CN106436674B CN201610953303.4A CN201610953303A CN106436674B CN 106436674 B CN106436674 B CN 106436674B CN 201610953303 A CN201610953303 A CN 201610953303A CN 106436674 B CN106436674 B CN 106436674B
Authority
CN
China
Prior art keywords
standard
sand gravel
penetrator
blow counts
spt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610953303.4A
Other languages
Chinese (zh)
Other versions
CN106436674A (en
Inventor
杨玉生
刘小生
温彦锋
赵剑明
刘启旺
李红军
孙平
朱凯斌
杨正权
梁文杰
王龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Institute of Water Resources and Hydropower Research
Original Assignee
China Institute of Water Resources and Hydropower Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Institute of Water Resources and Hydropower Research filed Critical China Institute of Water Resources and Hydropower Research
Priority to CN201610953303.4A priority Critical patent/CN106436674B/en
Publication of CN106436674A publication Critical patent/CN106436674A/en
Application granted granted Critical
Publication of CN106436674B publication Critical patent/CN106436674B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D1/00Investigation of foundation soil in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D1/00Investigation of foundation soil in situ
    • E02D1/02Investigation of foundation soil in situ before construction work
    • E02D1/022Investigation of foundation soil in situ before construction work by investigating mechanical properties of the soil

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

It is a kind of that the liquefied method of sand gravel layer is differentiated using standard penetration test (SPT), first experiment sand gravel layer is drilled to the experiment above 5cm of sand gravel layer absolute altitude;Standard penetration test (SPT) device has been reconnected, penetrator has been put into drilling to bottom hole after checking the connector of sounding rod;Then it uses punching hammer that penetrator is first squeezed into saturation sand gravel layer 5cm, then start recording often squeezes into the Standard piercing blow counts of 3cm, is divided into 10 examination section meter 30cm;Draw graph of relation between each examination segment standard injection blow counts and pile penetration, the invalid examination section influenced by greater particle size sand gravel is rejected accordingly, and according to the Standard piercing blow counts and pile penetration of effective examination section, Standard piercing blow counts when Equivalent Conversion injection 30cm;According to the Standard piercing blow counts of equivalent injection saturation sand gravel 30cm, saturation sand gravel seismic liquefaction evaluation is carried out.The present invention makes up the prior art to be influenced by the larger gravel of grain size, causes Standard piercing blow counts bigger than normal, and then seismic liquefaction evaluation result is caused to be partial to unsafe defect.

Description

It is a kind of that the liquefied method of sand gravel layer is differentiated using standard penetration test (SPT)
Technical field
The invention belongs to in-situ test technical fields, are related to a kind of liquefied using standard penetration test (SPT) differentiation sand gravel layer Method.
Background technology
80% or more China's hydroelectric resources is distributed in the west area that seismic activity is frequent and intensity is big, and this area riverbed is big There is coating, being commonly present in coating under geological process may liquefied sand gravel layer more.With strategy to develop western regions Implement, following more and more earth-rock works are built on sand gravel coating, stability of the sand gravel layer under geological process It is the major issue for the relationship engineering safety that must take into consideration.But since sand gravel layer cobble-stone grain size is larger, according to method for normalizing When carrying out standard penetration test (SPT) in sand gravel layer, Standard piercing blow counts are easy to be influenced and bigger than normal by the gravel of greater particle size, When the standard penetration test (SPT) method in existing specification being caused to be applied to sand gravel layer Liquefaction, result can be caused to be partial to uneasiness Entirely.Therefore, a kind of improved standard penetration test (SPT) method is designed, differentiates sand gravel layer in design earthquake by field test index Whether earthquake liquefaction occurs under effect, is of great significance to the earth and rockfill dam or gate dam safety evaluation that are built on sand gravel layer.
Invention content
It is an object of the invention to overcome disadvantage of the existing technology, making up existing standard penetration test (SPT) method can only fit For the deficiency of the fine grained soils seismic liquefaction evaluation such as sand, silt, it is a kind of using standard penetration test (SPT) differentiation to seek design offer The liquefied method of sand gravel layer.Using the energy that drops hammer by penetrator injection sand gravel layer, hammered according to each examination segment standard injection Number and pile penetration relational graph reject the invalid examination section that blow counts are influenced by gravel, are to squeeze by remaining effectively examination section Equivalent Conversion The Standard piercing blow counts of 30cm in sand gravel layer, then with earthquake liquefaction Critical Standard injection blow countsComparison differentiates full Whether liquefy with sand gravel.
To achieve the goals above, the present invention realizes in standard penetration test (SPT) device, the specific steps are:
It is a kind of that the liquefied method of sand gravel layer is differentiated using standard penetration test (SPT), which is characterized in that include the following steps:
It drills to the above 5cm of sand gravel layer absolute altitude Step 1: sand gravel layer will be tested using conventional drilling tool, in cleaning hole Surflaes, and carry out mud off;
Step 2: connecting standard penetration test (SPT) device, the connector of sounding rod is tightened, ensures that the connector of sounding rod is not loose It is de-, then penetrator is put into bottom hole in hole, and impact opening bottom is avoided, measurement obtains drilling depth, keeps penetrator, feeler inspection It is in plumbness after bar, guide rod connection;
Step 3: the punching using 63.5kg is hammered into shape, with 76cm freely fall away from, using automatic drop hammer method, by penetrator with Several impacts per minute are buried after middle 5cm, then start recording often squeezes into the Standard piercing blow counts of 3cm, are divided into 10 examination sections Count 30cm;
It is passed through with the standard of each examination section Step 4: drawing pile penetration according to the above-mentioned Standard piercing blow counts for often squeezing into 3cm Enter blow counts variation relation curve, if increasing with Standard piercing blow counts, in pile penetration and Standard piercing blow counts relational graph There is horizontal segment, illustrate that injection blow counts are influenced by gravel, then give up the part between horizontal segment starting point and end point, By remaining blow countsWith corresponding pile penetration lengthAs effective examination section;For leading to Standard piercing due to gravel influence Blow counts increased examination section suddenly is invalid examination section, is denoted as=0,=0;
Step 5: Standard piercing blow counts when injection 30cm is calculated as follows
(1)
Standard piercing blow counts when-injection 30cm;- give up remaining blow counts after horizontal segment;- correspond toEffective examination segment length;m- examination section number, value are equal to 10;
Step 6: calculating Liquefaction Criterion in China injection critical count according to the following formula
- the value of critical of standard penetration hammering number;- Standard piercing blow counts a reference value, basic seismic design acceleration For 0.10g, 0.15g, 0.20g, 0.30g, 0.40g when it is correspondingValue is respectively 7,10,12,16 and 19;- saturation gravel Stone Standard piercing point depth, unit m;- level of ground water, unit m;- sticky content percentage is adopted when less than 3 With 3;- regulation coefficient determines corresponding regulation coefficient value according to classification of design earthquake, and first group of earthquake of design takes 0.80, the Two groups take 0.95, and third group takes 1.05;
Step 7: comparisonWithIf, then sand gravel liquefy;If>, then sand gravel do not liquefy.
It is further preferred that the standard penetration test (SPT) device includes mainly punching hammer, pallet, sounding rod and penetrator. Punching hammers the steel-casting for the 63.5kg that attaches most importance into shape, and centre has the center hole of a diameter 45mm, the guide rod embedded by center hole It is hammered into shape mounted on punching intermediate;The punching hammer carries automatic decoupling device, and its bottom is provided with pallet;It adopts the bottom of pallet It is fastenedly connected sounding rod with screw thread;The local inclination of the sounding rod is less than 1/1000, and bottom is fastened with by screwed connection Penetrator;The penetrator is made of penetrator head, soil sampler and penetrator boots three parts, and penetrator crown end is provided with Apopore.
In addition, penetrator is struck the middle 5cm that buries with per minute 15 ~ 30.
It is further preferred that the examination section of the step 3 is using 10 or more examination section meter 30m or more, in the step 4 formula M values take it is corresponding be more than 10 value.
Beneficial effects of the present invention:
Compared with prior art, the present invention provides a kind of differentiations to be saturated the liquefied standard penetration test (SPT) method of sand gravel, When can make up existing specification Plays injection blow counts liquifying method applied to saturation sand gravel layer progress Liquefaction, due to Standard piercing blow counts are influenced by the larger gravel of grain size, cause Standard piercing blow counts bigger than normal, and then cause to differentiate that result is inclined In unsafe defect, key is provided for the geotechnical engineerings sand gravel ground seismic liquefaction evaluation such as highly seismic region hydraulic and hydroelectric engineering It supports.
Description of the drawings
Fig. 1 is the structural schematic diagram of standard penetration test (SPT) device of the present invention;
Fig. 2 is a kind of step flow chart differentiating the liquefied method of sand gravel layer using standard penetration test (SPT) of the present invention.
Reference numeral:1- punchings are hammered into shape;2- pallets;3-sounding rods;4-penetrators;5- apopores;6-soil samplers;7 - Penetrator boots.
Specific implementation mode
Technological means, character of innovation, reached purpose and effect to make the present invention realize are easy to understand, below to this Invention further illustrates.
The embodiment recorded herein is the specific specific implementation mode of the present invention, for illustrating design of the invention, It is explanatory and illustrative, should not be construed as the limitation to embodiment of the present invention and the scope of the invention.Except what is recorded herein Outside embodiment, those skilled in the art can also based on the application claims and specification disclosure of that using aobvious and The other technical solutions being clear to, these technical solutions include any obvious using making for the embodiment to recording herein The technical solution of substitutions and modifications.
The present embodiment realized by standard penetration test (SPT) device, experiment process as shown in Fig. 2, the specific steps are:
Step 1: experiment saturation sand gravel layer is drilled to more than experiment saturation sand gravel layer absolute altitude using conventional drilling tool 5cm, surflaes in cleaning hole, and carry out mud off;
Step 2: connecting standard penetration test (SPT) device, the connector of sounding rod 3 is tightened, ensures that the connector of sounding rod 3 is not loose It is de-, then penetrator 4 is put into bottom hole in hole, and impact opening bottom is avoided, measurement obtains drilling depth, keeps penetrator 4, feeler inspection It is in plumbness after bar 3, guide rod connection;
Step 3: using the punching hammer 1 with automatic decoupling device, weight 63.5kg, with freely falling away from using automatic for 76cm Penetrator is struck the middle 5cm that buries by drop weight method with per minute 15 ~ 30, then start recording often squeezes into the Standard piercing hammering of 3cm Number, is divided into 10 examination section meter 30cm, and the present invention can also use following experiment method that can such as be divided into 10 examination sections or more, amount to 30cm or more, according to the lower section step(5)The Standard piercing blow counts of 30cm constantly are converted into, step is continued(6)And step (7);
It is passed through with the standard of each examination section Step 4: drawing pile penetration according to the above-mentioned Standard piercing blow counts for often squeezing into 3cm Enter blow counts variation relation curve, if increasing with Standard piercing blow counts, in pile penetration and Standard piercing blow counts relational graph There is horizontal segment, illustrate that injection blow counts are influenced by gravel, then give up the part between horizontal segment starting point and end point, By remaining blow countsWith corresponding pile penetration lengthAs effective examination section;For leading to Standard piercing due to gravel influence Blow counts increased examination section suddenly is invalid examination section, is denoted as=0,=0;
Step 5: Standard piercing blow counts when injection 30cm is calculated as follows
In this formula,Standard piercing blow counts when-injection 30cm;- give up remaining blow counts after horizontal segment;- correspond toEffective examination segment length;m- examination section number, if examination section overall length is 30cm, m is equal to 10, if examination section overall length More than 30cm, then m is more than 10;
Step 6: calculating Liquefaction Criterion in China injection critical count according to the following formula
- the value of critical of standard penetration hammering number;- Standard piercing blow counts a reference value, basic seismic design acceleration For 0.10g, 0.15g, 0.20g, 0.30g, 0.40g when it is correspondingValue is respectively 7,10,12,16 and 19;- saturation gravel Stone Standard piercing point depth(m);- level of ground water(m);- sticky content percentage, when less than 3, using 3;- adjustment Coefficient determines corresponding regulation coefficient value according to classification of design earthquake, specifically can be according to《Earthquake In China moves parameter zoning map》 (GB18306-2015)The classification of design earthquake of division, one group of earthquake of design take 0.80, and second group takes 0.95, and third group takes 1.05;
Step 7: comparisonWithIf, then sand gravel liquefy;If>, then sand gravel do not liquefy.
If Step 8: when need to carry out the penetration test of next depth, repeats aforesaid operations step and tested;This example relates to And standard penetration test (SPT) apparatus structure as shown in Figure 1, including mainly punching hammer 1, sounding rod 3 and penetrator 4.Punching hammers 1 into shape There are the center hole of a diameter 45mm in the steel-casting of weight 63.5kg, centre, pass through center hole installation by adhering for placing guide rod Among punching hammer 1, the free-falling direction for controlling punching hammer;The bottom of punching hammer 1 with automatic decoupling device is set It is equipped with pallet 2, punching is hammered into shape on 1 energy freely falling body to pallet, fallen away from 76cm;The bottom of pallet 2 is fastenedly connected with directly using screw thread The sounding rod 3 of diameter 42mm;The local inclination of sounding rod 3 is less than 1/1000, and graduation mark is provided on sounding rod 3, for intuitively seeing Survey depth of penetration;The penetrator 4 of hollow metal tube structure with cutting edge is fastened with sounding rod 3 by screwed connection, by penetrator Head, soil sampler(Split pipe)6 and 7 three parts of penetrator boots composition, the long 145mm of penetrator head, top is provided with a diameter of 30mm Apopore 5, soil sampler(Split pipe)6 long 500mm, outer diameter 51mm, internal diameter 35mm, 7 length 55mm of penetrator boots, cutting edge 20 degree of angle, cutting edge single-blade thickness 2.5mm.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all the present invention spirit and Within principle, any modification, equivalent replacement, improvement and so on should all be included in the protection scope of the present invention.

Claims (5)

1. a kind of differentiating the liquefied method of sand gravel layer using standard penetration test (SPT), which is characterized in that include the following steps:
It drills to the above 5cm of sand gravel layer absolute altitude Step 1: sand gravel layer will be tested using conventional drilling tool, it is residual in cleaning hole Soil, and carry out mud off;
Step 2: connecting standard penetration test (SPT) device, the connector of sounding rod (3) is tightened, ensures that the connector of sounding rod (3) is not loose It is de-, then penetrator (4) is put into bottom hole in hole, and impact opening bottom is avoided, it measures and obtains drilling depth, holding penetrator (4), It is in plumbness after sounding rod (3), guide rod connection;
Step 3: the punching using 63.5kg is hammered into shape, with freely falling away from using automatic drop hammer method, by penetrator (4) with every for 76cm Minute several impacts are buried after middle 5cm, then start recording often squeezes into the Standard piercing blow counts of 3cm, are divided into 10 examination section meters 30cm;
It is hammered into shape with the Standard piercing of each examination section Step 4: drawing pile penetration according to the above-mentioned Standard piercing blow counts for often squeezing into 3cm Several variation relation curves are hit, if increasing with Standard piercing blow counts, are occurred in Standard piercing blow counts relational graph in pile penetration Horizontal segment illustrates that injection blow counts are influenced by gravel, then gives up the part between horizontal segment starting point and end point, will remain Remaining blow counts △ niWith corresponding pile penetration length △ siAs effective examination section;For causing Standard piercing to be hammered into shape due to gravel influence Number increased examination section suddenly is hit, is invalid examination section, is denoted as △ ni=0, △ si=0;
Step 5: Standard piercing blow counts when injection 30cm is calculated as follows
Standard piercing blow counts when N-injection 30cm;△ni- give up remaining blow counts after horizontal segment;△si- correspond to △ niEffective examination segment length;M-examination section number, value are equal to 10;
Step 6: calculating Liquefaction Criterion in China injection critical count according to the following formula
Ncr- the value of critical of standard penetration hammering number;N0- Standard piercing blow counts a reference value, basic seismic design acceleration are Corresponding N when 0.10g, 0.15g, 0.20g, 0.30g, 0.40g0Value is respectively 7,10,12,16 and 19;ds- saturation sand gravel mark Quasi- injection point depth, unit m;dw- level of ground water, unit m;ρc- sticky content percentage, when less than 3, using 3; β-regulation coefficient determines corresponding regulation coefficient value according to classification of design earthquake, and first group of earthquake of design takes 0.80, second group 0.95 is taken, third group takes 1.05;
Step 7: comparison N and NcrIf N≤Ncr, then sand gravel liquefy;If N>Ncr, then sand gravel do not liquefy.
2. as described in claim 1 a kind of using the standard penetration test (SPT) differentiation liquefied method of sand gravel layer, it is characterised in that: The standard penetration test (SPT) device includes mainly punching hammer (1), pallet (2), sounding rod (3) and penetrator (4).
3. as claimed in claim 2 a kind of using the standard penetration test (SPT) differentiation liquefied method of sand gravel layer, it is characterised in that: Punching hammer (1) is attached most importance to the steel-casting of 63.5kg, and centre has the center hole of a diameter 45mm, guide rod to pass through the embedded peace of center hole It is intermediate mounted in punching hammer (1);The punching hammer (1) carries automatic decoupling device, and its bottom is provided with pallet (2);Pallet (2) bottom is fastenedly connected sounding rod (3) using screw thread;The local inclination of the sounding rod (3) is less than 1/1000, and bottom is logical It crosses screwed connection and is fastened with penetrator (4);The penetrator (4) is by penetrator head, soil sampler (6) and (7) three, penetrator boots It is grouped as, penetrator crown end is provided with apopore (5).
4. as described in claim 1 a kind of using the standard penetration test (SPT) differentiation liquefied method of sand gravel layer, it is characterised in that: Penetrator (4) is struck into the middle 5cm that buries with per minute 15~30.
5. a kind of use standard penetration test (SPT) as described in claims 1 to 3 any one differentiates the liquefied method of sand gravel layer, It is characterized in that:The examination section of the step 3 tries section meter 30m or more, the m values in the step 4 formula (1) using 10 or more Take the corresponding value more than 10.
CN201610953303.4A 2016-11-03 2016-11-03 It is a kind of that the liquefied method of sand gravel layer is differentiated using standard penetration test (SPT) Active CN106436674B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610953303.4A CN106436674B (en) 2016-11-03 2016-11-03 It is a kind of that the liquefied method of sand gravel layer is differentiated using standard penetration test (SPT)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610953303.4A CN106436674B (en) 2016-11-03 2016-11-03 It is a kind of that the liquefied method of sand gravel layer is differentiated using standard penetration test (SPT)

Publications (2)

Publication Number Publication Date
CN106436674A CN106436674A (en) 2017-02-22
CN106436674B true CN106436674B (en) 2018-07-13

Family

ID=58179946

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610953303.4A Active CN106436674B (en) 2016-11-03 2016-11-03 It is a kind of that the liquefied method of sand gravel layer is differentiated using standard penetration test (SPT)

Country Status (1)

Country Link
CN (1) CN106436674B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107190720A (en) * 2017-06-07 2017-09-22 深圳市工勘岩土集团有限公司 Observation of groundwater levels is bored into well
CN107829422B (en) * 2017-09-28 2020-05-29 上海申元岩土工程有限公司 Method for nondestructively identifying terrace diseases and rapidly repairing terrace diseases in micro-damage mode
CN108797553A (en) * 2018-05-02 2018-11-13 北京城建勘测设计研究院有限责任公司 A kind of Ge Ailu sandy soils foundation bearing capacity acquisition methods
CN111368382B (en) * 2018-12-06 2022-10-04 中国石油天然气股份有限公司 Method and system for determining earthquake liquefaction index
CN110879190A (en) * 2019-12-04 2020-03-13 中国水利水电科学研究院 Portable working degree tester and testing method for working degree of cemented sand gravel
CN113720766B (en) * 2021-06-24 2024-03-08 河北工程大学 Indoor compaction test method for evaluating earthquake liquefaction potential of sandy soil
CN115478525A (en) * 2022-08-23 2022-12-16 长江岩土工程有限公司 In-hole standard penetration test hammer applied to deep stratum test and test method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000178956A (en) * 1998-12-17 2000-06-27 Ohbayashi Corp Ground survey method
JP4428599B2 (en) * 2000-02-28 2010-03-10 応用地質株式会社 In-hole static penetration test equipment with boring function
CN100585089C (en) * 2008-09-05 2010-01-27 长安大学 Downhole standard penetrometer
CN101644062B (en) * 2009-08-21 2011-04-27 江苏省无锡探矿机械总厂有限公司 Quantitative automatic impact mechanism
CN101705677B (en) * 2009-11-27 2012-03-21 中国科学院武汉岩土力学研究所 Method and device for automatically detecting thicknesses of penetration type dregs
CN103469778B (en) * 2013-09-25 2015-09-30 青岛理工大学 Standard penetration test method for dividing rock weathering degree

Also Published As

Publication number Publication date
CN106436674A (en) 2017-02-22

Similar Documents

Publication Publication Date Title
CN106436674B (en) It is a kind of that the liquefied method of sand gravel layer is differentiated using standard penetration test (SPT)
CN206752536U (en) A kind of cast-in-situ bored pile bottom hole sediment measurement apparatus
CN103075150B (en) In-situ stress testing method of method for relieving stress in original hole site for multiple times
CN106503329B (en) Anti-liquefaction Judgment Method for Stone Column Composite Foundation based on excess pore water pressure ratio
CN106408211B (en) A method of differentiating buried saturated sand earthquake liquefaction
CN103469778B (en) Standard penetration test method for dividing rock weathering degree
CN106157181A (en) A kind of based on boring the parameter method to soil property country rock quick real-time grading
CN104990640A (en) Drill hole inner wall soil temperature rapid determination apparatus
CN109555502B (en) Industrial test method for presplitting permeability increase of high-gas coal roadway
CN101922159A (en) Method for quickly detecting quality of gravel pile
CN206681671U (en) A kind of jackstone stratigraphical drilling device
CN108509746A (en) A kind of Exploring Loose Rock Country in Tunnels method of determining range
CN101619571B (en) Method for determining optimal compacting number of dynamic compaction based on transient response of groundwork
CN109540738A (en) Consider the method that soil layer type determines deep covering layer soil in-situ relative density
CN108536927B (en) A method of estimation deep tunnel equivalent cross-section is prominent to gush disaster earthquake intensity
CN103469779B (en) Standard penetration test device for dividing rock weathering degree
CN203475404U (en) Standard penetration test device for dividing rock weathering degree
CN115758067A (en) Pile foundation impact drilling geological layering method
Ding et al. Experimental research on rotation-percussion drilling of diamond bit based on stress wave
CN109344519B (en) Rapid evaluation method for compaction state inside filled high-speed railway embankment
CN208685681U (en) End-sealed cast pile with precast concrete enlarged footing
CN203361121U (en) Standard penetrometer
CN112627149A (en) Dynamic penetration test method for boulder filled foundation
CN105277451A (en) Method for measuring and calculating damage factor of rocks surrounding explosion area
Ho Analysis of deep jet grouting field trial in clay

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant