ~ 30.
5. a kind of employing standard penetration test (SPT) described in claim 1 ~ 3 any one described in differentiates the side of sand gravel layer liquefaction Method it is characterised in that:The examination section of described step 3 adopts more than 10 examination more than section meter 30m, described step 4 formula(1)In M value takes the corresponding value being more than 10.
CN201610953303.4A 2016-11-03 2016-11-03 It is a kind of that the liquefied method of sand gravel layer is differentiated using standard penetration test (SPT) Active CN106436674B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610953303.4A CN106436674B (en) 2016-11-03 2016-11-03 It is a kind of that the liquefied method of sand gravel layer is differentiated using standard penetration test (SPT)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610953303.4A CN106436674B (en) 2016-11-03 2016-11-03 It is a kind of that the liquefied method of sand gravel layer is differentiated using standard penetration test (SPT)

Publications (2)

Publication Number Publication Date
CN106436674A true CN106436674A (en) 2017-02-22
CN106436674B CN106436674B (en) 2018-07-13

Family

ID=58179946

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610953303.4A Active CN106436674B (en) 2016-11-03 2016-11-03 It is a kind of that the liquefied method of sand gravel layer is differentiated using standard penetration test (SPT)

Country Status (1)

Country Link
CN (1) CN106436674B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107190720A (en) * 2017-06-07 2017-09-22 深圳市工勘岩土集团有限公司 Observation of groundwater levels is bored into well
CN107829422A (en) * 2017-09-28 2018-03-23 上海申元岩土工程有限公司 A kind of method that non-damage drive terrace disease and quick micro- damage repair terrace disease
CN108797553A (en) * 2018-05-02 2018-11-13 北京城建勘测设计研究院有限责任公司 A kind of Ge Ailu sandy soils foundation bearing capacity acquisition methods
CN110879190A (en) * 2019-12-04 2020-03-13 中国水利水电科学研究院 Portable working degree tester and testing method for working degree of cemented sand gravel
CN111368382A (en) * 2018-12-06 2020-07-03 中国石油天然气股份有限公司 Method and system for determining earthquake liquefaction index
CN113720766A (en) * 2021-06-24 2021-11-30 河北工程大学 Indoor compaction test method for evaluating liquefaction potential of sandy soil earthquake
CN115478525A (en) * 2022-08-23 2022-12-16 长江岩土工程有限公司 In-hole standard penetration test hammer applied to deep stratum test and test method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000178956A (en) * 1998-12-17 2000-06-27 Ohbayashi Corp Ground survey method
JP2001241030A (en) * 2000-02-28 2001-09-04 Oyo Corp Static penetration testing equipment in bore hole equipped with boring function
CN101349050A (en) * 2008-09-05 2009-01-21 长安大学 Downhole standard penetrometer
CN101644062A (en) * 2009-08-21 2010-02-10 江苏省无锡探矿机械总厂有限公司 Quantitative automatic impact mechanism
CN101705677A (en) * 2009-11-27 2010-05-12 中国科学院武汉岩土力学研究所 Method and device for automatically detecting thicknesses of penetration type dregs
CN103469778A (en) * 2013-09-25 2013-12-25 青岛理工大学 Standard penetration test method for partitioning rock weathering degree

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000178956A (en) * 1998-12-17 2000-06-27 Ohbayashi Corp Ground survey method
JP2001241030A (en) * 2000-02-28 2001-09-04 Oyo Corp Static penetration testing equipment in bore hole equipped with boring function
CN101349050A (en) * 2008-09-05 2009-01-21 长安大学 Downhole standard penetrometer
CN101644062A (en) * 2009-08-21 2010-02-10 江苏省无锡探矿机械总厂有限公司 Quantitative automatic impact mechanism
CN101705677A (en) * 2009-11-27 2010-05-12 中国科学院武汉岩土力学研究所 Method and device for automatically detecting thicknesses of penetration type dregs
CN103469778A (en) * 2013-09-25 2013-12-25 青岛理工大学 Standard penetration test method for partitioning rock weathering degree

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘小生等: "地基土动力特性测试中的若干问题", 《水利学报》 *
袁钟等: "标准贯入试验的应用及贯入击数的影响因素", 《港工技术》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107190720A (en) * 2017-06-07 2017-09-22 深圳市工勘岩土集团有限公司 Observation of groundwater levels is bored into well
CN107829422A (en) * 2017-09-28 2018-03-23 上海申元岩土工程有限公司 A kind of method that non-damage drive terrace disease and quick micro- damage repair terrace disease
CN108797553A (en) * 2018-05-02 2018-11-13 北京城建勘测设计研究院有限责任公司 A kind of Ge Ailu sandy soils foundation bearing capacity acquisition methods
CN111368382A (en) * 2018-12-06 2020-07-03 中国石油天然气股份有限公司 Method and system for determining earthquake liquefaction index
CN111368382B (en) * 2018-12-06 2022-10-04 中国石油天然气股份有限公司 Method and system for determining earthquake liquefaction index
CN110879190A (en) * 2019-12-04 2020-03-13 中国水利水电科学研究院 Portable working degree tester and testing method for working degree of cemented sand gravel
CN113720766A (en) * 2021-06-24 2021-11-30 河北工程大学 Indoor compaction test method for evaluating liquefaction potential of sandy soil earthquake
CN113720766B (en) * 2021-06-24 2024-03-08 河北工程大学 Indoor compaction test method for evaluating earthquake liquefaction potential of sandy soil
CN115478525A (en) * 2022-08-23 2022-12-16 长江岩土工程有限公司 In-hole standard penetration test hammer applied to deep stratum test and test method

Also Published As

Publication number Publication date
CN106436674B (en) 2018-07-13

Similar Documents

Publication Publication Date Title
CN106436674A (en) Method for discriminating sand-gravel stratum liquefaction through standard penetration test
Sivrikaya et al. Determination of undrained strength of fine-grained soils by means of SPT and its application in Turkey
Mujtaba et al. Evaluation of relative density and friction angle based on SPT-N values
CN106503329B (en) Anti-liquefaction Judgment Method for Stone Column Composite Foundation based on excess pore water pressure ratio
CN206752536U (en) A kind of cast-in-situ bored pile bottom hole sediment measurement apparatus
CN103469778B (en) A kind of standard penetration test method dividing degree of rock weathering
CN106157181A (en) A kind of based on boring the parameter method to soil property country rock quick real-time grading
CN105738010B (en) Penetration type soil pressure cell method for embedding and device in deep layer weak soil
CN106408211A (en) Deep saturated sand earthquake-induced liquefaction judgment method
KR100915544B1 (en) Penetration test apparatus for geotechnical site investigation
CN106869909A (en) It is determined that inclining the test device and its method of testing of filled opening hydrogeological parameter
CN101922159A (en) Method for quickly detecting quality of gravel pile
CN108867605A (en) A kind of vehicle-mounted feeler inspection device
CN101619571B (en) Method for determining optimal compacting number of dynamic compaction based on transient response of groundwork
CN203475404U (en) Standard penetration test device for dividing rock weathering degrees
CN107386252B (en) A kind of Punching Borehole Cast-in-place Concrete Pile pile foundation Seines types automatic discrimination system and its working method
Shahien et al. SPT-CPT correlations for Nile Delta silty sand deposits in Egypt
CN103469779B (en) A kind of standard penetration test device dividing degree of rock weathering
Wotherspoon et al. Soil profile characterization of Christchurch strong motion stations
Jarushi et al. Piezocone penetration testing in Florida high pile rebound soils
CN208685681U (en) A kind of end seals precast concrete enlarged footing cast stake
CN105714752A (en) Static sounding construction technology for pavement of urban road
CN211113564U (en) Novel heavy dynamic sounding tester and auxiliary device for foundation trench
CN105277451A (en) Method for measuring and calculating damage factor of rocks surrounding explosion area
CN110952602B (en) Method for estimating extreme side resistance of pile foundation soil by using retaining wall casing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant